Supply Record of Mitsubishi Geothermal Power Plant

Total Output 3,103 MW Total Unit 102 Units Coped with Different Steam & Brine in 13 Countries
As of 2012 December

Iceland 15-Units 565 MW Greece 1-Unit 2 MW Turkey 2-Unit 94.8 MW Japan 14-Units 272.3 MW Mexico 12-Units 210 MW

USA 18-Units 511.5 MW

Portugal 1-Unit 3 MW

Phillipine 19-Units 702.7 MW Indonesia 6-Units 386.3 MW

Kenya 6-Units 149.8 MW

El Salvador 3-Units 61.1 MW

Costa Rica 2-Units 32 MW

New Zealand 3-Units 113 MW


4

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Projects in Indonesia ( KAMOJANG #1, 2 & 3)


Specification #1 Unit OD: 1983 5 stage2, Condensing, Down Exhaust 17 inch 30,000 kW 3,000 rpm 0.65 MPa 162 C 240 t/h 0.013 MPa

Type Last Stage Blade Output Speed Pressure Temp. Flow Rate Exhaust Pressure

#2 & 3 Unit OD: 1987 5 stage2, Condensing, Down Exhaust 23 inch 55,000 kW 3,000 rpm 0.65 MPa 162 C 380 t/h 0.01 MPa

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Projects in Indonesia ( DARAJAT #1)

Specification Type Last Stage Blade Output Speed Pressure Temperature Flow Rate Exhaust Pressure

OD: 1994

6 Stages x 2, Condensing, Down Exhaust 23 inch 55,000 kW 3,000 rpm 0.95 MPa 180 340 t/h 0.01 MPa

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Projects in Indonesia ( DARAJAT #2, 3)


Specification Type Last Stage Blade Output Speed Pressure Temperature Flow Rate Exhaust Pressure
2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

OD: 2000 (#2), 2007 (#3) 8 Stages x 2, Condensing, Down Exhaust 30 inch ISB 81,300 kW (#2) 110,000 kW (#3) 3,000 rpm 1.35 MPa (#2) 1.45 MPa (#3) 193 (#2) 199 (#3) 450 t/h (#2) 630 t/h (#3) 0.006 MPa (#2) 0.008 MPa (#3)
7

Share in the World

G 5.6% 5.1% O 10.3% A 10.7%

Others

MHI 24.6% T 23.6%

F 20.1%

Share in total (MW basis)


Ref. Proceedings World Geothermal Congress 2010 Geothermal Power Generation in the World 2005-2010 Update Report

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Wide Output Range from 100kW to 151MW

TC4F

160
APPRICATION RANGE (MW)

90 70 50 30 10 1 0

1 1 1 1 4 12 12 18 14 14 8 9 5 5 10
UNITS

SC2F

Approx. 120MW

Approx. 60MW

SC1F

15

20

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Number of Casing (Exhaust Flow)


ST TYPE SC1 F SC2 F TC4 F 0 2 20 40 60 UNITS 80 31 67

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

10

Turbine Exhaust Direction


ST EXHAUST DIRECTION
Turbine Condenser

AXIAL LOWER UPPER 0


Turbine

13 37 50 20 40 UNITS 60

Turbine Condenser

Condenser

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

11

Plant Cycle
PLANT CYCLE
Separator Aux. Steam Gas Extractor Ejector Non-condensable Gas

Dry Steam Single Flash Double Flash

7 75 16 2 20
Evaporator Binary Turbine

Condenser Steam Production Well Cooling Water Turbine Reinjection Well Hot Well Pump Cooling Tower

Binary 0
Separator

Single Flash Cycle

40 UNITS
Generator

60

80

Separator

Gas Extractor Ejector Non-condensable Gas

HP Steam Production Well

Turbine

Production Well

Preheater

Recuperator Cooling Water LP Steam Reinjection Well Condenser Hot Well Pump Cooling Tower Reinjection Well Condenser CWP Work Fluid Pump Cooling Tower

Double Flash Cycle

Binary Cycle

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

12

RECENT PROJECTS

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

13

ICELAND HELLISHEIDI #1#6

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

14

ICELAND HELLISHEIDI #1#6


GENERATOR
FL 3300 FL 1925

TURBINE

CONDENSER

FL 0

Specification Type Last Stage Blade Output Speed Pressure Temperature Exhaust Pressure

