RAN Implementation Workshop

Contents

Swap Scenario Demo Swap Scenario introduction BTS Solution Power Solution CME Solution Joint Discussion

Swap Scenario Demo


BTS Swap Scenario Summarization Site alteration solution(Indoor to Outdoor) Demo for Scenario 1 Demo for Scenario 2 Demo for Scenario 3 Demo for Scenario 4 Macro or Distributed BTS selection

BTS Swap Scenario Summarization


Scenario No
1 2 3 4 5 8 9 10

Site Type
Distribution Distribution Distribution Outdoor Outdoor Outdoor Outdoor VIP Sites

ZTE BTS Type


BS8700 BS8700 BS8700 BS8900A BS8900A BS8900A BS8900A --

Existing Scenario
Macro Indoor Macro Outdoor Macro Outdoor Macro Outdoor Macro Outdoor Macro Indoor Macro Indoor --

Existing Space
Sufficient Sufficient Insufficient Sufficient Insufficient Sufficient Insufficient --

Swap Description
Install ZTE BTS in designed location and then swap
Install ZTE BTS in designed location and then swap Dismantle existing BTS and then install ZTE BTS and swap Install ZTE BTS in designed location and then swap Dismantle existing BTS and then install ZTE BTS and swap Install ZTE BTS in designed location and then swap Dismantle existing BTS and then install ZTE BTS and swap By Mobile BTS Swap

Site alteration solution(Indoor to Outdoor)

Basically all BTS sites will be changed to Outdoor Type (around 800 sites) except for TPs special requirement to keep it. What we need to do for this kind of sites:
Work Equipment New BTS Power Cabinet Model Outdoor/ Distribute W301 12V / 2V 13.5KVA Based on TSS NEC Move from Indoor to Outdoor Power Rack. New cable may require From indoor rack to outdoor rack Antenna will be reused during 2G SWAP Based on TSS, All battery will be reused Remark Based on TSS (including new jumper)

New

Battery Cabinet Gen set AC PDB Microwave (IDU) Battery Antenna / feeder Existing BTS

Move/ Reuse

Dismantle

Existing Gen set


Existing Power System Shelter

20KVA

Demo for Scenario 1: BS8700 swap existing Indoor site with sufficient space
To Existing BSC

Existing GSM ZTE GSM Downtime On Air On Air

Feeders
AC Power

Transmission

ZTE power cabinet MW IDU

ZTE RRU Can be installed by tower, pole, wall mounted

Power Off

Battery Power Rack

On
Transmission Power Existing BTS

ZTE BBU

Step 1 After ZTE BS8700 workingZTE power 5 Downtime.transmission cable it on 4 Before swap. BS8700 and set BTS. 3 Power on Power install normally, 2 ReconnectZTE First off existing between dismantle original equipments and jumper air. ZTE BBU and install IDU and battery into Transfer original MWZTE BS8700 BBU&RRU, cabinet. ThenMW IDU. Reconnect cables. cable from ZTE RRU to antenna. ZTE power cabinet. and optical fiber. layout power cable Disconnect feeder cable to antenna.
Feeder cable Power cable Optical Fiber Transmission

Time consumption analysis for Scenario 1


Time
T0 T0+00:05

T0=agreed swap start time point


1. Before swap. Install ZTE power cabinet first, then install ZTE BS8700(BBU+RRU), layout power cable and optical fiber. 2. Swap start; 3. Power Off original BTS 4. Transfer original MW IDU into ZTE power cabinet, transmission cutover both BTS and BSC side. 5. Connect the jumper from ZTE RRU and antenna.

One day Preparation

60 min

T0+00:30

T0+00:45

6. Power on ZTE BS8700

T0+01:00

7. Drive Test and Call test 8.Test result submit and evaluation Battery can remove into ZTE power cabinet during or after swap. After ZTE BS8700 working normally, dismantle the existing equipments.

