LIFT UNIT SFT SFT SFT SFT NO 1 -1 -1 -2 L B QUANTITY 9669.1406 -176.9832 -35.9375 -92.1875 9364.03 FOR 6 SLABS SFT 56184.00 REMARKS
56184
MATERIAL RATES AS PER RMC M-25 M-35 CUM CUM 4125 4750 lafarge quotation lafarge quotation
ITEM-1- BEAMS TO SUPPORT FLOATING COLUMNS Co-Eff 1.02 1.00 1.00 1.00 Description Cost of the concrete- M25 grade Labour charges for laying Curing Vibration charges Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 5393.25 3.00% 5287.50 2% Unit Cum Cum Cum Cum Rate 4125.00 1000.00 30.00 50.00 Amount 4207.50 1000.00 30.00 50.00 5287.50 105.75 5393.25 161.80 5555.05 ITEM-1.2 A,B, D & F pt beams, drops Beams, RCC beams & columns Co-Eff 1.02 1.00 1.00 1.00 Description Cost of the concrete- M35 grade Labour charges for laying Vibration charges Curing Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 6043.50 3.00% 5925.00 2% Unit Cum Cum Cum Cum Rate 4750.00 1000.00 50.00 30.00 Amount 4845.00 1000.00 50.00 30.00 5925.00 118.50 6043.50 181.31 6224.81 12 to 24 ft level 24 to 36 ft level 36 to 48 ft level 48 to 60 ft level 60 to 72 ft level ITEM-1.2 C & E Slabs 6274.81 6324.81 6374.81 6424.81 6474.81 5% Extra on labour charges for each floor Remarks 2% wastage Remarks 2% wastage
Description Cost of the concrete- M35 grade Labour charges for laying Vibration charges Curing Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity
Amount 4845.00 800.00 50.00 30.00 5725.00 114.50 5839.50 175.19 6014.69
Remarks 2% wastage
ITEM-1.2 G Staircase Co-Eff 1.02 1.00 1.00 1.00 Description Cost of the concrete- M25 grade Labour charges for laying Vibration charges Curing Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 5597.25 3.00% 5487.50 2% Unit Cum Cum Cum Cum Rate 4125.00 1200.00 50.00 30.00 Amount 4207.50 1200.00 50.00 30.00 5487.50 109.75 5597.25 167.92 5765.17 12 to 24 ft level 24 to 36 ft level 36 to 48 ft level 48 to 60 ft level 60 to 72 ft level ITEM-2 REINFORCEMENT Co-Eff 1.05 1.00 10.00 Description Cost of steel Transportation - considering 5km Binding Wire Unit MT MT Kg Rate 55000.00 500.00 70.00 Amount 57750.00 500.00 700.00 Remarks Including 5% wastage 5825.17 5885.17 5945.17 6005.17 6065.17 5% Extra on labour charges for each floor Remarks 2% wastage
1.00
Labour Charges bending, binding & fixing Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity
MT 62950.00 64209.00
4000.00 2% 3.00%
12 to 24 ft level 24 to 36 ft level 36 to 48 ft level 48 to 60 ft level 60 to 72 ft level ITEM-3 SHUTTERING - BEAMS SUPPORTING FLOATING COLUMNS Co-Eff 1.00 1.00 1.00 1.00 Description L/C beam shuttering Material Charges Consumables Plant & machinery Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 336.60 3.00% 330.00 2% Unit Sqm Sqm Sqm Sqm Rate 150.00 150.00 20.00 10.00
66185.27 66235.27 66285.27 66335.27 66385.27 Extra Rs.50/MT for each floor for lifting charges
Amount 150.00 150.00 20.00 10.00 330.00 6.60 336.60 10.10 346.70
Remarks
ITEM-3 SHUTTERING FOR OTHERS Co-Eff 1.00 1.00 1.00 1.00 1.00 Description L/C for shuttering Material Charges Material for Staging Consumables Plant & machinery Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 362.10 3.00% 355.00 2% Unit Sqm Sqm Sqm Sqm Sqm Rate 150.00 130.00 50.00 20.00 5.00 Amount 150.00 130.00 50.00 20.00 5.00 355.00 7.10 362.10 10.86 Remarks
372.96 12 to 24 ft level 24 to 36 ft level 36 to 48 ft level 48 to 60 ft level 60 to 72 ft level POST TENSIONING Co-Eff 1.00 1.00 1.00 Description Post tensioning works Cement for grouting Material for Staging Sub - Total Add 2% for Tools and Tackles Sub - Total water & Electricity 663.00 3.00% 650.00 2% Unit Sqm Sqm Sqm Rate 500.00 100.00 50.00 Amount 500.00 100.00 50.00 650.00 13.00 663.00 19.89 682.89 Remarks ( Utracon Quote 425+taxes) 422.96 472.96 522.96 572.96 622.96 Extra Rs.50 for each floor for lifting charges
