Perencanaa BEBAN IMBANG BALOK Bentang 1.

AB

2.

Tentukan Beban maksimum setiap bentang (Beban mati (DL + BB) + Beban Hidup (LL)) Beban Mati Beban Mati BB = 1000 kg/m DL = 1000 kg/m Beban Hidup Beban Hidup LL = 3000 kg/m Total = 5000 kg/m Total Rencanakan Beban Imbang Beban imbang awal maksimum 70% dari beban maksimum beban Imbang = 3500 kg/m Beban imbang akhir Kehilangan Prategang Beban imbang =

3.

Beban imbang awal maksimum 70% da beban Imbang

20% 2800 kg/m

Beban imbang akhir Kehilangan Pratega Beban imbang

4.

Beban Sisa akhir Sisa awal --> Beban awal tanpa LL - Beban imbang Awal Bebab awal tanpa (LL) = 2000 kg/m Beban Imbang awal = 3500 kg/m Beban Sisa awal = 1500 kg/m Ke Atas Sisa akhir --> Beban Total - Beban Imbang akhir Beban Total = 5000 kg/m Beban Imbang Akhir = 2800 kg/m Beban Sisa akhir = -2200 kg/m ]

Sisa awal --> Beban awal Bebab awal tanpa ( Beban Imbang awa Beban Sisa awal

Ke Bawah

Sisa akhir --> Beban Total Beban Total Beban Imbang Akh Beban Sisa akhir

5. Beban Sisa awal = 1500 kg/m Ke Atas Beban Sisa awal

Beban Sisa akhir

-2200 kg/m

Ke Bawah

Beban Sisa akhir

6. 7.

Menaksir tb

0.18 m

Menetapkan T1 dan T2 T1 = 145944.4444 T1 = 204166.6667 T1 Guna = 204167 kg T2 = 163333 kg Eksentrisitas kabel Momen akibat beban imbang = T .e Momen akibat beban imbang titik tinjau / T = e Eksentrisitas kabel pada titik tertentu Momen akibat 3500 + Momen akibat 204166.6667 204166.7 Gambar layout Luas penampang perlu A = T1 0,5 x izin awal T1 0,5 x izin akhir 40 Mpa 1701.389 cm2

10.

0=

e total

11. 12.

Mutu Beton (fc =) A = 204166.6667 = 120 A = 163333.3333 = 90

1814.815 cm2

13.

Tentukan bentuk penampang A= I= tb = Periksa tegangan awal momen tumpuan a = T1/ A M. Ya I b = T1/ A M. Yb I Periksa tegangan awal momen lapangan T1/ A M. Ya a = I b = T1/ A M. Yb I

14.

Periksa tegangan akhir momen tumpuan a = T2/ A M. Ya I b = T2/ A M. Yb I

Periksa tegangan akhir momen lapangan T2/ A M. Ya a = I b = T2/ A M. Yb I

AB Tafsir Tinggi balok 1/15L sampai 1/20 L = 16 m = 80 cm = 90 cm

Panjang (L) Tinggi Balok Dipilih

s/d Oke

106.6667

Beban Mati BB DL Beban Hidup LL Total

= = = =

0 kg/m 0 kg/m 0 kg/m 0 kg/m

Tentukan Beban maksimum setiap bentang (Beban mati (DL + Beban Mati BB = DL = Beban Hidup LL = Total = Rencanakan Beban Imbang Beban imbang awal maksimum 70% dari beban maksimum beban Imbang = Beban imbang akhir Kehilangan Prategang Beban imbang Beban Sisa akhir

Beban imbang awal maksimum 70% dari beban maksimum beban Imbang = 0 kg/m Beban imbang akhir Kehilangan Prategang Beban imbang =

20% 0 kg/m

Sisa awal --> Beban awal tanpa LL - Beban imbang Awal Bebab awal tanpa (LL) = 0 kg/m Beban Imbang awal = 0 kg/m Beban Sisa awal = 0 kg/m Ke Bawah Sisa akhir --> Beban Total - Beban Imbang akhir Beban Total = 0 kg/m Beban Imbang Akhir = 0 kg/m Beban Sisa akhir = 0 kg/m Ke Bawah

Bebab awal tanpa (LL) Beban Imbang awal Beban Sisa awal

= = =

6000 9800 3800

Beban Total Beban Imbang Akhir Beban Sisa akhir

= = =

14000 7840 -6160

Beban Sisa awal

Momen Maksimum berdasrkan : = 0 kg/m Ke Bawah Beban Sisa awal Momen Lapangan max = Momen Tumpuan max = = 0 kg/m Ke Bawah Beban Sisa akhir Momen Lapangan max = Momen Tumpuan max =

3800 19.62 kg.m 27.6 kg.m -6160 26270 kg.m 29400 kg.m

Beban Sisa akhir

Momen Lapangan Guna Momen Tumpuan Guna

= =

26270 kg.m 29400 kg.m

e total

Eksentrisitas kabel Momen akibat beban imbang = T .e Momen akibat beban imbang titik tinjau / T = e Eksentrisitas kabel pada titik tertentu Momen akibat 9800 204167

al momen lapangan M. Ya

M. Yb

hir momen lapangan M. Ya

M. Yb

BC

etiap bentang (Beban mati (DL + BB) + Beban Hidup (LL)) Beban Mati 1000 kg/m BB 5000 kg/m DL Beban Hidup 8000 kg/m LL 14000 kg/m Total

= = = =

1000 kg/m 5000 kg/m 8000 kg/m 14000 kg/m

ban maksimum 9800 kg/m

Rencanakan Beban Imbang Beban imbang awal maksimum 70% dari beban maksimum beban Imbang = 9800 kg/m Beban imbang akhir Kehilangan Prategang Beban imbang =

20% 7840 kg/m

20% 7840 kg/m

kg/m kg/m kg/m

Ke Atas

Bebab awal tanpa (LL) Beban Imbang awal Beban Sisa awal

= =

6000 kg/m 9800 kg/m =800 kg/m 3

Ke Atas

kg/m kg/m kg/m

Ke Bawah

Beban Total Beban Imbang Akhir Beban Sisa akhir

14000 kg/m = 7840 kg/m -6160 kg/m =

Ke Bawah

kg/m

Ke Atas

Beban Sisa awal

3800 Ke Atas

kg/m

Ke Bawah

Beban Sisa akhir

-6160 Ke Bawah

bang titik tinjau / T = e + Momen akibat 204166.7 9800 = e total