AC Power Availability Conditions Transmission Availability Antenna and feeder Availability

T0+01:15
Notes

T0+04:00

Rollback deadline ( If necessary)

Down Time: around 60 Min

Demo for Scenario 2: BS8700 swap existing outdoor site with sufficient space

ExistingGSM ZTE GSM Downtime On Air On Air

4 After ZTE Power install normally, 2 ReconnectZTE First off existing it on air. 5 Before swap. BS8700 and set BTS. Step 1 Downtime.transmission cablepower 3 Power on BS8700 workingZTE between Transfer original MWZTE BS8700 BBU&RRU, dismantle original equipments and jumper ZTE BBU and install IDU and battery into cabinet. ThenMW IDU. Reconnect cables. ZTE power cabinet. Disconnect feeder cable cable from ZTE RRU to antenna. layout power cable and optical fiber. to antenna.
ZTE Power Existing Power Cabinet Cabinet MW IDU Battery Rack

Feeders

ZTE RRU Can be installed by tower, pole, wall mounted

Existing BTS

Power On
ZTE BBU

Power Off

AC Power Transmission

DC

Feeder cable Power cable Optical Fiber Transmission

Time consumption analysis for Scenario 2


Time
T0 T0+00:05

T0=agreed swap start time point


1. Before swap. Install ZTE power cabinet first, then install ZTE BS8700(BBU+RRU), layout power cable and optical fiber. 2. Swap start; 3. Power Off original BTS 4. Transfer original MW IDU into ZTE power cabinet, transmission cutover both BTS and BSC side. 5. Connect the jumper from ZTE RRU and antenna.

One day Preparation

60 min

T0+00:30

T0+00:45

6. Power on ZTE BS8700

T0+01:00

7. Drive Test and Call test 8.Test result submit and evaluation Battery can remove to ZTE power cabinet during or after swap. After ZTE BS8700 working normally, dismantle the existing equipments.

AC Power Availability Conditions Transmission Availability Antenna and feeder Availability

T0+01:15
Notes

T0+04:00

Rollback deadline ( If necessary)

Down Time: around 60 Min

Demo for scenario 3: BS8700 swap existing outdoor site with insufficient space
Step 1 Downtime.transmission cable it on ThenZTE 6 Reconnect Power off existing layoutdismantle 5 After ZTE power working normally, install 3 Power on ZTE Install ZTE first,between ZTE 2 Install ZTEBS8700 cabinetRRU, BTS. air. 4 Before swap. BS8700 and set then power original feeder cables. BBU in ZTE cables cabinet. Connect RRUcable from disconnect power ,dismantle existing equipments. cable andMW IDU.fiber to designed place.power cable and optical Reconnect jumper and RRU to antenna. ZTE optical fiber. Transfer original MW IDU and battery into ZTE power cabinet.

ZTE GSM Existing GSM Downtime On Air On Air

Feeders
Transmission AC Power Existing Power Cabinet MW IDU Battery Rack

ZTE Power Cabinet


Existing BTS

ZTE RRU Can be installed by tower, pole, wall mounted

Power On
ZTE BBU

Power Off

AC Power Transmission

DC

Feeder cable Power cable Optical Fiber Transmission

Time consumption analysis for Scenario 3


Time
T0 T0+00:05

T0=agreed swap start time point


1. Install ZTE RRU before swap. Layout power cable and optical fiber to designed place before swap. 2. Swap start, power Off original BTS and power rack. 3. Disconnect original BTS power, jumper and transmission cable. Then dismantle original BTS and power cabinet.