SL.NO
1.1
1.2
1.3
QUANTITIES FOR DEVELOPEMNT OF PORT FACILITIES AT PORT UNIT QTY RATE AMOUNT DESCRIPTION Laying reinforced cement concrete of grade M25 / M35 / M40 (Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works below basement floor slab. All depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works up to plinth lvl a) Beams to support floating columns(M25) Cum 55.00 5,555.05 305528 Laying reinforced cement concrete of grade M25 / M35 / M40(Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works above basement floor . All depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works above + 0' to 12'0' lvl. 0 a)Pt beam(M35) Cum 1.50 6,224.81 9337 b)Drops (M35) Cum 22.00 6,224.81 136946 c)Pt Slab (M35) Cum 169.00 6,014.69 1016483 d)RCCbeams (M35) Cum 32.00 6,224.81 199194 e)RCC Slab (M35) Cum 3.80 6,014.69 22856 f) Columns (M35) Cum 38.50 6,224.81 239655 g)Staircase (M25) Cum 4.6 5,765.17 26520 Laying reinforced cement concrete of grade M25 / M35 / M40(Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works above plinth. All depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works above 12'0"' to +24'0" lvl 0 a)Pt beam(M35) Cum 1.50 6,274.81 9412 b)Drops (M35) Cum 22.00 6,274.81 138046 c)Pt Slab (M35) Cum 169.00 6,014.69 1016483 d)RCCbeams (M35) Cum 32.00 6,274.81 200794 e)RCC Slab (M35) Cum 3.80 6,014.69 22856 f) Columns (M35) Cum 38.50 6,274.81 241580 g)Staircase (M25) Cum 4.6 5,825.17 26796 Laying reinforced cement concrete of grade M25 / M35 / M40 for P.T. Slabs & R.C.C beams (Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works above plinth (double ht). All depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works from 24' 0" to +36'0" lvl 0 a)Pt beam(M35) Cum 1.50 6,324.81 9487 b)Drops (M35) Cum 22.00 6,324.81 139146 c)Pt Slab (M35) Cum 169.00 6,014.69 1016483 d)RCCbeams (M35) Cum 32.00 6,324.81 202394 e)RCC Slab (M35) Cum 3.80 6,014.69 22856 f) Columns (M35) Cum 38.50 6,324.81 243505
SL.NO
1.4
1.5
1.6
DESCRIPTION g)Staircase (M25) Laying reinforced cement concrete of grade M25 / M35 / M40 for P.T. Slabs & R.C.C beams (Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works above plinth . All depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works from 36' 0" to +48'0" lvl a)Pt beam(M35) b)Drops (M35) c)Pt Slab (M35) d)RCCbeams (M35) e)RCC Slab (M35) f) Columns (M35) g)Staircase (M25) Laying reinforced cement concrete of grade M25 / M35 / M40 (Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works all depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works from +48'0" to 60'0" lvl a)Pt beam(M35) b)Drops (M35) c)Pt Slab (M35) d)RCCbeams (M35) e)RCC Slab (M35) f) Columns (M35) g)Staircase (M25) Laying reinforced cement concrete of grade M25 / M35 / M40 (Design mix) with 20mm graded machine crushed blue coarse ordinary Portland cement, for all types of works all depths as per specification and as directed by the Engg.in.charge but excluding the cost of reinforcement steel. All other works from +60'0" to 72'0" lvl a)Pt beam(M35) b)Drops (M35) c)Pt Slab (M35) d)RCCbeams (M35) e)RCC Slab (M35) f) Columns (M35) g)Staircase (M25) h)Lmr&Hrm i)O.H.T
UNIT Cum
QTY 4.6
RATE 5,885.17
AMOUNT 27072
SL.NO
2.1
UNIT DESCRIPTION Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications up to plinth lvl a) Beams to support floating columns M.T Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+0'0" to 12'0" a)Ptslabs & Drops,tiebeam b)RCCbeams c)RCC Slab d) Columns e)Staircase Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+12'0" to 24'0" lvl a)Ptslabs & Drops,tiebeam b)RCCbeams c)RCC Slab d) Columns e)Staircase Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+24'0" to 36'0" lvl a)Ptslabs & Drops,tiebeam b)RCCbeams c)RCC Slab d)Columns e)Staircase M.T M.T M.T M.T M.T
