You are on page 1of 52

THE TATA POWER COMPANY LIMITED

BHIRA 100MW-AUGMENTATION SCHEME


INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 1 OF 52

SECTION-2.1

1.0 PREAMBLE

1.1 This Bid for Bhira 100 MW Augmentation Project, in Raigad District, Maharashtra is a Schedule
wise lump-sum fixed Price Bid for design, engineering, procurement, construction, fabrication,
erection, testing, commissioning for Civil, Hydro mechanical including sub storage utilisation and
Electro mechanical Works of the Power Plant as per technical specifications on a EPC basis.

1.2 Payment shall be made in Indian Rupees or US $. There is no provision for payment due to
exchange rate fluctuation. If Bidder quotes in any other currency, he shall indicate the $ equivalent
Rupee value on the date of Quotation, which shall prevail on both plus and minus sides.

1.3 Bidder has also choice of submitting offers on entire EPC basis or either of the two individual
packages as defined in Article 7.0 in Volume I of Bid Documents. For this purpose, Civil & Hydro
mechanical including sub storage utilisation and Electro mechanical contents are placed in different
Volumes. Criteria for loading in case of two individual package offers is spelt out in para 19.2 under
ITB. Bidders shall note that whichever package they offer to execute, documents and their support
materials should be complete in all aspects. No columns should be left out, which shall mean
incomplete submission, and may lead to rejection.

1.4 Bidder shall quote his firm and fixed lump sum price for the entire Works / either of two packages
under this Contract and the same shall not be subject to any variation or cost escalations for the
entire contract period.

1.5 Price Schedules consists of following:

Schedule no.1 : Total Bid Price
Schedule no.2 : Breakdown of Planning, Design and Engineering. This shall mean sum of
respective packages in case of either of two package offered.
Schedule no.3: Civil and Hydro mechanical Works. Supply items of steel for Penstocks
Is covered in Schedule no 4. Butterfly Valve is covered in E & M Works.
Pump units in the Mulshi barrage work shall be handled under E & M
Package - This is relevant in case of double package.
Schedule no. 4 : Supply of steel for penstock and under ground tunnel
Schedule no 5 : Off shore .Supply of Plant / E & M equipment and mandatory spares.

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 2 OF 52

Schedule no. 6: On shore supply of Plant /E & M, equipment and mandatory spare parts.,
Schedule no. 7 : Transportation of Plant & equipment and mandatory spares
Schedule no. 8 : Storage, erection,testing and commissioning Services essentially required for
the works.
Schedule no 9 : This includes Optional price for the following;
i) Tunnel no 1 Rehabilitation works ( from Dawdi intake to surge shaft at Dongarwadi )
ii) Work of Intake screens and gates at Dawdi Intake
iii) Interconnection of Unit 3 & 4 to Auxilliary Reservoir ( AR) and AR to Unit 3& 4.
Please provide the breakdown with full details.
Regarding Schedule 9.0 please see para 11.0 Major Civil Works at Part 1 Section I, Volume IV
under Scope of Works As mentioned in para 4.3 of Scope of Works General under
Section I, Part I under Technical Specifications Volume IV, the Technical Details fir these jobs
shall be provided along with that for Mulshi Reservoir dyke works.

1.6 It would be clear that the total Price given in the Bid Form is broken into 7 elements in Schedule,
which is further broken into individual sub work Prices ( Schedule 2 to 8. Schedule number 3
does not include supply of steel for penstocks and underground tunnel and supply and erection of
Butter fly Valve unit. Thus total Bid Price shall be sum of Schedules 2 to 4, 7, 8 plus 5 or 6 or
combination of 5 and 6 as the case may be. ( Please note that Schedule 5 & 6 contain the same
items each of which would be procured Off shore or On shore, but not from both sources ).

1.7. In case of any discrepancy noted between Total Bid Price and other break-up Schedules, former
shall prevail and latter will be corrected as deemed fit.. Bidder shall further note that where there is
discrepancy between amount stated in figures and those in words, amount stated in words shall
prevail. Similarly, in case of any discrepancies between the Total Bid Price and summation of
Schedule Prices (prices indicating the total of that Schedule) the Total Bid Price shall prevail and
the Schedule Prices shall be corrected accordingly.

1.8 Bidder shall quote his lump sum price for entire Works in Schedule no.1 with break-up of items
listed in Schedules 2 to 8. Prices quoted in Schedule nos. 2 to 4, 7, 8 and 5 or 6or combination of 5
and 6, as the case may be.( Please note that items mentioned in Schedule 5 & 6 are same and
shall be procured Off shore or Onshore, and not from both sources.) shall govern for financial
evaluation. In Schedule Nos.2 to 8 Bidder shall furnish break-up of his lump sum prices quoted in
Total Bid Price i.e. Schedule No.1.


THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 3 OF 52

1.9 Section 2.2 gives the basis to work out the payment for Civil Works during execution on pro rata
basis.

1.10 Bidder is advised to visit site and appraise himself of Conditions fully, act of submission of Bid by
the Bidder will be construed as evidence that he has examined the site conditions in detail and he
shall not raise any claims, disputes, for any additional cost or extension of time for the completion
against the Owner, who shall not bear any liability for any such claims. Secondly also that while
preparing the Price Schedules, Bidder has adequately provided for them in his quoted prices. No
claims of extra compensation will be payable for items and situations not foreseen.

1.11 No column in the Schedules shall be left blank. Items against which no prices are quoted shall not
be separately paid for and the Bidder shall be deemed to have covered the cost of execution of
such items (according to the requirements of the Bid documents) in the prices quoted for other
items.

1.12 Bidder shall, if so desired by Owner furnish at any stage of the Bidding or Contract execution,
further break-up of prices considered for any or all items.

1.13 Bidder shall be deemed to have allowed in his price for provision, maintenance and final removal of
all temporary works of whatsoever nature required for execution of the Works.

