SECTION 1. SCOPE

CONTENT

PAGE 4

2.

APPLICABLE CODES

3.

RELATED ENGINEERING SPECIFICATIONS

4.

DRAWINGS AND REFERENCES FOR WORKS

5.

WORK FLOW

6.

EXCAVATION

7.

BURYING

8.

CUTTING AND BENDING

9.

THREADING

10.

WELDING

11.

PREHEATING AND HEAT TREATMENT

18

12.

ASSEMBLY

19

13.

FLANGED JOINTS

21

14.

PROTECTIVE COATING AND WRAPPING

22

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 3 OF

39

REV. 0

SECTION 15. INSPECTION

CONTENT

PAGE 22

16.

PRESSURE TEST

27

17.

PRESERVATION

33

18.

FLUSHING

35

19.

DOCUMENTATION

37

APPENDIX-1

SUPPLEMENTARY RT REQUIREMENTS

38

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 4 OF

39

REV. 0

1.

SCOPE

This specification covers the general quality requirements for the fabrication, inspection and testing of underground piping system on the plant site, excluding transfer pipe line.

2.

APPLICABLE CODES

ANSI / ASME B 31.3 :

Chemical Plant and Petroleum refinery Piping (up to B31.3b-1986)

3.

RELATED ENGINEERING SPECIFICATIONS

The following Engineering Specifications are related to herein :

(1)

PTTCHEM-SP-P103

Piping Materials (Underground Pipings)

(2)

PTTCHEM-SP-P605

Welding Procedure Specifications of Underground Pipings

(3)

PTTCHEM-SP-P805

Welding Performance Qualification Test of Underground Pipings

(4)

PTTCHEM-SP-P121

Protective Coating and Wrapping for Underground Steel Piping

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 5 OF

39

REV. 0

4.

DRAWINGS AND REFERENCES FOR WORKS

4.1

The following drawings and references necessary for the work will be prepared by PTTCHEM.

(1) (2) (3) (4) (5)

Plot plan Piping Arrangement Drawings (Plan and Elevation) Piping Material Classifications Notes for Piping Drawings Others, if any

4.2

All drawings and related documents shall be in English language and the metric units of measurement shall be used except for pipe sizes, flanges and flange bolting.

4.3

Welding symbols, terms and definitions shall be in accordance with AWS A2.4 and A3.0. (PTTCHEMSP-T-003, Par. 4.1)

5.

WORK FLOW

Underground construction works shall normally be performed in the following sequence.

Step 1. 2. 3. 4. 5. 6. 7. 8.

Work Description Check & confirm the pipe route & measure pipe length & level Coating work for straight pipe & fitting Pin hole test Carry out the excavation work Provide the Bell Hole at the each pipe joint for welding activities Laying the pipe on the temporary support for the welding work Welding work Radiographic & visual inspection for welds

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 6 OF

39

REV. 0

9. 10. 11. 12. 13. 14.

Hydrostatic test Proper cleaning on the pipe surface for the wrapping work Coating / wrapping work for joint portion Pin hole test Provide the pipe support & remove the temporary support Backfilling work with proper compaction

6.

EXCAVATION

6.1

Depth of burial of pipes shall be as indicated in Piping Arrangement Drawings. Excavation shall be done considering safety of the work. Especially, if depth of vertical excavation is deep, the piping works shall be done after protective measure is taken to prevent landslide.

6.2

Before the excavation work, Contractor shall confirm that there is no other buried object around the place of excavation.

6.3

Pipe casings shall be provided according to the Piping Arrangement Drawings.

7.

BURYING

7.1

When works of burying pipe are carried out, protective measures to prevent accident such as landslide, flooding of water, downfall of workers, ect. shall be taken into consideration fully.

7.2

During underground piping works, full care shall be taken to prevent soil and sand from flowing into pipes and to prevent pipes from refloating due to underground water or rainwater.

7.3

When back-filling is carried out, small-grain sand shall be used for the parts directly contacting with pipes.

7.4

Back-filling work shall be done so that the coated and wrapped surface of the piping will not be damaged.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 7 OF

39

REV. 0

7.5

Back-filling with small-grain sand shall be done as shown in Fig. 7.5

7.6

Additional soil and sand containing gravel, crushed stone or similar can be used only for upper portion of underground pipes as shown Fig. 7.5.

7.7

Back filling shall be done with appropriate tamping and to have 5 - 100 mm overheaping. Tamping method may be any one of the followings.

(1) (2) (3) (4) (5)

Water binding method Rammer method Vibrator method Compact roller method Combination of above method

FIG. 7.5

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 8 OF

39

REV. 0

8.