Preparation

300 min

T0+02:00 T0+04:00 T0+04:45 T0+05:00 T0+05:15

4. Install ZTE power cabinet first, then install ZTE BBU in the power cabinet. Connect power cable and optical fiber. Transfer MW IDU into ZTE power cabinet.
5. Transmission cable layout. Reconnect jumper cables to original feeder cables. 7. Power on ZTE BS8700 and set it on air. 8. Drive Test and Call test 9.Test result submit and evaluation

AC Power Availability Conditions Transmission Availability Antenna and feeder Availability

Down Time: around 300 Min

Demo for Scenario 8: ZTE BS8900A swap existing indoor site with sufficient space

ZTE GSM Existing GSM Downtime On Air On Air

To existing BSC

4 Power swap. workingexisting transmission 5 Transmission cutover. and set it and Step 1 Before on BTS Install ZTE BS8900Aon air.then 2 After ZTE ZTEBS8900A Layout BTSand power 3 Downtime. Power off normally. dismantle original Layout power transfer MW IDU and and to s to original cabinet.equipments. batteryjumper power cabinet. cable. Reconnect jumper cable ZTE cable. feeder cables.

Feeders

ZTE power cabinet Power Off

BS8900A

MW IDU

Power On

Battery Transmission Rack

Power Distribution

Existing BTS AC Power Transmission

Feeder cable Power cable Optical Fiber Transmission

Time consumption analysis for Outdoor swap Indoor


Time
T0 T0+00:02

T0=agreed swap start time point


1. Installation ZTE BS8900A rack and power cabinet, layout power and jumper cable before swap. 2. Swap start, power Off original BTS and power rack. 3. Disconnect original BTS jumper and transmission cable 4. Transfer original MW IDU to ZTE power cabinet, transmission cutover both BTS and BSC side. 5. After transmission is ok ,feeder cable modification (if necessary)and remake the connectors (if necessary). Test VSWR and then reconnect jumper cables to feeder cables. 6. Power on ZTE BS8900A and set on air.

Preparation

180 min

T0+00:15 T0+01:00 T0+02:45 T0+03:00 T0+04:15 Notes

8. Drive Test and Call test 9.Test result submit and evaluation After ZTE BS8900A working normally, transfer battery to ZTE power cabinet. Dismantle original BTS and power cabinet (If required).

AC Power Availability Conditions Transmission Availability Antenna and feeder Availability

T0+05:00

Rollback deadline ( If necessary)

Down Time: around 180 Min

Macro or Distributed BTS selection


Distributed solution is preferred to save cable loss and achieve better performance.
Condition Available tower load and space Space available, not enough load No enough space but enough load No space or no load for the tower Hub sites No Macro BTS Addition Work No Tower Strengthen Structure Design Distributed BTS and RRU on Tower (close to the Antenna) Site Type

Share sites

Swap Scenario introduction


Indoor to Outdoor Outdoor to Outdoor Indoor to Indoor

Swap scenario Overview

Material Proposal
Cable type
Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Feeder Fiber Jumper Signal cable MW cable

Cable Name
P0 P1 P2 P3 G0 G1 G2 G3 G4 G5 Feeder Fiber Jumper E1 cable /Utp5 cable MW cable

From
Genset ATS/ACDB DC DC

To
ATS/ACDB DC BTS Battary

Sceneria
Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

New

Reused Dismantle

Remark

Grounding System Grounding Bar Indoor to Outdoor DC BTS Battery ATS/ACDB Genset BTS BBU RRU BTS/BBU IDU Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Antanna RRU Antanna IDU ODU Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

Swap scenario Overview

Material Proposal
Cable type
Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Feeder Fiber Jumper Signal cable MW cable

Cable Name
P0 P1 P2 P3 G0 G1 G2 G3 G4 G5 Feeder Fiber Jumper E1 cable /Utp5 cable MW cable

From
Genset ATS/ACDB DC DC

To
ATS/ACDB DC BTS Battary

Sceneria
Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

New

Reused Dismantle

Remark

Grounding System Grounding Bar Indoor to Outdoor DC BTS Battery ATS/ACDB Genset BTS BBU RRU BTS/BBU IDU Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Antanna RRU Antanna IDU ODU Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

Swap scenario Overview

Material Proposal
Cable type
Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Jumper Feeder Fiber Jumper Signal cable MW cable

