McDonalds QUIRINO Quirino Avenue cor., Taft Avenue, Manila Pre-bid Meeting GSNB Office, Sct. Lozano Street, Quezon City May 21, 2012 Time Started : 4:15 PM Time Ended : 5:30 PM Attendees:

Minutes of the Meeting

1. 2. 3. 4. 5. 6. 7.
8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

Alvin Cua Jopet Gonzalez Marvin San Gabriel Albert Nepomuceno Atoy Beduya Neri Reyes KC Banate Almar Enriquez Louie Cruzado Willy Gamiw Cesar Centeno Mar Laron Allen Badocdoc Michael Banzon Merylle Capispisan Alex Pamintuan Sheryl Camposano Mark Anthony Pantilo Ma. Ronabelle Lareza

GADC GADC GADC GSN+P Architecture Studio PABS/ GSN+P Architecture Studio GSN+P Architecture Studio GSN+P Architecture Studio Psychrochill Phasor UECM Gras Builders AceMtech Gentech FepJr Cardrian Cardrian Namco Almadeco Powerphases

Items Discussed: Civil/Architectural Works 1. 2. 3. GSN to revise site development plan to correct the elevation (the existing building already demolished) Reference elevation from sidewalk level (check the existing site condition) Store flooring elevate approximately one step from sidewalk level Consider 1.2m high fence on right and rear side, GSN also to update structural plan Foundation with footing tie beam Canopy with typical details (verify on plan) Consider 4 inches CHB for parapet With horizontal louver on DT With concrete mouldings

4.
5. 6. 7. 8. 9.

GSNB Center, 118 Scout Lozano St., Sacred Heart, Quezon City, 1113, Philippines +63.2.415.5207 voice +63.2.352.1880 voice / facsimile Info.gsnp@gmail.com email www.gsnparchstudio.com website

10. ACP on face and termination only, will use moisture resistant gypsum for exterior ceiling (check on plan) 11. With decofoam in paint finish (same colour on wall paints)

Plumbing Works 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. Cistern tank located along remote areas Grease tank near remote areas and septic at grid 5 Will use solar water heater, provide stub-out along grid A-1 at roof deck Drainage divided into three outlets Water meter located at genset area Area drain cover with hinges (cover in hot deep galvanized to avoid from rust) Can use ordinary float valve instead of Bermad brand Goulds brand for booster pumps All drainage pipe are PVC Excavation for sewer and water tapping by plumbing contractor Necessary leg work by trade

Mechanical Works 23. Bid as per plan 24. Contact/email GSN for queries Electrical Works 25. Provide stub-out only for detached DC 26. Provide necessary hangers for lighting fixtures 27. See attached file of Notes for other items (GSN issued during prebid)

Other Matters

28. Project Duration 100 calendar days


29. E-bidding schedule on Monday May 28, 2012

The above shall be deemed as an accurate record of the meeting unless written notice to the contrary is received within two (2) days from receipt of this document.

Prepared By: GSN+p Architecture Studio Engr. Neri G. Reyes Cost Planning Group

GSN+p Architecture Studio

Minutes of the Meeting

Page 2 of 3

GSN+p Architecture Studio

Minutes of the Meeting