You are on page 1of 12

E.G.C.D. DIV.

5, NAJIBABAD
Project Estimate :

Restoration of Bank of Faridpur Maan Dy. For Increasing the


Discharge capacity From Km. 0.700 to km 10.906

Bill of Quantity
Chainage in
Km.

0.700

Area of
Filling in
Daula in M2

Area of Filling
in left bank in
M2

Area of filling in
right bank in M2

=0.40

Total
area of
filling in
M2

Mean
area of
filling
in M2

Length Quantity
in
of Filling
Meter in cum

0.99

4.05

2.52

300

756.00

4.39

4.22

500

2110.00

6.76

5.575

300

1672.50

1.74

4.25

200

850.00

3.76

2.75

500

1375.00

=0.59

=2.73
1.000

=0.36
1.20 x 0.80 = 0.96
1.10 x 0.90 = 0.99

1.500

=3.19

=0.21
2.00 x 1.50 = 3.00
1.800

=3.76

2.000

=1.03

=0.71

2.500

=0.285
1.50x0.75 = 1.125

= 1.065

=0.70

=0.58

3.000
=0.625
3.500
4.000

= 2.06

4.095

500

2047.50

2.81

3.62

500

1810.00

1.405
500
Total C/O

702.90
11323.90

1.75

1.65 x 1.10 = 1.81


= 0.28
-

4.43

=0.71
-

Total B/F

=0.62

4.500
=0.62

11323.90

3.97

1.985

500

992.50

2.11

3.04

500

1520.00

3.00

2.555

500

1277.50

3.56

3.28

500

1640.00

1.93

2.745

500

1372.50

1.86

1.895

500

947.50

3.44

2.65

200

530.00

2.88

3.18

300

948.00

3.05

2.965

500

1482.50

5.02

4.035

500

2017.50

1.76

3.39

500

1695.00

2.27

2.015

500

1007.50

=0.95
= 1.78

5.000
=0.62

=1.16

=0.33

= 1.02

5.500
=0.28

=0.73
=0.97

6.000
=0.62
6.500

= 2.10

=0.84

= 1.23

7.000

=0.70

1.05 x 0.50 = 0.52


=0.62

=0.72

= 1.00

7.200
=0.44

=1.15
=0.85

7.500
=0.28
8.000

=1.43

=1.17

=1.64

=0.70
3.55x0.20 = 0.71

8.500
=0.62

= 1.55

2.45
0.80 x 0.50 = 0.40

=0.33

=0.96

=0.47

9.000
9.500

=0.97

=1.30
Total C/O

26754.40

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Alawalpur Branch for


increasing Discharge capacity of Alawalpur Branch from Km. 0.000
to Km.
Restoration of Bank of Mahu Dy. Km. 7.000 to 8.500

Bill of Quantity
Chainage in
Km.

Area of
Filling in
Daula in M2

7.000

Area of Filling
in left bank in
M2

Area of filling in
right bank in M2

= 1.28

= 0.73

= 1.56

= 1.10

Total
area of
filling in
M2

Mean
area of
filling
in M2

Length Quantity
in
of Filling
Meter in cum

4.95

4.87

4.91

1000

4910.00

2.68

3.775

500

1887.50

= 0.28

8.000

= 1.50

= 1.54
= 1.83

= 0.285

8.500
= 0.62

= 1.56
= 0.215
Total

J.E.

A.E.

6797.5/M3

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Alawalpur Branch for


increasing Discharge capacity of Alawalpur Branch from Km. 0.000
to Km.
Internal Section of Mahu Dy. Km. 7.000 to 8.500

Bill of Quantity
Chainage in
Km.
7.000
8.000
8.500

Depth of Silt
in M.
0.28+0.22+0.32
3
0.26+0.22+0.24
3
0.22+0.18+0.20
3

Average
Depth of Silt
in M.

Sectional
Measurements
of Silt in M2

Area of
Silt in
M2

Mean
area of
Silt in
M2

0.27

1.17

0.24

0.98

1.075

1000

1075.00

0.20

0.62

0.80

500

400.00

Total

J.E.