Cable Name
P0 P1 P2 P3 G0 G1 G2 G3 G4 G5 Jumper Feeder Fiber Jumper E1 cable /Utp5 cable MW cable

From
Genset ATS/ACDB DC DC

To
ATS/ACDB DC BTS Battary

Sceneria
Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

New

Reused Dismantle

Remark

Grounding System Grounding Bar Indoor to Outdoor DC BTS Battery ATS/ACDB Genset BTS BTS BBU RRU BTS/BBU IDU Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Antanna Antanna RRU Antanna IDU ODU Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

Swap scenario Overview

Material Proposal
Cable type
Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Feeder Fiber Jumper Signal cable MW cable

Cable Name
P0 P1 P2 P3 G0 G1 G2 G3 G4 G5 Feeder Fiber Jumper E1 cable /Utp5 cable MW cable

From
Genset ATS/ACDB DC DC

To
ATS/ACDB DC BTS Battary

Sceneria
Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

New

Reused Dismantle

Remark

Grounding System Grounding Bar Indoor to Outdoor DC BTS Battery ATS/ACDB Genset BTS BBU RRU BTS/BBU IDU Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Antanna RRU Antanna IDU ODU Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

Swap scenario Overview

Material Proposal
Cable type
Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Jumper Feeder Fiber Jumper Signal cable MW cable

Cable Name
P0 P1 P2 P3 G0 G1 G2 G3 G4 G5 Jumper Feeder Fiber Jumper E1 cable /Utp5 cable MW cable

From
Genset ATS/ACDB DC DC

To
ATS/ACDB DC BTS Battary

Sceneria
Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

New

Reused Dismantle

Remark

Grounding System Grounding Bar Indoor to Outdoor DC BTS Battery ATS/ACDB Genset BTS BTS BBU RRU BTS/BBU IDU Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Grounding Bar Indoor to Outdoor Antanna Antanna RRU Antanna IDU ODU Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor Indoor to Outdoor

BTS Solution

BTS Swap Scenario Summarization RRU Configuration Principle Antenna Usage / Swap Alarm 8700 8900 8908 Material list

BTS Swap Scenario Summarization


No
1

Classification

Scenario
1Space and load of Tower were enough for RRU 2Tower owner was TP 1Space or load of tower were not enough. 2sharing sites: sharing location was rejected by operator 1Space and load of Tower were enough for RRU 2Tower owner was TP 1Space or load of tower were not enough. 2sharing sites: sharing location was rejected by operator Due to locationPower supply

Strategy
Swap to Distribute 8700

Indoor Site 2
1 Outdoor Site 2 1 Special case

Swap to Outdoor 8900


Swap to Distribute 8700 Swap to Outdoor 8900 Swap to Outdoor 8908

RRU Configuration Principle


Single Band 900M S1~S3 S4 S1~S4 1800M S5~S6 S7~S8 MBR R8860E R8860E R8882 R8860E+R8860E

S9~S12
Dual Band 900M S1~3 S4 S1~4 S1~4 1800M S1~S3 S1~S4 S5~S6 S7~S10

R8882+R8882
Configuration MBR R8860E(900M)+R8860E(1800M) R8860E(900M)+R8882(1800M) R8860E(900M)+R8882(1800M)+R8860E(1800M)

Antenna Solution for 3G


All Antenna will be reused in 2G SWAP. Only 3G comes, the antenna will be SWAP or added For 3G, single band 2.1GHz antenna is preferred
Site Type Frequency
Dual Band Share Sites Single Band

Space available for new 2.1G Antenna


Yes No Yes No Yes

Solution
Add new 2.1G Antenna Change to Tri- band antenna Add new 2.1G Antenna Change to Dual-band Antenna Add new 2.1G Antenna Change to Tri- band antenna Add new 2.1G Antenna

Dual Band Non-Share Sites Single Band

No Yes

No

Change to Dual-band Antenna

For Single Band site (900 or1800) upgrade to Dual band, dual band/Tri band antenna swap is proposed. (Using the 900 Antenna Position and Pole)