CUTTING AND BENDING

8.1

Pipes and fittings shall be cut with cutting machine and beveled by machine, grinding, etc. according to the shapes specified in the WPS.

8.2

Cutting surfaces shall be cleaned with grinder.

8.3

Butt weld end preparation is acceptable only if the surface is reasonably smooth and true and all slag from oxygen or arc cutting is cleaned from flame-cut surfaces. Discoloration which remains on a flame-cut surface is not considered to be detrimental oxidation. (B31.3, Par. 328.4.2(a) (1))

8.4

Preheating may sometimes be instructed prior to thermal cutting according to Par. 11.

8.5

In case pipe cutter shall be used for piping works, the inner surface of pipe at cut-end shall be well finished by reamer or file.

8.6

Seamless pipe having nominal size up to 1.1/2 inch shall be bent with a radius of 5 times the outside diameter of the pipe in cold state as a rule, and this work shall be made by pipe bender.

9.

THREADING

9.1

Thread to be used for pipe be "American Standard Taper Pipe thread (NPT)" stipulated in ANSI B1.20.1.

9.2

Seal tape or liquid gasket shall be used for threaded joints as a rule.

9.3

In case where pipes are seal-welded after screwed-in, lubricant, seal tape, etc. shall not be used, and all exposed threads shall be covered by the seal weld.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 9 OF

39

REV. 0

10.

WELDING

10.1

General

(1)

No welding shall be commenced without the welding procedures qualified.

(2)

Welders involved shall be qualified by PTTCHEM prior to the start of production welding in accordance with Engineering Specification PTTCHEM-SP-P-805, Welding Performance Qualification Test of Underground Pipings.

(3)

Welding shall be performed in accordance with Engineering Specification PTTCHEM-SP-P605, Welding Procedure Specifications of Underground Pipings.

(4)

All welds shall be immediately after completion of welding provided with the welder's identification stamp. For such cases where stamping will be deleterious to the parent material (thin materials, notch sensitive materials, stainless steel, non-ferrous materials, ect.) stencil stamping / marking may be Substituted for such die-stamping and shall be maintained until PTTCHEM's inspection complete.

(5)

Welding materials such as electrodes and fillers shall be properly stored, and shall be properly heated/dried before use.

(6)

Peening is only permitted to the extent necessary to clean the weld. (PTTCHEM-SP-P-T-003, Par. 7.5)

Peening is not permitted on the root pass and final pass of the weld.

(7)

Fillet welds (including socket welds) may vary from convex to concave. The size of fillet weld s determined as shown on Fig. 10.1.A. (B31.3, Par. 328.5.2)

Typical weld details for slip-on flanges and socket welding components are shown in Fig. 10.1B and Fig. 10.1C. (B31.3 Par. 328.5.2(a))

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 10 OF

39

REV. 0

(8)

No weld shall be covered/concealed by external attachments such as pads.

(9)

Grounding wire shall be firmly fastened by screw or clamp to the material to be welded.

(10) The root pass of single butt joints shall be welded such the complete penetration to be attained.

Equal Leg Fillet Weld NOTE : The size of an equal leg fillet weld is the length of the largest inscribed isosceles right triangle (theoretical NOTE :

Unequal Leg Fillet We The size of an unequal leg fillet weld leg lengths of the largest right triangle which can be inscribed within the weld cross section (e.g. 1/2 in. x 3/4 in.) (B31.3, Fig. 328.5.2A)

throat = 0.707 X size).

FIG. 10.1A FILLET WELD SIZE

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 11 OF

39

REV. 0

FIG. 10.1B - TYPICAL DETAILS FOR DOUBLE-WELDED SLIP-ON AND SOCKET WELDING FLANGE ATTACHMENT WELDS

FIG . 10.1C - MINIMUM WELDING DIMENSIONS FOR SOCKET WELDING COMPONENTS OTHER THAN FLANGES

(11) No welding shall be done if there is impingement on the weld area of any rain, snow, sleet, or excessive wind, or if the weld area is frosted or wet, unless an appropriate protection s provided. (B31.3, Par. 328.5.1 (e)) (12) Welding shall not be performed when the ambient temperature is below 5 C, unless the pipe is preheated as per Par. 11. (13) internal and external surfaces to be welded shall be clean and free from paint, galvanized paint, oil, rust, dirt, loose scale, or other material that would detrimental to either the weld or the base metal under welding conditions. the adjacent base metal surfaces shall be cleaned, too, within 25 mm from the edge of the joint. (B31.3, par. 328.4.1) (PTTCHEM-SP-T-003, Par. 7.3)

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 12 OF

39

REV. 0

(14) Inside of circumferential weld bead shall not have any burr or fragment of welding rod and all adhering substances shall be removed once located.