1.14 Price Schedules shall be read in conjunction with Conditions of Contract, Specifications and other
sections of the Bid documents and these documents are to be taken as mutually explanatory of one
another.

1.15 Bidder shall note that Price Schedules do not generally give a full description of Work to be
performed under each item. He is thus deemed to have read Technical Specifications, Drawings,
contractual obligations (Whether specifically mentioned or not) and other sections of Bid
Documents to ascertain full scope of work included in each item while filling in rates and prices.

1.16 Except as otherwise specifically provided, Bid Prices shall include all costs & expenses including
transport to site, packing, unpacking, storage at site, transit insurance, site insurance, third party
insurance, all taxes, duties, custom duties, octroi ( Bhira does not have Octroi. For imported items
Contractor shall use N Forms) / entry tax, etc. as may be assessed, Sub-Contractor/Sub-Vendor or
their employees by all municipal, state or national government authorities in connection with the

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 4 OF 52

Facilities, in and outside of India, together with all risks, liabilities, contingencies and obligations
imposed or implied by Bidder.

1.17 Bidder shall (or his Assignee, if applicable in case of Foreign Bidders / Joint Venture Bidder with at
least one foreign firm as partner) get registered with concerned Sales Tax Authorities in the State
where the project is located.

1.18 Bidder shall confirm that no tax, duty or levy in any form shall be payable by Owner for the bought
out items which are dispatched directly by his sub-vendor/ his assignees sub-vendor (if applicable,
in case of foreign bidder/joint venture bidder with at least one foreign firm as partner) as Ex-works
(India) supplies to the project site. However, Owner will issue requisite Sales Tax declaration forms
in respect of such bought out items, on production of documentary evidence of registration with the
concerned Sales Tax Authorities. Minimum value of such items shall be indicated in Schedule no
10.0 DECLARATION REGARDING DEEMED EXPORT BENEFITS.

1.19 Bidder shall list out the Plant / equipment including Mandatory spares to be imported from the
Associates / Collaborators country by the Manufacturer or by the Bidder . The details of such
spares suggested are included in Schedules 5 .0 to 8.0 ,

1.20 Successful Bidder shall commence work on the Facilities immediately upon Owners Letter of
Intent, which shall be immediately followed by Letter of Award, when he shall sign Contract. He
has to immediately start to achieve Completion of Facilities and Project execution in order to
complete Project within time specified in Bidding Documents.

1.21 Bid shall be valid for a period of 180 days from the date of opening of bids as stipulated in the
Biding Document and it shall remain binding upon Bidder.

1.22. Until a formal Contract is prepared and executed, this Bid, together with written acceptance thereof
in the form of Owners Letter of Intent and Letter of Award shall constitute a binding contract
between Owner & Bidder.

1.23 Owner reserves the right to accept or to reject any Bid, and to annul the Bid process and reject all
Bids at any time prior to award of Contract, without thereby incurring any liability to the affected
Bidder/s or any obligation to inform the affected Bidder/s of the grounds for Owners action.



THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 5 OF 52





SCHEDULE NO 1.0
TOTAL BID PRICE
Sl No Item Description Break up schedule
No
Foreign component
US $
Indian Component
INR
1 Planning, Design and
Engineering
2.0
(2.1, 2.2 & 2.3)

2 Civil and Hydro mechanical
works .
3.0
3 Supply of steel for penstocks
and underground tunnel
4.0
4 Off shore Plant E & M
equipment & mandatory
spares.
5.0
5 On shore Plant,/E & M
equipment and mandatory
spare parts
6.0
6 Transportation and other
mandatory services
7.0
7 Storage, erection, testing and
commissioning services
required for Works
8.0


Total of Bid price (in figures )
Total of Bid Price (in words )

----------------------------------------------------------------------------------------------------------------------------------------------
Note: Total Bid Price entered above shall be non variable, except for the arithmetic corrections in the
Price Schedules mentioned in Bid Form ( with Price) at pre sheets .
.

-----------------------------------------------------------------------------------------------------------------------------------------------



THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 6 OF 52

SCHEDULE 2.0
BREAKDOWN OF PLANNING DESIGN AND ENGINEERING PACKAGE
Breakdown
schedule
No.
Item Descriptions Price Breakup
Considered for
payment
Foreign
component
US $
Indian Component
INR
2.1 Overall Planning Report 15% .


2.2 Detailed Design and
Engineering
55%
2.3 Testing and Commissioning
and O&M Manuals
15%
- Final Completion Reports 5%
Total

-----------------------------------------------------------------------------------------------------------------------------------------------
Total here plus 10 % advance shall be the figure recorded at Schedule 1.0 at Sl no 1.
------------------------------------------------------------------------------------------------------------------------------------------




















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 7 OF 52


SCHEDULE 3.0
CIVIL & HYDRO MECHANICAL WORKS - TOTAL
Sl no Item Descriptions Break up schedule
No
Foreign component
US $
Indian Component
INR
1 Mobilisation and
Infrastructure development
and induction of all
requirement
3.1 .


2 Construction of barrage in
Mulshi reservoir at Palse
village
3.2
3 Valve House and all hydro
mechanical works including
at Tail Race
3.3
4 Supply of steel for penstocks
and underground tunnel
4.0
5 Surface penstocks, &
Underground steel liners,
penstock steel, fabrication,
erection and testing
3.4
6 Underground tunnel -Civil
works, gates structures
3.5
7 Power house, Tail channel
Civil works
3.6
8 Any other items ( to be
specified by Bidder )
3.7










THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 8 OF 52

SCHEDULE 4.0
SUPPLY OF STEEL FOR PENSTOCKS AND UNDERGROUND TUNNEL
I
N

T
o
t
a
l

U
S

T
o
t
a
l

O
t
h
e

E
x
e
i
s
e


A
p
p
l
i
c
a
b
l
e

T
a
x
e
s
















C
u
s
t
o

T
o
t
a
l

p
r
i
c
e

.