Alarm Handling
Block # Pair #
01 02

Outdoor Alarms existing mentioned


Alarm description
High Voltage Door Open

Alarm description with ZTE System

Alarm description with non-ZTE System

03
04 Powerone Rectifier (Outdoor) 05 06 07 08 09 10 01 02 03 04 05 ELTEK Rectifier (Outdoor) 06 07 08 09

AC Main Fail
Low Voltage Distribution Fuse Temp Generator Running OB Light Low Fuel GEM Active Rectifier Fail Door Open AC Main Fail

Low Voltage
HEX/LOAD High Voltage Generator Running OB Light Low Fuel GEM Active NIL GEM Fail

10
11 12

Alarm Handling
Block # Pair #
01 02 03 04 05 06 07 08 09 Indoor BTS Alarms 10 11 12

Indoor Alarms existing mentioned


Alarm description
NIL NIL NIL NIL NIL NIL

Alarm description handling with ZTE System

Alarm description handling with non-ZTE System

Generator Running
OB Light Low Fuel Door Open Hi Temp Air Conditioner Smoke Detector AVR GEM Active GEM Fail High Voltage High Load AC Main Fail Low Voltage

13
14 15 16 17 18 19 20

Base Band Unit


The ZXSDR B8200 GU360 is used as base band unit for GSM and UMTS.
The following cards are used within the BBU PM Module

CC
UBPG BPC BPK

Control and Clock Module


Universal Baseband Processing for GSM Baseband Processing Board Type C Baseband Processing Board Type K

FS
SA FAN

Fabric Switch Module


Site Alarm Fan Module

Dimensions:
Weight: Power Consumption: Product Description:

88.4 (h) x 482.6 (w) x 197 (d)


8.75kg 240W

Remote Radio Unit


3 RRU types are used: Type R8840 Frequency Band 2100Mhz Weight 16.5kg Dimensions 370x320x160 Max Power consumption 288W Breaker requirement 16A Product Description

R8860E

900Mhz

20.0kg

370x320x160

335W

16A

R8882

1800Mhz

23.0kg

472x320x152

455W

16A

B8200

R8860

R8840

R8882

Radio Unit ZXSDR R8860E/RSU60E


Performance Indices
1T2R Capacity:

370 mm

6TRXs/4Cs/4TRXs+1C/2TRXs+2Cs

Max TOC:

80W
320 mm

Receiving Sensitivity:

GSM : -113.5dBm@single antenna UMTS: -129.1dBm@dual antennas

MCPA based, high PA efficiency Supporting GU dual mode High output power

Frequency band:

850M/900M/1800M/1900M

Interface Indices
2*1.25Gbps CPRI optical interfaces 2*Antenna interfaces 1 AISG interface 1 Frequency extension interface

Environment Indices(R8860E)

Power Supply: -48V DC, 220V/110V AC Temperature Range: -40 to +55 Protection Class: IP65

Remote Radio Unit ZXSDR R8882


Performance Index
Capacity:

Tx/RxRx Rx Tx/Rx
480 mm

PA PA

20Kg
320 mm

MCPA based , high PA efficiency Supporting GU or GL dual mode 2T4R, supporting 2 sectors or MIMO 2*2 Large capacity and easy expansion High speed CPRI optical interface

G/U: 2*4 TRXs or 2*2Cs GU : 2*(4TRXs+1C)/2*(2TRXs+2Cs)@900M GL : 4 TRXs+1*20M cell/8 TRXs+1*10M cell@1800M UL : 2 Carriers + 1*10M cell in MIMO 2*2@2100M Output Power: 2*60W Receiving Sensitivity: GSM : - 113.5dBm@single antenna UMTS: -129.1dBm@dual antennas LTE : -103.5dBm@5/10/15/20M Frequency: 850/900/1800/1900M /2100M TPC: GU900M: 300W@2*4G1U|GL1800M: 300W@8TRXs+10M Power Supply: -48V DC Temperature Range: -40 to +55 Protection Class: IP65 Interface: 2 CPRI optical interfaces