(15) Spatter, slag, etc. shall be thoroughly removed.

(16) Weld defects shall be completely removed by chipping, gouging, grinding, or other methods (suitable for the type of material being repaired) to sound metal, and the excavated area shall be examined by liquid penetrant methods to assure complete removal of defects.

(17) Repair welds shall be made using the same Welding Procedure used for the original weld or any other previously approved Welding Procedures.

(18) The repaired welds shall be re-examined as required for the original welding.

(19) Any weld repairs of solid material (plate, forging, pipe, etc.) need the approval of PTTCHEM and shall be performed using such procedures only, that are approved by PTTCHEM.

(20) All site-welding activities shall be done under proper protection against weather conditions to the satisfaction of PTTCHEM.

(21) Contractor shall maintain proper records containing all relevant information on each and every welder performance as the work progresses.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 13 OF

39

REV. 0

10.2

Edge Preparation and Alignment

(1)

Circumferential Welds

(a)

If component ends are trimmed as shown in Fig. 10.2A. for correcting internal misalignment, such trimming shall not reduce in a finished wall thickness below the required minimum wall thickness, "tm". Where necessary, weld metal may be deposited on the inside or outside of the component to provide alignment. It is also permissible to size pipe ends of the same nominal size to improve alignment, if the above wall thickness requirements are maintained. When a girth weld joints components of unequal wall thickness and one is more than 1.1/2 times components of the other wall, end preparation and geometry shall be in accordance with acceptable designs for unequal well thickness in ANSI B16.5. (B31.3, Par. 328.4.2(b) (1), (4) & (5))

FIG. 10.2A - TRIMMING AND PERMITTED MISALIGNMENT

(b)

Inside surfaces of components at ends to be jointed in girth or miter groove welds shall be aligned within the limits in the WPS. If the external surface of the two components are not aligned, the weld shall be tapered between them. (B31.3, Par. 328.4.3 (a) (1) & (2))

(2)

Branch Connection Welds

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 14 OF

39

REV. 0

(a)

Branch connections which abut the outside surface of the run wall shall be contoured for grove welds which meet the WPS requirements. (B31.3, Par. 328.4.3(c) (1)) (See Fig. 10.2B)

FIG. 10.2B PREPARATION FOR BRANCH CONNECTIONS

(b)

Run opening for branch connections shall not deviate from the required contour by more than the dimension "m" in Fig. 10.2B. In no case shall deviations of the shape of the opening cause the root spacing tolerance limits in the WPS to be exceeded. Weld metal may be added and refinished if necessary for compliance. (B31.3, Par. 328.4.3(c) (3))

10.3

Tack Welding

Tack welding shall be done as followings :

(1)

Avoid unreasonable set-up or other factors which would cause residual stress.

(2)

Keep adequate root opening by using spacer, etc.

(3)

Select welding rood of appropriate size for tack welding so as to fit the root opening.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 15 OF

39

REV. 0

(4)

Adopt dummy plate or start with backstep method when an arc is struck.

(5)

Provide jigs (bridges or clamps)) in minimum number necessary for setting up. Use jigs (bridges or clamps) made of material whose quality is the same as or better than base metal.

(6)

Remove the jigs by grinder or gas cutting and, in case of gas cutting, cut it at upper part of its weld toe and finish by grinder down to the surface of base metal. Jigs shall never be struck down by hammer or plucked off.

10.4

Branch Connections

All branch attachment welds shall be of full penetration groove type. When the branch pipe is welded directly to main pipe, welding shall be performed, unless otherwise specified, as shown in the following figures.

NOTE

These sketches show minimum acceptable welds. Welds may be larger than those shown here.

Remarks: 1. 2. Throat thickness "tc" shall be the lesser of 0.7 x "Tn" or 1/4 in. (6.4 mm). The symbols used herein are as follows: Th: nominal thickness of main pipe Tb: nominal thickness of branch pipe Tr: nominal thickness of reinforcement pad 3. At first, weld the part (a) and finish off the weld surface with grinder and then weld the part (b).

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 16 OF

39

REV. 0

4.

Where reinforcement pad is necessary, it is indicated in the Piping Arrangement Drawing and Notes for Piping Drawings.

5.

If pads or saddles are used, a vent hole shall be provided at the side (not at the crotch) in the ring or saddle to reveal leakage in the weld between branch and main run and to allow venting during welding. Pads or saddles may be made in more than one piece if joints between pieces have adequate strength and if each piece has a vent hole. A good fit shall be provided between reinforcing pads or saddles and the parts to which they are attached.

6.

