CHILLED WATER SYSTEM OPTIMIZATON


Presented by David A. Rogers, P.E Harold A. Hougham, P.E.

CHILLED WATER SYSTEM OPTIMIZATON

ENGINEERING APPLIED TO OPERATIONS (Retro Commissioning)

CHILLED WATER SYSTEM OPTIMIZATON

THE CONCEPT SYSTEM FUNDAMENTALS THE PROCESS THE RESULTS

CHILLED WATER SYSTEM OPTIMIZATON

THE CONCEPT

CHILLED WATER SYSTEM OPTIMIZATON

CHILLED WATER SYSTEM OPTIMIZATON

CHILLED WATER SYSTEM OPTIMIZATON

CHILLED WATER SYSTEM OPTIMIZATON

SYSTEM FUNDAMENTALS

CHILLED WATER SYSTEM OPTIMIZATON


THE THREE RULES FOR HYDRONIC SYSTEMS OPTIMIZATION
PUMP LESS WATER PUMP LESS WATER PUMP LESS WATER

CHILLED WATER SYSTEM OPTIMIZATON

Distribution System DELTA T Drives the Plant (s)

CHILLED WATER SYSTEM OPTIMIZATON

Syllabus
Systems Concepts Simple Formulas Rules of Thumb System Configurations Hydraulic Profile System Components Delta T Flow Limited Plant How your System works Now/Optimized

CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts
A system is a group of components that when connected and operating provide a desired result.

CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts
Production Distribution Load

CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts
Pumps Chillers

Pumps Load

Cooling Tower

CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts
Chilled Water System
Secondary Pumps Chillers

Data & Controls Production System


Decoupler

Distribution System

Load

Primary Pumps

CHILLED WATER SYSTEM OPTIMIZATON

Simple Formulas
Chilled Water Delta T = T return water - T supply water GPM/TON = 24/Delta T Pump Affinity Laws = Q1/Q2=N1/N2 H1/H2=(Q1/Q2)2 BHP1/BHP2=(Q1/Q2)3 Q = Flow, N = rpm, H = Head BHP = Brake Horsepower

CHILLED WATER SYSTEM OPTIMIZATON

Simple Formulas
Chilled Water Delta T
Control Valve

CHWR T = 60oF

Cooling Coil

CHWS T = 42oF

Chilled Water Delta T = T return water T supply water Chilled Water Delta T = 60 42 = 18 degrees.

CHILLED WATER SYSTEM OPTIMIZATON

Simple Formulas
GPM/Ton = 24/Delta T
How many tons of cooling are served by a 6,000 gpm/12 degree delta T distribution system?
GPM = 6,000

Delta T = 12 degrees 24/Delta T = 24/12 = 2 GPM/Ton Tons Cooling = GPM/(24/Delta T) = 6,000/2 = 3,000 tons

HOW MANY CHILLERS DO I HAVE ON LINE TO SERVE THIS 3000 TON LOAD?

CHILLED WATER SYSTEM OPTIMIZATON

Simple Formulas
Pump Affinity Laws
Pump Affinity Laws can be used to estimate system performance but should be modified to reflect system performance. What is the approximate required pumping horsepower if I cut system flow in half while still serving the same cooling load?
10,000 GPM requires 240 BHP 5,000 GPM requires ? BHP. Q1 = 10,000 GPM, Q2 = 5,000 GPM, BHP1 = 240 BHP2 = BHP1(Q2/Q1)3 or BHP2 = 240(5,000/10,000)3 = 240/8 30 BHP

CHILLED WATER SYSTEM OPTIMIZATON

Rules of Thumb
Water Always Flows from a Higher Pressure to a Lower Pressure. Minimum Delta P for a control valve = 5 psig Minimum Delta P for a Bldg Interface = 20 psig Distribution System Delta T should always be Production System Delta T Production System Delta T should always be < Chiller Delta T

CHILLED WATER SYSTEM OPTIMIZATON

Rules of Thumb
Minimum Delta P Across a Control Valve is 5 psig
Control Valve

P3= 11 psig

P1= 18 psig

Cooling Coil

Delta P = 18 11 = 7 psig

WHAT HAPPENS IF DELTA P IS ZERO?