QTY
RATE
AMOUNT
9.7
66,135.27
0 641512
2.2
2.3
SL.NO
2.4
UNIT DESCRIPTION Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+36'0" to 48'0" lvl
QTY
RATE
AMOUNT
SL.NO
2.5
2.6
3.0
3.1
UNIT DESCRIPTION a)Ptslabs & Drops,tiebeam M.T b)RCCbeams M.T c)RCC Slab M.T d)Columns M.T e)Staircase M.T Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+48'0" to 60'0"lvl a)Ptslabs & Drops,tiebeam M.T b)RCCbeams M.T c)RCC Slab M.T d)Columns M.T e)Staircase M.T Fixing in position following reinforcement steel of all diameters, for RCC including the same from Owner's stores to site of work, straightening, cleaning, cutting, bending to shapes and length as per details, binding with black soft anneled binding wire, providing cover blocks to steel supports and spacers bars etc., complete for all depths and heights as per specifications.+60'0" to 72'0"lvl a)Ptslabs & Drops,tiebeam M.T b)RCCbeams M.T c)RCC Slab M.T d)Columns M.T e)Staircase M.T h)Lmr&Hrm M.T i)O.H.T M.T Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. up to plinth lvl. a) Beams to support floating columns Sqm Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +0' to 12"0"
135.00
346.70
0 46805
SL.NO
DESCRIPTION a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +12'0" to +24'0" lvl a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +24'0" to 36'0" lvl a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +36'0" to 48'0" lvl
3.2
3.3
3.4
SL.NO
DESCRIPTION a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +48'0" to 60'0" lvl a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase Installing, dismantling and removing after specific period the following form work (of approved quality to give a fair and smooth exposed concrete finish including scaffolding, centering, bracing, providing openings, cutouts, pockets etc., complete in all types of cast-insitu concrete works) as per specifications, drawings and as directed by the Engineer-incharge. +60'0" to 72'0" lvl a)Pt beam b)Drops c)Pt Slab d)RCCbeams e)RCC Slab f) Columns g)Staircase h)Lmr&Hrm i)O.H.T Post tensioning works: Supply and installation of post-tensioning materials, including strand, anchorages and sheathing.Stressing of tendons, including the supply of stressing equipment.Grouting of tendons, including the supply of grouting equipment. Preparation of post-tensioning shop drawings First floor(+12'0"lvl) Second floor(+24'0"lvl) Third floor(+36'0"lvl) Fourth floor(+48'0"lvl) Fifth floor(+60'0"lvl) Sixth floor(+72'0"lvl)
3.5
3.6
SL.NO UNIT DESCRIPTION 5 Existing concrete breaking for suspendedslab,columns and lifpits. Remove the debries from construction site deposted in location directed by the Engineer Incharge. L.S 6 Construction of newpiles and pile caps are as per drawings.
QTY
RATE
AMOUNT
L.S
L.S -
L.S
L.S
L.S -
TOTAL AMOUNT
Rs
34,698,009
Offer for Construction of Buidling for Gangavaram Port Ltd Bill of Quantities Item No. Description Construction of RCC superstructure(frame work only) for a ground plus five floor building inclusive of all materials,excluding the design and cost of foundation ,brickwork,flooring, engineering -services and 1 interior works etc. Unit Qty. Rate(Rs.) Amount(Rs.)
Sft
56184
618
34698009
NOTE: 1 2 3 4 5 6 7 8
VAT & Service Tax extra, if applicable. Rate is only for skeleton RCC Structure. No Brick walls, no plastering and no flooring. Total building floor area will be of 56184 Sft Floor to floor Height considered as 12fts only The above price based on the Quantities given by you , any revision in the quantities/drawings extra price will be charged for additional scope of work Rate excluding glazing works Space for labour,material storage shall be provided by client
56184
S NO
DESCRIPTION
UNIT
SYAM