GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership AREA LIABLE TO FLOODING

The site lies within the Environment Agencys indicative flood risk areas for Zone 2 and 3. The proposed site is part of the H17 residential allocation included in Sedgemoor District Councils development framework. The site lays approximately 100m to the north of the tidal estuary of the River Brue. The Brue reaches the sea at Highbridge, 1500m to the west. The course of the Brue has been altered and straightened over the years upstream of the site. The current tidal limit is immediately to the south of the site at the sluices at New Clyce Bridge. To the north and east of the site are residential properties. To the south is a boat building yard and housing, to the west is a wastewater treatment works with the Apex Leisure Park containing several lakes and a caravan park on land further to the west. The Brue catchment has an area of approximately 259km2 and is predominantly wetland within the Somerset Levels. The existing site varies in level from 5.6 to 6.8mAOD. The existing topographical survey has been tied into Ordnance Datum from the benchmark on New Clyce Bridge. The total site area is approximately 27120m2. The site falls away from the River Brue towards the residential dwellings alongside the northern boundary. An earth bank tidal defence, which runs along the southern and western boundaries, defends parts of the area, such as the Sewage works to a level varying between 8.45m and 8.60m AOD. On the southern boundary of the site there is a raised parcel of land that reaches 8.00mAOD. To the east of the site on Huntspill Moor the River Brue is linked to the manmade Huntspill River, dug in the 1940s, and to the south by an artificial channel known as Cripps River. The Huntspill and Cripps rivers were built to improve drainage of the area. The attached drawing EE00431/Fig01 shows the site location. The attached drawing EE00431/Fig02 shows the existing site topographical survey, and predicted flood extents. The drawings are included in Appendix A. A copy of the EA flood map is included in Appendix B.

Completed by: Andrew Crewdson

Page 1 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

PROBABILITY OF FLOODING AND POTENTIAL CHANGE The impact of urban development and land use change on the River Brue is likely to be minimal, particularly in view of recent policies such as PPG and PPS25 aimed at reducing such impacts. The Environment Agency have stated that there is a maximum fluvial 1 in 100 year level of 5.0mAOD for the River Brue because of the interlinked watercourses and wetland areas upstream of Highbridge. Due to the Highbridge Sluice there is no tidal influence on the Brue upstream of Clyce Bridge. The River Brue is therefore highly unlikely to have any major flood influence on the site but will need to be considered if any surface water drainage outfalls are considered to the Brue. EXTENT AND STANDARD OF FLOOD DEFENCES An earth bank currently defends western parts of the site, which is part of the Environment Agencys tidal defence scheme for Highbridge. The bank varies in level between 8.60 and 8.54mAOD over a distance of approximately 290m. An additional bank running along the southern boundary provides some further defence at a level of 8.14m AOD. The lowest point in the area exposed to tidal influence is at 7.81m AOD, or 50mm short of the 1 in 200 year predicted flood level. This defence level of 7.81m equates to an approximate return period of 1 in 150 years for tidal flooding. LIKELY DEPTH OF FLOODING 1 in 200 Year Event The 1 in 200 year still water level in the tidal Brue for Highbridge has been agreed with the Environment Agency as 7.86mAOD. Behind the existing defence at 7.81m the ground drops away to a low-dished area with an invert of approximately 7.20m. The perimeter of the dished area has a level of 7.59m and a plan area of 2347m2. Any flows overtopping the 7.81m level would flow east into this dished area and impound up to a level of 7.59m, before then flowing north, east and south into existing areas of development. This dished area has an approximate storage volume of 445m3.
Completed by: Andrew Crewdson

Page 2 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

Using the design flood level of 7.86m and the existing defence level of 7.81m a tide would spill over the low spot for just under 14 minutes based on tide curves derived from Hinkley Point gauging station. The width of the spill is between 4.5 and 5.0m with cross sectional flow area varying between 0.0m2 and 0.14m2. Assuming the tide is travelling at a rate of 0.5m/s calculates out as a total volume of 28.3m3 travelling through the lowest point. From this it can be seen that no flood water would enter this site, part of the H17 allocation, during a 1 in 200 year tide event. The full tidal overtopping calculations are included in Appendix C. 1 in 200 Year + 30% Climate Change Event To allow for potential rises in tide levels initially an additional 0.40m was added to the 1 in 200 year tidal level and a further 0.30m for freeboard giving a 1 in 200 year + climate tide level of 8.56m AOD for any earth flood defences. Further work to revise the climate change allowances following publication of PPS25 has now been undertaken. We have calculated a revised tidal design level of 8.87mAOD for 2110 to cover a development life span of 100 years. We have carried out an assessment of existing ground levels within the Highbridge / Burnham area to create some contouring of the surrounding area. These contours are shown on EE00431/Fig5 and Fig6. We have then assumed that we will construct the Phase 1 development including our flood alleviation proposals and that the land to the south of Phase 1 (Boatyard site) will be raised to 8.90m. Any overtopping floodwater passing along the south side of the site, will still run through Smith Way, Sparks Way and out into Newtown Road before heading north toward Newtown Lake. To assess the maximum volume of flood water that the tide could generate we have drawn up a series of spill profiles to match the predicted tide curve level and calculated the possible flow area available through each cross sectional area of the spill. If tide levels were to reach the level of 8.87m, spilling through the area with the lowest ground levels between 8.11 and 7.81mAOD there would be approximately 150,000m3 of water entering into the Highbridge area over the spill length of 70m. This tidal volume is based on a single tide cycle in just over 1 hours of flow between 0.76 and 1.06m deep. We have considered 3 tide cycles passing over this spillway and a total volume of floodwater of 450,000m3 dispersed in the Highbridge/Burnham area. The lowest areas immediately to the north of the site are at 5.2m, rising to 5.5m. At 5.5m floodwater would start to enter the northern side of the site, as the low-lying areas below 5.5m will have filled. Therefore using the 5.5m contour area as a storage pond level (less a 20% allowance for buildings) we have calculated the maximum impounding level of 3 tide
Completed by: Andrew Crewdson