O
f
f
s
h
o
r
e

p
r
i
c
e


O
n
s
h
o
r
e

P
r
i
c
e


U
n
i
t

P
r
i
c

Q
t
y

(
t
o
n
s

I
t
e
m

D
e
s
c
r
i
p
t
i
o
n
s



S
l
.
N
o

Note: Full specification of the different steel sections to be provided.


THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 9 OF 52

SECTION-2.2

SCHEDULE OF PAYMENT MILESTONES

1.0 Intention of Schedule of Payment Milestones is to provide regular monthly payments to Contractor
for Works, which reflects the value of the work performed by Contractor.

2.0 Owner has identified certain important milestones and payment to be released against each of
these milestones. A date of the achievement of each Payment Milestone expressed as a number
of months from the LOI shall be entered in the column provided.

3.0 Maximum payment against completion of each activity of that main section has been limited to the
percentage indicated in MINIMUM MILESTONES CONSIDERED BY OWNER, based on Owners
best application of the value of the activity as related to the total costs of the concerned item as a
whole.

4.0 Bidder shall fill the following Schedules of Payment Milestones i.e. SCHEDULES 2.1, 2.2, 2.3, 3.1
to 3.7 & 3.8 by incorporation certain important milestones identified by Owner

4.1 Monthly Cash flow, showing the total price of that particular month identified in SCHEDULE 11.0.
As Annexure to this, Contractor shall provide the supply and stage by stage delivery schedule,
payment requirements of E & M equipment and / or H & M or any other supply item.

4.2 Completion Month for each activity of that main section is indicated in MINIMUM MILESTONES
CONSIDERED BY OWNER. This is not considered as exact payment for Work quantities
executed, but merely a Progress Control mechanism. On achievement of all Milestones by
Schedule, Contractor anyway gets the full amount as bid by him.
4.3 In each of the Schedules 2.1 to 2.3, 3.1 o 3.7 and 7.0 to 11.0 Contractor shall fill up his prices.
Amount under Rs (INR) shall be worked out as % break up figure of that work component.
Completion month column shall be the figure that is derived from the Master Control chart enclosed
in Volume IV & V of Tender documents. As stated in para 5.0, at next occasion of finalizing the
Master control Chart with the successful Bidder, the % payment figure and month may be altered,
and the decision of Project Manager shall be final and binding.
5.0 As first activity after Award of Work, Contractor is required to review and conduct additional site
studies for design and engineering as needed. Then the final dimension and other details as size,
length, work quantities, project component construction parameters and final Master control Chart

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 10 OF 52

shall emerge out. To this extent, the current Intermediate Milestones may be fine tuned by Project
Manager at that stage, based on inputs from successful Bidder. But Contractor is not entitled for
any additional price compensation on this account. Decision of Project Manager in this regard shall
be final.
6.0 Contractor shall, after approval of his detailed designs and drawings furnish to Owner an initial Bill
of quantities for all major items of work, to be reviewed and updated periodically with Owner. This
will be used for assessment of percentage progress of component at any stage. Measurements of
particular components of work shall be taken jointly by the Owners and Contractors
representatives. Same shall be mutually agreed and entered into a measurement book in the
format approved by Owner Project Manager and shall be signed jointly by both the parties.

7.0 Bidder shall note that all foundation excavation shall be paid once and that to after foundation
concrete is laid in position for covering the same. Re-excavation on account of floods in the
river/landslides/change in design levels and gradients, etc. shall not be considered for extra
payment.

8.0 Bidder shall note that while working out the quantity of excavation for payment, measurements shall
be taken for plan dimensions only unless the excavated slopes are required permanently as design
requirements and if already approved in advance by Project Manager. Extra excavation if required
for stable slopes shall be considered to have been included in the scope in the scope of foundation
excavation.
















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 11 OF 52


MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE NO 2.1.
OVER ALL PLANNING REPORT
Sl no Item Descriptions % break up considered
for release of payment
Amount ( INR ) Completion
month
- Submission of Mater Control Work
Chart with Milestones and
Intermediate Milestones.
Completion of investigation,
Geological, geographical, geo
technical, topographical studies as
needed, firming up design criteria of
all Project components, dimensions,
standards, technical specifications,
safety & Inspection systems.
Completing all the reliventI
Drawings & their approval
Finalisation of construction
drawings, Review & modifications
of these as per site requirements
and approval by Project Manager,
detailed below

1 First Instalment activities in above
area

20%

2 Design of critical components and
submission of overall planning
report to OWNER and
commencement of works

50%

4 Third Instalment on approval of
Planning Report
20%

------------------------------------------------------------------------------------------------------------------------------------------
Total
Total here plus 10 % advance shall be the figure recorded at Schedule 2.1 at Sch no 2.

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 12 OF 52


-------------------------------------------------------------------------------------------------------------------------------------

MINIMUM MILESTONES CONSIDERED BY OWNER

SCHEDULE NO 2.2
DETAILED DESIGN AND ENGINEERING
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 .
Monthly Instalments ensuring
that construction work
Continues without delay


Up to 90 % of total
provision




-----------------------------------------------------------------------------------------------------------------------------------------------
Total
-----------------------------------------------------------------------------------------------------------------------------------------------
Total here plus 10 % advance shall be the figure recorded at Schedule 2.2 at Sch no 2.

















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 13 OF 52




MINIMUM MILESTONES CONSIDERED BY OWNER

SCHEDULE NO 2.3
COMMISSIONING MANUAL AND O & M MANUAL
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 Draft preparation of manuals
and submission

20%

2 Acceptance of above & later
revised version

22.5%

3 Submission of draft manual
for O & M of Civil Works / E
& M works
25 %
4 Acceptance of above by
Owner & later revised
version specified number of
copies as per SCC

22.5%


------------------------------------------------------------------------------------------------------------------------------------------
Total
------------------------------------------------------------------------------------------------------------------------------------------
Total here plus 10 % advance shall be the figure recorded at Schedule 2.3 at Sch no 2.











THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 14 OF 52






MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE NO 3.1
CIVIL AND HYDRO MECHANICAL WORKS
MOBILISATION ADVANCE
Sl no Item Descriptions % break up
considered for release
of payment
Amount
( INR )
Completion
month
1 Payment based on phase wise
induction of man power,
Equipment and build up of facilities
construction power Matching with
Schedule 2.1 above, detailed below:

Detailed break down of this
2 Mobilisation of equipment and
facilities, for main / critical
works commencement to satisfaction
of Owner.

3 Induction of men land acquit ion,
provision of camp, stores,
workshops, living facilities, water
supply etc.

4 Induction of construction machinery,
hoist, winches and commission at
shaft at Dongarwadi ledge and at 130
m, 901 & at 1926 m of tunnel length

5 Finalise all other arrangements for
smooth start of works


Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 1



THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 15 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.2
CONSTRUCTION OF BARRAGE IN MULSHI RESERVIOR AT PALSE
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1

-----------------------------------------------------------------------------------------------------------------------------------------------
Total

1. Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 2.
2 In this package, the pump units to be erected at the barrage included under E & M package.
3. Completion of individual Work means always To the full satisfaction of PROJECT MANAGER
4. Data on this shall be provided as addendum for the bidder
-----------------------------------------------------------------------------------------------------------------------------------------------

This scheme of construction of bund, hydraulic gates and pumping scheme can be completed
early and the completion time shall be indicated by Contractor after properly assessing on our
furnishing the additional data for this assignment.


SPECIFICATION OF MULSHI RESERVOIR BARRAGE JOB AND DATA WILL BE PROVIDED
LATER






THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 16 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.3
VALVE HOUSE AND RELATED HYDRO MECHANICAL WORKS
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 Approval of all Level II & III
Drawings, specifications of
Butterfly valve finalisation.
No separate
payment involved.

.


2 Completion of Winch
hoisting arrangements and
induction of construction
machinery for excavation of
shaft
No separate
payment involved.


3 Supply order placement for
Butterfly valve & accessories
No separate
payment involved.


4 Excavation & shot Crete as
required for valve house &
supporting system

5%
5 Construction of Civil
structures of Butterfly valve
house
20%
6 All related H M works of the
package

10%
7 Concrete lining, grouting and
Commissioning of Water
Conductor system after
removal of Concrete Plug
30%

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 17 OF 52

separating present flow
system
8 Completion of erection of
Valve House and all the Civil
Works. Testing etc

10%
10 Miscellaneous activities

5%
11 Performance acceptance 10%

-----------------------------------------------------------------------------------------------------------------------------------------------
Total
-----------------------------------------------------------------------------------------------------------------------------------------------
1. Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 3
2. Completion of individual Work means always To the full satisfaction of Project Manager
3. Butterfly valves supply and erection is included in E & M Works





















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 18 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.4
SURFACE PENSTOCKS, UNDERGROUND STEEL LINERS FABRICATION & ERECTION
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 Submission & approval of
detailed Work plan with
Level II & III charts, Q & I
Plans
No separate
payment involved.

.


2 Activate Consortium partners,
/ Vendors, Agencies for all
works. Place order for P S
Liner steel to fit with
Work schedules.
No separate
payment involved.


3 Completion of winch and hoist
arrangement at 578 m point
and start of penstock pedestal
work over entire 880 m.
No separate
payment involved.


4 On Receipt of steel liners
commencing fabrication work

10%
5 Excavation for 1926 2035 m
penstock section and Pipe
laying
20%
6 fabrication works 75%
Completion
25%
7 Erection start over the entire
length including the tunnel
Portion, testing & Inspection.

10%

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 19 OF 52

8 Completion of erection over
balance length, testing,
Inspection
10%
9 Miscellaneous items of work

5 %
10 Performance acceptance 10%

---------------------------- ------------------------------------------------------------------------------------------------------------------
Total
-----------------------------------------------------------------------------------------------------------------------------------------------
1. Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 5.
2. Completion of individual Work means always To the full satisfaction of PROJECT MANAGER

























THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 20 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.5
UNDER GROUND TUNNEL INCUDING THE GATE STRUCTURES
Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 Total Work plan of
excavation of portals at 130
m and 1926 m, entry of
inclined tunnel at 901m, also
Level II & III charts, Quality &
Inspection plans and their
approval
No separate
payment involved.

.


2 Activate Vendors,
Consortium partners and
other agencies,
all facilities and supplies
matching this with Schedule
No separate
payment involved.


3 Erection of winches, hoists,
gentry arrangements, rail
system and portals at 130 m
and power house
10%
4 Excavation of 3 portals
above, tunnel in 0 130m ,
901-1216.
15%
5 Laying of steel liners along 0
130 m, align, welding,
testing ( MT ) and concrete
back packing

15%
6 Excavation of rest 315 m of 20%

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 21 OF 52

901 1216m & 310 m of
tunnels

7 Laying of steel liners from
both directions from 901 m &
1926 m and Concrete back
packing @ 50 m / month
10%
8 Grouting, finishing, testing of
tunnel of all Civil Works
5%
9 Miscellaneous

5%
10 Performance acceptance 10%
---------------------------------------------------------------------------------------------------------------------------------------------
Total
-----------------------------------------------------------------------------------------------------------------------------------------------
1. Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 6
2. Completion of individual Work means always To the full satisfaction of PROJECT MANAGER
-----------------------------------------------------------------------------------------------------------------------------------------------



















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 22 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.6
POWER HOUSE, TAIL CHANNEL INCLUDING GATES

Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 Total Work Plan of Surface
excavation of Powerhouse,
Tailrace Channel and Level II
& III charts, Quality &
Inspection plans and their
approval
No separate
payment involved.

