5, NAJIBABAD
Project Estimate :
Bill of Quantity
Chainage in
Km.
0.700
Area of
Filling in
Daula in M2
Area of Filling
in left bank in
M2
Area of filling in
right bank in M2
=0.40
Total
area of
filling in
M2
Mean
area of
filling
in M2
Length Quantity
in
of Filling
Meter in cum
0.99
4.05
2.52
300
756.00
4.39
4.22
500
2110.00
6.76
5.575
300
1672.50
1.74
4.25
200
850.00
3.76
2.75
500
1375.00
=0.59
=2.73
1.000
=0.36
1.20 x 0.80 = 0.96
1.10 x 0.90 = 0.99
1.500
=3.19
=0.21
2.00 x 1.50 = 3.00
1.800
=3.76
2.000
=1.03
=0.71
2.500
=0.285
1.50x0.75 = 1.125
= 1.065
=0.70
=0.58
3.000
=0.625
3.500
4.000
= 2.06
4.095
500
2047.50
2.81
3.62
500
1810.00
1.405
500
Total C/O
702.90
11323.90
1.75
4.43
=0.71
-
Total B/F
=0.62
4.500
=0.62
11323.90
3.97
1.985
500
992.50
2.11
3.04
500
1520.00
3.00
2.555
500
1277.50
3.56
3.28
500
1640.00
1.93
2.745
500
1372.50
1.86
1.895
500
947.50
3.44
2.65
200
530.00
2.88
3.18
300
948.00
3.05
2.965
500
1482.50
5.02
4.035
500
2017.50
1.76
3.39
500
1695.00
2.27
2.015
500
1007.50
=0.95
= 1.78
5.000
=0.62
=1.16
=0.33
= 1.02
5.500
=0.28
=0.73
=0.97
6.000
=0.62
6.500
= 2.10
=0.84
= 1.23
7.000
=0.70
=0.72
= 1.00
7.200
=0.44
=1.15
=0.85
7.500
=0.28
8.000
=1.43
=1.17
=1.64
=0.70
3.55x0.20 = 0.71
8.500
=0.62
= 1.55
2.45
0.80 x 0.50 = 0.40
=0.33
=0.96
=0.47
9.000
9.500
=0.97
=1.30
Total C/O
26754.40
Bill of Quantity
Chainage in
Km.
Area of
Filling in
Daula in M2
7.000
Area of Filling
in left bank in
M2
Area of filling in
right bank in M2
= 1.28
= 0.73
= 1.56
= 1.10
Total
area of
filling in
M2
Mean
area of
filling
in M2
Length Quantity
in
of Filling
Meter in cum
4.95
4.87
4.91
1000
4910.00
2.68
3.775
500
1887.50
= 0.28
8.000
= 1.50
= 1.54
= 1.83
= 0.285
8.500
= 0.62
= 1.56
= 0.215
Total
J.E.
A.E.
6797.5/M3
Bill of Quantity
Chainage in
Km.
7.000
8.000
8.500
Depth of Silt
in M.
0.28+0.22+0.32
3
0.26+0.22+0.24
3
0.22+0.18+0.20
3
Average
Depth of Silt
in M.
Sectional
Measurements
of Silt in M2
Area of
Silt in
M2
Mean
area of
Silt in
M2
0.27
1.17
0.24
0.98
1.075
1000
1075.00
0.20
0.62
0.80
500
400.00
Total
J.E.
A.E.
Length Quantity
in
of Silt in
Meter
cum
1475.00/M3
Bill of Quantity
Chainage in
Km.
7.800
8.000
9.000
Area of
Filling in
Daula in M2
(0.6+2.4/2)x0.6
= 0.90
(0.8+2.3/2)x0.5
= 0.77
Area of Filling
in left bank in
M2
Area of filling in
right bank in M2
Total
area of
filling in
M2
Mean
area of
filling
in M2
1.50x0.65 = 0.975
1.5x0.70 = 1.05
2.92
2.02
2.47
200
494.00
7.66
4.84
1000
4840.00
5.61
6.635
1000
6635.00
6.91
6.26
1000
6260.00
9.41
8.16
500
4080.00
6.32
7.865
500
3932.50
5.93
6.125
1000
6125.00
1.40
7.165
1000
7165.00
6.51
7.455
1000
7455.00
1.55x0.45 = 0.690
1.4x0.4 = 0.56
0.65x0.95 = 0.61
1.75x1.05 = 1.84
(0.6+2.4/2)x0.6
= 0.90
=
3.13
1.6x0.45=0.70
10.000
11.000
(0.8+2.3/2)x0.5
= 0.77
2.12
1.41
1.70x1.80 = 3.06
=
1.18
1.7x0.50 = 0.85
(0.6+2.4/2)x0.6
= 0.90
=
1.94
2.40x0.50 = 1.20
13.000
12.000
=
1.93
1.70x0.85 = 1.44
(0.6+2.4/2)x0.6
= 0.90
=
11.500
=
1.18
1.10x0.5 = 0.55
(0.8+2.3/2)x0.5
= 0.77
=
1.64
1.30x0.80 = 1.04
(0.8+2.3/2)x0.45
= 0.72
14.000
(0.6+2.4/2)x0.6
= 0.90
15.000
(0.80+2.4/2)x 0.5
1.64
=
1.63
1.40x1.25 = 1.75
Length Quantity
in
of Filling
Meter in cum
=
1.18
1.60 x 1.50 = 2.40
= 0.80
=
1.56
1.30x1.50 = 1.95
16.000
=
1.56
1.60x0.90 = 1.44
16.600
1.60x1.20 = 1.92
(0.6+2.4/2)x0.6
= 0.90
1.63
6.790
1000
6790.00
6.72
6.895
600
4137.00
=
1.64
1.50x0.90 = 1.35
(0.6+2.4/2)x0.6
= 0.90
=
7.07
1.40
Total
J.E.