Page 3 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

cycles by dividing the total flood volume in 3 tide cycles (450,000m3) by the potential storage area (221.04ha). This equates to a total water depth of 200mm, or a level of 5.70mAOD without any allowances for draw down by the highway and surface water drainage network or the volume of storage available below the 5.5m contour. At the entrance to the site off Newtown Road the existing ground level is at 6.40m, we propose to raise the access road up to a level of 7.65m as soon as highway design standards permit (approx 15m distance). This will be 1.25m above the existing ground level to the south of the site where flood flow depths would be up to 1.1m deep based on our flow path/depth analysis. Then the access road or site level would rise up further to a level of 8.90m along the southern site frontage to provide an engineered flood defence at point 3 on our development option layout. Alternatively if the access road follows a more northerly route along the old railway line then the site frontage levels will be raised to a similar profile. This raised defence area would be constructed, as a minimum width of 5m to ensure surcharging by floodwater did not cause a breach failure. The width of flow available through the housing area varies between 40 and 70m and we estimate that the flow depth through this area would vary between 1.0 and 1.3m because of the housing layout. By adopting the proposed levels on the southern boundary shown on drawing EE00431/Fig4C we would ensure that the proposed site frontage is always at least 1.4m above the existing ground levels along the boundary with Smith Way / Sparks Way housing area. On this basis if the remainder of the Phase 1 site area to the rear of the proposed development option defences were raised to a minimum of 6.5m, floodwater would not enter the Phase 1 development area. MHWS tide is approximately 5.80m AOD. The site is generally not at risk from waves or storm surges due to its distance inland, but should it occur there is 300mm freeboard above the 1 in 200 year + climate change tidal level. EFFECTS OF CLIMATE CHANGE The impacts of climate change on the hydrological regime of the River Brue are not fully known. In general climate change in the west of England is expected to result in an increase in rainfall intensity and higher rainfall totals during the winter period. This might be expected to lead to an increase in heavy rainfall events such as occurred in October and December 2000 and July 2005. An additional 30% flow above the 1 in 100 year flow should be considered for climate change, however the main flood risk in this location is tidal.
Completed by: Andrew Crewdson

Page 4 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

Tide levels are predicted to increase due to climate change. Generally it is believed that tide levels in the southwest will increase by 4mm a year. When combined with the rate the southwest peninsula is sinking a value of 5mm is used. Tide 1 in 200 year design tide level has been increased in line with Annex B of PPS 25 to cover a life span of 100 years. In a higher flood level tidal event flows would travel through the site north, east and south towards the existing development areas once the low ponding area was full. NATURE AND LIFETIME OF DEVELOPMENT AND EXTENT OF FLOOD PROOFING The site is currently defended to a 1 in 150 year return period tidal event, or 50mm short of the current 1 in 200 year design standard. It has been proven earlier that this part of the H17 site would not flood in a 1 in 200 year tide event. The site defence only becomes substandard when climate change and freeboard allowances are added onto the predicted still water tide levels, i.e. development could proceed as long as the defences were improved within the timescale of the development of the whole of the H17 allocation. Each landowner would need to deliver part of the defence scheme as part of their planning permission. To provide adequate flood protection to the whole of this site when considering climate change the Environment Agency have agreed to the development option as shown on Fig04. Refer to Fig04 for the reference locations: Phased Development Option Due to land ownership constraints the H17 site will proceed in two phases, phase 1 being the northern part, phase 2 being the boatyard site. Phase 1 will provide a raised flood defence to 8.90m between the existing EA defences at point 1, through point 2 finishing at point 3, currently at 6.85m within the site. To the east of point 3 ground levels would be ramped down to the site entrance at a level of 6.40m. Closing of the gap through the boat yard would occur when the boatyard is developed within the next 5 years. General Design Features The raised land on the southern boundary between points 1 and 3 could be used as part of a residential unit or garden area. A typical sketch showing how this could work is included on Figure 4 as section A - A. Typically a minimum width of 5m of raised land is required as a defence before any building can be located. If no buildings are to be used to back onto the earth defence then a width of 8m earth banking should be used.
Completed by: Andrew Crewdson

Page 5 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

Finished floor levels on the properties fronting the tidal defences in the west and south should be set at 9.05m AOD. Other property in the north and eastern parts of the site should have minimum floor levels 300mm above the local ground level. The proposed site access road from the east will have a landscape buffer on the south side, this will be shaped to form a dished channel to store and convey flood water to the east along the existing flood route in a climate change event. The road and landscape buffer design can be detailed to mirror the existing flood regime where flows travel to the east toward the existing development if Option 2 is promoted. Once the boatyard is developed this potential climate change flood route would be closed off. The attached drawing EE00431/Fig03 shows the proposed site layout. The attached drawing EE00431/Fig04 shows the flood proposals for Phase 1 of the development. Surface Water Run-off Greenfield and Brownfield run-off for the existing site was calculated using the IH124 and Wallingford methods. Run-off was calculated as the following: Return Period Greenfield (l/s) 1.9 2.1 5.2 Brownfield (l/s) 195 221.6 471.9

1 in 2 year Mean Annual Flood 1 in 100 year

The maximum proposed site peak run-off based on the illustrative masterplan has been calculated as follows: Return Period Developed site (l/s) 196.9 223.7 477.1 620.2

1 in 2 year Mean Annual Flood 1 in 100 year Climate Change

Surface water run-off from the proposed development should be disposed of using SUDS Techniques if previous site use and ground levels permit. If a direct discharge to a watercourse using attenuation is proposed then the discharge rates should be no greater
Completed by: Andrew Crewdson

Page 6 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership than the existing run-off rate.

There is sufficient capacity to connect into the existing Wessex Water surface water sewer to the west of the site to achieve a direct tidal outfall. The land needed to complete the connection is under the control of Gaia Partnership. A copy of the Wessex Water sewer records is included in Appendix B. If a direct discharge to the tidal estuary can be achieved then no reduction in the existing peak flow or attenuation would be needed. Any outfalls through the existing / proposed tidal defence wall should be fitted with a flap valve and adequate storage provided within the site should the outfall become hydraulically locked during a tidal event. Pipe System Due to the location of the proposed development there will be issues with the outfall to the estuary becoming tide locked. Using the tidal curves in Appendix D it has been calculated that during the climate change event the system would be tide locked for a total of up to 360 minutes. Using WinDes a maximum volume of 882.3m3 would be required to sufficiently store the flows from a 6 hour storm during a 100 year climate change event without flooding the site. This can be delivered by using a 1.2m x 260m Pipe with a 225mm orifice plate or pipe controlling the outflow. The discharges from the proposed system are as follows: Pipe System Return period