Examination and any necessary repairs of the completed weld between branch and run shall be made before adding reinforcing pads or saddles. (B31.3, Par. 328.5.4(h))

7.

If reinforcement pads for branches should be made out of two segments, the segments shall be welded in location away from the main pipe and the weld shall not run parallel to the main pipe's axis.

8.

Location of vent hole which is equipped in the reinforcement pad plate is shown is shown as below;

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 17 OF

39

REV. 0

10.5

Half Coupling Join

Half coupling joint shall be welded as shown in the following figures:

10.6

Miscellaneous

(1)

When welded pipe is used in horizontal line, the pipe shall be laid so that the longitudinal weld line comes to upper side of the pipe (gas side). Arrangement of circumferential, longitudinal and other (branch, support, etc.) weld lines shall be as shown in the following figures :

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 18 OF

39

REV. 0

Remarks :

1. 2.

L and L1 show the distance between both toes of bead. L shall be the larger of three times of the pipe wall thickness or one outer diameter of opening.

3.

L1 shall be five times the pipe thickness or over.

(2)

If fabrication aids such as temporary fixtures are removed after welding, the attachment locations on the main pressure part shall be properly ground to eliminate surface stress risers.

11.

PREHEATING AND HEAT TREATMENT

11.1

Pre-heating

(1)

Preheating shall be performed by propane flame or by other appropriate method prior to commencing the welding.

(2)

Materials to be preheated and recommended preheating temperature shall be as follows :

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 19 OF

39

REV. 0

TABLE 11.1 - PREHEAT TEMPERATURES

Base Metal P-Number

Weld Metal Analysis A-Number

Base Material Group

Nominal Wall Thickness, (mm)

Minimum Temperature (C)

Carbon Steel

<25.4

10

Remarks : 1. The preheat temperature required according to the Welding Procedure Specifications shall be checked by use of temperature-indicating crayons or other suitable methods to ensure that the required preheat temperature is obtained prior to and maintained during the welding operation.

2. Heating width shall be three times the pipe wall thickness to each side from the bevel end. But it is not necessary to exceed 100 mm.

11.2

Postweld Heat Treatment

No postweld heat treatment is required.

12.

ASSEMBLY

12.1

Unless otherwise specified in the Drawings, valves shall normally be mounted with their stems upward for horizontal line, to access way for vertical line.

12.2

Class designation and construction of each value as mounted in the piping system shall be as shown in the Piping Arrangement Drawing, Piping Material Classifications and Piping Material Dimensions.

For all materials supplied, confirm that they are in conformity to the description of Piping Materials Classification.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 20 OF

39

REV. 0

12.3

Each fabricated component of piping shall be cleaned the inner surface and then both ends shall be protected with suitable caps.

12.4

Valves shall be installed as closed after cleaning, and shall not be opened during installation of piping systems.

12.5

In installing, flanged joints shall be fastened, after checking for the alignment of flange center and the parallelness of flange face, so that the gasket contact faces bear force uniformly and then made up with relatively uniform bolt stress.

12.6

Piping works shall be accurately performed in checking horizontal and vertical directions and mutual distances between parallel pipelines, using level, plummet, etc.

12.7

When assembling flanged connections, the gasket and bolt nut, shall be give paste for prevention of seizure, leakage, or adherence. Especially, asbestos sheet gasket be given paste amply.

Recommended pastes are as listed below :

Service of Piping air, steam, hot water nitrogen, etc. oil, gasoline and other solvents piping system of low temperature piping system of 100 C and over piping system of below 100 C piping system of low temperature Remark :

Object Joint sheet gasket VALQUA #6 Metal gasket VALQUA #5

Paste

LOWTEN PASTE 100

Bolt, Nut

SMOCON OR MOLY KOTE

LOWTEN PASTE 100

VALQUA, LOWTEN, PASTE, SMOCON, AND MOLY KOTE are brand names.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 21 OF

39

REV. 0

12.8

When works are done in the vicinity of piping made of, or lined with special materials such as plastic, rubber, glass, etc., care shall be taken not to give them damage by fire, impact, etc.

12.9

All general aspects such as cleanliness and safety requirements as regard fabrication including welding and cutting shall be ensured in accordance with standard and sound engineering practices, to the satisfaction of PTTCHEM.

