juwi India Proposal 50kWp System

Sumit Tiwari Manager : Sales juwi India Renewable Energies Pvt. Ltd.

Content
1. juwi at a glance 2. Why juwi? 3. Engineering capabilities 4. Construction capabilities 5. Organization chart 6. Accreditations

juwi at a glance

juwi at a glance
Established 1996 Workforce Over 1,700 employees (Dec 2011) Revenues ~ 980 Mil. (2011) EPC and Project Development of Renewable Energy Plants Number of PV power plants Over 1700 installations Over 950 MWp of global installation ~22 MWp Installed in India ~50MWp Under progress Total investment since 1996 Over 3.5 billion Annual energy output Approx 3 billion kWh Annual emission reduction Approx 2.2 billion kg of CO2
Headquartes of the juwi group in Wrrstadt, Germany
4

juwi at a glance

juwi India wholly-owned subsidiary of juwi Holding AG India Offices India Head Office: Samhita Plaza, N. 248, 1st Floor, 80 Feet Road, Defence Colony, Indiranagar, Bangalore 560038 Regional Office Delhi DLF Galleria, N. 208, 2nd Floor, Mayur Vihar District Centre, Mayur Vihar I, Delhi 110091

Completed EPC Project Sites 2.46 MWp District Surendranagar, Gujarat 5.214 MWp District Jodhpur, Rajasthan 10 MWp District Rajkot, Gujarat 2 MWp District Jhansi, Uttar Pradesh 2 MWp District Rajgarh, Madhya Pradesh Work in progress 21 MWp + 5.44 MWp 24 MWp District Jodhpur, Rajasthan
5

Proposal for 50kWp

Site Availability
Available Roof top ( South Facing Shadow free) : 600sqm Proposed Solar PV plant Capacity : 50kWp Plant Type : Grid Interactive ( Internal )

System Line Diagram

System Configuration
System Details : 50kWp Power Warranty : 90% after 10 Years , 80% after 25 years of Operation Solar Inverter : 50kVA

Inverter Efficiency > 94 % Structure Design : 160KM /h Windspeed withstand capacity. System Design, Workman ship Warranty,DLP : 5 years

Energy Details
Typical Energy Generation in Year : 75,000-80,000 kWH Per Annum Equivalent : 25000 Litres of Diesel Consumption in year Typical Cost 10,00,000.00 INR Worth Diesel ( @40INR per Litre) or 5,20,000.00 INR from State Electricity Board ( @ 6.5INR per KWH) Equivalent : Reduction in emission of 32000kG of CO2 from thermal power plant in years

10

Pricing Details
Cost of 50 kWp System : 70,00,000.00 INR Subsidy from MNRE : 21,00,000.00 AD Benefit in IT tax Exemption :11,76,000.00 INR ( 80% AD first Year) Net Cost of System after availing IT Benefit : 37,24,000.00 INR Plant Life 25 years :

11

Pay Back Calculations


Grid Availability 100 % : 6.5 Years

Non Grid Availability ( 100% DG) : <3 years 50% Grid Availability 50 % DG : 4.2 Years

12

Rooftop Benefits
1. Negligible maintenance Cleaning is the only thing required for Solar PV Power plant , No spares or refueling in any manner required. 2. Reduced MVA demand from EB Supply 3. Reduced Diesel Consumption 4. High Design life of 25 years

13

Why juwi?

14

Why juwi?

juwi offers impeccable value to its customers through engineering and construction service quality of the highest international standard

Design-supervision and supply-chain support from a 980 mn group Huge global installation base (over 950 MWp at the end of 2011) Long-term O&M support capability (over 300 MWp) Close to 22 MWp installed in India five projects already completed 50MWp under process All projects installed well within the PPA time-frame not a single overrun Process quality certification achieved through TUV Nord Accredited MNRE Channel Partner with Rating 1A ( highest for technical and financial criteria
15

Our Business Associates : SunReign

Value-add through qualified and enlisted business associates Supported by qualified and enlisted business associates (channel partners) like SunReign. Our partners have in-depth understanding of PV business. They help us expand our reach in their geographical territories, and help clients with the first-level analysis of their requirement. They work closely with juwi to understand the customers requirements and bring in the most optimum and technically suitable solution to customers. They also assist juwi in execution, supervision and maintenance activities.
16

Engineering Capabilities

17

Engineering Organization

Electrical Design (DC side)

Tools & Processes

Electrical Design (AC side)

Civil Design

Supported by appropriate tools and process, juwi engineering team is organized to carry out all aspects of complete design and engineering of a Solar PV plant.

Structural Design

Design Methodology

Electrica Design (DC) 1. Selection of Modules & Inverters. 2. Creation of DC side SLD. 3. Energy yield simulation using PVSyst. 4. Sizing of AC / DC side using proprietary juwi tool. 5. DC side loss can cable estimation using proprietary juwi tools.

Electrical Design (AC) 1. Design of LV and HV Systems. 2. Selection of Cables, Switchgear, Transformers & Protection Scheme for AC Side. 3. Design of Earthing layout and Lightning protection scheme for the plant. 4. Design of illumination scheme.

Civil Design 1. Design of module mounting foundations. 2. Design of roads, internal drains, perimeter fences and inverter and control rooms in a PV Plant. 3. Appropriate design tools CAD, STAAD are used at relevant stages.

Structural Design 1. Design of module mounting structures. 2. Design of structures of prefab rooms and switch yard components. 3. Appropriate design and drafting tools CAD, STAAD Pro as used at relevant stages.

Relevant National & International Standards

juwi uses prudent design practices along with use of appropriate National and International Standards for design of its PV Plants,

Design based on Global Expertise


Global System Engineering Product Management Global R&D New product development & Product Testing

Product Qualification.

Design tools & Best Engineering Practices

India System Engineering

juwi India Engineering team has access to a host of global resources to bring in the best solution for a given PV requirement.

Construction Capabilities

21

Completed Project # 1
2.46 MWp, Surendranagar, Gujarat Project implemented under Type of PV modules Inverters Evacuation voltage Gujarat state policy FS-277, 32,000 Nos. SMA 630 CP, 4 Nos. 11 kV

22

Completed Project # 2
5.21 MWp, Osian, Jodhpur, Rajasthan Project implemented under Type of PV modules Inverters Evacuation voltage National Solar Mission (migration policy) FS-380, 65,175 Nos. SMA 630 CP, 8 Nos. 33 kV

23

Completed Project # 3
10 MWp, Meravadar, Gujarat Project implemented under Type of PV modules Inverters Evacuation voltage Gujarat state policy FS-380, 125,025 Nos. SMA 630 CP, 16 Nos. 66 kV

24

Completed Project # 4
2 MWp, Jhansi, Uttar Pradesh Project implemented under Type of PV modules Inverters Evacuation voltage IREDA RPSSGP SF-145, 13,824 Nos. AEG Protect 500 kW, 4 Nos. 11 kV

25

Completed Project # 5
2 MWp, Rajgarh, Madhya Pradesh Project implemented under Type of PV modules Inverters Evacuation voltage IREDA RPSSGP FS-380, 25025 Nos. SMA 630, 3 Nos. 11/33 kV

26

Org Chart

27

Org Chart
Management Team

28

Accreditation

29

Quality certification

30

Accredited by CRISIL-MNRE

31

Thank You for Your Attention