ILLUSTRATED PRODUCT CATALOGUE MAJOR PROJECTS 1990 2010 1990-2010

CLIENT ELF ANTAR LOCATION Donges, France YEAR OF DELIVERY - 1992


SCOPE : Supply of 1 catalytic reformer and 1 Hot oil heater f f

CLIENT - Petrokemya LOCATION Al Jubail, Saudi Arabia YEAR OF DELIVERY - 1993


SCOPE : Design and supply of 10 milliseconds cracking f f furnaces in 5 modules, prefabricated in Belgium and f shipped to Saudi Arabia. The 5 modules of 2 heaters each were entirely prefabricated, equipped and tested in Europe with all the auxiliaries equipment, instruments, piping and wiring, including lighting fixtures. To be shipped, each module was rolled from the yard to the deck of the semi-submersible heavy lift vessel with 4 trailers each with 80 hydraulic heights controlled and steerable double-wheels. Technology M.W. Kellogg.

CLIENT Mitteldeutsche Erdoel Ref LOCATION Leuna, Germany YEAR OF DELIVERY - 1994
SCOPE : Leuna 2000 Project. Engineering and f fabrication of 6 Heaters : 1 Column Feed Heater, 1 Reactor f Charge Heater, 3 Hydrotreaters, 1 Catalytic Reformer, technology Lurgi.

CLIENT IBN Hayyan LOCATION Al Jubail, Saudi Arabia YEAR OF DELIVERY - 1994
SCOPE : Supply of 1 modularised EDC cracking f f furnace.

CLIENT Reliance Industries Limited LOCATION Jamnagar, India YEAR OF DELIVERY - 1996
SCOPE : Reliance 1 Project. Design and supply of 12 heaters : 4 Hydrodesulfurisation Heaters, 2 Vacuum f f Distillation Heaters, 4 Atmospheric Distillation Heaters and 2 Reactor Charge Heaters.

CLIENT Rafineria Gdanska LOCATION Gdansk, Poland YEAR OF DELIVERY - 1996


SCOPE : Replacement of a Vacuum Distillation Heater in 7 days. Stage 1 : Removal of the old heater from foundations. Stage 2 : The new heater built on temporary foundations is being rolled on position by mean of trolleys pushed on the rails by hydraulic jacks. Stage 3 : Placement of the new heater on the existing foundations.

CLIENT Hadeed LOCATION Al Jubail, Saudi Arabia YEAR OF DELIVERY - 1996


SCOPE : Installation of a fully modularised Process Gas Heater to be installed at 40 meters elevation on the top of reactor structure.

CLIENT UEI Posven LOCATION Puerto Ordaz, Venezuela YEAR OF DELIVERY - 1997
SCOPE : Supply of 2 gas heater, technology HYL.

CLIENT Fina Antwerp Olefins LOCATION Antwerp, Belgium YEAR OF DELIVERY - 2001
SCOPE: FAO Project, supply of 1 Naphta Ethane Cracking Furnace. Recognition of Excellence in Quality and Safety, ExxonMobil technology.

CLIENT Sincor LOCATION Jos, Venezuela YEAR OF DELIVERY - 2001


SCOPE : Design, full modularisation and sea transportation of 8 Heaters : 2 Cracking Heaters, 1 Reactor Charge Heater, 1 Hydrotreater, 2 Vacuum Distillation Heaters, 2 Atmospheric Distillation Heaters.

CLIENT Holborn Europa LOCATION Holborn, Germany YEAR OF DELIVERY - 2000


SCOPE : Supply of 1 Steam Reformer (Haldor Topsoe Technology) and 1 hydrodesulfurisation heater.

CLIENT Air Liquide LOCATION Antwerp, Belgium YEAR OF DELIVERY -2001


SCOPE : Jupiter Project, supply of 1 232 tubes Steam Reformer, Haldor Topsoe technology.

CLIENT Sasol LOCATION Sasolsburg, South Africa YEAR OF DELIVERY -2002


SCOPE : Supply of 2 steam superheaters.

CLIENT ExxonMobil Chemical LOCATION Jurong Island, Singapore YEAR OF DELIVERY - 2006
SCOPE : LSTK project. Design and fabrication of the 9th furnace of the Singapore Olefins Plant : 1 steam cracking furnace, Exxon Technology.

CLIENT Chandra Asri Petrochemical Center LOCATION West Java, Indonesia YEAR OF DELIVERY - 2007
SCOPE : Furnace expansion project. Supply and erection of 1 Steam Cracker, KBR technology.

CLIENT Reliance Industries Limited LOCATION Jamnagar, India YEAR OF DELIVERY - 2008
SCOPE: Reliance II Project. Design and supply of 28 modularised furnaces : 3 Steam Superheaters, 2 Vacuum Distillation Heaters, 1 Reboiler, 11 Reactor Charge Heaters, 1 Catalytic Reformer, 4 Atsmospheric Distilation Heaters, 2 Hot Oil Heaters, 6 Hydrotreaters, 1 Delayed Coker.

CLIENT Total Petrochemicals LOCATION Gonfreville, France YEAR OF DELIVERY - 2007


SCOPE : Supply of 1 modularised Steam Superheater. Prefabrication in Thessaloniki, Greece and sea transportation to Gonfreville, France.

CLIENT Oman Aromatics LOCATION Sohar, Sultanate of Oman YEAR OF DELIVERY - 2008
SCOPE : Design and supply of 15 aromatic heaters : 8 Reboilers, 6 Reactor Charge Heaters and 1 Catalytic Reformer.

CLIENT P.I.C. LOCATION Shuaiba, Kuwait YEAR OF DELIVERY - 2009


SCOPE : Aromatic Complex project. Design and supply of 4 Reboilers and 2 Reactor Charge Heaters, UOP technology.

CLIENT Kinef LOCATION Kirishi, Russia YEAR OF DELIVERY - 2007


SCOPE : Supply of 1 Visbreaker and 2 Vacuum Distillation Heaters in 2004. Erection of the Heaters on the Kirishi Site in 2007.

CLIENT ExxonMobil Chemical LOCATION Jurong Island, Singapore YEAR OF DELIVERY 2010
SCOPE : Supply of 7 cracking furnaces, fulkly modularised in Thailand, and shipped to Singapore, Exxon technology.

CLIENT Total Petrochemicals LOCATION Immingham, United Kingdom YEAR OF DELIVERY - 2007
SCOPE : Supply of 1 64 tubes Steam Reformer, Jacobs technology.

CLIENT Total Petrochemicals LOCATION Gonfreville, France YEAR OF DELIVERY - 2011


SCOPE : UGO 2011 project : supply of 2 Steam Cracking furnaces, Shaw technology.

CLIENT Hellenic Petroleum LOCATION Elefsis Refinery, Greece YEAR OF DELIVERY - 2010
SCOPE : Supply of 1 Steam Methane Reformer, Haldor Topsoe technology and 2 hydrocrackers.

CLIENT NIS Gazpromneft LOCATION Pancevo Refinery, Serbia YEAR OF DELIVERY - 2012
SCOPE : Supply of 1 complete steam reforming unit for Hydrogen production, Haldor Topsoe technology.