Requirements Related Requirements Project Identification Sign Informational Signs Quality Assurance
PART 2 - PRODUCTS
DATE JOB/EWO
2.01
Sign Materials
PART 3 - EXECUTION 3.01 3.02 3.03 3.04 Project Identification Sign Information Signs Maintenance Removal
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
PART 1 - GENERAL 1.01 A. B. Requirements Furnish, install, and maintain project identification sign. Provide temporary on-site informational signs to identify key elements of construction facilities. Remove signs upon completion of construction. Allow no other signs to be displayed. Related Requirements Section 01500 - Contractors Temporary Facilities Project Identification Sign Contractor shall provide at each separate approved work location a sign indicating the presence of the individual Contractor. Only one sign will be allowed at each site location. Individual signs shall be 1.2 m high x 2.4 m wide. Free
DWG. TYPE PLANT NO. INDEX DRAWING NO.
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
C. D. 1.02
Date:
A. 1.03 A.
Section 01580
SHT. NO. REV. NO.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
1 OF 3
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DESCRIPTION
ENGG
CERT
PMT
1.04
DATE JOB/EWO
A.
2.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
B. 1.05 A. B.
Erect at appropriate locations to provide required information. Quality Assurance Sign Painter: Professional Experience in type of work required. Finishes, Painting: Adequate to resist weathering and fading for scheduled construction period.
PROJECT ENGINEER
____________ DATE
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
Sign Materials Structure and Framing: May be new or used, wood or metal, in sound condition structurally adequate to work, and suitable for specified finish. Sign Surfaces: Exterior softwood plywood with medium density overlay, standard large sizes to minimize joints. Thickness: As required by standards to span framing members, to provide even, smooth surface without waves or buckles.
Section 01580
B.
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
2 OF 3
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DESCRIPTION
ENGG
CERT
PMT
PART 3 - EXECUTION 3.01 A. Project Identification Sign Paint exposed surfaces of supports, framing and surface material; one coat of primer and one coat of exterior paint. Paint graphics in styles, sizes, and colors selected. Information Signs Paint Exposed Surfaces: One coat of primer and one coat of exterior paint. Paint graphics in styles, sizes, and colors selected. Install at a height for optimum visibility; on ground mounted poles or attached to temporary structural surfaces. Maintenance Maintain signs and supports in a neat, clean condition; structure, framing or sign. repair damages to
B. 3.02 A. B. C.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________
PROJECT ENGINEER
____________ DATE
3.03 A.
CERTIFIED _ __________
DATE: ________
CONSTRUCTION AGENCY
________________ DATE:
B. 3.04 A.
Relocate informational signs as required by progress of the work. Removal Remove temporary signs, framing, supports, and foundations at completion of project.
OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:
Date:
- END OF SECTION -
Section 01580
CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDINGS
DRAWING NO.
DOC K55 A
VE-417361 BI-25-00002
RABIGH
SAUDI ARABIA
JOB/EWO#
3 OF 3
00
15-Sep-07
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
REV. NO.
DATE JOB/EWO
DESCRIPTION
ENGG
CERT