G H A Z IA B A D D E V E L O P M E N T A U T H O R IT Y
G H A Z IA B A D .

TENDER DOCUMENT VOLUME II PRICE BID


NAME OF WORK:

bfUnjkdqat ;kstuk esa lM+dksa dk fuekZ.k ,oa ikdksZ dk fodkl dk;Z A

EST. COST : Rs. 35.34 Lacs YEAR : 2009 -10


1

EXECUTIVE ENGINEER
15-09-09

DOWNLOAD COPY

GHAZIABAD DEVELOPMENT AUTHORITY GHAZIABAD. TENDER DOCUMENT VOLUME II PRICE BID

NAME OF WORK:

bfUnjkdqat ;kstuk esa lM+dksa dk fuekZ.k ,oa ikdksZ dk fodkl dk;Z A


: : : : : : : : Rs. 35.34 Lacs Rs. 1100/- only Rs. 0.70 Lacs Three months One year Three months 25-09-09 25-09-09 : : 25-09-09 After Sanction PQ Bid as and when informed by GDA.

Estimated Cost Cost of Tender Earnest Money Time of Completion Liability /Maintenance period Validity of Tender Date of Receipt of Tender Date of Opening of Tender i)
ii)

Pre-Qualification Bid Price Bid

15-09-09

DOWNLOAD COPY

GHAZIABAD DEVELOPMENT AUTHORITY, GHAZIABAD BILL OF QUANITTY


Name of Work : Construction of Interlocking tiles road & Development of Park in Indrakunj Arthala, Ghaziabad. Qty. 3 in Unit 4 Rate 5 Amount 6

S.No. Item of Work 1 2 1. Excavation in foundation

ordinary soil including lift upto 15 meter (5 ft.) and lead upto 30m (100 ft.) and including filling, watering and ramming or excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30M (100 ft.) from the Cum. 38.00 5776.00 foundation trenches. 2. UPPWD SOR 2008/251(A) 152.00 Concrete with 4cm. (1") gauge brick ballast, fine sand of 1.25 fineness modulus and cement in proportion (12:6:1) in foundation and under floors, including supply of all materials, labour, T&P etc. required for proper completion of the work. UPPWD SOR 2008/273 3. 92.00 Cum. cum. 1550.00 2100.00 142600.00 323400.00

M-150 brick work in mortar 1:4 in 154.00 foundation and plinth including supply of all materials labour and

15-09-09

DOWNLOAD COPY

tools and plants, etc. required for proper completion of the work. UPPWD SOR 2008/305 4. M-150 work in mortar 1:4 in superstructure including supply of all materials labour and tools and plants, etc. required for proper completion of the work. UPPWD SOR 2008/305+309+310 5. Earth work in filling in 7.00 cum. 2285.00 15995.00

embankment in 20 cm layer each layer ramming dressing watering etc. all complete including carting up to 5.00 Km. with cutting carting, all loading unloading SOR 288.00 cum. 103.10 29692.80 including royality @ 6.00 per cum. complete, UPPWD 2008/253(A) + 261(B) = 231(A) 6. Dismentling of existing plaster including disposal of refuses as directed by E/I with in the distance of 60M S.I. 706 7. 12mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:4 over brick work minimum thickness not to be less than 1 cm. including supply of all material labour T&P etc. required for proper completion of work. S.I. No. 584/08 8. 990.00 sqm. cum. 62.00 3450.00
15-09-09

460.00

sqm.

7.00

3220.00

61380.00 75900.00

Cement concrete with 2 cm gauge 22.00 4

DOWNLOAD COPY

approved stone grit instead of 4cm., gauge stone ballast, coarse sand and cement in the proporation of 4:2:1 including supply of all materials, labour T&P etc. required for proper completion of the work. Sl. No. 279(a)/08 9. R.C.C. work with cement coarse sand and 20cm (3/4") approved stone ballast gauge in

proportion of 1:2:4 in slab work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGGI binding wire, and including necessary centering and shuttering, supply of all materials, labour T&P etc. required for proper completion of the work binding wire to be supplied by the contractor free of cost. Sl.No. 284/08 10. Mild Steel or iron work such as RCC or RB work including bending for proper shape and including supply of steel & its wastage, bend hooks and athorised overlapping shall be measured and including cost of binding wire. Sl.No. 504/08 11. 9.00 Qtl. Qtl. 4900.00 5400.00 44100.00 21600.00 7.00 cum. 4450.00 31150.00

