You are on page 1of 2

P & ID Check List

The following shall be considered in P & ID Check List -Verify revision, purpose of revisions, numbering, title. -Verify notes reference drawings (including Removal P&IDs) -Verify holds are indicated -Verify piping spec break -Verify line number, cross check with line schedule and sizing -Verify all sizes are indicated and match the process calculations : control valves, relief valves, by pass -Verify limit of package, limit of supply -Verify that all installation requirements are shown : no slope, high point, min. straight length, no pocket, min. length, etc. -Verify low temperature impact if expansion (control valve, relief valve, depressurization) -Verify insulation requirement for piping, equipment and instruments are shown including pp/acoustic -Verify proper valving for drain, relief valves -Verify isolation of equipment (spectacle blind, double block and bleed) with job standard -Verify consistency of double block and bleed -Verify operability for start-up, opening of valve with high differential pressure especially riser valves -Verify any by-pass requirements and appropriate valving -Verify that working range of control valve is adequate or need of split-range -Verify requirements of API 14C are fulfilled (safe chart) (for offshore projects) -Verify all SP items are indicated -Verify equipment, data and level diagrams are filled in and match the process calculations -Verify piping, valve, equipment and instrument symbology and numbering. Verify symbology against standard legend, symbols and instrument interface (if applicable) -Have IDC been done. -Have all design changes been included -Have all changes clouded, previous ones removed -Verify reference to other P&IDs and line continuity -Are P&IDs properly signed -Are all the set points indicated -Have all other discipline comments been entertained -Are all tie-in points shown and does the tie-in schedule revision agree with the P&IDs -Do all equipment numbers and specs. Agree with process data sheets or specifications and Equipment list -Verify all the nozzles of an equipment including drain, vent, manholes etc. have been shown -Verify provisions for future expansion is kept, if the same is anticipated -Are complete instrumentation and control loops shown on the P&IDs

-Verify if instrumentation details is as per job specification (isolation valve size and spec., vent & drain requirements, etc.) -Verify if failure position of shutdown and control valves are shown -Verify if full bore valves are indicated

You might also like