Physical Index
Volume:

480 mm*320 mm*150 mm (H*W*D)

Weight: 20 Kg

PA PA

PA PA

PA PA

Radio Unit ZXSDR RSU82


Performance Index
2T4R Capacity:

GU: 2*(4TRXs+1C)/2*(2TRXs+2Cs)@900M GL : 2*2TRXs+10M@900M 2*2TRXs+20M/2*4TRXs+10M@1800M UL : 2*1C+10M @2100M

Max TOC:

900M/1800M: 2*80W|2100M: 2*60W

Receiving Sensitivity:

GSM : -113.5dBm@single antenna UMTS: -129.2dBm@dual antennas UMTS: -131.9dBm@UMTS four antennas LTE: -103.5dBm@LTE 2*2MIMO, 5/10/15/20M

MCPA based, high PA efficiency Supporting GU,GL or UL dual mode Large capacity and easy expansion

Frequency Band:

700/DD/850/900/1800/AWS/1900/2100MHz

One module supports 2 sectors or


MIMO

Interface Index
2 CPRI optical interfaces

Physical Index

4*Antenna interfaces
1 AISG interface

Volume: 482 mm*72 mm*360 mm (H*W*D) Weight: 15 kg

Radio Unit ZXSDR R8840/RSU40


Performance Index
1T2R Capacity:

370 mm

4 carriers

Max TOC:

60W

Receiving Sensitivity:

UMTS: -129.2dBm@dual antennas

Frequency band:

MCPA based, high PA efficiency Supporting 4 UMTS carriers Mature commercial application

2100M/AWS

Interface Index
2*1.25Gbps CPRI optical interfaces 2*Antenna interfaces 1 AISG interface 1 Frequency extension interface

Environment Indices(R8860E)

Power Supply: -48V DC, 220V/110V AC Temperature Range: -40 to +55 Protection Class: IP65

Integrated Outdoor Macro BTS ZXSDR BS8900A


Performance Index
Capacity:

Base Band Unit: B8200

Complete Style

GU : GSM 36 TRXs + UMTS 12 CSs GUL: GSM 24 TRXs + UMTS 12 CSs + LTE 3*20M Cells 900M/1800M: 80W/2*80W| 2100M: 60W/2*60W GSM : -113.5dBm@single antenna UMTS: -129.2dBm@dual antennas UMTS: -131.9dBm@UMTS four antennas LTE: -103.5dBm@LTE 2*2MIMO, 5/10/15/20M

Output Power:

Radio Unit: RSU40/ RSU60E/RSU82

Receiving Sensitivity:

Supporting GUL multi-mode All in one outdoor site solution 28 hours battery backup

Large capacity Rich interfaces Smooth evolution

TPC :

G S444+ US111: 655W G S666+ U S222+ L S111: 1475W -48V DC, 220V AC, 380V AC

Power Supply:

Interface Index
Abis/Iub/S1/X2 interface:

Protection class: IP55

8 E1/T1 (Expandable to 16) 1 GE optical or 1*GE/FE electrical 2 STM-1 (not for S1/X2)

Physical Index
Volume : 1600 mm Weight: 190

CPRI interface:

*600 mm *600 mm (Standard style)

Max. 12 CPRI optical or GE/FE interfaces

kg (BC8910A+RC8911A, without battery)

ZXSDR BS8900A Cabinets Introduction


ZXSDR BS8900A Component Module Baseband cabinet BC8910A RC8910A Radio cabinet RC8911A Battery cabinet PC8910A

Dimension of each cabinet (H*W*D) :

800 mm*600 mm*600 mm

Weight:

BC8910A: 94 kg RC8910A: 127 kg (RSU40/RSU60E) 139 kg (RSU82)

