ir. E.C. Hartman & ir. J.H. Alberts consultants urban water management at DHVB.V.
Coastal Urban Development requires balancing between value creation and cost-effectiveness
Value Creation
New Land
Coastal Landscaping
Water Fronts Leisure, Yachting
Floating pavilion
Key-issues
Coastal and Urban Flooding Cost-effective reclamation Prevent Salinization
Water Resource Management (Fresh water supply and fresh water storage) Ecological Development
Location:
250 kilometers south of the capital Beijing along the shore of the Bohai Sea.
Bohai Sea
Close-Loop economy
water and land efficient development
Masterplan
Area Distinction
<
Start-up area
Inland Lake
Inland Sea
Severe shortage of fresh water resources (limited rainfall, high evaporation, and polluted rivers) Brackish soil and groundwater
Minimize the use of drinking water Storage of available rain and river water in short wet season Rainwater will be used for landscape irrigation Separate greywater and blackwater Minimize the effect of wastewater by treating the wastewater to a level required by the receiving water system Re-use of treated waste water Drip irrigation
Biological Aerated Filter: Small footprint Limited moving parts Can be automated easily Experience with similar projects
Green roof for Semi-basement Parking lots Infiltration storm water ditches
Porous pavements
Cobble ditch along footpaths Planting soil elevation is a little lower than pavement Use permeable crates to develop local waterstorage
Cobble ditch
+2.0m
+1.78m =
0m =
2.5
+4.5m
0m = LAT
+2.0m
+1.0m 0m = LAT
Follow-up
Construction of the urban water and landscape design started in 2011. The conceptual design is one of the corner stones of the total masterplan for eco-city Caofeidian (6.4 km2) and is an example for the development of other cities located in water scarce regions worldwide.
Algae Lagoon
Reservoir
Tidal Gate