#1 ~ 4(COD2006,2008) 6 stage x 1, Condensing, Axial Exhaust 30 inch ISB 40,000 kW 4 units 3,000 rpm 0.75 MPa 168 C 0.01 MPa

#5, 6(COD 2010) 45,000 kW 2 units


15

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

ICELAND HELLISHEIDI #1#6

TURBINE SECTIONAL DRAWING

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

16

ICELAND HELLISHEIDI #1#6

Low Turbine House (Crane Level)


CRANE

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

17

ICELAND HELLISHEIDI #1#6


Complete Turbine Module fully assembled before Shipping

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

18

ICELAND HELLISHEIDI #1#6


Complete Turbine Module fully assembled before Shipping

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

19

KENYA OLKARIA #1~#3

Specification OD: #1,2 2003, #3 2010 Type Last Stage Blade Output Speed Pressure Temperature Flow Rate Exhaust Pressure 6Stages x 1, Condensing, Down Exhaust 30 inch 34,830 kW 3,000 rpm 0.5 MPa 150 389 t/h 0.007 MPa

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

20

TURKEY GERMENCIK
Specification Type Last Stage Blade Output Speed Pressure Temperature Exhaust Pressure
Feature

OD: 2009

6 Stages x 2, Condensing, Top Exhaust 24 inch ISB 47,400 kW 3,000 rpm 0.588 MPa 158 0.02 MPa

High Gas Content: 12.4% in HP steam High Availability: 99.9% in first year
2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 21

ICELAND NESJAVELLIR #1~ #4


Specification OD: 1998 (Unit#1,2), 2001 (Unit#3), 2005 (Unit#4) Type Last Stage Blade Output Speed Pressure Temperature Flow Rate Exhaust Pressure
2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

8 Stages x 1, Condensing, Top Exhaust 24 inch 30,000 kW (Rated), 3,000 rpm 1.2 MPa 188 206.1 t/h 0.02MPa

22

JAPAN SUMIKAWA
Specification Type Last Stage Blade Output Speed Pressure Temperature Flow Rate Exhaust Pressure
Feature Applied Top Exhaust Design to Double Flow Turbine Water Cooled Nozzle
2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 23

OD: 1995 5Stages x 2, Condensing, Top Exhaust 23 inch 50,000 kW 3,000 rpm 0.49 MPa 151 389 t/h 0.011 MPa

2. What we can do for you

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

24

Unit Output

If you provide

- Production Well Characteristic

- Atmospheric Conditions (Pressure and Wet Bulb Temperature)

MHI propose ECONOMICAL Plant with


- Optimum Cycle - Optimum Design Conditions Main Steam Pressure Condenser Pressure Wet Bulb Temperature - Plant Output based on above conditions

- Optimum Turbine Type with minimum exhaust loss

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

25

Single Flash Cycle

Separator Aux. Steam

Gas Ejector

Vacuum Pump Non-condensable Gas

Steam Production Well

Condenser

Cooling Water Turbine Reinjection Wel Hot Well Pump Cooling Tower

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

26

Double Flash Cycle

Separator

Gas Ejector

Vacuum Pump Non-condensable Gas

Condenser HP Steam Turbine Production Well LP Steam Reinjection Wel Cooling Water Cooling Tower Hot Well Pump

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

27

Advantage Double Flash

30.0 25.0

kW (%)

20.0 15.0 10.0 150

Bottom Hole Temp. ()

200

250

300

Calculated Conditions Brine flow rate of production well : Constant Turbine exhaust pressure : 0.1 bara HP main steam pressure : Optimized Pressure LP main steam pressure : Constant (1.2 bara)
2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved. 28

Main Steam Pressure

600 500
Steam Flow (ton/h)

80

Generator Output (MW)

400 300 200 100 0 0 5 10 15 Main Steam Pressure (bara.)


Steam Flow

70

60

MW

X
Heat Drop in Turbine

50

Conditions : Turbine Exhaust Press. = 0.1 bara Inlet Steam : Saturated

40 0 5 10 15 Main Steam Pressure (bara.)

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

29

Main Steam Pressure

Wetness of Turbine Exhaust (%)

20

Exhaust Press. = 0.05 bara 0.10 bara 0.15 bara

15

10

5 0 5 10 15 Main Steam Pressure (bara.)