800 mm 600 mm

RC8911A: 93 kg (RSU40/RSU60E)* 99 kg (RSU82)*

600 mm

PC8910A: 47 kg*

* Without battery

Temperature Range:

-40 C to +55C

Protection: IP55

Outdoor Mini BTS ZXSDR BS8908


Performance Index
Capacity:

O6 or S444 (three units in cascading)

13 kg
420 mm

Output Power: 40W (GMSK) / 25W (8PSK) Receive Sensitivity: -112dBm@single antenna Frequency: 900M/1800M Typical Power Consumption

(DC): 160W (900M)

Power Supply:

-48V DC, 220V/110V AC

Temperature Range: -40C to +55C Protection Class: IP65 Transmission: SDH, IP, microwaves

& satellite

Physical Index

Low power consumption Flexible networking

Optimized design Natural cooling

Volume: Weight:

420 mm*315 mm*100 mm (H*W*D) 13 kg

Interface Index
Abis Interface:

4*E1/T1 1*GE/FE optical or 1*GE/FE electrical


Roof top

Tower top

DC Power Distributor 4
The DCPD4 is used when the existing DC power system is re-used, either for indoor or outdoor sites and has the following functions: 1) Provides one channel of -48V DC power input and supports a current of not more than 80A 2) Provides eight channels of DC power output, each of which is controlled by an independent 20A air switch to support a current of not more than 16A 3) Provides lightning protection and surge protection for the power output through a built-in lightning protection board 4) Provides dry contact alarm output on the lightning protection board
PE grounding pole DC power input port (1) Output circuit breaker (8) DC power output port (8) Lightning protection alarm port

Dimensions: Weight: Breaker size of existing power system

465X44.45X200 (19inch / 1U) 5.0kg 80A

Outdoor Lightning Protection


The PIMDC module will be used for all RRU types as outdoor lightning protection. The PIMDC module can be mounted directly onto the each individual RRU.

R8840 Example

R8860E Example

R8882 Example

Product Description

Material List
Cable type Power cable Power cable Power cable Power cable Power cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Grounding cable Jumper From Genset ATS/ACDB DC DC DC Grounding System DC BTS Battery Rack ATS/ACDB Genset BBU To ATS/ACDB DC BTS BBU Battery W301(T601) AC power cable 4*16mm2 8900 DC Power cable BBU DC Power calbe Battary power cable 4*16mm2 4mm26mm210mm2 Local purchase product supply product supply Local purchase Local purchase 1*16mm2 1*16mm2 product supply product supply product supply Name Discription Special requirement Resource

Grounding Bar Grounding Main cable Grounding Bar DC Grounding cable Grounding Bar 8900 Grounding cable

Grounding Bar Battary Rack Grounding cable 1*16mm2 Grounding Bar Grounding Bar Antanna 1/2 jumper 1/2 jumper cable less than 10 meter

product supply

Fiber

BBU

RRU

Fiber

2m 3m 5m 10m 20m 25m 30m 35m 40m 45m 50m 60m 70m
1/2 jumper

product supply

Jumper Signal cable

RRU BTS/BBU

Antanna IDU E1/UTP5

product supply product supply

E1 cable and UTP5 cable

Material (DC CableFiber CableRF Cable)


DC Cable:The following cross sections shall be used CrossSection 4mm2 Max. Cable run for R8840 >0m <110m Max. Cable run for R8860E >0m <90m Max. cable run for R8882 >0m <60m

6mm2 10mm2 16mm2

>110m =<170m >170m =<290m -

>90m =<140m >140m =<240m -

>60m =<100m >100m =<170m


>170m =<250m

2m 3m 5m 10m 20m 25m 30m 35m 40m 45m 50m 60m 70m

Jumper: Typically new RF jumper cables will be installed.

1/2 jumper cable should be less than 15 meter. DIN connectors will be typically used.

