Review ITT Bandar Lampung

No
1

Description
Introduction 1.1 Specification

Clause No
1.1

Page
3

Issue
Appendices Design & Other Information

Question
Can you provide the attachment. because it has not been included in this document

Company
MM

Name
Tris

1.2 Interpretation and Omissions 4

1.2

Scope of Works 2.1 General

Good Industry Practice and to accepted Indonesian and whether this interpretation is referring to International Standards and practices in SNI costruction standards to international engineering,design,construction, operation and standards maintenance" The Project and WSS Shall be delivaered in 2 parts: being: a) BWSS-BOT.b) Secondary and Tertiary Distribution System (DS), Design and Construction.. whether it is an integral phasing? at the first stage was built for 2 years, all in the first stage should be finish in the end of second years. whereas in stage 2 there still have for the Design and Build phase 1. Please be clarified.

MM

Tris

2.1

MM

Tris

2.2 Timing or Phasing of works

2.2

2.3 Specific Requirements

2.3

2.4 Optional

2.4

"Delivery of the above works shall also be divided into Is the delivery phase 1 which is intended to two phase.(a) phase 1 -20.5 Ml/day .(b) Phase 2 20.5 ML / day is completed by the end of 41.ML/day ." the second years. And Phase 2 for 3 years construction. Please provide the Distribution Area for both phase ' Community consultation" for community consultation was entered in the specific requirement, What about the EIA study whether it could be provided and given a copy. "Back up Power Supply for BWSS" This exlusions ..,but Back up can be add for deliver affordable tariff outcame, can PDAM provide the data off the lights/ no electricity power in one year for the Bandar lampung. The contractor is required to provide unit pricing for these componen in its submission but these costs are not to be include in the Tariff Calculations for two things in question are Distribution System Connections Stubs and Customer Connections to Distribution System, can be given a strict limit of two cases related to payment rates

MM

Tris

MM

Tris

MM

Tris

2.5 Discretionary

2.5

MM

Tris

2.6 Project Companys Responsibility Description of Water Supply Scheme

No

Description
3.1 Bulk Water Supply System (BWSS)

Clause No
3.1.1

Page

Issue
license to extract 500 l/sec refer to Appendix A1

Question
no attachments, can the PDAM complement and How long SIPA letter can be use, Is this extract already considering with the Q 95 % dependable flow way sekampung

Company
MM

Name
Tris

3.1.2 Overview 3.1.3 Key Element

3.1.2 3.1.3

The Authority has already developed a feasible Could you please provide Pre FS /FS for this arrangement for the BWSS project a site adjacent to the intake has been identifield for the No data for All the figure , Please provide WTP see figure 3.3. Refer to section 5.1.2.2 for the figure as mention in 3.1.3 key elemens specification of this required drinking water quality standard, a nominal alighment . See figure 3.2 " refer to appendix A2 preliminary hydrolic model and design for the pipe networks that will be required has also been developed " the project company shall be responsible for developing the final design for the secondary system that will meet the demands within these zones" for the secondary system : pipe network that will be utilized to supply the designeated supply zone, and tertiary system the pipe network that supplies the water from the secondary pipes to the street network. Please provide the data appendix A2 prelimanary hydrolic model, also for figure 3.4- 3.5 and 3.6 Could you please provide the preliminary design supply zones

MM MM

Tris Tris

3.2 Distribution System

3.2.2

MM

Tris

3.2.3

MM

Tris

3.2.3

Contomer Connections , along tertiary pipe lines, the Is the Pricing stand alone? Not include in project company may be required by authority to install the tariff calculation? What the boundtry branch stubs for all proposed last mile connections, The limit for the customer connection? project company shall provide unit pricing in the tender submission for this purpose. Figure 3.7 Last Mile Connections Components No figure in this section 23 23 23

MM

Tris

MM

Tris

4 Project Requirements 4.1 General Requirement 4.2 Preliminary Work

4.2.1

4.3 Property & Property Acquisition

4.2.2

28

"--- ALL preliminary work for all stages wherewver To match with this condition, The Project possible is completed at the commencement (stage1) of company need datas provided by PDAM as, the project Pre FS or FS/ EIA, RDS, and existing data from PDAM" Independent Cerifier, and according with clause 9 and Does it means that to find and use for 23 of agreement , that the fees of the independent the independent certifier is a project certifier shall be paid by the project company company that proposed and asked for

MM

Tris

MM

Tris

approval to the PDAM? How the Mechanism payment ?