A.E.
57913.5 / M3
Bill of Quantity
Chainage in
Km.
11.500
12.000
13.000
14.000
15.000
16.000
16.600
Depth of Silt
in M.
0.40+0.30+0.42
3
0.38+0.28+0.36
3
0.36+0.22+0.36
3
0.32+0.20+0.22
3
0.28+0.20+0.22
3
0.22+0.12+0.22
3
0.26+0.10+0.26
3
Average
Depth of Silt
in M.
Sectional
Measurements of
Silt in M2
Area of
Silt in
M2
Mean
area of
Silt in
M2
0.37
4.05
0.34
3.72
3.885
500
1942.50
0.31
3.38
3.800
1000
3800.00
0.25
2.71
3.045
1000
3045.00
0.23
2.49
2.600
1000
2600.00
0.19
2.05
2.270
1000
2270.00
0.21
2.27
2.270
600
1362.00
Total
J.E.
A.E.
Length Quantity
in
of Silt in
Meter
cum
15019.50/M3
Bill of Quantity
Chainage in
Km.
Area of
Filling in
Daula in M2
Area of Filling
in left bank in
M2
Area of filling in
right bank in M2
Total
area of
filling in
M2
Mean
area of
filling
in M2
Length Quantity
in
of Filling
Meter in cum
1.50x0.55 = 0.83
2.73
2.75x0.60 = 1.65
3.52
3.125
975
3046.87
8.08
5.80
1000
5800.00
10.90
9.49
800
7592.00
11.05
10.975
650
7133.75
5.52
8.285
500
4142.50
4.60
5.06
950
4807.00
Total
32522.12
(0.8+2.4/2)x0.5
0.025
1.000
= 0.80
(068+2.4/2)x0.6
= 0.90
(068+2.4/2)x0.6
= 0.90
2.800
3.500
1.70x1.40 = 2.38
(068+2.4/2)x0.6
= 0.90
2.12
6.00
4.00
1.80x2.55 = 4.59
=
4.000
5.000
(0.8+2.4/2)x0.5
= 0.80
1.92
1.56
3.60
3.80
Contd.........
Total
B/F
6.000
(0.8+2.4/2)x0.5
= 0.80
7.000
7.750
1.70x1.50 = 2.55
1.80x1.60 = 2.88
1.60x1.20 = 1.92
1.70 x 1.60 = 2.72
=
=
1.33
2.12
5.27
4.935
1000
4935.00
5.60
5.435
1000
5435.00
5.41
5.505
750
4128.75
1.40x1.40 = 1.96
Total
J.E.
32522.12
A.E.
47020.87/M3
Bill of Quantity
Chainage in
Km.
0.025
1.000
2.000
2.800
3.500
4.000
5.000
6.000
Depth of Silt
in M.
0.32+0.28+0.30
3
0.30+0.25+0.28
3
0.28+0.20+0.22
3
0.26+0.18+0.22
3
0.20+0.15+0.20
3
0.28+0.20+0.24
3
0.22+0.12+0.20
3
0.18+0+0.16
3
Average
Depth of Silt
in M.
Sectional
Measurements
of Silt in M2
Area of
Silt in
M2
Mean
area of
Silt in
M2
0.30
4.89
0.28
4.55
4.72
975
4602.00
0.23
3.73
4.14
1000
4140.00
0.22
3.57
3.65
800
2856.00
0.18
2.91
3.24
650
2106.00
0.24
3.89
3.40
500
1700.00
0.18
2.91
3.40
1000
3400.00
0.11
1.77
2.34
1000
2340.00
Total
J.E.
A.E.
Length Quantity
in
of Silt in
Meter
cum
21144.00/M3
Total B/F
10.000
=0.62
= 0.78
=0.62
= 1.40
2.16
450
972.00
2.60
2.325
500
1162.50
1.92
2.26
400
904.00
= 0.58
2.05
=0.65
10.500
10.900
26754.40
= 0.66
Total
J.E.
A.E.
29792.90/M3