CHILLED WATER SYSTEM OPTIMIZATON

Rules of Thumb
Minimum Delta P Across a Building Interface is 20 psig
Pressure Compensating Control Valve

Pout= 18 psig Building Pin= 40 psig Delta P = 40 18 = 22 psig

WHAT HAPPENS IF DELTA P IS 10 PSIG?

CHILLED WATER SYSTEM OPTIMIZATON

Rules of Thumb
Distribution System Delta T should always be Production System Delta T
TPS=42oF
Chillers Secondary Pumps

TDS=42oF

Production System
TPR=56oF
Primary Pumps

Distribution System
TDR=58oF

Load

Distribution Delta T = 58 42 = 16 degrees Production Delta T = 56 42 = 14 degrees

CHILLED WATER SYSTEM OPTIMIZATON


Production System Delta T < Distribution System Delta T

Rules of Thumb

Load in Tons 2000 1800 1600 800

Chiller % Load 100 90 80 40

Production CHWR 58 56.4 54.8 48.4

Production Delta T 16 14.4 12.8 6.4

Distribution Delta T CHWR 58 58 58 58 16 16 16 16

CHILLED WATER SYSTEM OPTIMIZATON

Rules of Thumb

Production System Delta T should always be < Chiller Delta T


0.75

0.7

0.65 KW/Ton CHILLER 3 CHILLER 4&5 CHILLER 6&7 0.6

0.55

0.5 20 30 40 50 60 % Full Load 70 80 90 100

CHILLED WATER SYSTEM OPTIMIZATON

System Configurations
Primary/Secondary Constant Flow/Variable Flow Primary Only Constant Flow Variable Primary Flow (VPF) Variable Flow Multiple Plants/Common Distribution Loop Plant 1 Primary/Secondary Plant 2 Primary Only Plant 3 Primary/Secondary

CHILLED WATER SYSTEM OPTIMIZATON

Primary/Secondary
Constant Flow/Variable Flow
Chillers Secondary Pumps

Production System

Distribution System

Load

Primary Pumps

CHILLED WATER SYSTEM OPTIMIZATON

Primary Only
Constant Flow
Chillers Secondary Pumps

Production System

Distribution System
Load

Primary Pumps

CHILLED WATER SYSTEM OPTIMIZATON

Variable Primary Flow


Variable Flow
Chillers

Production/ Distribution System Production/ Distribution Pumps


Load

CHILLED WATER SYSTEM OPTIMIZATON

Multiple Plants on a Common Distribution Loop

CHILLED WATER SYSTEM OPTIMIZATON

Hydraulic Profile
A graphical representation of the dissipation of system head.
Ft of Head

Distance

CHILLED WATER SYSTEM OPTIMIZATON

Hydraulic Profile
Primary/Secondary System

Ft of Head

CHILLED WATER SYSTEM OPTIMIZATON

Hydraulic Profile
Two Plants Common Distribution Loop

Ft of Head

CHILLED WATER SYSTEM OPTIMIZATON

Hydraulic Profile
The Hydraulically Most Remote Point
Hydraulically most remote point & location of VFD DP sensor

Ft of Head

Physically most remote point

Distance

CHILLED WATER SYSTEM OPTIMIZATON

Hydraulic Profile
Building System/Hydraulically Most Remote Point

Ft of Head

CHILLED WATER SYSTEM OPTIMIZATON

System Components
Chillers Cooling Towers Pumps Control Valves/Cooling Coils

CHILLED WATER SYSTEM OPTIMIZATON

Chillers/Cooling Towers

CHILLED WATER SYSTEM OPTIMIZATON

Chiller Performance
COP = Output/Input COP = Q4-1/W1-2 Q2-3 = m(h2 h3) Point 3 Pressure = C Point 2

Pressure
h3 = h4 LIFT Q4-1 = m(h4 h1) Pressure = C Point 4 Temperature = C W1-2 = m(h2 h1) Point 1 Compressor Work