Allowable run-off (l/s) 196.9 374.6 477.1 620.2

Proposed post development peak site run-off (l/s) and critical storm duration 65.3 (30min winter) 82.3 (30min winter) 91.3 (60min winter) 101.8 (60min winter)

Control Measures

2 year 30 year 100 year Climate change

1.2m x 260m Pipe with 225mm Orifice Plate or Pipe

We have therefore created a system with adequate storage in the event of a climate change tide locking event happening. Once the flows are able to discharge to the estuary, the system would be completely emptied within 150 minutes i.e. half the period of free flowing outfall between tide lock. Discharge rates from the development have also been improved; with the 2-year event peak site run-off having been reduced by two thirds. All flap valves should be subject to regular maintenance to prevent floodwaters entering the system. See Appendix C for the IH124, existing Brownfield and proposed run-off calculations.
Completed by: Andrew Crewdson

Page 7 of 8

Date: 01 October 2007

GEOENVIRONMENTAL CONSULTING ENGINEERS

clarkebond
FLOOD RISK ASSESSMENT
Project No: EE00431 Revision: C Date of Revision: 01/10/07

SITE: H17 Newtown Road, Highbridge NGR: 331400, 147350 CLIENT: Gaia Partnership

OVERALL ASSESSMENT OF FLOOD RISK AND RECOMMENDATIONS The site does lie within the 1 in 200 year tidal zone. To mitigate the flood risk to the property and the occupiers the following should be put in place as part of the planning proposals: Surface water run-off should be disposed of using SUDS Techniques including pre-treatment of surface water run-off where ground conditions and ground water levels permit. After initial treatment a direct discharge to the tidal estuary can be achieved by connecting to a Wessex Water manhole to the west of the study area in land under control of the Gaia Partnership; A flood defence embankment wall is required to a level of 8.90m to alleviate tidal flooding on the site. This can be delivered in two parts linked to phased planning applications given the current level of flood defence is so close to the 1 in 200 year design event; Minimum finished floor levels to be 9.05m AOD in the south and west on the top of the flood defence bund and 300mm above ground levels locally in the north and east. Site ground level / parking behind the frontage tidal defences can remain at the existing ground levels. Any proposed outfalls are to be fitted with flap valves or similar to prevent the ingress of flood waters, and should the valves become hydraulically locked during times of high water, adequate storage should be provided to prevent the system surcharging. All flap valves should be subject to regular maintenance to prevent floodwaters entering the system. We recommend that the phased development option be constructed and that the planning authority and EA use their powers to enforce delivery of the defence between points 1 and 8 on drawing EE00431/Fig4 when a planning application is lodged on the boatyard site.

Reviewed by N A Smith N A Smith N A Smith N A Smith

Date 03/11/06 06/11/06 14/11/06 01/10/07

Revision Original issue A B C

Completed by: Andrew Crewdson

Page 8 of 8

Date: 01 October 2007

Appendix A Drawings Fig. 1 Fig. 2 Fig. 3 Fig. 4 Fig. 5 Fig. 6 Site Location Plan Existing Site Layout, Topographical Survey and Existing Flood Regime Proposed Site Layout Proposed Flood Alleviation Options Flood Flows and Storage Enlarged Flow Regime at Site

Appendix B Third Party Records EA Flood Risk Map Wessex Water Sewer Records

Appendix C Greenfield and Brownfield Run-off Calculations IH 124 Method Calculation Spreadsheet Area Take-Off Calculation WinDes Brownfield Run-Off Calculations

EE00431 - Newtown Road, Highbridge

September 2007

IoH 124 Greenfield & Existing Brownfield run-off IoH 124 Greenfield QBARrural = 0.00108 AREA0.89 SAAR1.17 SOIL2.17 AREA (km2) = SAAR* = SOIL* = Catchment area = Total Site area = Brownfield area = Greenfield area = 0.50 750 0.3 50.000 ha 2.039 ha 0.958 1.081 0.099 m3/s for 50 ha

MAF / QBAR Greenfield =

Windes Wallingford Procedure Brownfield flow 0.958 ha - 2yr storm 195 l/s

Summary
Return Periods Growth factors Greenfield 50 ha flow (m3/s) Greenfield plus 1.081ha Site area flow (m3/s) 0.0021 0.0017 0.0019 0.0026 0.0032 0.0039 0.0041 0.0045 0.0052 0.0067 Brownfield 0.958 ha site area flow (m3/s) 0.2216 0.1521 0.1950 0.2399 0.2906 0.3588 0.3705 0.4134 0.4719 0.6135 Total existing site run-off (m3/s) 0.2237 0.1538 0.1969 0.2425 0.2937 0.3627 0.3746 0.4179 0.4771 0.6202

Mean Annual Flood (MAF) 1 yr 2 yr 5 yr 10 yr 25 yr 30 yr 50 yr 100 yr Climate Change

1.00 0.78 0.88 1.23 1.49 1.84 1.90 2.12 2.42 100yr+ 30%

= = = = = = = = = =

0.099 0.077 0.087 0.122 0.147 0.182 0.188 0.209 0.239 0.311

m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s m3/s

EE00431\IoH 124 Somerset.xls\IoH 124

H17 Newtown Road, Highbridge

October 06

Impermeable Area

Impermeable Area

Impermeable Area

Proposed Site All


Total site area = 27121 m2 2.712 ha 4710 m2 0.471 ha 0.424 ha

Proposed Site Brownfield


Total site area = (Not all positively drained) Roof Area Imp % = 90 8602 m2 0.860 ha 1228 m2 0.123 ha 0.111 ha

Proposed Site Greenfield


Total site area = 18519 m2 1.852 ha 3481 m2 0.348 ha 0.313 ha

Roof Area Imp % = 90

Roof Area Imp % = 90

Block Paving Imp % = 70

1442 m2 0.144 ha 0.115 ha

Block Paving Imp % = 70

301 m2 0.030 ha 0.024 ha

Block Paving Imp % = 70

1140 m2 0.114 ha 0.091 ha

Access Road & Footpath Imp % = 100

7496 m2 0.750 ha 0.750 ha

Access Road & Footpath Imp % = 100

2136 m2 0.214 ha 0.214 ha

Access Road & Footpath Imp % = 100

5360 m2 0.536 ha 0.536 ha

Greenfield contribution = Imp % = 20

13473 m2 1.347 ha 0.269 ha

Greenfield contribution = Imp % = 20

4937 m2 0.494 ha 0.099 ha

Greenfield contribution = Imp % = 20

8537 m2 0.854 ha 0.171 ha

Total = + 30% climate change =

1.289 ha 1.547 ha

For Windes Design For Windes Design

Total = + 30% climate change =

0.348 ha 0.418 ha

For Windes Design For Windes Design

Total = + 30% climate change =

0.941 ha 1.129 ha

For Windes Design For Windes Design

Current Site Total


Total site area = 27121 m2 2.712 ha 4032 m2 0.403 ha 0.363 ha 3605 m2 0.361 ha 0.324 ha 13514 m2 1.351 ha 1.351 ha 5970 m2 0.597 ha 0.119 ha