.


2 Activate Vendors,
Consortium partners and
other agencies, all facilities
and supplies matching this
With Schedule
No separate
payment involved.


3 Concreting of Base Raft,
erection of Draft tube
In the powerhouse.
10%
4 Concreting up to turbine floor
of the power house and
associated beams, columns,
slabs, walls etc.
15%
5 Concreting up to Generator
floor of the power house and
associated beams, columns,
slabs, walls etc.
20%
6 Completion of the
superstructure including
20%

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 23 OF 52

control and cable
rooms and remaining
miscellaneous civil works like
plastering floor finishes etc. in
the powerhouse

7 Tail race works, switch yard,
transformer and transmission
tower foundation works
10%
8 Miscellaneous works

5%
9 Performance acceptance 10%

-----------------------------------------------------------------------------------------------------------------------------------------------
Total
-----------------------------------------------------------------------------------------------------------------------------------------------
1. Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 7

2. Completion of individual Work means always To the full satisfaction of Project Manager


















THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 24 OF 52





MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.7
ANY OTHER ITEMS (TO BE SPECIFIED BY BIDDER) (LUMPSUM)


Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1 .


2
3
4
5
6
7
8
9
10


Total here plus 10 % advance shall be the figure recorded at Schedule 3.0 at Sl no 8







THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 25 OF 52


MINIMUM MILESTONES CONSIDERED BY OWNER
SCHEDULE 3.8
STORAGE, ERECTION TESTING AND COMMISSIONING OF
ELECTRO - MECHANICAL PLANT & MACHINERY

Sl no Item Descriptions % break up
considered for
release of payment
Amount ( INR ) Completion month
1

Model studies on Pelton
Turbine



3 months
2 Design & Drawings 6 months
3 Placement of order for
generator
6 months
4 Placement of order for
crane
6 months
5 Erection of earth mat 7 months
6 Erection of EOT crane 17 months
7 Erection of turbine and
generator
31 months
8 Trail run & commissioning 36 months

Total


1. Total here shall match the figure recorded at Schedule 1.0 at Sl no 8.
2. Completion of individual Work means always To the full satisfaction of PROJECT MANAGER
3 Please note: E & M Package includes supply and erection of Butterfly valve for the Water conductor
system, Pump units for the Mulshi barrage works.


Comment [n1]: Ref. not avl.to be
checked
Comment [n2]: To be checked

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 26 OF 52

SCHEDULE 5.0
OFFSHORE SUPPLY OF PLANT / E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Unit Price
2
Total Price
2
Qty.
FOB CIF
Item Description Code
1

(1) (2) (3) (1) x (3)
1.0 MECHANICAL
1.1 Turbine and Auxiliaries
1.1.1 Turbine equipment 1 set
1.1.2 Hydraulically operated turbine
inlet spherical valve and
accessories
1 set
1.1.3 Upstream inlet pipe assembly 1 set
1.1.4 Downstream pipe assembly with
the dismantling cum expansion
joint
1 set
1.1.5 Butterfly valve and accessories 1 set
1.1.6 Electronic governor and
Auxiliaries
1 set
1.1.7 Oil pumping unit with accessories
complete with oil piping
1 set
1.1.8 Cooling water system 1 set
1.1.9 Station drainage system 1 set
1.2 EOT Crane and Accessories 1 set
1.3 Fire Protection system 1 set
1.4

1.5
Air-conditioning and Ventilation
system
Emergency D G Set
1 set

1 set


THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 27 OF 52

SCHEDULE 5.0
OFFSHORE SUPPLY OF PLANT / E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Unit Price
2
Total Price
2
Qty.
FOB CIF
Item Description Code
1

(1) (2) (3) (1) x (3)
2.0 INSTRUMENTATION AND
CONTROL SYSTEM
1 set
3.0 ELECTRICAL
3.1 Generator and auxiliaries
3.1.1 11KV, 100 MW Vertical
synchronous generators with
10% continuous over load
capability and auxiliaries
complete with auxiliary drive
motors, Safety devices, Local
control panels, LPBs, etc.,
1 set
3.1.2 LAVT Cubicle including all
accessories.
1 set
3.1.3 NGT Cubicle including all
accessories.
1 set
3.2 Transformers
3.2.1 Power transformer 130 MVA,
11KV / 220 kV with OLTC
1 set
3.3 220 KV over head Transmission
line to interconnect GT and
existing 220KV switchyard
including all accessories.
1 set
3.5 415 V Switchgear and AC
Distribution board.
1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 28 OF 52

SCHEDULE 5.0
OFFSHORE SUPPLY OF PLANT / E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Unit Price
2
Total Price
2
Qty.
FOB CIF
Item Description Code
1

(1) (2) (3) (1) x (3)
3.6 220 V DC Distribution board for
Power house.
1 lot
3.7 Transformer Control, metering
and relay panel for the plant with
synchronizing panel
1 lot
3.8 Cables (Power, Control &
Instrumentation), Cable
accessories and cabling system
complete
LS
3.9 Plant lighting system complete LS
3.10 Construction power supply
arrangement
LS
3.11 Earthing and Lightning Protection
system for the complete plant
LS
4.0 220 KV Switchyard
4.1 220KV, 2000 Amps, 40 kA / 1sec
3-phase SF6 gas circuit
Breakers.
1 No
4.2 220KV,2000A, 40kA/1 sec ,three
pole ,three phase, center break
,motorized Isolator with out earth
switch.
1 Set
4.3 220KV, 2000A, 40kA/1 sec, three
pole, three phase, centre break,
1 Set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 29 OF 52

SCHEDULE 5.0
OFFSHORE SUPPLY OF PLANT / E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Unit Price
2
Total Price
2
Qty.
FOB CIF
Item Description Code
1