P-1

Enthalpy

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Tower Performance


Entering Condenser Water 95 degrees Range 95 85 = 10 degrees

Leaving Condenser Water 85 degrees

Outside Air Wet Bulb Temperature 76 degrees

Approach 85 76 = 9 degrees

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Tower Performance


2.5 2.0

Tower Size Factor

Constants Heat Load Range Wet Bulb

1.5

1.0

0.5 5 10 15 20 25 30

Approach

CHILLED WATER SYSTEM OPTIMIZATON

Pumps
How They Work Arrangements

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work


B C A Pressure Inlet Tip of Impeller Vane Centrifugal Pump A B C Outlet Tip of Impeller Vane

Velocity

Suction Flow Path

Discharge

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work


NPSH = Net Positive Suction Head
B C A Pressure B C Outlet Tip of Impeller Vane

Centrifugal Pump
Collapsing Bubbles Vapor Bubbles

x x x x

Velocity

Suction Pump Impeller Blade Flow Path

Discharge

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work


Typical Pump Curve

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work


Variable Frequency Drives

CHILLED WATER SYSTEM OPTIMIZATON

Pumps How They Work


Variable Speed Pump Curves

CHILLED WATER SYSTEM OPTIMIZATON

Pumping Arrangements

Head Ft.

Head Ft.

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


Configurations How They Work

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


Configurations
CONTROL VALVE

CHWR 56+ degrees Leaving Air 55 degrees Delta T: 56 42 = 14 degrees COOLING COIL CHWS 42 degrees

Entering Air 70 degrees

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


How They Work Control Valves Waste Energy

Ft of Head

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


How They Work
Actuator Arm Connected to the Valve Shaft

Valve Shaft

Valve Disc Not Fixed

FLOW Valve Seat Fixed

CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


How They Work

CHILLED WATER SYSTEM OPTIMIZATON

Delta T
Difference between CHW Return & CHW Supply and Chilled Water Supply Temperatures Delta T = TCHWR - TCHWS Q = C x GPM x Delta T For the same Q if delta T is low then GPM is high & if delta T is high then GPM is low! 5,000,000 Btuh = C x 1000 gpm x 10 F = C x 500 gpm x 20 F

CHILLED WATER SYSTEM OPTIMIZATON Low Delta T / Flow Limited Plant


2,000 Ton Chillers, 14 degree Secondary Pump P-2, delta T, 3,429 gpm each Variable Flow
Chiller

42 degree CHWS Load Typical

Chiller

Chiller

Distribution Loop Production Decoupler Loop

Pressure Compensating Valve Typical

Load in Tons 2000 2000 2000 2300

Production Gpm 3429 6858 6858 10287

On Line Tonnage (1)2000 (2)4000 (2)4000 (3)6000

Percent Loaded 100 50 50 38.3

Distribution Gpm 3429 4000 6000 6900

Distribution CHWR 56 54 50 50

Dist. Delta T 14 12 8 8

CHILLED WATER SYSTEM OPTIMIZATON

Delta T Flow Limited Plant


CENTRIFUGAL CHILLER EFFICIENCIES
0.75 0.7

0.65 KW/Ton CHILLER 3 CHILLER 4&5 CHILLER 6&7 0.6

0.55

0.5 20 30 40 50 60 % Full Load 70 80 90 100

CHILLED WATER SYSTEM OPTIMIZATON Delta T Flow Limited Plant


Estimated Annual Part Load Chiller Savings due to Increased Efficiency for non Flow Limited Operations
Flow limited average kw/ton = 0.55 Non flow limited average kw/ton = 0.523 Annual average part load = 2000 tons Annual part load hours of operation = 8,000 Cost of electricity including demand = $0.14 Estimated annual part load chiller savings due to increased efficiency of operation = (0.55-0.523)(2000)(8000)(0.14) = $60,480

CHILLED WATER SYSTEM OPTIMIZATON High Delta T / Full Load Plant


2,000 Ton Chiller, 14 degree Secondary Pump P-2, delta T, 3,429 gpm Variable Flow
Chiller