A.E.

Length Quantity
in
of Silt in
Meter
cum

1475.00/M3

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Nagina Branch for


increasing Discharge capacity of Nagina Branch from Km. 0.000 to
Km. 16.600

Restoration of Nagina Branch from Km. 7.750 to 16.600

Bill of Quantity
Chainage in
Km.
7.800
8.000

9.000

Area of
Filling in
Daula in M2
(0.6+2.4/2)x0.6
= 0.90
(0.8+2.3/2)x0.5
= 0.77

Area of Filling
in left bank in
M2

Area of filling in
right bank in M2

Total
area of
filling in
M2

Mean
area of
filling
in M2

1.50x0.65 = 0.975

1.5x0.70 = 1.05

2.92

2.02

2.47

200

494.00

7.66

4.84

1000

4840.00

5.61

6.635

1000

6635.00

6.91

6.26

1000

6260.00

9.41

8.16

500

4080.00

6.32

7.865

500

3932.50

5.93

6.125

1000

6125.00

1.40

7.165

1000

7165.00

6.51

7.455

1000

7455.00

1.55x0.45 = 0.690

1.4x0.4 = 0.56

0.65x0.95 = 0.61

1.75x1.05 = 1.84

(0.6+2.4/2)x0.6
= 0.90
=
3.13
1.6x0.45=0.70

10.000

11.000

(0.8+2.3/2)x0.5
= 0.77

2.12

1.41
1.70x1.80 = 3.06

=
1.18
1.7x0.50 = 0.85

(0.6+2.4/2)x0.6
= 0.90
=
1.94
2.40x0.50 = 1.20

13.000

2.20 x 2.0 = 4.40


1.80x0.55 = 0.99

12.000

=
1.93
1.70x0.85 = 1.44

(0.6+2.4/2)x0.6
= 0.90
=

11.500

=
1.18
1.10x0.5 = 0.55

(0.8+2.3/2)x0.5
= 0.77
=
1.64
1.30x0.80 = 1.04

(0.8+2.3/2)x0.45
= 0.72

14.000

(0.6+2.4/2)x0.6
= 0.90

15.000

(0.80+2.4/2)x 0.5

1.64

1.80 x 1.05 = 1.89


=
2.12
2.35x1.20 = 2.82

=
1.63
1.40x1.25 = 1.75

Length Quantity
in
of Filling
Meter in cum

1.50 x 1.25 = 1.87

=
1.18
1.60 x 1.50 = 2.40

= 0.80
=
1.56
1.30x1.50 = 1.95
16.000

=
1.56
1.60x0.90 = 1.44
16.600

1.60x1.20 = 1.92

(0.6+2.4/2)x0.6
= 0.90

1.63

6.790

1000

6790.00

6.72

6.895

600

4137.00

=
1.64
1.50x0.90 = 1.35

(0.6+2.4/2)x0.6
= 0.90
=

7.07

1.40
Total

J.E.

A.E.

57913.5 / M3

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Nagina Branch for


increasing Discharge capacity of Nagina Branch from Km. 0.000 to
Km. 16.600

Restoration of Nagina Branch from Km. 7.750 to 16.600

Bill of Quantity
Chainage in
Km.
11.500
12.000
13.000
14.000
15.000
16.000
16.600

Depth of Silt
in M.
0.40+0.30+0.42
3
0.38+0.28+0.36
3
0.36+0.22+0.36
3
0.32+0.20+0.22
3
0.28+0.20+0.22
3
0.22+0.12+0.22
3
0.26+0.10+0.26
3

Average
Depth of Silt
in M.

Sectional
Measurements of
Silt in M2

Area of
Silt in
M2

Mean
area of
Silt in
M2

0.37

4.05

0.34

3.72

3.885

500

1942.50

0.31

3.38

3.800

1000

3800.00

0.25

2.71

3.045

1000

3045.00

0.23

2.49

2.600

1000

2600.00

0.19

2.05

2.270

1000

2270.00

0.21

2.27

2.270

600

1362.00

Total

J.E.