12.10 13. FLANGED JOINTS

13.1

Before bolting up, flange faces shall be aligned to the design plane to within 1/16 in./ft (0.5%) maximum measured across any diameter; flange bolt (B31.3, par. 335.1.1(c))

13.2

Any damage to the gasket seating surface which would prevent gasket seating shall be repaired, or the flange shall be replaced. (B31.3, Par. 335.2.1)

13.3

In assembling flanged joints, the gasket shall be uniformly compressed to the proper design loading. (B31.3, Par. 335.2.2(a))

13.4

Bolts should extend completely through their nuts. Bolts that fail to do so are considered acceptably engaged if the lack of complete thread engagement is not more than one thread. (B31.3, Par. 335.2.3)

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 22 OF

39

REV. 0

13.5

The bolt holes of flanges shall be located symmetrically from vertical center line in horizontal piping line, and from plant north-south center line in vertical piping line, unless otherwise indicated in the drawing.

Vertical Centerline Horizontal Piping

Plant North-South Centerline Vertical Piping

14.

PROTECTIVE COATING AND WRAPPING

Protective coating and wrapping shall be in accordance with Engineering Spec. PTTCHEM-SP-P-121, Protective Coating and Wrapping for Underground Steel Piping.

15.

INSPECTION

15.1

General

(1)

Safety requirements as regards testing and inspection including radiography shall be ensured in accordance with standard and sound engineering practices to the satisfaction of PTTCHEM.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 23 OF

39

REV. 0

(2)

PTTCHEM's final inspection shall be performed in accordance with PTTCHEM's drawings and Engineering Specifications. Contractor shall not be released from his responsibility

before getting approval by PTTCHEM, even after the completion of the inspection.

(3)

Prior to, during and after completion of the works, the tests and inspection as listed in Table 15.1 shall be performed by the Contractor.

TABLE 15.1 Stage Inspection and Test Check Points

(1) Prior to commenting work

(a) Check of materials

1)

Color Code, Material Designation, Lot No. REQ. No.

(b) Welder's performance qualification (c) Welding procedure qualification (d) Welding rod

1)

Welder's performance qualification certificates

1)

Brand name & size

(2) Prior to welding work

(a) Edge preparation

1) 2)

Shape & dimensions Cleanliness Out of roundness Thickness Misalignment, Root opening Method of preheating Width of heating Temperature measurement Heating temperature Drying temperature Drying time Brand name & size

(b) Shape of Pipe end

1) 2)

(c)

Tack welding

1) 1) 2) 3) 4)

(d) Preheating

(e) Welding rod

1) 2) 3)

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 24 OF

39

REV. 0

Stage (3) During Welding

Inspection and Test (a) Welding condition 1) 2) 3)

Check Points Welding parameters Protecting measure for welding Weather condition

(4) After completion of welding work

(a) Visual examination

1)

Inside surface misalignment, if accessible

2) 3)

Outer surface misalignment Inside surface weld protrusion, if accessible

4) 5) 6) 7) 8) 9)

Wave irregularity Uneven leg length Irregular height of bead Undercut Overlap Bead center shift

10) Height of reinforcement deposit 11) Throat thickness of fillet welds (b) Non-destructive examination 1) radiography (RT)

(5) During and after completion of work

(a) Visual inspection

(6) After

(a) Hydrostatic test completion of work

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 25 OF

39

REV. 0

15.2

Non-Destructive Examination & Visual Examination of Welds

(1)

Extent of Required Examination

The required weld examination shall be in accordance with Table-15.2.

TABLE 15.2

Type of weld Examined Material Flange Class Type Examination Girth Butt Weld Branch Weld Socket Weld Attachment Weld Piping Class Description

Carbon Steel

150

Visual RT

100% 2%

100% -

100%

100% -

150B13 150B03

Remarks : 1.

Non-destructive examination is not required for the piping system designed for internal pressure less than 1.0 kg/cm2g, such as vents, drains, etc.

2.

Percentage figures indicated shall be the sampling of welds made by each welder. The entire length of the selected welds shall be examined.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 26 OF

39

REV. 0

(2)

Radiographic Examination (RT)

(a)

Method :

Radiography of welds shall be in accordance with ASME Code Sec. V, Article 2 and the supplementary procedures described in Appendix-1.

(b)

Acceptance criteria :

Limitations on imperfections in welds shall be as stated in ANSI/ASME B31.3, Par. 341.3.2 for the degree of service condition involved.

(c)

Visual Examination

After completion of welding, all welds shall be visually inspected on the outside and to the maximum extent possible also on the inside. The sequential execution of the welding operations shall be such as to enable maximum possible extent of visual inspection of the welds on the inside: for example, welding the pipe onto a socket coupling only after the weld between the coupling and the main pipe has been visually inspected on the inside for freedom from defects.

Followings shall be met, checking visually or in using measuring instrument.