42 degree CHWS Load Typical

Production Loop Decoupler

Distribution Loop

Pressure Compensating Valve Typical

Load in Tons 2000 2000 2000

Production Gpm 3429 3429 3429

Production CHWR 56 56 56

Percent Loaded 100 100 100

Distribution Gpm 3429 3000 2667

Distrib. CHWR 56 58 60

Dist. Delta T 14 16 18

CHILLED WATER SYSTEM OPTIMIZATON High Delta T / Part Load Plant

Load in Tons 2000 1800 1800 1600

Production Gpm 3429 3429 3429 3429

Production CHWR 56 54.6 54.6 53.2

Percent Loaded 100 90 90 80

Distribution Gpm 3429 2700 2400 1920

Distrib. Gpm 56 58 60 62

Dist. Delta T 14 16 18 20

CHILLED WATER SYSTEM OPTIMIZATON Chilled Water Cost Variables


Variables Average Annual Cooling Load Electric Chiller/Tower/Condenser & Production Pumps Absorption Chiller/Tower/Condenser & Production Pumps Distribution System Delta T Cost of CHP Electrical Power Power Factor Pump Efficiency Pump Design Flow Pump Design Head Pump Hp Electric Chiller Capacity Absorption Chiller Capacity Number of Electric Chillers Number of Absorption Chillers Electric Chillers Absorption Chillers 4,500 0.9 0.3 11 $0.065 0.9 0.87 15000 155 750 2000 1385 1 2 12 16 Tons Kw/Ton Kw/Ton Degrees F $/Kwh Constants Flow 500 Ton 12000 Btuh Power 0.746 Kw/Hp Max Speed 60 Hz GPM/Ton 24 System Curve Constant 0.8 MM 1,000,000

GPM Ft Hp Tons Tons

Assumptions Absorption Chillers are always lead chillers Electrical Cost includes all byproduct burdens Building Pumping is not considered a CHP operatio

Delta T Delta T Costs not Included

Calculations Distribution Flow Distribution Pump Hp each Distribution Pumping Kw each Absorption Chillers Operating Electric Chillers Operating Number of Distribution Pumps Running Percent rpm each pump Annual Average Cost of Cooling Electric Chillers Flow Absorption Chillers Flow 9818 GPM 210 Hp 200 Kw Capital Funding Sinking Funds Administrative

Load 2 1

Flow 2 2

1 65% $5.57 $/MMBtu 4000 GPM 2078 GPM

CHILLED WATER SYSTEM OPTIMIZATON

How does your System work Now ?


Existing Distribution System Maximum Delta T = ?? degrees Existing Distribution System Average Delta T = ? degrees Chillers Staging? System Pumping Energy Optimized or not Optimized? (Control Delta P)

CHILLED WATER SYSTEM OPTIMIZATON

How should your System work when Optimized?


Optimized Maximum Delta T = ?? degrees Optimized Average Delta T = ?? degrees Chillers Staging ?? System Pumping Energy Optimized or not Optimized ??

CHILLED WATER SYSTEM OPTIMIZATON

THE PROCESS

CHILLED WATER SYSTEM OPTIMIZATON


Step #1

Chilled Water Systems Questionnaire for Initial System Evaluation

SYSTEM DATA ROI

CHILLED WATER SYSTEM OPTIMIZATON


Step #2

Pre Project Staff Training

CHILLED WATER SYSTEM OPTIMIZATON


Step #3 Pre Project Measurement & Verification (M&V)

Data Historian/Sensors Project ?