A.E.

Length Quantity
in
of Silt in
Meter
cum

15019.50/M3

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Nagina Branch for


increasing Discharge capacity of Nagina Branch from Km. 0.000 to
Km. 16.600

Restoration of Bank of Nagina Branch cum Escape Km. 0.000 to 7.750

Bill of Quantity
Chainage in
Km.

Area of
Filling in
Daula in M2

Area of Filling
in left bank in
M2

Area of filling in
right bank in M2

Total
area of
filling in
M2

Mean
area of
filling
in M2

Length Quantity
in
of Filling
Meter in cum

1.50x0.55 = 0.83

1.70 x 0.65 = 1.10

2.73

2.75x0.60 = 1.65

1.95 x 0.50 = 0.97

3.52

3.125

975

3046.87

8.08

5.80

1000

5800.00

10.90

9.49

800

7592.00

11.05

10.975

650

7133.75

5.52

8.285

500

4142.50

4.60

5.06

950

4807.00

Total

32522.12

(0.8+2.4/2)x0.5
0.025

1.000

= 0.80
(068+2.4/2)x0.6
= 0.90

1.25 x 2.15 = 2.68


2.000

(068+2.4/2)x0.6
= 0.90

2.800

3.500

1.70x1.40 = 2.38

(068+2.4/2)x0.6
= 0.90

1.75x 2.80 = 4.90

2.12

6.00

4.00

1.80x2.55 = 4.59
=

4.000

5.000

(0.8+2.4/2)x0.5
= 0.80

1.92

1.56

3.60

3.80

Contd.........

Total
B/F
6.000

(0.8+2.4/2)x0.5
= 0.80

7.000

7.750

1.70x1.50 = 2.55
1.80x1.60 = 2.88

1.60x1.20 = 1.92
1.70 x 1.60 = 2.72

=
=

1.33

2.12

5.27

4.935

1000

4935.00

5.60

5.435

1000

5435.00

5.41

5.505

750

4128.75

1.40x1.40 = 1.96

Total

J.E.

32522.12

A.E.

47020.87/M3

E.G.C.D. DIV. 5, NAJIBABAD


Project Estimate :

Restoration of Internal & External Section of Nagina Branch for


increasing Discharge capacity of Nagina Branch from Km. 0.000 to
Km. 16.600

Restoration of Bank of Nagina Branch cum Escape Km. 0.000 to 7.750

Bill of Quantity
Chainage in
Km.
0.025
1.000
2.000
2.800
3.500
4.000
5.000
6.000

Depth of Silt
in M.
0.32+0.28+0.30
3
0.30+0.25+0.28
3
0.28+0.20+0.22
3
0.26+0.18+0.22
3
0.20+0.15+0.20
3
0.28+0.20+0.24
3
0.22+0.12+0.20
3
0.18+0+0.16
3

Average
Depth of Silt
in M.

Sectional
Measurements
of Silt in M2

Area of
Silt in
M2

Mean
area of
Silt in
M2

0.30

4.89

0.28

4.55

4.72

975

4602.00

0.23

3.73

4.14

1000

4140.00

0.22

3.57

3.65

800

2856.00

0.18

2.91

3.24

650

2106.00

0.24

3.89

3.40

500

1700.00

0.18

2.91

3.40

1000

3400.00

0.11

1.77

2.34

1000

2340.00

Total

J.E.

A.E.

Length Quantity
in
of Silt in
Meter
cum

21144.00/M3

Total B/F
10.000
=0.62

= 0.78

=0.62

= 1.40

2.16

450

972.00

2.60

2.325

500

1162.50

1.92

2.26

400

904.00

= 0.58

0.75 x 0.85 = 0.64


=0.62

2.05
=0.65

10.500

10.900

26754.40

= 0.66
Total

J.E.

A.E.

29792.90/M3