Power solution

DC Swap Scenario Summarization DC System Swap solution Product description

DC Swap Scenario Summarization


Scenario No 1 2 3 4 5 6 7 8 Site Type Outdoor Outdoor Outdoor Outdoor Indoor Indoor Indoor Indoor Equipment DC DC Battery Battery DC DC Battery Battery 12V 2V 12V 2V Voltage Swap Description TP SWAP LIST DC Re-used 8700 used Battery Re-used New Cabinet Battery Re-used Cabinet Re-used TP SWAP LIST DC Re-used 8700 used Battery Re-used New Cabinet Battery Re-used Cabinet Re-used T601 BC 8910 ZTE Rack Swap Description W301 BC 8910 ZTE Rack

ATS/ACDB Swap Scenario


No 1 Site type indoor to outdoor Scenario ATS(indoor) ACDB(indoor) ATS(outdoor) ACDB(indoor) ACDB Solution ATS&ACDB SWAP ATS SWAP ACDB reused ACDB Reused (CW Or no CW) Swap Description Swap to IPS Remark Class A

indoor to outdoor

New ACDB

Class A Pay attention to ACDB location

outdoor to outdoor

ACDB Reused

Power Solution
1TP decide the Existing Power System will be reused or not

Example:
Zone Zone1 Zone1 Zone1 Zone1 Zone1 Site ID IPSO02 IIB237 IIB252 IRP768 IRP771 Site Type Outdoor Metro out door Macro Distributed Distributed Distributed Configuration 2/0/0/0-0/0/0/0 0/0/0/0-2/0/0/0 222/222 222/222 222/222 Rectifier Status EOL EOL EOL New rectifier New rectifier

2 For New rectifier siteZTE will provide BC8910 for 8700 installation.

For EOL sites, ZTE will provide the Outdoor Power Cabinet W301
Totally 18U space available 5U reserved for BBU (for distributed BTS) Rest space for MW IDU More than 5 IDU sites, the MW vendor should Provide a separate Outdoor Cabinet.

18U

Battery Swap Solution


All battery will be reused.
1If the power will not be swapped, the battery will not be swapped either.

2If the existing battery is 12V, ZTE will provide outdoor battery cabinet. The existing battery will be moved to ZTE battery cabinet

3If the existing battery is 2V, ZTE only provide rectifier cabinet. Existing battery and battery cabinet will be reused.

12V battery cabinet

T601

CME Solution

PAD Foundation Rack Foundation(New base frame) RRU Bracket Sunshade Structure Antenna Bracket Other CME

PAD Foundation
Scenario No Model 1 Model 2 Site Type 2 Cabinet 3 Cabinet Swap Solution Water floor area Water floor area Height 600mm high 600mm high PDF

Model 3
Model 4

2 Cabinet
3 Cabinet

200mm high
200mm hight

Rack Foundation(New base frame)


Scenario No Model 1 Site Type Rooftop Greenfield Rooftop Greenfield Rooftop Greenfield New base frame Existing Base frame Swap Solution New base frame Dismantle Channel steel New base frame Dismantle existing structure Installation on existing foundation Remark Each rank two base frame

Model 2
Model 3 M o d e l 1 M o d e l 2 M o d e l 3

Base frame
Base frame

Each rank two base frame

Dismantle New base frame

Dismantle Put on concrete

RRU Bracket
7 RRU Brackets was designed for tower type for TP project
No 1 2 3 4 5 6 7 Tower type Generic tower Monopole Guy-mast (single RRU) Guy-mast (double RRU) Angle tower Pipe leg Pipe leg with long bolts PDF Format remark

Sunshade Foundation
No Model 1 Sunshade Type 2 Cabinet Description Remark

Model 2

3 Cabinet

Antenna Bracket
No Model 1 antenna Pole length 2m Description Remark

Model 2

antenna

3m

2m

3m

Other CME
No 1 CME Type Cable Bridge Description Design Remark

Cable Bridge