You are on page 1of 1

Insert name of Consultant Engineering Proposal For Insert project name

Project Purpose Insert Description of Project Insert (include linear feet of route and construction cost estimate) Scope of Work Engineering services shall provide design drawings and specifications that meet or exceed the requirements of Utilities Standards and Construction Specifications Manual (Manual), utilize Utilities Master CIP Technical Specifications, and standard drawing templates for the construction of water mains, force mains, reclaimed water mains, pump stations, gravity system, pump stations, and renewal or replacement of wastewater gravity system, pump stations, and substandard water distribution system. The Engineer is responsible for all work of their subconsultants/subcontractors to meet the requirements of the Engineers proposal. The County requires the subconsultant/subcontractor proposals to be attached to the Engineers proposal. The following tasks will be performed as part of the work: Task 100 Preliminary Engineering; Task 200 Construction Documents; Task 300 Surveying; Task 400 Geotechnical Investigation; Task 500 Ecological Investigation; Task 600 Public Relations: Community Meeting/Public Notification-Flier Production and Mailing Procedure; Task 700 Bidding Assistance; and Task 800 Construction Administration Services. TASK 100 - PRELIMINARY ENGINEERING The purpose of the preliminary engineering phase is to present project completion alternatives to Utilities in a manner that will allow Utilities to make an informed decision as to how the project shall proceed. Minimal survey services will be performed during the Preliminary Engineering unless approved by the Utilities Project Manager. Subtask 110 Data Collection 1. Coordinate and attend Kick-off meeting. Prepare and distribute meeting minutes.

You might also like