BEFORE

AFTER

CHILLED WATER SYSTEM OPTIMIZATON


Step #4

Chilled Water System Engineering Evaluation & Analysis

CHILLED WATER SYSTEM OPTIMIZATON


750 HP; 14,000 GPM; 8o T;
800 700 600 500 400 300 200 100 0
22 24 10 12 14 16 18 20 8

Pumping HP

System Delta T

CHILLED WATER SYSTEM OPTIMIZATON


Step #5 Report of Findings and Recommendations

ROI

CHILLED WATER SYSTEM OPTIMIZATON


Step #6 Implement Chilled Water System Optimization Construction Project

CHILLED WATER SYSTEM OPTIMIZATON


Step #7 Commission Chilled Water System Optimization Project

CHILLED WATER SYSTEM OPTIMIZATON


Step #8 Post Project M&V for Rebate Verification

BEFORE

AFTER

CHILLED WATER SYSTEM OPTIMIZATON


Step #9

Post Project Staff Training

CHILLED WATER SYSTEM OPTIMIZATON

THE RESULTS

CHILLED WATER SYSTEM OPTIMIZATON

The University of California Davis Medical Center, Sacramento

CHILLED WATER SYSTEM OPTIMIZATON

UCDMC
1. 3,000,000 square feet Trauma Center/Hospital/Clinic & Educational Buildings. 2. 26 MW CHP w/ Primary/Secondary 16 degree plant serving a 12 degree campus. 3. Each building was decoupled and pumped. 4. Average distribution system delta T was 8 degrees. Maximum delta T was 11 degrees.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Operations
1. 18 degree distribution system delta T w/ 114 degrees outside air temperature. 2. Central plant spare distribution pump and chiller capacity. 3. Some buildings performing in excess of 20 degree delta T. 4. Average system delta T is 12 degrees.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Financial
1. Financial data not available due to lack of system instrumentation.

Energy
2. Energy data not available due to lack of system instrumentation.

CHILLED WATER SYSTEM OPTIMIZATON

Lessons Learned
1. Create a system optimization sensor project to facilitate data acquisition for pre & post project M&V. 2. Provide pre project staff/management training to facilitate a coordinated effort for all parties. 3. Develop a detailed Site Acceptance Test for control valve commissioning.

CHILLED WATER SYSTEM OPTIMIZATON

BIOTECHNICAL CORPORATION

CHILLED WATER SYSTEM OPTIMIZATON

Biotechnical Corp
1. 3,000,000 square feet of R&D, Office & Production across 25 buildings. 2. Three Central Plants on common distribution loop, 14,100 ton installed capacity. 3. Delta T performance was 6 degrees part load and a maximum of 11 degrees at full load. 4. A 14 degree campus.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Operations
1. Achieving distribution loop 20 degree Delta T @ full and part load. 2. Maximum flow distribution pumping requires 3 and not 4 operational pumps 3. Delayed major capital infrastructure expansion project for 3 years due to optimizing use of existing infrastructure.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Financial
1. Financial data not available due to lack of system instrumentation.

Energy
1. Energy data not available due to lack of system instrumentation.

CHILLED WATER SYSTEM OPTIMIZATON

Lessons Learned
1. Discovered other system issues that were masked by poor system performance; Damper Failures, Sensor Calibration, etc. 2. Train installing controls contractor on Systems Optimization Concept and Process. 3. Verify AHU isolation valve arrangement and function prior to issuing contract requiring continued system operation during construction.

CHILLED WATER SYSTEM OPTIMIZATON

The University of Iowa Hospital and Clinics

CHILLED WATER SYSTEM OPTIMIZATON

UIHC
1. 4,000,000 square feet of contiguous hospital/clinic space between five buildings. 2. Central Plant metered and billed for each building. 3. Each building is decoupled and pumped.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Operations
1. Resolved low chilled water pressure & flow to Operating Room Air handlers. 2. Resolved condensation issue on cooling panel ceilings in patient rooms. 3. Removed tertiary building pumps and reduced operation of building pumps

CHILLED WATER SYSTEM OPTIMIZATON

Results
Financial
1. Savings $2,800,000 for the last 2 cooling seasons primarily from penalty reduction. 2. Chilled Water billing based on building flow and an assumed Delta T of 16 Degrees.

CHILLED WATER SYSTEM OPTIMIZATON

Results
Energy
1. Original simple payback estimate 5 years. 2. System instrumentation was not adequate to measure actual energy reduction.

CHILLED WATER SYSTEM OPTIMIZATON

Lessons Learned
1. Building system instrumentation not adequate to provide M&V for energy consumption. 2. Building system energy savings and production/distribution billed savings are not the same number. 3. Production/distribution system billed savings represented a simple payback of less than 9 months.

CHILLED WATER SYSTEM OPTIMIZATON