M.S. or iron work of heavy sizes 4.00 such as trusses, and section such as holding down bolts, hold fast, tie

15-09-09

DOWNLOAD COPY

rods

grating

etc.

wrought

to

required from including supply of steel bolts, nuts wastage etc. and their fixing required for proper completion of the work. Sl.No. 503/08 12. M.S. or Iron work of (small size and section) M.S. Gril & stair case railling such as holding down bolts, hold fast, tie rods grating etc. wrought to required from including supply of seel bolts, nuts wastage etc. and their fixing required for proper completion of the work. Sl.No. 502(a)/08 13. 47.00 Qtl. sqm. 5650.00 540.20 265550.00 229585.00

Supply and fixing of M-30/60mm 425.00 thick I shaped mechanically grey @ compressed concrete cement paver

ordinary red interlocking cement blocks manufactured by high pressure and control vibration machine having plan dimension 200 x (160+ 120mm) with minimum 5mm. thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30MPA and 4.50 Kg. per no including cost of material, labour, T&P etc. required for proper completion of the work as
15-09-09

DOWNLOAD COPY

directed by Engineer-in-charge. 14. Supply and fixing of M-80/60mm thick I shaped mechanically grey @ compressed concrete cement paver

ordinary red interlocking cement blocks manufactured by high pressure and control vibration machine having plan dimension 200 x (160+ 120mm) with minimum 5mm. thick topping of O.P. cement mixed with 25% marble powder. The compressive strength of concrete paver block shall not be less than 30MPA and 4.50 Kg. per no including cost of material, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge. 15. Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supply of all material, labour tools & plants etc. required for proper completion of the work. UPPWD SOR 2008/6006 16. 625.00 sqm. sqm. 25.00 39.50 15625.00 5806.50 3345.00 sqm. 676.65 2263394.25

Painting or varnishing work in 147.00 small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved

15-09-09

DOWNLOAD COPY

superior quality reaqdy mixed paint or varnish including supply of all materials, labour, tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-1950. 2008/641/642. Total : 3534774.55 UPPWD SOR

15-09-09

DOWNLOAD COPY

G H A Z IA B A D D E V E L O P M E N T A U T H O R IT Y
G H A Z IA B A D .
NAME OF WORK:

bfUnjkdqat ;kstuk esa lM+dksa dk fuekZ.k ,oa ikdksZ dk fodkl dk;Z A


PRICE BID

I/We hereby tender for the execution of above mentioned work according to the Bill of quantities, Specification and terms and conditions referred to in the tender documents within the time frame as mentioned and in accordance with the specifications, design, drawings and instruction in writing and with such materials as are provided for and in all other respects in accordance with such conditions so for as applicable. I/We hereby agree to the percentage mentioned (below/above) on the printed rates of the Bill of Quantities for the execution of the above work. 1. 2. 3. 4. 5. The Quantities are liable to wide variation upto 25% extent for which no claim whatsoever shall be entertained. All extra items shall be executed on the same rates as % percentage tendered by the contractor section wise on the basis of schedule of rates at the time of inviting the tenders or the current schedule rates which ever is lesser. Al works shall be carried out as per Most C.P.W.D. / U.P.P.W.D. detailed specification and amendments made therein from time to time. Sales Tax as admissible from time to time will be recovered from the gross amount of the bills. In the event of any dispute Ghaziabad Courts will have exclusive jurisdiction and no suit shall be lie in any other court outside Ghaziabad District.

6.

Bsdsnkj }kjk fufonk ds lkFk #0 100@& dk LVkEi isij rFkk #0 & 1@& dk jsosU;w LVSEi ij Bsdsnkj ekud Hkk"kk esa gLrk{kj dj layXu fd;k tk;sxk] ftl ij Bsdsnkj }kjk ;g vUMjVsfdax nh tk;sxh fd fufonk dh njsa oS|rk dh vof/k 10 fnu esa okfil ugha yh tk;sxh rFkk fu/kkZfjr oS|rk vof/k esa fufonk dh njsa okfil yh tkrh gSA ml fLFkfr esa fufonk ds lkFk layXu /kjksgj jkf'k 100izfr'kr tCr dj yh tk;sxh A
I/We ......................................................... hereby offer to execute the above Work ........................................................ on ............................................ % (in figure) (in
15-09-09

7.