(1) (2) (3) (1) x (3)
motorized Isolator with earth
switch.
4.4 220KV, 1500/1A single phase,
five core current transformer for,
both metering & protection cores.
1 Set
4.5 198 KV, class-III, Zinc oxide non-
linear type, gapless lightning
arrestor with insulating base &
surge counters.
1 Set
4.6 220KV/3 / 110V/3 / 110V/3 /
110V/3, single phase, oil filled,
three core, capacitor voltage
transformer.
1 Set
4.7 Galvanized steel structures for all
equipments in the 220KV
switchyard and other relevant
accessories
LS
4.8 IPS Aluminium tube conductor of
suitable size with required
clamps, connectors & all other
hardware required for
termination.
LS
4.9 220 KV Bus post Insulator LS
4.10 Lightening protection system
complete with conductors and
LS

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 30 OF 52

SCHEDULE 5.0
OFFSHORE SUPPLY OF PLANT / E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Unit Price
2
Total Price
2
Qty.
FOB CIF
Item Description Code
1

(1) (2) (3) (1) x (3)
lightening mast, galvanized steel
ground wire with necessary
hardwares for the whole
switchyard
4.11 Grounding mat, earthing pits & all
grounding works interconnection
with that of existing grid.
LS
4.12 Control and relay Panel with
required accessories and
interconnection with the existing
line panel.
1 Set
5.0 SCADA and related accessories. LS
5.0 Minor Civil works for Switchyard
of Power house
LS
6.0 Mandatory spares 1 lot
7.0 General, Special tools and
tackles required for erection and
maintenance of all the
equipments
1 lot
TOTAL (To Grand Summary)

In Figures
In Words




THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 31 OF 52

SCHEDULE 6.0
ONSHORE SUPPLY OF PLANT /E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Qty. EXW Unit Price
1
EXW Total Price
1
Item Description Code
1

(1) (2) (1) x (2)
1.0 MECHANICAL
1.1 Turbine and Auxiliaries
1.1.1 Turbine equipment 1 set
1.1.2 Hydraulically operated turbine
inlet spherical valve and
accessories
1 set
1.1.3 Upstream inlet pipe assembly 1 set
1.1.4 Downstream pipe assembly with
the dismantling cum expansion
joint
1 set
1.1.5 Butterfly valve and accessories 1 set
1.1.6 Electronic governor and
Auxiliaries
1 set
1.1.7 Oil pumping unit with
accessories complete with oil
piping
1 set
1.1.8 Cooling water system 1 set
1.1.9 Station drainage system 1 set
1.2 EOT Crane and Accessories 1 set
1.3 Fire Protection system 1 set
1.4

1.5
Air-conditioning and Ventilation
system
Emergency D G set
1 set

1 set

2.0 INSTRUMENTATION AND 1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 32 OF 52

SCHEDULE 6.0
ONSHORE SUPPLY OF PLANT /E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Qty. EXW Unit Price
1
EXW Total Price
1
Item Description Code
1

(1) (2) (1) x (2)
CONTROL SYSTEM
3.0 ELECTRICAL
3.1 Generator and auxiliaries
3.1.1 11KV, 100 MW Vertical
synchronous generators with
10% continuous over load
capability and auxiliaries
complete with auxiliary drive
motors, Safety devices, Local
control panels, LPBs, etc.,
1 set
3.1.2 LAVT Cubicle including all
accessories.
1 set
3.1.3 NGT Cubicle including all
accessories.
1 set
3.2 Transformers
3.2.1 Power transformer 130 MVA,
11KV / 220 kV with OLTC
1 set
3.3 220 KV over head Transmission
line to interconnect GT and
existing 220KV switchyard
including all accessories.
1 set
3.5 415 V Switchgear and AC
Distribution board.
1 set
3.6 220 V DC Distribution board for
Power house.
1 lot

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 33 OF 52

SCHEDULE 6.0
ONSHORE SUPPLY OF PLANT /E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Qty. EXW Unit Price
1
EXW Total Price
1
Item Description Code
1

(1) (2) (1) x (2)
3.7 Transformer Control, metering
and relay panel for the plant with
synchronizing panel
1 lot
3.8 Cables (Power, Control &
Instrumentation), Cable
accessories and cabling system
complete
LS
3.9 Plant lighting system complete LS
3.10 Construction power supply
arrangement
LS
3.11 Earthing and Lightning
Protection system for the
complete plant
LS
4.0 220 KV Switchyard
4.1 220KV, 2000 Amps, 40 kA /
1sec 3-phase SF6 gas circuit
Breakers.
1 No
4.2 220KV,2000A, 40kA/1 sec ,three
pole ,three phase, center break
,motorized Isolator with out
earth switch.
1 Set
4.3 220KV, 2000A, 40kA/1 sec,
three pole, three phase, center
break, motorized Isolator with
earth switch.
1 Set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 34 OF 52

SCHEDULE 6.0
ONSHORE SUPPLY OF PLANT /E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Qty. EXW Unit Price
1
EXW Total Price
1
Item Description Code
1

(1) (2) (1) x (2)
4.4 220KV, 1500/1A single phase,
five core current transformer for,
both metering & protection
cores.
1 Set
4.5 198 KV, class-III, Zinc oxide
non-linear type, gapless lightning
arrestor with insulating base &
surge counters.
1 Set
4.6 220KV/3 / 110V/3 / 110V/3 /
110V/3, single phase, oil filled,
three core, capacitor voltage
transformer.
1 Set
4.7 Galvanized steel structures for
all equipments in the 220KV
switchyard and other relevant
accessories
LS
4.8 IPS Aluminium tube conductor of
suitable size with required
clamps, connectors & all other
hardware required for
termination.
LS
4.9 220 KV Bus post Insulator LS
4.10 Lightening protection system
complete with conductors and
lightening mast, galvanized steel
ground wire with necessary
LS