Current Site Brownfield


Total site area = 19344 m2 1.934 ha 1203 m2 0.120 ha 0.108 ha 3277 m2 0.328 ha 0.295 ha 11087 m2 1.109 ha 0.554 ha 3777 m2 0.378 ha 0.076 ha

Current Site Greenfield


Total site area = 13321 m2 1.332 ha 2829 m2 0.283 ha 0.255 ha 328 m2 0.033 ha 0.030 ha 2427 m2 0.797 ha 0.797 ha 2193 m2 0.219 ha 0.044 ha

Roof Area Imp % = 90 Concrete Imp % = 90 Access Road + Parking Imp % = 100 Greenfield contribution = Imp % = 20

Roof Area Imp % = 90 Concrete Imp % = 90 Access Road + Parking (50% Positively Drained) Imp % = 50 Greenfield contribution = Imp % = 20

Roof Area Imp % = 90 Concrete Imp % = 90 Access Road + Parking (+50% Brownfield Area) Imp % = 100 Greenfield contribution = Imp % = 20

Total = + 30% climate change =

2.039 ha 2.446 ha

For Windes Design For Windes Design

Total = + 30% climate change =

0.958 ha 1.149 ha

For Windes Design For Windes Design

Total = + 30% climate change =

1.081 ha 1.297 ha

For Windes Design For Windes Design

AREAS Rev A.xls\AC Data

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date 28 September 07 File Brownfield.sws Micro Drainage

Page 1 Newtown Road Highbridge Brownfield 2yr Flow Designed By AMC Checked By System1 W.10.4

STORM SEWER DESIGN by the Modified Rational Method Network Design Table
PN 1.000 Length (m) 10.00 Fall (m) 0.100 Slope (1:X) 100.0 Area (ha) 0.958 T.E. (mins) 2.00 DWF (l/s) 0.0 k (mm) 0.600 HYD SECT o DIA (mm) 375

Network Results Table


PN 1.000 Rain (mm/hr) 75.0 T.C. (mins) 2.1 US/IL (m) 5.000 E.Area (ha) 0.958 E.DWF (l/s) 0 Foul (l/s) 0 Infil. (l/s) 0 Vel (m/s) 1.81 CAP (l/s) 200 Flow (l/s) 195

(c)1982-2006 Micro Drainage

Appendix D Tidal Calculations

Hinkley Tidal Calculations 1 in 200 year event Tidal Inflow -1 in 200 year event Tidal Curve 1 in 200 year + 30% Climate Change Tidal Inflow -1 in 200 year event + 30% Climate Change

EE00431 - H17 Newtown Road, Highbridge FRA Date 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 10/03/01 Time 00:15:00 00:30:00 00:45:00 01:00:00 01:15:00 01:30:00 01:45:00 02:00:00 02:15:00 02:30:00 02:45:00 03:00:00 03:15:00 03:30:00 03:45:00 04:00:00 04:15:00 04:30:00 04:45:00 05:00:00 05:15:00 05:30:00 05:45:00 06:00:00 06:15:00 06:30:00 06:45:00 07:00:00 07:15:00 07:30:00 07:45:00 08:00:00 08:15:00 08:30:00 08:45:00 09:00:00 09:15:00 09:30:00 09:45:00 10:00:00 10:15:00 10:30:00 10:45:00 11:00:00 11:15:00 11:30:00 11:45:00 12:00:00 12:15:00 12:30:00 12:45:00 13:00:00 13:15:00 13:30:00 13:45:00 ACD 1.464 1.173 0.928 0.706 0.644 0.742 0.972 1.334 1.764 2.22 2.72 3.302 3.943 4.611 5.324 6.069 6.83 7.603 8.373 9.095 9.792 10.448 11.058 11.604 12.08 12.468 12.756 12.942 13.01 12.919 12.69 12.348 11.882 11.354 10.782 10.144 9.465 8.782 8.102 7.412 6.705 6.025 5.37 4.74 4.132 3.563 3.025 2.527 2.062 1.634 1.286 1.011 0.709 0.555 0.518 ODN -4.34 -4.63 -4.87 -5.09 -5.16 -5.06 -4.83 -4.47 -4.04 -3.58 -3.08 -2.50 -1.86 -1.19 -0.48 0.27 1.03 1.80 2.57 3.30 3.99 4.65 5.26 5.80 6.28 6.67 6.96 7.14 7.21 7.12 6.89 6.55 6.08 5.55 4.98 4.34 3.67 2.98 2.30 1.61 0.91 0.23 -0.43 -1.06 -1.67 -2.24 -2.78 -3.27 -3.74 -4.17 -4.51 -4.79 -5.09 -5.25 -5.28 1 in 200 year Peak of 7.86m

September 2007

LP

HP

LP

-5.156 -5.077 -4.864 -4.516 -4.097 -3.647 -3.149 -2.564 -1.913 -1.229 -0.494 0.280 1.076 1.891 2.708 3.481 4.232 4.945 5.614 6.218 6.752 7.194 7.531 7.759 7.860 7.736 7.463 7.070 6.546 5.958 5.327 4.630 3.894 3.158 2.430 1.696 0.949 0.235 -0.448 -1.100 -1.726 -2.307 -2.852 -3.352 -3.816 -4.238 -4.577 -4.839 -5.126 -5.263 -5.28

Hinkley 2001 data.xls\10-03 2001 extrap to 7.86

EE00431 - Site H17 - Highbridge, FRA

September 2007

1 in 200 Tidal Inflow Time mAOD Spill Level Tidal peak Ponding Invert level mAOD 7.81 7.86 7.22 Time 07:07 07:15