(a) (b) (c)

Inside surface misalignment : 1.5 mm or less Outside surface misalignment : 3.0 mm or less Under cut :

Undercut shall be finished smoothly with grinder or file not to leave any notch, even when the value is within the limit. After finishing, the thickness of pipe shall not be less than the minimum design thickness. (d) Overlap : Grinding off

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 27 OF

39

REV. 0

15.3

Visual Inspection

Visual inspection shall be made for :

(1)

Correction for jig mark

(2)

Removal of spatter and slag

(3)

Any harmful flaw on the flange face, inner and outer surface of pipe

(4)

Shape and size of branches and other attachments shall comply with the Drawings.

16.

PRESSURE TEST

16.1

GENERAL

(1)

Prior to initial operation, each piping system shall be pressure tested to ensure tightness. (B31.3, Par. 345.1)

(2)

If any weld of a piping system remains concealed, gas leak test at test pressure equal to that for a pneumatic test shall be conducted in lieu of hydrostatic test for the concealed weld.

(3)

In case partial hydraulic pressure tests are applied for sections of underground piping, connection points between the two parts (sections) may be checked using non-destructive examination method, after obtaining approval by PTTCHEM.

16.2

Test Fluid

Hydrostatic testing shall be performed using clean water in general for all cases steels.

(1)

If there is a possibility of damage due to freezing, or if the operating fluid or piping material would be adversely affected by water, any other suitable liquid may be used.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 28 OF

39

REV. 0

(2)

If hydrostatic testing is not considered practicable, a pneumatic test maybe substituted, using air or another nonflammable gas.

16.3

Test Preparation

(1)

All joints, including welds, are to be left uninsulated and exposed for examination during the test, except that joints previously hydro tested in accordance with the Code may be insulated or covered. (B31.3, Par. 345.3.1)

(2)

Piping designed for vapor or gas shall be provided with additional temporary supports, if necessary, to support the weight of the test liquid. (B31.3, Par. 345.3.2)

(3)

Expansion joints shall be provided with temporary restraint if required for pressure load during the test, or shall be isolated from the test. (B31.3, Par.345.3.3)

(4)

Equipment which is not to be subjected to the pressure test shall be either disconnected from the piping or isolated by blinds during the tests. A valve may be used provided the valve (including its mechanism) is suitable for the test pressure. (B31.3, Par. 345.3.4)

(5)

A flanged joint at which a blind plate is inserted to isolate other equipment during the test need not be pressure tested.

(6)

If a pressure test is to be maintained for a period of time and the test liquid in the system is subject to thermal expansion, precautions shall be taken to avoid excessive pressure. (B31.3, par. 345.2.1 (b))

(7)

In case where the piping to be tested is connected to other piping in outside of battery limit, the piping shall be isolated by blind plate or valve.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 29 OF

39

REV. 0

(8)

In case where orifice, control valve, positive displacement type of area type flow meter, strainer, etc. are installed in the piping line to be tested, Contractor shall, prior to the test, obtain instruction of PTTCHEM.

(9)

When the test of piping system is to be carried out separately for each part divided at the position of flanged joint, blind plate shall be inserted between the flanges. Minimum thickness of such blind plates shall be as shown in Table 16.3.

(10)

All piping and equipment shall be properly provided with vents to remove air completely when filled with water. Provide vent and drain connections at the highest and lowest part of the line, respectively. These connections may be closed with blind flange after completion of the test.

(11)

At least two pressure gauges, having the range of 1.5 - 2 times the test pressure, shall be provided, one of them being installed at the pump discharge. However, for piping within 1.0 m of length, one or more pressure gauge(s) shall be used.

Pressure gauges shall be installed at those high and low points as near as possible to the highest and lowest of the piping to be tested, on order to prevent overstress in the piping.

(12)

In case of piping with check valve, the source of pressure shall be located in the upstream of the check valve. If this is not possible, check valve disc shall be removed or lifted up by lever (the latter is in case of valve equipped with lever) before the test. If valve disc was removed, it shall be confirmed, after completion of the test, that the disc was restored perfectly.

(13)

A grip shall be fixed to outside of each blind plate to be used for the test, and shall be painted in red to distinguish them from those for other use. A list of all blind plates and blind flanges installed for the purpose of the test shall be made and , before start-up of the plant, it shall be checked according to the list, whether such blind plates and blind flanges were removed without fail.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 30 OF

39

REV. 0

Table 16.3 Minimum thickness of blind plates for pressure testing unit : mm Test Pressure
kg/ cm
2

Flange Size (B)

11/2 1.6 2.3 3.2 3.2 4.0 4.0 4.5 5.0 5.0 6.0 6.5 6.5 7.0 7.0 7.5 7.5 8.0 8.0 8.5 8.5 9.5 10.5