DOWNLOAD COPY

words) .............................................................................. .................................. above/below the rates printed on the attached bill of quantity in respect of section. ........................................................ of the works.

Contractor
Asst. Engineer(E) G.D.A. Officer Opening Tender Officer Recommending Vice Chairman Tender G.D.A.

SCHEDULE 'C' The following materials shall be issued at the rates and places noted against each, in case of delay and non-supply of materials no claim what so ever willbe entertained on this account. How ever suitable extension of time shall be granted in these ground for these items at serial No. 1,2,3, & 4. Material Rate Unit Remarks 1. Cement 240/Per bag 2. Flush door shutters Ghaziabad development 3. Ribbed Tor steel 30000/- Per MT authority godown at Ghaziabad 4. Mapxhalt 80/100 (in or any other lace with in 8 Km. drums) from Ghaziabad development 5. G.I. Pipes Authority office, Ghaziabad. 6. RCC hume pipe/PVC pressure pipe/C.I. titan Pipe 7. Water Tanks 1. Any other materials if available in Authority stores can be issued to the contractor for the specific use in the construction work at stock issue rate or market rate which ever is higher after due permission of the Executive Engineer. The Contractor shall not have the option to refuse to take delivery of and article stated above. No claim will not be accepted in this account. For non supply or non availability in market the deptt. shall not be held responsible. Contractor should ensure that duly required quantities are got issued. The surplus quantity of materials if available in good condition may be taken by dept. No charged will be paid contractor for the surplus materials. Calculation for materials based on U.P. PWD Yard stick shall be binding on contractor. One bag of cement will be considered equivalent to 1.18 sq.ft. All receipt is given by the contractors authorised agent whose name should be intimated to the Engineer In charge in writing shall be conclusive proof of the delivery of the materials. For the issue of material more then bonafied requirement the cost will be recovered at punetive rates which shall be two times of the issue rate. All incidental for cartage, storage safe custody straighting of steel bars etc. shall be born by the contractors.
15-09-09

2. 3. 4. 5. 6. 7. 8.

10

DOWNLOAD COPY

9. 10. 11. 12. 13.

For cement storage, work double lock system will have to followed by the contractor. Not more then one monthly requirement shall be issued at a time. Bonafide wastage in steel will be calculated @ 3% on measured quantity and will be permitted in working out steel consumed. The contractor will have to return empty maxphalt drums to Ghaziabad Development Authority in good condition, failing which cost of the same @ Rs. 40/- per drum shall be recovered from him. Bonafied variation in cement will be calculated @ 2% on consumption will be permitted in working out cement consumed.

14.

izkf/kdj.k LVksj esa LVhy @ lhesUV @ th0vkbZ0ikbZi miyC/k u gksus dh fLFkfr es bsdsnkj dks mijksDr lkexzh cktkj ls ; djus dh vuqefr fuEu 'krksZ ds vuqlkj nh tk;sxh A 1Bsdsnkj }kjk cktkj ls LVhy@lhesUV@th0vkbZ0ikbZi ; dh fLFkfr esa 'ksM;wy ^lh* dh nj ls] izkf/kdj.k }kjk ; dh x;h lkexzh dh nj vFkok cktkj nj es atks Hkh U;wure gS] ml ij ; dh tk;sxh A ; dh x;h lkexzh LVhy@lhesUV@th0vkbZ0ikbZi vkbZ0,l0vkbZ0 ekdZ gksuk pkfg, rFkkC;kt HkkM+k] mrjkbZ ,oa C;kt bR;kfn dksbZ ns; ugha gksxk A ; dh x;h lkexzh LVhy@lhesUV@th0vkbZ0ikbZi dh ewy jlhnsa foHkx esa tek djkuh gksxh A ;fn Bsdsnkj }kjk 'ksM;wy lh ls fu/kkZfjr nj ls de ij lkexzh ; dh tkrh gSa rks nksuksa dk vUrj foHkkx es tek djkuk gksxk rFkk ;fn 'ksM;wy lh es fu/kkZfjr nj ls vf/kd nj ij lkexzh ; dh tkrh gS ml fLFkfr es vUrj dk Hkqxrku ugha fd;k tk;sxk A

2-

34-

Conractor

Officer Opening Tender

Officer Issuing Tender

Vice chairman G.D.A

15-09-09