Width of breach = Cross sectional flow area = Distance from defence to Low Spot = Area of ponding "A" below 7.59m = Max depth based on total volume over area = or = * Assumed velocity = 0.5 m/s

4.63 0.139 0.00 2347.00 0.012 7.232

m 2 m m2 m m m

Flow (m3/s)*

Volume (m3)

07:07:25 07:15:00 07:21:03

7.810 7.860 7.810

0.0000 0.0694 0.0000

15.7 12.6

Total volume =

28.3

Flow Calcs Highbridge 1in200.xls\Tidal Inflow - 1 in 200

EE00431 - H17 Newtown Road, Highbridge FRA

September 2007

10.000

Peak 8.874mAOD
8.000

Spill Level (7.81mAOD)


6.000

4.000

2.000

Tidal Lock (1.70mAOD) 1 in 200 + CC tide curve derived from Hinkley

0.000

-2.000

-4.000

-6.000 00:00:00

01:00:00

02:00:00

03:00:00

04:00:00

05:00:00

06:00:00

07:00:00

08:00:00

09:00:00

10:00:00

11:00:00

12:00:00

13:00:00

14:00:00

15:00:00

-8.000

Flow Calcs Highbridge 1in200 CC.xls/Tidal Curve Graph - 1 in 200 CC

EE00431 - H17 Newtown Road, Highbridge FRA

September 2007

1 in 200 + CC Tidal Inflow Time 01:15:00 01:30:00 01:45:00 02:00:00 02:15:00 02:30:00 02:45:00 03:00:00 03:15:00 03:30:00 03:45:00 04:00:00 04:15:00 04:22:39 04:30:00 04:45:00 05:00:00 05:15:00 05:30:00 05:45:00 06:00:00 06:15:00 06:24:11 06:30:00 06:45:00 07:00:00 07:15:00 07:30:00 07:45:00 08:00:00 08:01:50 08:15:00 08:30:00 08:45:00 09:00:00 09:15:00 09:30:00 09:45:00 10:00:00 10:26:30 10:15:00 10:30:00 10:45:00 11:00:00 11:15:00 11:30:00 11:45:00 12:00:00 12:15:00 12:30:00 12:45:00 13:00:00 13:15:00 13:30:00 13:45:00 mAOD -5.156 -5.107 Marsh level -4.921 Tidal peak -4.595 Marsh level -4.191 -3.752 -3.258 -2.666 -2.000 -1.292 -0.522 0.297 1.149 1.638 Outfall 2.028 2.919 3.770 4.606 5.408 Flow Volume 6.168 (m3/s) (m3) 6.864 7.488 7.810 0.0 0.0 8.015 8.3 1453.8 8.428 23.8 14462.6 8.722 35.8 26842.1 8.874 42.1 35059.5 8.699 34.9 34635.6 8.358 20.9 25130.5 7.885 5.0 11672.3 7.810 0.0 274.5 7.270 6.589 5.866 Total volume = 149531 5.077 4.251 3.432 2.629 1.827 1.638 Outfall 1.017 0.251 -0.476 -1.164 -1.816 -2.416 -2.972 -3.476 -3.937 -4.351 -4.674 -4.917 -5.181 -5.292 -5.28 Width of breach = mAOD 7.81 8.874 5.5 Time 08:35 09:30 10:25 Cross sectional flow area 7.810 = Cross sectional flow area 8.015 = Cross sectional flow area 8.428 = Cross sectional flow area 8.722 = Cross sectional flow area 8.874 = Cross sectional flow area 8.699 = Cross sectional flow area 8.358 = Cross sectional flow area 7.885 = Cross sectional flow area 7.810 = Distance from defence to Low Spot = Area of ponding at 5.5mAOD = Area considered deducting buildings at 20% = Max depth based on total volume over area = or = Level after 3 tide cycles = * Assumed velocity = 0.5 m/s 70.00 m 6.670 16.661 47.617 71.681 84.139 69.797 41.894 9.983 6.670 m2 m2 m2 m2 m2 m2 m2 m2 m2

0.00 2762979 m 2210383 m 0.068 5.568 m m

5.70 m

Flow Calcs Highbridge 1in200 CC.xls/Tidal Inflow - 1 in 200 CC

Appendix E WinDes Calculations

WinDes Result File Pipe System 100yr + 30% CC under Tide Lock Conditions WinDes Result File Pipe System 2yr WinDes Result File Pipe System 30yr WinDes Result File Pipe System 100yr WinDes Result File Pipe System 100yr + 30% Climate Change

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CC Test Tide Lock.src Micro Drainage

Page 1 Newtown Road Highbridge CC Tide Lock Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period (+30%)


Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 Maximum Outflow (l/s) 0.2 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0 0.0 Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.9868 4.1693 4.3662 4.5817 4.7182 4.8187 4.9822 5.1342 5.3342 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 4.0513 4.2533 4.4742 4.7227 4.8872 5.0177 5.3067 3.0000 3.0000 3.0000 3.0000 3.0000 Rain (mm/hr) 89.02 59.85 38.41 23.81 17.74 14.29 10.50 8.44 7.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.02 59.85 38.41 23.81 17.74 14.29 10.50 0.00 0.00 0.00 0.00 0.00 Maximum Depth (m) 0.9868 1.1693 1.3662 1.5817 1.7182 1.8187 1.9822 2.1342 2.3342 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.0513 1.2533 1.4742 1.7227 1.8872 2.0177 2.3067 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum Volume (m) 279.5 375.7 482.1 597.1 666.5 715.3 787.4 842.4 886.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 313.1 420.9 540.0 668.9 746.7 801.4 882.3 0.0 0.0 0.0 0.0 0.0 Status

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K

Time-Peak (mins) 19 34 64 124 184 244 364 484 604 0 0 0 0 0 0 0 0 0 0 19 34 64 124 184 244 364 0 0 0 0 0

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CC Test Tide Lock.src Micro Drainage

Page 2 Newtown Road Highbridge CC Tide Lock Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period (+30%)


Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Outflow (l/s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 Rain (mm/hr) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Maximum Depth (m) 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum Volume (m) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Status

O O O O O O O

K K K K K K K

Time-Peak (mins) 0 0 0 0 0 0 0

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CC Test Tide Lock.src Micro Drainage

Page 3 Newtown Road Highbridge CC Tide Lock Pipe System Designed By AMC Checked By Source Control W.10.4 Rainfall Details