10

12

14

16

18

20

24

7 14 21 28 35 42 49 56 63 70 77 84 91 98 105 112 119 126 133 140 175 210

2.3 2.6 3.2 4.0 4.5 4.5 5.0 5.5 5.5 7.0 7.0 7.5 8.0 8.0 8.5 8.5 9.0 9.0 9.5 9.5 11.0 12.0

3.0 4.5 5.0 6.0 6.5 7.0 7.5 8.5 9.0 10.5 11.0 11.5 12.0 12.5 13.0 13.5 14.0 14.0 14.5 15.0 16.5 18.0

3.2 5.0 6.0 7.0 7.5 8.5 9.0 9.5 10.0 12.0 13.0 13.5 14.0 14.5 15.0 15.5 16.0 16.5 17.0 17.0 19.0 21.0

5.0 7.0 8.5 9.5 11.0 12.0 12.5 13.5 14.5 17.5 18.5 19.0 20.0 20.0 21.5 22.0 22.5 23.5 24.0 24.5 27.5 30.0

6.0 8.5 10.5 12.0 13.5 15.0 19.0 17.0 18.0 21.5 23.0 24.0 25.0 26.0 27.0 27.5 28.5 29.5 30.0 31.0 34.5 38.0

7.5 10.5 12.5 14.5 16.5 18.0 19.0 20.5 21.5 26.5 27.5 29.0 30.0 31.0 32.5 33.5 34.5 35.5 36.5 37.0 41.5 45.5

8.5 12.0 15.0 17.0 19.0 21.0 22.5 24.0 25.5 31.0 32.5 34.0 35.0 36.5 38.0 39.0 40.0 41.5 42.5 43.5 48.5 53.5

9.5 13.0 16.0 18.5 20.5 22.5 24.5 26.0 27.5 33.5 35.0 36.5 38.0 39.5 41.0 42.5 43.5 45.0 46.0 47.0 53.0 58.0

10.5 15.0 18.5 21.0 23.5 26.0 28.0 29.5 31.5 38.5 40.0 42.0 43.5 45.5 47.0 48.5 50.0 51.5 53.0 54.0 60.5 66.0

12.0 17.0 20.5 23.5 26.5 29.0 31.5 33.5 35.5 43.0 45.5 47.0 49.0 51.0 53.0 54.5 56.0 58.0 59.5 61.0 68.0 74.5

13.0 18.5 22.5 26.0 29.0 31.5 34.5 36.5 39.0 47.0 49.5 51.5 53.5 56.0 58.0 59.5 61.5 63.5 65.0 66.5 74.5 81.5

15.5 21.5 26.5 30.5 34.5 37.5 40.5 43.5 46.0 56.0 58.5 61.0 63.5 66.0 68.5 70.5 73.0 75.0 77.0 79.0 88.0 96.5

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 31 OF

39

REV. 0

Remarks

1.

In case where piping diameter is 1B or under,

Test Pressure (kg/cm2)

Thickness of Blind Plate (mm)

40 or under 41 - 60 61 - 115 116 - 210

2.3 3.2 4.5 6.0

2.

In case where piping diameter is 26B or over, following formula shall be applied to determine the thickness of blind plate. -

thickness of blind plate (t) mm =

D ( 3P / 16SE )1/2

where,

D P SE

: : :

Outer diameter of gasket (mm) test pressure (kg/cm2) allowable stress (kg/cm2)

16.4

Hydrostatic Test

(1)

The pump for pressure test shall be attended constantly during the test by suitable members of operators.

(2)

Procedures for hydrostatic pressure test shall be as follows.

(a)

After filling the piping to be tested with water and purging air from there, the pressure shall be increased gradually in the steps as shown in table 16.4, maintaining for at

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 32 OF

39

REV. 0

least 3 minutes in each step and no abnormal conditions such as leakage, etc. shall be confirmed.

(b)

After the pressure test, the pressure value shall be decreased down to max. operating pressure x 1.1. Then welded joints shall be checked against leakage.

16.5

Test Pressure

The hydrostatic pressure at any point in the system shall be as shown in Piping Line Schedule.

16.6

Pressure Releasing and Draining

(1)

After completion of the test, pressure shall be released by opening the valve gradually so as not to endanger personnel or damage equipment.

16.7

Others

(1)

Piping always open to atmosphere, such as vent pipe, drain pipe, outlet pipe of safety valve, etc. are not tested.

16.8

Test Records

Records shall be made of each piping system during the testing period.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 33 OF

39

REV. 0

17.

PRESERVATION

17.1

Preservation with Full Water

After completion of the hydrostatic test, the piping shall be kept preservation with full water until water flushing carries out, in order to prevent inside rust of piping.