30

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Condenser Pressure

Gross Output (A)

Output (MW) ($)

Parasitic Load (B)


Condenser Pressure (bara.) Condenser Pressure (bara.) Condenser Pressure (bara.)

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

(C) - (D) ($)

Optimum Pressure

Net Output (C) = (A) - (B)

Construction Cost ($)

Construction Cost (D)

31

Design Wet Bulb Temperature


Generator Output (%)
110
Case-2 Case-1

100

Case-1 Design Wet Bulb Temp. Generator Output Cost for Cooling Water System Low Low Low

Case-2 High High High

90 30 20 10 0 0 2 4 6 8
Case-2 Case-1

Design Wet Bulb Temp.

Wet Bulb Temp. ()

(month)
32

10 12

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

3. Technologies for higher performance and reliabilities

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

33

Standard Feature for Geothermal Steam Turbine


Last Stage Stationary Drain Groove/Hallow Blade Last Stage Rotating BladeStelight Shield Rotating Blade Integral Shroud Blade Rotating Blade Material12Cr, 17-4PH Nozzle Material 12Cr,18Cr-8Ni High Stress Part in Rotor Shot Peening Rotor Disc Low stress by Tapered Shape

Drain Chatcher

Rotor MaterialLow Sulfiur CrMoV Alloy

40

Optional Feature for Dirty Steam


CasingCarbon Steel Diaphragm Fitting Part : Stainless Welding

Rotor GlandInconel Coating for Low Sulfur CrMoV Alloy Rotor Material 12Cr Alloy

Rotating Blade Titanium Alloy

DiaphragmCarbon Steel Horizontal Surface and Fitting Part : Stainless Welding


41

3-D Design Blade


Conventional

Internal Efficiency Ratio

1.15 1.10 1.05 1.00 0.95 0.90 0.85


Conventional F3-D Nozzle

3-D Design

0.2 0.3 0.4 0.5 0.6 0.7 0.8

Velocity Ratio

Efficiency Improvement due to 3-D Nozzle

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

42

Erosion Protection

Drain Ditch on Stationary Blade

Hollow Nozzle

Stellite Strip on Moving Blade


Stellite Strip

To Turbine Exhaust Drain Hole Ditch Drain Hole Ditch Drain

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

43

Measures Against Scaling (at 1st Stage Nozzle)


How to Supervise Scrubber
Geothermal Steam Clean Steam Separator Injection Pump Clean Water ( 10 % of Steam) Drain with Impurity Steam Temp. Nozzle Metal Temp. To Turbine Clean Water ( 2 % of Steam) No Re-Evaporation Water Cooled Nozzle To Turbine Steam (Inlet) Concave Flow Area Steam Nozzle

Measures Scrubber & Blade Washing Water Cooled Nozzle


Width Convex Cooling Water To Water Cooler

Scaling

Blade Washing
Narrower Flow Area
Geothermal Steam

Steam (Outlet) ReEvaporation Conventional Nozzle

Cooling Water Hole

Less Output

Temperature Distribution
2% 2 Water Inject

GPxA
G: Flow Rate

1 A

Test Results in Actual Turbine


1 1 % Water Inject
(P/G) - (P/G)0

Conventional Nozzle

Water Cooled Nozzle

P: Pressure at Nozzle Inlet A: Nozzle Flow Area : Clean Condition (P/G)0 : Clogged Condition (P/G)0

0 10

Verification in Actual Turbine


5

After 9 Months Operation


0

24

48

72 (Hour)

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

44

PEEK LINING BEARING


PEEK : PolyEtherEtherKetone Higher allowable contact pressure
120

- Downsizing - Lower mechanical loss


Journal Bearing

Bearing Loss [%] %

100 100 80 80 60 60 40 40 20 20 0 0

62%

62% Reduction

Conventional (White metal)

PEEK

PEEK

Thrust Bearing

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

45

Rotor Gland Protection


Welding overlay and thermal spraying for rotor gland area were developed to protect a rotor from erosion-corrosion. Problem at Rotor Gland Area Air + Geothermal Steam Erosion/Corrosion Damaged part Countermeasure Inconel 625 (Welding overlay or Thermal spray)

Inconel 625 (thermal spray) Base metal

Damage on rotor gland

Thermal spray by Inconel 625


46

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Material Selection for Geothermal Turbine