Region Return Period (years) M5-60 (mm) Ratio-R

ENG+WAL 100 19.000 0.350

Cv (Summer) Cv (Winter) Shortest Storm (mins) Longest Storm (mins)

0.750 0.840 15 10080

Summer Storms Winter Storms Climate Change %

Yes Yes +30

Time / Area Diagram


Total Area (ha) = 1.289 Time from: 0 (mins) to: 4 Area (ha) 1.289

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CC Test Tide Lock.src Micro Drainage

Page 4 Newtown Road Highbridge CC Tide Lock Pipe System Designed By AMC Checked By Source Control W.10.4 Circular Pipe Details

Diameter (m) Slope (1:x)

2.100 500.0

Length (m) Invert Level (m)

260.000 3.000

Cover Level (m)

6.400

Orifice Outflow Control


Diameter (m) 0.010 Discharge Coefficient 0.600 Invert Level (m) 3.000

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 2yr New Pipe.src Micro Drainage

Page 1 Newtown Road Highbridge 2yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 2 year Return Period


Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 62.3 63.5 62.1 57.7 53.4 49.8 41.9 35.8 31.5 28.1 23.3 17.6 13.3 10.8 8.1 6.6 5.7 5.0 4.5 64.5 65.3 62.6 55.5 49.2 42.6 33.2 27.5 23.6 20.8 17.0 12.7 Maximum Outflow (l/s) 62.3 63.5 62.1 57.7 53.4 49.8 41.9 35.8 31.5 28.1 23.3 17.6 13.3 10.8 8.1 6.6 5.7 5.0 4.5 64.5 65.3 62.6 55.5 49.2 42.6 33.2 27.5 23.6 20.8 17.0 12.7 Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.4597 3.4737 3.4577 3.4107 3.3682 3.3342 3.2902 3.2607 3.2397 3.2233 3.1993 3.1673 3.1368 3.1228 3.1088 3.0988 3.0903 3.0838 3.0793 3.4852 3.4942 3.4632 3.3887 3.3292 3.2937 3.2482 3.2202 3.2008 3.1863 3.1628 3.1333 Rain (mm/hr) 36.37 24.05 15.35 9.61 7.27 5.95 4.48 3.66 3.12 2.74 2.24 1.68 1.26 1.03 0.77 0.63 0.54 0.47 0.42 36.37 24.05 15.35 9.61 7.27 5.95 4.48 3.66 3.12 2.74 2.24 1.68 Maximum Depth (m) 0.4597 0.4737 0.4577 0.4107 0.3682 0.3342 0.2902 0.2607 0.2397 0.2232 0.1992 0.1673 0.1368 0.1228 0.1088 0.0988 0.0903 0.0838 0.0793 0.4852 0.4942 0.4632 0.3887 0.3292 0.2937 0.2482 0.2202 0.2007 0.1862 0.1628 0.1333 Maximum Volume (m) 53.2 57.2 52.6 40.4 30.9 24.4 17.3 13.3 10.9 9.1 6.9 4.5 2.8 2.1 1.6 1.3 1.0 0.9 0.8 60.6 63.5 54.2 35.3 23.6 17.8 11.8 8.8 7.0 5.9 4.2 2.6 Status

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K

Time-Peak (mins) 13 22 38 70 100 130 188 248 308 368 490 734 1080 1468 2192 2936 3632 4312 5040 14 23 40 72 102 130 190 248 308 368 490 734

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 2yr New Pipe.src Micro Drainage

Page 2 Newtown Road Highbridge 2yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 2 year Return Period


Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 9.6 7.8 5.9 4.8 4.1 3.6 3.2 Maximum Outflow (l/s) 9.6 7.8 5.9 4.8 4.1 3.6 3.2 Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.1163 3.1073 3.0918 3.0823 3.0763 3.0718 3.0678 Rain (mm/hr) 1.26 1.03 0.77 0.63 0.54 0.47 0.42 Maximum Depth (m) 0.1163 0.1073 0.0918 0.0823 0.0763 0.0718 0.0678 Maximum Volume (m) 1.9 1.5 1.1 0.8 0.7 0.6 0.5 Status

O O O O O O O

K K K K K K K

Time-Peak (mins) 1100 1460 2128 2912 3592 4352 5024

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 2yr New Pipe.src Micro Drainage

Page 3 Newtown Road Highbridge 2yr Pipe System Designed By AMC Checked By Source Control W.10.4 Rainfall Details

Region Return Period (years) M5-60 (mm) Ratio-R

ENG+WAL 2 19.000 0.350

Cv (Summer) Cv (Winter) Shortest Storm (mins) Longest Storm (mins)

0.750 0.840 15 10080

Summer Storms Winter Storms Climate Change %

Yes Yes +0

Time / Area Diagram


Total Area (ha) = 1.289 Time from: 0 (mins) to: 4 Area (ha) 1.289

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 2yr New Pipe.src Micro Drainage

Page 4 Newtown Road Highbridge 2yr Pipe System Designed By AMC Checked By Source Control W.10.4 Circular Pipe Details

Diameter (m) Slope (1:x)

2.100 500.0

Length (m) Invert Level (m)

260.000 3.000

Cover Level (m)

6.400

Orifice Outflow Control


Diameter (m) 0.225 Discharge Coefficient 0.600 Invert Level (m) 3.000

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 30yr New Pipe.src Micro Drainage

Page 1 Newtown Road Highbridge 30yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 30 year Return Period


Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 76.8 79.3 79.3 76.2 72.5 68.8 62.2 56.5 51.8 48.0 39.9 30.0 22.1 17.9 13.1 10.5 8.9 7.8 6.9 79.7 82.3 81.7 76.5 70.9 65.5 55.8 48.4 41.6 36.4 29.5 21.9 Maximum Outflow (l/s) 76.8 79.3 79.3 76.2 72.5 68.8 62.2 56.5 51.8 48.0 39.9 30.0 22.1 17.9 13.1 10.5 8.9 7.8 6.9 79.7 82.3 81.7 76.5 70.9 65.5 55.8 48.4 41.6 36.4 29.5 21.9 Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.6403 3.6763 3.6763 3.6328 3.5827 3.5362 3.4592 3.3987 3.3527 3.3197 3.2807 3.2328 3.1933 3.1688 3.1358 3.1213 3.1128 3.1068 3.1008 3.6818 3.7198 3.7103 3.6368 3.5622 3.4962 3.3912 3.3217 3.2887 3.2637 3.2303 3.1918 Rain (mm/hr) 68.84 45.83 29.24 18.11 13.53 10.95 8.11 6.54 5.54 4.83 3.89 2.87 2.11 1.69 1.24 1.00 0.84 0.73 0.65 68.84 45.83 29.24 18.11 13.53 10.95 8.11 6.54 5.54 4.83 3.89 2.87 Maximum Depth (m) 0.6403 0.6763 0.6763 0.6328 0.5827 0.5362 0.4592 0.3987 0.3527 0.3197 0.2807 0.2328 0.1932 0.1688 0.1358 0.1213 0.1128 0.1068 0.1008 0.6818 0.7198 0.7103 0.6368 0.5622 0.4962 0.3912 0.3217 0.2887 0.2637 0.2302 0.1918 Maximum Volume (m) 116.8 131.9 131.7 113.7 94.2 77.3 53.0 37.6 27.9 21.9 16.0 10.1 6.4 4.6 2.7 2.1 1.7 1.5 1.3 134.1 150.7 146.5 115.5 86.6 64.0 35.8 22.3 17.0 13.7 9.8 6.3 Status

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K

Time-Peak (mins) 15 24 40 74 106 136 196 256 314 370 490 734 1100 1456 2156 2936 3664 4320 5072 15 25 44 80 112 142 200 252 312 370 490 728

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 30yr New Pipe.src Micro Drainage

Page 2 Newtown Road Highbridge 30yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 30 year Return Period


Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 16.1 12.9 9.5 7.7 6.4 5.6 5.0 Maximum Outflow (l/s) 16.1 12.9 9.5 7.7 6.4 5.6 5.0 Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.1563 3.1343 3.1158 3.1063 3.0968 3.0893 3.0838 Rain (mm/hr) 2.11 1.69 1.24 1.00 0.84 0.73 0.65 Maximum Depth (m) 0.1563 0.1343 0.1158 0.1063 0.0968 0.0893 0.0838 Maximum Volume (m) 3.8 2.6 1.9 1.5 1.2 1.0 0.9 Status

O O O O O O O

K K K K K K K

Time-Peak (mins) 1096 1464 2136 2912 3640 4352 5008

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 30yr New Pipe.src Micro Drainage

Page 3 Newtown Road Highbridge 30yr Pipe System Designed By AMC Checked By Source Control W.10.4 Rainfall Details

Region Return Period (years) M5-60 (mm) Ratio-R

ENG+WAL 30 19.000 0.350

Cv (Summer) Cv (Winter) Shortest Storm (mins) Longest Storm (mins)

0.750 0.840 15 10080

Summer Storms Winter Storms Climate Change %

Yes Yes +0

Time / Area Diagram


Total Area (ha) = 1.289 Time from: 0 (mins) to: 4 Area (ha) 1.289

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 30yr New Pipe.src Micro Drainage

Page 4 Newtown Road Highbridge 30yr Pipe System Designed By AMC Checked By Source Control W.10.4 Circular Pipe Details

Diameter (m) Slope (1:x)

2.100 500.0

Length (m) Invert Level (m)

260.000 3.000

Cover Level (m)

6.400

Orifice Outflow Control


Diameter (m) 0.225 Discharge Coefficient 0.600 Invert Level (m) 3.000

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 100yr New Pipe.src Micro Drainage

Page 1 Newtown Road Highbridge 100yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period


Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 83.6 87.2 88.1 85.5 82.0 78.3 71.7 66.1 61.0 56.6 49.5 37.8 27.8 22.2 16.1 12.8 10.8 9.4 8.3 86.9 90.8 91.3 87.0 81.6 76.3 66.8 58.7 51.9 46.4 37.5 27.6 Maximum Outflow (l/s) 83.6 87.2 88.1 85.5 82.0 78.3 71.7 66.1 61.0 56.6 49.5 37.8 27.8 22.2 16.1 12.8 10.8 9.4 8.3 86.9 90.8 91.3 87.0 81.6 76.3 66.8 58.7 51.9 46.4 37.5 27.6 Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.7383 3.7933 3.8073 3.7678 3.7143 3.6618 3.5732 3.5032 3.4462 3.3997 3.3322 3.2707 3.2218 3.1938 3.1568 3.1338 3.1228 3.1153 3.1098 3.7893 3.8508 3.8588 3.7903 3.7093 3.6333 3.5117 3.4207 3.3537 3.3122 3.2692 3.2208 Rain (mm/hr) 89.02 59.85 38.41 23.81 17.74 14.29 10.50 8.44 7.12 6.19 4.96 3.62 2.64 2.11 1.53 1.22 1.02 0.88 0.78 89.02 59.85 38.41 23.81 17.74 14.29 10.50 8.44 7.12 6.19 4.96 3.62 Maximum Depth (m) 0.7383 0.7933 0.8073 0.7678 0.7143 0.6618 0.5732 0.5032 0.4462 0.3997 0.3322 0.2707 0.2217 0.1937 0.1568 0.1338 0.1228 0.1153 0.1098 0.7893 0.8508 0.8588 0.7903 0.7093 0.6333 0.5117 0.4207 0.3537 0.3122 0.2692 0.2207 Maximum Volume (m) 158.9 184.2 190.8 172.4 148.3 125.8 90.6 66.3 49.5 37.8 24.1 14.6 9.0 6.4 3.8 2.6 2.1 1.8 1.6 182.2 211.6 215.3 182.8 145.9 114.0 69.0 42.9 28.1 20.7 14.4 8.8 Status

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K

Time-Peak (mins) 15 25 42 76 108 140 202 260 320 376 492 734 1100 1456 2196 2904 3568 4392 4992 16 26 46 82 116 148 208 264 320 374 492 730

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 100yr New Pipe.src Micro Drainage

Page 2 Newtown Road Highbridge 100yr Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period


Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 20.1 16.1 11.7 9.3 7.8 6.7 6.0 Maximum Outflow (l/s) 20.1 16.1 11.7 9.3 7.8 6.7 6.0 Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.1828 3.1563 3.1273 3.1148 3.1073 3.0998 3.0928 Rain (mm/hr) 2.64 2.11 1.53 1.22 1.02 0.88 0.78 Maximum Depth (m) 0.1828 0.1563 0.1273 0.1148 0.1073 0.0998 0.0928 Maximum Volume (m) 5.6 3.8 2.3 1.8 1.5 1.3 1.1 Status

