Project Scope
The project will focus on delivering Solutions LTD. a new website to sell high tech gadgets, specifically targeting European and Asian Markets. The project will run from November 16th to December 21st, 2012. Though placing the product catalogue was on the original contract, we do not have an estimate for the time that will take, nor do we have the expertise to do so. Any issues during the project will be referred back to Solutions LTD., who will decide whether or not to proceed as planned or adjust the project in some way (time or cost). After the project, Solutions LTD. will be responsible for maintaining their website.
Gantt Chart
11/16/2012 11/16/2012 11/16/2012
Draft possible formats 11/21/2012 Collect legal, tech, commercial, product data
11/19/2012
11/22/2012
11/23/2012
Implement design
11/29/2012
Assemble website
11/30/2012 12/3/2012 12/5/2012
12/11/2012
Website Tested
12/11/2012
Website Designed
11/29/2012
Website Completed
12/13/2012
Project Start
11/16/2012
Website Installed
12/4/2012
Week 1
13
17
21
25
29
Nov. 16
Nov. 22
Nov. 30
Dec. 5
Dec. 13
Nov. 20
Nov. 23
Dec. 4
Dec. 12
Collect the betausers opinions and implement the suggested modifications
Dec. 14
Officially open the Web site and close the project
David
Project Manager
Prepare the text and product photos/details to be implemented in the web pages, and get approval from SOLUTIONS
5 Days, 5,000
Draft 3 possible design formats/styles of the web site Implement the text & photos in the HTML web pages prt2
Mosaab
Designer & HTML/Web Expert
1 Day, 1,000
1 Day, 1,000
4 Days, 4,000
Collect product information and commercial data
5 Days, 5,000
Implement the text & photos in the HTML web pages prt1 Collect the betausers opinions and implement the suggested modifications
Santiago
HTML/Web Expert
2 Days, 2,000
Collect the legal and technical data
5 Days, 5,000
1 Day, 1,000
Koushik
IT Specialist
2 Days, 2,000
2 Days, 2,000
1 Day, 1,000
1 Day, 1,000
SOLUTIONS
50% payment upfront 30% due at the beginning of the second full week of the project (26/11) 20% due at the start of the third week (3/12)
Project Cost
35000
30000
25000
WBS
Initiation 1 Planning 2
Website Design
Execution 3
Control 4
Closeout 5
Install Website
3.3
Initiation
Microplanning
Draft Possible Designs 1.1
Approve Designs
1.2
Designs Approved
1.1.2
1.2.2
1.1.3
1.2.3
Planning 2
Execution
3
Product Research
2.2.1
3.1.2
Control
Closeout 5
Test Website
4.1
5.1
5.2
Change Order
It has come to our attention that there are technical specification differences between models available in Asia and in Europe. This requires a period of research, clarification and correction in order to complete the project.
This is only necessary if Solutions LTD. Desires to differentiate between the two immediately