Table 16.4 PRESSURIZING STEP AND HOLDING TIME OF HYDROSTATIC PRESSURE TEST Steps Pressure(kg/c m g) Step 1 2 by test pump, etc.
2

Pressurizing Method

Measuring Instrument Pressure gauge

Holding Time (minutes) in each step : 3 at least press. : 30

Step 2

10

Step 3

20

Step 4 Step 5

30 40

Step 6

60

Step 7

100

Step 8

200

Step 9

300

Remarks:

1.

Holding time may be extended if checking is not completed within the specified holding time.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 34 OF

39

REV. 0

2.

The piping shall not be left at pressurized condition for a long period.

17.2

Curing

(1)

Nozzle of aboveground shall be covered with metal sheet to prevent incoming dust.

(2)

The red-colored protection box shall be placed to the following parts, in order to prevent damage during construction.

- Valve stem of aboveground - Nozzle of aboveground - Cathodic protection cable of aboveground (lead to test box)

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 35 OF

39

REV. 0

18.

FLUSHING

18.1

Flushing Method

Flushing shall be made by water flushing method.

18.2

General Requirements for Cleaning and Flushing

(1)

Cleaning at Fabrication Work

(a)

Vinyl caps or other end protections which cover ends of pipes shall not be removed until the fabrication work is started.

(b)

For valves, fittings and other parts, the same as above item (a) shall be observed.

(c)

Inside surface of fabricated piping shall be made free from slag, scale and other foreign matter, with grinder, chisel, wire brush, etc. After completion of cleaning, ends of the piping shall be covered with caps until the installation in the field.

(2)

Preparation for Flushing

(a)

Following preparation works shall be carried out according to Flushing Plan.

1) 2) 3) 4) 5) 6) 7) 8)

Temporary piping work Countermeasure for safety Coordination procedure and assignment of man concerned Prevention of pubic nuisance Cooperation with operator Judgment criteria of flushing Treatment of piping accessories Confirmation of support (slide or fix)

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 36 OF

39

REV. 0

(b)

Support shall be attached to exhaust piping to prevent accident caused by the reaction force during flushing.

18.3

Water Flushing

(1)

Water for Flushing

As a rule, industrial water will be used.

(2)

Degree of Water Flushing

Flushing shall be performed till the water becomes free from foreign materials, scale, etc. This shall be decided by PTTCHEM upon observing turbidity of water taken out into beaker or cup.

(3)

Procedure for Water Flushing

(a)

Water flushing shall be perform in the method of running by pressurized water, or rapid draining with water filled.

(b)

Where instruments are including in the piping system to be flushed, the instruments shall, as a rule, be removed and spool pipe (distance piece) shall be inserted of the instrument. When flushing is carried out in the condition with instrument. When

flushing is carried out in the condition with control valve connected, the procedure shall be as follows.

1) Disconnect the companion flange at upstream side of the control valve and cover opening of the control valve.

2) Flush the piping of upstream side.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 37 OF

39

REV. 0

19.

DOCUMENTATION

The records pertaining to all inspection and testing activities shall be diligently and meticulously maintained by the Contractor.

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 38 OF

39

REV. 0

APPENDIX-1

SUPPLEMENTARY RT REQUIREMENTS

1.

Personnel Qualification

Technicians who perform the radiographic inspection of welds must have the knowledge of method and apparatus there of and, at the same time, the sufficient Technique and experience of taking and processing of photograph. Those who make the judgment for non-destructive inspection shall be those appointed by PTTCHEM.

2.

Safety (Radiation Protection)

Prior to the radiographic examination, the scattering radiogractive ray around the area shall be measured and the controlled area of the radioactive ray shall be established, providing the sufficient countermeasure to prevent hazard of radioactive ray.

3.

Recommended Identification System (Marking)

A permanent identification system is preferred to provide on the radiograph as follows :

UNDERGROUND PIPING CONSTRUCTION WORKS

PTTCHEM-SP-P-602 PAGE 39 OF

39

REV. 0

Where, (a) Diameter of pipe (inch)

(b)

Weld No. (Isome Dwg. No.)

(c)

Thickness (mm)

(d)

Put symbols A, B, C... in clockwise sequence, looking in the direction same as that of flow, starting from the top (horizontal pipe) or the plant north (vertical pipe).

(e)

In case of re-photographing, put symbol "R" which means re-inspection and for cut out is "C O"

(f)

Date

(g)

Welder No.

(h)

Arrow mark

(i)

A-lead marked tape

(j)

Penetrameter

(k)

Effective length mark (Location Markers)

(l)

Contractors symbol mark