O O O O O O O

K K K K K K K

Time-Peak (mins) 1100 1468 2136 2936 3640 4368 5072

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 100yr New Pipe.src Micro Drainage

Page 3 Newtown Road Highbridge 100yr Pipe System Designed By AMC Checked By Source Control W.10.4 Rainfall Details

Region Return Period (years) M5-60 (mm) Ratio-R

ENG+WAL 100 19.000 0.350

Cv (Summer) Cv (Winter) Shortest Storm (mins) Longest Storm (mins)

0.750 0.840 15 10080

Summer Storms Winter Storms Climate Change %

Yes Yes +0

Time / Area Diagram


Total Area (ha) = 1.289 Time from: 0 (mins) to: 4 Area (ha) 1.289

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File 100yr New Pipe.src Micro Drainage

Page 4 Newtown Road Highbridge 100yr Pipe System Designed By AMC Checked By Source Control W.10.4 Circular Pipe Details

Diameter (m) Slope (1:x)

2.100 500.0

Length (m) Invert Level (m)

260.000 3.000

Cover Level (m)

6.400

Orifice Outflow Control


Diameter (m) 0.225 Discharge Coefficient 0.600 Invert Level (m) 3.000

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CCyr New Pipe.src Micro Drainage

Page 1 Newtown Road Highbridge CC Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period (+30%)


Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 91.4 96.0 97.6 95.7 92.4 89.0 82.4 76.8 71.8 67.4 59.7 48.6 36.1 28.8 21.0 16.7 14.0 12.1 10.7 95.2 100.3 101.8 98.4 93.3 88.2 78.8 70.8 64.0 57.9 48.5 35.8 Maximum Outflow (l/s) 91.4 96.0 97.6 95.7 92.4 89.0 82.4 76.8 71.8 67.4 59.7 48.6 36.1 28.8 21.0 16.7 14.0 12.1 10.7 95.2 100.3 101.8 98.4 93.3 88.2 78.8 70.8 64.0 57.9 48.5 35.8 Storm Duration (mins) 15 30 60 120 180 240 360 480 600 720 960 1440 2160 2880 4320 5760 7200 8640 10080 15 30 60 120 180 240 360 480 600 720 960 1440 Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Summer Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.8608 3.9378 3.9663 3.9328 3.8778 3.8213 3.7208 3.6403 3.5737 3.5187 3.4317 3.3237 3.2622 3.2268 3.1873 3.1608 3.1418 3.1298 3.1223 3.9238 4.0133 4.0398 3.9788 3.8928 3.8093 3.6688 3.5617 3.4787 3.4127 3.3232 3.2607 Rain (mm/hr) 89.02 59.85 38.41 23.81 17.74 14.29 10.50 8.44 7.12 6.19 4.96 3.62 2.64 2.11 1.53 1.22 1.02 0.88 0.78 89.02 59.85 38.41 23.81 17.74 14.29 10.50 8.44 7.12 6.19 4.96 3.62 Maximum Depth (m) 0.8608 0.9378 0.9663 0.9328 0.8778 0.8213 0.7208 0.6403 0.5737 0.5187 0.4317 0.3237 0.2622 0.2267 0.1873 0.1608 0.1418 0.1298 0.1223 0.9238 1.0133 1.0398 0.9788 0.8928 0.8093 0.6688 0.5617 0.4787 0.4127 0.3232 0.2607 Maximum Volume (m) 216.5 254.5 269.1 252.1 224.7 197.2 151.2 116.8 90.8 71.3 45.6 22.6 13.5 9.5 5.9 4.1 3.0 2.4 2.1 247.4 293.1 307.1 275.4 232.0 191.6 128.7 86.4 58.6 40.9 22.5 13.3 Status

O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O

K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K K

Time-Peak (mins) 16 26 44 78 112 144 206 266 326 384 500 736 1100 1468 2156 2872 3560 4392 4960 16 28 46 84 118 152 214 274 332 386 492 734

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CCyr New Pipe.src Micro Drainage

Page 2 Newtown Road Highbridge CC Pipe System Designed By AMC Checked By Source Control W.10.4

Summary of Results for 100 year Return Period (+30%)


Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Control (l/s) 26.1 20.9 15.1 12.0 10.1 8.8 7.8 Maximum Outflow (l/s) 26.1 20.9 15.1 12.0 10.1 8.8 7.8 Storm Duration (mins) 2160 2880 4320 5760 7200 8640 10080 Winter Winter Winter Winter Winter Winter Winter Maximum Water Level (m OD) 3.2133 3.1868 3.1498 3.1293 3.1193 3.1123 3.1068 Rain (mm/hr) 2.64 2.11 1.53 1.22 1.02 0.88 0.78 Maximum Depth (m) 0.2132 0.1868 0.1498 0.1293 0.1193 0.1123 0.1068 Maximum Volume (m) 8.2 5.9 3.5 2.4 2.0 1.7 1.5 Status

O O O O O O O

K K K K K K K

Time-Peak (mins) 1100 1468 2200 2832 3584 4408 5048

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CCyr New Pipe.src Micro Drainage

Page 3 Newtown Road Highbridge CC Pipe System Designed By AMC Checked By Source Control W.10.4 Rainfall Details

Region Return Period (years) M5-60 (mm) Ratio-R

ENG+WAL 100 19.000 0.350

Cv (Summer) Cv (Winter) Shortest Storm (mins) Longest Storm (mins)

0.750 0.840 15 10080

Summer Storms Winter Storms Climate Change %

Yes Yes +30

Time / Area Diagram


Total Area (ha) = 1.289 Time from: 0 (mins) to: 4 Area (ha) 1.289

(c)1982-2006 Micro Drainage

Clarke Bond Structures Ltd Malvern House Yeoford Way Exeter EX2 8LB Date September 07 File CCyr New Pipe.src Micro Drainage

Page 4 Newtown Road Highbridge CC Pipe System Designed By AMC Checked By Source Control W.10.4 Circular Pipe Details

Diameter (m) Slope (1:x)

2.100 500.0

Length (m) Invert Level (m)

260.000 3.000

Cover Level (m)

6.400

Orifice Outflow Control


Diameter (m) 0.225 Discharge Coefficient 0.600 Invert Level (m) 3.000

(c)1982-2006 Micro Drainage