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 35 OF 52

SCHEDULE 6.0
ONSHORE SUPPLY OF PLANT /E & M EQUIPMENT, AND MANDATORY SPARE PARTS
Qty. EXW Unit Price
1
EXW Total Price
1
Item Description Code
1

(1) (2) (1) x (2)
hardwares for the whole
switchyard
4.11 Grounding mat, earthing pits &
all grounding works
interconnection with that of
existing grid.
LS
4.12 Control and relay Panel with
required accessories and
interconnection with the existing
line panel.
1 Set
5.0 SCADA and related accessories. LS
5.0 Minor Civil works for Switchyard
of Power house
LS
6.0 Mandatory spares 1 lot
7.0 General, Special tools and
tackles required for erection and
maintenance of all the
equipments
1 lot










THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 36 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
1.0 MECHANICAL
1.1 Turbine and Auxiliaries
1.1.1 Turbine equipment 1 set
1.1.2 Hydraulically operated turbine
inlet spherical valve and
accessories
1 set
1.1.3 Upstream inlet pipe assembly 1 set
1.1.4 Downstream pipe assembly
with the dismantling cum
expansion joint
1 set
1.1.5 Butterfly valve and accessories 1 set
1.1.6 Electronic governor and
Auxiliaries
1 set
1.1.7 Oil pumping unit with
accessories complete with oil
piping
1 set
1.1.8 Cooling water system 1 set
1.1.9 Station drainage system 1 set
1.2 EOT Crane and Accessories 1 set
1.3 Fire Protection system 1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 37 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
1.4

1.5
Air-conditioning and Ventilation
system
Emergency D G set
1 set

1 set

2.0 INSTRUMENTATION AND
CONTROL SYSTEM
1 set
3.0 ELECTRICAL
3.1 Generator and auxiliaries
3.1.1 11KV, 100 MW Vertical
synchronous generators with
10% continuous over load
capability and auxiliaries
complete with auxiliary drive
motors, Safety devices, Local
control panels, LPBs, etc.,
1 set
3.1.2 LAVT Cubicle including all
accessories.
1 set
3.1.3 NGT Cubicle including all
accessories.
1 set
3.2 Transformers
3.2.1 Power transformer 130 MVA,
11KV / 220 kV with OLTC
1 set
3.3 220 KV over head 1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 38 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
Transmission line to
interconnect GT and existing
220KV switchyard including all
accessories.
3.5 415 V Switchgear and AC
Distribution board.
1 set
3.6 220 V DC Distribution board for
Power house.
1 lot
3.7 Transformer Control, metering
and relay panel for the plant
with synchronizing panel
1 lot
3.8 Cables (Power, Control &
Instrumentation), Cable
accessories and cabling
system complete
LS
3.9 Plant lighting system complete LS
3.10 Construction power supply
arrangement
LS
3.11 Earthing and Lightning
Protection system for the
complete plant
LS
4.0 220 KV Switchyard

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 39 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
4.1 220KV, 2000 Amps, 40 kA /
1sec 3-phase SF6 gas circuit
Breakers.
1 No
4.2 220KV,2000A, 40kA/1 sec
,three pole ,three phase, center
break ,motorized Isolator with
out earth switch.
1 Set
4.3 220KV, 2000A, 40kA/1 sec,
three pole, three phase, center
break, motorized Isolator with
earth switch.
1 Set
4.4 220KV, 1500/1A single phase,
five core current transformer
for, both metering & protection
cores.
1 Set
4.5 198 KV, class-III, Zinc oxide
non-linear type, gapless
lightning arrestor with
insulating base & surge
counters.
1 Set
4.6 220KV/3 / 110V/3 / 110V/3
/ 110V/3, single phase, oil
filled, three core, capacitor
1 Set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 40 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
voltage transformer.
4.7 Galvanized steel structures for
all equipments in the 220KV
switchyard and other relevant
accessories
LS
4.8 IPS Aluminum tube conductor
of suitable size with required
clamps, connectors & all other
hardware required for
termination.
LS
4.9 220 KV Bus post Insulator LS
4.10 Lightening protection system
complete with conductors and
lightening mast, galvanized
steel ground wire with
necessary hardwares for the
whole switchyard
LS
4.11 Grounding mat, earthing pits &
all grounding works
interconnection with that of
existing grid.
LS
4.12 Control and relay Panel with
required accessories and
1 Set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 41 OF 52

SCHEDULE 7.0
TRANSPORTATION AND OTHER INCIDENTIAL MANDATORY SPARES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion

Item Description Code
1

(1) (2) (Optional) (1) x (2)
interconnection with the
existing line panel.
5.0 SCADA and related
accessories.
LS
5.0 Minor Civil works of
Switchyard for Power house
LS
6.0 Mandatory spares 1 lot
7.0 General, Special tools and
tackles required for erection
and maintenance of all the
equipments
1 lot














THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 42 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
1.0 MECHANICAL
1.1 Turbine and Auxiliaries
1.1.1 Turbine equipment 1 set
1.1.2 Hydraulically operated
turbine inlet spherical valve
and accessories
1 set
1.1.3 Upstream inlet pipe
assembly
1 set
1.1.4 Downstream pipe assembly
with the dismantling cum
expansion joint
1 set
1.1.5 Butterfly valve and
accessories
1 set
1.1.6 Electronic governor and
Auxiliaries
1 set
1.1.7 Oil pumping unit with
accessories complete with oil
piping
1 set
1.1.8 Cooling water system 1 set
1.1.9 Station drainage system 1 set
1.2 EOT Crane and Accessories 1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 43 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
1.3 Fire Protection system 1 set
1.4