Rotor
1. Materials Low Sulfur CrMoV (10325MGB) Standard Material Low Susceptibility against SCC 12Cr (10325GSR) Very Corrosive Geothermal Steam Low Susceptibility against SCC Low Corrosive Rate High Toughness
For

Moving Blade
1. Materials 12Cr (10705BA) For Intermediate Stages 17-4PH (10705BX, 10725BX, 10725DW) For 1st Stage and Last 2 3 Stages Tensile Strength, Corrosion Fatigue Strength: Higher Corrosion Rate: Lower Titanium Alloy (Ti-6A-4V) 1st Stage in Very Corrosive Geothermal Steam Tensile Strength, Corrosion Fatigue Strength: Highest Corrosion Rate: Lowest
For
Failure Stress (kg/mm2)

2. Mechanical Properties
Property 0.2 % Yield Stress Tensile Strength Elongation Deduction in Area Absorbed Impact Energy at 25 50 % FATT Corrosion Rate* Unit MPa MPa % % J mm/Year 10325MGB 635 740 15 40 20 80 0.023 10325GSR1 635 740 16 45 30 40 0.0015

50 40 30 20

17-4PH Ti-6A-4V 12Cr Corrosion Fatigue Strength (in Geothermal Steam)


105 106 107 108

8 Corrosion Rate (mg/cm2/3 Months) 6 4 2

SS400 SB410

Corrosion Rate in Geothermal Steam


12CrMo SUS 304 SUS 316 17-4PH Ti-6A-4V

Susceptibility against SCC*

at
*:

0.2 x 3.3

at

0.2 x 3.3

Tested in Actual Geothermal Steam

Material

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

47

Exhaust Direction
Exhaust Direction TG Pedestal Turbine House (Crane Hook Height) Pressure Loss in Exhaust No. of Exhaust Flow
Turbine

Bottom Tall Tall (FL 16.4m) ~ Zero Any

Top Middle Middle (FL 13.5m) High Any

Axial Low Low (FL 10m) Recover Only 1 Flow

Turbine Condenser Turbine Condenser

Condenser

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

48

Condenser (Direct Contact, Shell & Tube)

Direct Contact Condenser


Condenser

Shell & Tube Condenser


Condenser

Cooling Tower Hotwell Pump Circ. Water Pump

Cooling Tower

Level difference between Cooling Tower and Condenser is required.

No Level difference between Cooling Tower and Condenser is required. Additional small condensate pump is required. NCG temperature is higher
49

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Condenser (Direct Contact vs. Shell & Tube)

Direct Contact

Shell & Tube

Condenser at lower level than turbine.


2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Condenser at the same level as turbine.


50

ICELAND HELLISHEIDI #1#6


Shell & Tube Condenser

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

51

Advanced Direct Contact Condenser (ADCC)

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

52

Advanced Direct Contact Condenser (ADCC)

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

53

Advanced Direct Contact Condenser (ADCC)

Fill Material

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

54

CONTROL SYSTEMS DEPARTMENT


2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

Installation Records of DIASYS ( for Power Plant )

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

56

Installation Records of DIASYS ( for Geothermal Plant )

Nation ICELAND ICELAND ICELAND ICELAND MEXICO EL SALVADOR KENYA INDONESIA JAPAN JAPAN JAPAN JAPAN

Plant Name / Location KRAFLA NESJAVELLIR HELLISHEIDI HENGILL CERRO PRIETO AHUACHAPAN OLKARIA II DARAJAT TAKIGAMI OHNUMA YAMAGAWA OGIRI 2U

Unit

Capacity 30MW 30MW 40MW 45MW 25MW 30MW 35.1MW 110MW 25MW 12.5MW 30MW 30MW

3U,4U,COMMON 3U,4U 5U 1U,2U,3U,4U 1U,3U 1U,2U,3U 3U 1U 1U 1U 1U

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

57

High Speed , Critical and Scalability


Applied to Wide Range of Power Plant For Total DCS Use -Combined Cycle / Conventional Power / Coal Gasification -Plant Coordination Control / Automatic Start & Shutdown Control, Training Simulator For Critical Control Use -Steam/Gas Turbine Speed Control & Interlock System -Gas Engine / Turbine for Shipment -Super Critical Boiler For Utility Control Use -Desulfurizing Plant -Coal Handling -Water Treatment

2012 MITSUBISHI HEAVY INDUSTRIES, LTD. All Rights Reserved.

58

You might also like