Project Havelock City - Phase II Item [1] A B C D E F G H Description Note EARTHWORKS AND EXCAVATION EARTHWORK AND EXCAVATION EXCAVATION

EARTHWORK SUPPORTING SYSTEM DISPOSAL DEWATERING TERMITE TREATMENT EARTH FILLING Others (Please Specify) i) ii)

Bill of Quantities Bill No. 03a Earthworks and Excavation Block C & D Unit Quantity Rate US Dollars

Page 1 of 9

Project Havelock City - Phase II Item [2] A B C [3] A B C [4] A B C [5] A B [6] A B FORMWORK SUBSTRUCTURE FORMWORK SUPERSTRUCTURE FORMWORK Others (Please Specify) CONCRETE WORK SUB STRUCTURE CONCRETE SUPER STRUCTURE CONCRETE Others (Please Specify) REINFORCEMENT SUBSTRUCTURE REINFORCEMENT SUPERSTRUCTURE REINFORCEMENT Others (Please Specify) MASONARY WORK MASONARY ALL WORKS Others (Please Specify) WATERPROOFING / INSULATION / ROOF COVERING WATERPROOFING Others (Please Specify) Description

Bill of Quantities Form Work Block C & D Unit Quantity

Bill No. 03b

Rate

US Dollars

Page 2 of 9

Project Havelock City - Phase II Item [7] Description METAL WORK AND JOINERY METAL WORK - ALUMINIUM AND OTHER FABRICATIONS JOINERY [8] Floor, Wall and Ceiling Finishes Finishes (Wall / Ceiling / Floor etc) INTERNAL FLOOR FINISHES INTERNAL CEILING FINISHES INTERNAL WALL FINISHES EXTERNAL WALL FINISHES OTHER FABRICATIONS, FINISHES & FITTINGS [9] PAINTING AND DECORATION INTERNAL PAINT EXTERNAL PAINT G Others (Please Specify)

Bill of Quantities Joinery Block C & D Unit Qty

Bill No. 03g

Rate

US Dollars

Page 3 of 9

Project Havelock City - Phase II


Item

Description

Bill of Quantities Bill No. 03j Plumbing & Internal Drainage Block C & D Unit Quantity Rate US Dollars

[ 10 ] PLUMBING, SANITARY, LPG AND RAINWATER DRAINAGE SYSTEM A B C D COLD WATER SUPPLY AND DISTRIBUTION SYSTEM HOT WATER DISTRIBUTION SYSTEM SANITARY DRAINAGE SYSTEM INSTALLATION OF SANITARY APPLIANCES & PLUMBING FIXTURES LPG SYSTEM RAIN WATER DRAINAGE SYSTEM SUNDRY ITEMS (Inclusive of O/M Manuals, Testing, Main Connections, Etc) Others (Please Specify) i) ii) iii)

E F

G H

Page 4 of 9

Project Havelock City - Phase II Item Description

Bill of Quantities Bill No. 03k Fire Protection & Detection System Block C & D Unit Quantity Rate US Dollars

[ 11 ] FIRE PROTECTION AND DETECTION SYSTEM A B C D E F HOSEREEL SYSTEM WET RISER SYSTEM / HYDRANT SYSTEM FIRE ALARM SYSTEM PORTABLE FIRE EXTINGUISHERS GAS ALARM SYSTEM OTHERS - Testing and commissioning / maintenance / O&M manuals Others (Please Specify) i) ii) iii)

Page 5 of 9

Project Havelock City - Phase II Item Description

Bill of Quantities Bill No. 03l Electrical Installation Block C & D Unit Quantity Rate US Dollars

[ 12 ] SECURITY, DATA, VOICE AND ELECTRICAL INSTALLATION SYSTEMS Main Electrical Supply It is the Contractor's responsibility to obtain the electricity supply from the CEB station within the site and attending to all matters related to main electrical connection. Supply, Install, Commissioning and Maintaining (Comprehensive Maintenance During Defects Liability Period) of Generators MATV SYSTEM SECURITY SYSTEM - CCTV CCTV system ELECTRICAL SERVICES A B C D E F G H I J HIGH VOLTAGE (HV) SWITCHBOARDS TRANSFORMERS HV CABLES STANDBY GENERATOR SYSTEM POWERGRID POWER FAILURE SIGNAL CABLES LOW VOLTAGE (LV) SWITCHBOARDS DISTRIBUTION BOARDS DISTRIBUTION SUBMAINS FINAL SUB-CIRUIT WIRING FOR POWER POINTS FINAL SUB-CIRCUIT WIRING FOR LIGHTING POINTS
Page 6 of 9

Note

K L M N O P Q R 1 2 3 4 5 6 7 8

LIGHT FITTINGS SUPPLY AND INSTALLATION LIGHTING PROTECTION SYSTEM MAIN EARTHING SYSTEM CATV SYSTEM TELEPHONE WIRING FACILITY AUDIO INTERCOM / CARD ACCESS CONTROL CCTV SYSTEM SUNDRY ITEMS AND OTHERS Cost to include following services Testing and commissioning of systems Licensing Comprehensive maintenance during defect liability period Fire stops and fire proofing materials Haunching of underground pipes As built drawings Painting and labouring Any other element of work not specifically mentioned but are necessary for completion of Electrial Services of Block C&D Others (Please Specify) i) ii) iii)

TO SUB TOTAL
Page 7 of 9

US DOLLARS

Project Havelock City - Phase II

Item

Description

Bill of Quantities Bill No. 03m Air Conditioning & Mechanical Ventilation System Block C & D Unit Quantity Rate US Dollars

[ 13 ] AIR CONDITIONING AND MECHANICAL VENTILATION SYSTEMS A B C D AIR CONDITIONING MECHANICAL VENTILATION SYSTEM SUNDRY ITEMS / OTHERS (to include following) Others (Please Specify) i) ii) iii)

Page 8 of 9

Project Havelock City - Phase II Item [ 14 ] ELEVATORS A B ELEVATORS - SUPPLY AND INSTALLATION Others (Please Specify) i) ii) iii) Description

Bill of Quantities Elevators Block C & D Unit Quantity

Bill No. 03n

Rate

US Dollars

Page 9 of 9