1.5
Air-conditioning and
Ventilation system

Emergency D G set

1 set

1 set

2.0 INSTRUMENTATION AND
CONTROL SYSTEM
1 set
3.0 ELECTRICAL
3.1 Generator and auxiliaries
3.1.1 11KV, 100 MW Vertical
synchronous generators with
10% continuous over load
capability and auxiliaries
complete with auxiliary drive
motors, Safety devices,
Local control panels, LPBs,
etc.,
1 set
3.1.2 LAVT Cubicle including all
accessories.
1 set
3.1.3 NGT Cubicle including all
accessories.
1 set
3.2 Transformers
3.2.1 Power transformer 130 MVA, 1 set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 44 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
11KV / 220 kV with OLTC
3.3 220 KV over head
Transmission line to
interconnect GT and existing
220KV switchyard including
all accessories.
1 set
3.5 415 V Switchgear and AC
Distribution board.
1 set
3.6 220 V DC Distribution board
for Power house.
1 lot
3.7 Transformer Control,
metering and relay panel for
the plant with synchronizing
panel
1 lot
3.8 Cables (Power, Control &
Instrumentation), Cable
accessories and cabling
system complete
LS
3.9 Plant lighting system
complete
LS
3.10 Construction power supply
arrangement
LS

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 45 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
3.11 Earthing and Lightning
Protection system for the
complete plant
LS
4.0 220 KV Switchyard
4.1 220KV, 2000 Amps, 40 kA /
1sec 3-phase SF6 gas circuit
Breakers.
1 No
4.2 220KV,2000A, 40kA/1 sec
,three pole ,three phase,
center break ,motorized
Isolator with out earth
switch.
1 Set
4.3 220KV, 2000A, 40kA/1 sec,
three pole, three phase,
center break, motorized
Isolator with earth switch.
1 Set
4.4 220KV, 1500/1A single
phase, five core current
transformer for, both
metering & protection cores.
1 Set
4.5 198 KV, class-III, Zinc oxide
non-linear type, gapless
lightning arrestor with
1 Set

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 46 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
insulating base & surge
counters.
4.6 220KV/3 / 110V/3 /
110V/3 / 110V/3, single
phase, oil filled, three core,
capacitor voltage
transformer.
1 Set
4.7 Galvanized steel structures
for all equipments in the
220KV switchyard and other
relevant accessories
LS
4.8 IPS Aluminum tube
conductor of suitable size
with required clamps,
connectors & all other
hardware required for
termination.
LS
4.9 220 KV Bus post Insulator LS
4.10 Lightening protection system
complete with conductors
and lightening mast,
galvanized steel ground wire
with necessary hardwares
LS

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 47 OF 52

SCHEDULE 8.0
STORAGE, ERECTION, TESTING, COMMISSIONING & OTHER ESSENTIALLY REQUIRED SERVICES
Unit Price
1
Total Price
1
Qty.
Local
currency
portion
Foreign
currency
portion
Local
currency
portion
Foreign
currency
portion
Item Description Code
1

(1) (2) (3) (1 x 2) (1 x 3)
for the whole switchyard
4.11 Grounding mat, earthing pits
& all grounding works
interconnection with that of
existing grid.
LS
4.12 Control and relay Panel with
required accessories and
interconnection with the
existing line panel.
1 Set
5.0 SCADA and related
accessories.
LS
5.0 Minor Civil works of
Switchyard for Power house
LS
6.0 Mandatory spares 1 lot
7.0 General, Special tools and
tackles required for erection
and maintenance of all the
equipments
1 lot






THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 48 OF 52

Schedule 9.0
Optional Price for the following jobs :

1 Work of Tunnel number 1 Rehabilitation works from Dawdi Intake to Surge shaft at Dongarwadi

2 Work of Intake screens and Gates at Dawdi Intake as per the Bid Documents.

3 Interconnection of Unit no 3 & 4 to Auxiliary Reservoir ( AR ) and AR to Unit 3 & 4 .

Please devise appropriate Formats for this item


























Comment [n3]: To be included in
sch.1 ?

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 49 OF 52

SCHEDULE NO 10.0
DECLARATION REGARDING DEEMED EXPORT BENEFITS

1. The BIDDERS shall note that they are solely responsible for obtaining the deemed export benefits,
which they have considered in preparation of Bid and in case of failure to receive such benefits,
OWNER will not compensate us in any manner whatsoever.

2. The BIDDER shall furnish below the information required by the OWNER for issue to relevant
certificates in terms of the export import policy of the Govt. of India.
(A) (i) CIF value of import content of supply to :
Made by the bidder and assignee (if
applicable) in bid currency)
(B) (i) Name of the sub-contractor(s) of bidder and :
Assignees (if applicable) who shall supply the
goods directly to the employer and who name
is to be included in the main contract
(ii) Description, quantity and value (in bid : Description:.
Currency) of the goods to be supplied Quantity:..
Quantity by the above sub-contractor(s) Value :..
(iii) Value of import content of supply to be made
By sub- contractor(s) (in bid currency)

(The requirements listed above are as per current export and import policy of Govt. of India.)

Please state the currency and fill in the amount in figures and words

Signature _________________

Designation________________

Company__________________

Date______________________

Company seal


THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 50 OF 52

Note:
1) Continuation sheets of size and format may be used as per Bidders requirements and shall be
annexed to this schedule


































THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 51 OF 52

SCHEDULE 11.0

MONTHLY CASH FLOW


CIVIL & HM WORKS E & M WORKS TOTAL MONTHLY CASH
FLOW
PAYMENT
MILESTONE
MONTH US $ INR US $ INR US $ INR
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

THE TATA POWER COMPANY LIMITED
BHIRA 100MW-AUGMENTATION SCHEME
INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION

Volume - VII
PART II

Doc. No.
TCE.5270A-H-112-601
BILL OF QUANTITIES AND PRICE BID
TO BE FILLED BY BIDDER
PRICE SCHEDULES

SHEET 52 OF 52

28
29
30
31
32
33
34
35
36

As Annexure to this Contractor shall give the Delivery and Supply Schedule of each supply item and
monthly payment schedule accruing on that account. This has been sought for in Section 3.13, Part 3 of
this Volume.

You might also like