No

Description

Clause No
4.2.4

Page

Issue
Conceptual Design & Investigations , Authority has already undertaken some initial investigations relevant to the WSS "..All Design and Engineering for all stages whereever possible is completed at the commencement ( stage 1) of the project.." Technical investigation . " the project company shall be responsible for planning and undertaking all necessary technical investigations .."

Question Can we get the initial investigation report


Could be the PDAM give a time limit for DED , and preparation approval

Company
MM

Name
Tris

4.4 Design & Engineering

4.4.1

29

MM

Tris

4.4.4

4.5 Construction

4.4.5 4.5.6

36

Design Review Meeting, " to provide connection stubs or capped branches from tertiary pipelines to provide an interface point, or Customer Connection Point, from which the last mile connections can be installed (by the Authority, Project Company and/or a third party contractor) without interference to tertiary pipelines and without any requirement to dig up roads." All property acquisition must be completed before construction commences

We asked the PDAM to provide preliminary data and indications investigation ever conducted in the planning BWSS in Lampung, the data of this data should be placed in a folder that can be accessed on connecting to a network towards tertiary to customer connections point, can PDAM provide the existing datas underground utility around the project area.

MM

Tris

MM

Tris

4.5.8.1

39

In the case of property Can PDAM provide support and assurance associated with the land for the project, the processing of documents LARAP

MM

Tris

4.6 Operations & Maintenance 4.7 Handover 4.8 Defects Liability Period Performance Requirements

49 52 53 Comply with the conditions applied under the license with respect to extraction water from Way Sekampung For the Licence to extract up to 500 l/s from Way Sekampung, This licence periode for how long? Is the license already cover for 95 % dependable flow as state in the regulation The BWSS, when fully completed, shall be capable of Design Capacity for the BWSS is 20.5 Ml delivering at least 14,200 ML per year to the bulk water initially ( Phase 1) and 20.5 Ml /d phase 2 supply point. MM Tris

5.1 Bulk Water Supply System 5.1.1.2

54

MM

Tris

54

No Document Clause No Page 1 Introduction 3 1.1 Specification 3 1.2 Interpretation and Omissions 4 2 Scope of Works 5 2.1 General 5 2.2 Timing or Phasing of works 6 2.3 Specific Requirements 7 2.4 Optional 8 2.5 Discretionary 8 2.6 Project Companys Responsibility 3 Description of Water Supply Scheme 9 3.1 Bulk Water Supply System (BWSS) 9 3.2 Distribution System 16 4 Project Requirements 23 4.1 General Requirement 23 4.2 Preliminary Work 23 4.3 Property & Property Acquisition 28 4.4 Design & Engineering 29 4.5 Construction 36 4.6 Operations & Maintenance 49 4.7 Handover 52 4.8 Defects Liability Period 53 5 Performance Requirements 5.1 Bulk Water Supply System 54 5.2 Distribution System 67 5.3 Compliance Metering and Water Quality Monitoring 69 5.4 Power Supply 70 5.5 BWSS Staffing Requirements 71 5.6 Raw Water Quality Management 72 5.7 Operation & Maintenance Manuals 72 5.8 Asset Management System 75 6 Design & Construction Requirements 77 77 6.1 General 77 6.2 Redundancy 78 Regional Government of Bandar Lampung Municipality Bandar Lampung Water Supply Performance Specification 78 6.3 Materials Selection 6.4 Durability 80 6.5 Civil and Structural 6.6 Pipelines 81 6.7 Mechanical 85 6.8 Electrical 88 6.9 Monitoring, Instrumentation and Controls 90 6.10 Building and Utility Services 96 6.11 Overflow, Spills & Drainage 96 6.12 Administration, Laboratory & Maintenance Facilities 97 6.13 Other Requirements 97 7 Tender Submission Documentation 99 7.1 General 99

Issue

7.2 Executive Summary 7.3 Capability Summary 7.4 Technical Compliance & Alignment Statement 7.5 Detailed Scheme Description 101 7.6 Project Plan 7.7 Project Costing & Costing Framework 7.8 Risk Assessment 7.9 Plans & Manuals 7.10 Other References 108

99 100 100 101 102 103 106 106 107 108

Question

Company

Name

Note

:Conditions of Contract for Building and Engineering Works Designed by the Employer. Pada FIDIC tersebut, hal yang penting adalah diterapkannya suatu pembagian risiko yang berimbang antara pihak-pihak yang terkait dalam suatu pembangunan proyek, yaitu bahwa risiko dibebankan kepada pihak yang paling mampu untuk 1 mengendalikan risiko tersebut.