SPEC NO.

TCE.5270A-H-112-601

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION BROAD SCOPE, CODES & STANDARDS, TERMINAL POINTS & EXCLUSIONS

SECTION: C1 VOLUME V PART 1

SHEET 1 OF 4

1.0

BROAD SCOPE The broad scope of work shall comprise of engineering, design, manufacture, inspection and testing at manufacturers works, packing and forwarding, delivery to site, unloading from carriers/wagons, storing at site, transport to erection site, erection, testing and commissioning at site, carrying out performance / acceptance test of 1 x 100 MW rating Hydraulic Turbine Generator set and Auxiliaries, 220 kV Switchyard and other Electro Mechanical equipments as specified. Comprehensive insurance shall be provided till the unit is handed over. Sl. No. 1.0 1.1 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 1.1.8 1.1.9 1.1.10 1.1.11 1.2 1.3 1.4 2.0 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.2 2.3 2.4 2.5 2.6 2.7 Description Quantity 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 Set 1 No. 1 No. 1 No 1 No 1 Set 1 Lot 1 Set 1 Set 1 Set
ISSUE P0 TCE FORM 329 R3

MECHANICAL Turbine and Auxiliaries Turbine equipment with 10% continuous overload Hydraulic operated turbine inlet spherical valve Upstream inlet pipe assembly Downstream pipe assembly with the dismantling cum expansion joint Butterfly valve at valve house and Hoist Electronic governor and auxiliaries Oil pumping unit with accessories complete with oil piping Cooling water system Station drainage system Station compressed air system Instrumentation and control system for turbinegenerator and auxiliaries EOT Crane of suitable capacity (including auxiliary hoist) Fire protection system including emulsifier system. Air-conditioning and ventilation system ELECTRICAL Generator and Auxiliaries 100 MW with 10% continuous overload Vertical synchronous generator and auxiliaries complete with motors, safety devices, local control panels etc. LAVT Cubicle NGT Cubicle Synchronizing Panel Power transformer of 130 MVA, 11 / 220 kV 220 kV Switchyard equipment for one bay 220 KV Transmission Line including structures for interconnection of switchyard and Powerhouse. 11 kV HTSwitch gear(Extension panel) 11 KV Bus ducts Generator Circuit Breaker

SPEC NO.

TCE.5270A-H-112-601

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION BROAD SCOPE, CODES & STANDARDS, TERMINAL POINTS & EXCLUSIONS

SECTION: C1 VOLUME V PART 1

SHEET 2 OF 4

Sl. No. 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 3.0 2.0 2.1

Description Control, protection, metering and annunciation panels HT & LT Cables, Cable trays and other accessories Earthing and lightning protection for power house and switchyard Plant lighting system 220V Battery and Battery Chargers Fire Alarm and EVC System DCS / SCADA for the Power House LT Panels, AC and DC Distribution Boards. Electromechanical equipment for sub-storage

Quantity 1 Set 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot 1 Lot. 1 Lot

CODES AND STANDARDS All equipment, system and works covered under this specification shall comply with all currently applicable statutes, regulations and safety codes in the locality where the equipment will be installed. All equipment and systems shall conform to the standards / codes specified in Section C, Section D and Data sheet A. In case the Bidder offers equipment / systems conforming to any standards other than those specified in component specifications, the same shall be established to be equivalent or superior to the codes and standards as specified and the Bidder shall furnish copies of standards translated in English while submitting his proposal. Notwithstanding the recommendations and stipulations of the Codes and Standards mentioned above, the requirement of this specification shall be deemed minimum and shall be complied fully. All codes and standards referred to in the specification shall be understood to be the latest version as on the date of offer made by the Bidder unless otherwise indicated. The Contractor shall ensure that instruments and gauges to be used for testing and inspection of critical parameters as identified in the specification have valid calibration and the accuracy can be traced to National / International standards. TERMINAL POINTS Mechanical On the upstream side the scope shall be terminated at 15.0 m from the centre line of turbine runner as indicated in the layout drawing with 200 mm site trimming allowance. The scope shall include upstream Spherical Valve inlet pipe of suitable length with the site trimming allowance as specified. The inlet pipe shall be welded with the penstock pipe covered in Civil & Hydro-mechanical contractors scope. Cutting and edge preparation of the inlet pipe, cutting and

2.2

2.3

2.4

3.0 3.1 3.1.1

ISSUE P0 TCE FORM 329 R3

SPEC NO.

TCE.5270A-H-112-601

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION BROAD SCOPE, CODES & STANDARDS, TERMINAL POINTS & EXCLUSIONS

SECTION: C1 VOLUME V PART 1

SHEET 3 OF 4

edge preparation of the penstock pipe, welding of inlet pipe with penstock pipe shall be included in Contractors scope of work. 3.1.2 For EOT Crane, the long travel girder and the walkway platform along the long travel girder will be included in Civil & Hydro-mechanical contractors scope of work. The rails, rail clamps and fittings etc., shall be included in Contractors scope. Erection of EOT Crane rails shall be done by the Contractor. Electrical Supply, installation, testing and commissioning of all electrical equipment with the required accessories for 1 x 100 MW Hydel power plant including the following systems.

3.2 3.2.1

I. 220 kV Transmission line for interconnection of the switchyard and powerhouse. II. Addition of One 220 KV bay (one and half breaker scheme) including protection and metering at the existing Switchyard for power evacuation. III. Interconnection of new 220 KV bay with the existing switchyard main bus. IV. Earthing and Lightning protection for the powerhouse and hook-up with the existing plant earth mats. V. Fire Alarm and Emergency Voice Evacuation system for the new powerhouse and hook up with the existing system. VI. DCS / SCADA for the Power house & switchyard and hooking up with the existing system.

3.3

Construction Power Construction power at single point will be made available by Owner. Further distribution and safety of the same shall be in contractors scope at his own risk and cost.

3.4

Construction Water The Contractor shall arrange construction water at his own risk and cost.

3.5

Start-up and Essential spares Bidder shall include start-up and essential spares as listed in Section C33 and other data sheets and their respective specification. In case any items from these spares are used during installation, commissioning and testing, the Contractor
ISSUE P0 TCE FORM 329 R3

SPEC NO.

TCE.5270A-H-112-601

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION BROAD SCOPE, CODES & STANDARDS, TERMINAL POINTS & EXCLUSIONS

SECTION: C1 VOLUME V PART 1

SHEET 4 OF 4

shall replace the same at the time of handing over of the units / completion of facilities. 3.5 3.5.1 Miscellaneous Foundation bolts for all equipment, Grouting of foundation bolts for all equipment including supply of grouting materials, minor chipping, levelling for Turbine, Spherical Valve & Generator and all other auxiliaries, provision of anchor fasteners as applicable shall be included in the Contractors scope. Initial fill of oil, grease, all lubricants plus 10% extra quantity for the complete equipment shall be included in Contractors scope. EXCLUSIONS The equipment and services to be provided by OTHERS shall be as follows:4.1 4.2 Construction of Power house Penstocks.

3.5.2

4.0