Prepared by:
Date:
Holcim Group Support Ltd Cement Manufacturing Services with support of Corporate Sustainable Development 08.03.2011
The copyright for this document and all appendices are reserved by Holcim Group Support Ltd
Page 2
Annex:
Page 3
1.
INTRODUCTION Since 2007, a yearly assessment of cement manufacturing performance is performed by HGRS/CMS with the objective to identify, in a systematic way, plants with significant potential for improvements. To get a comprehensive overview of the plant performance, eight performance indices have been defined in the following manufacturing areas: Production cost Production capacity Maintenance Product quality Thermal energy Electrical energy Environmental performance OH&S. In addition, an overall performance index is calculated as average of the eight performance indices.
2.
METHODOLOGY The study has been made for the 97 integrated cement plants of the consolidated group companies. White cement plants and grinding stations are not considered. The overall performance of a cement plant is summarized by the radar screen as shown in the graph (see page 4). The methodology has been updated in 2010 with two minor adjustment: the Production Cost Index yields a score of 100 points when the ratio of Actual / Budget for Specific Cost Cement is 0.9 or lower; a score of 90 points when the ratio is 1.0; a score of 0.5 when the ratio is 1.1; a score of 0 when the ratio is 1.5 or greater. the Enviro Index includes a new indicator PCB elimination reflecting the always increasing environmental targets in the Holcim group. Accordingly, we recalculated the Production Cost Index for the 2009 in order to have fully comparable figures. Insofar, the red and blue diagrams reflect the actual performance profile of a plant (resp. in 2010 and 2009) while the green diagram indicates the highest achieved value for each index in the Group (Benchmark). The performance of each plant may be evaluated according to the gap it has with respect to the best in class for each index.
Page 4
Radar Screen
Production Capacity
100%
OH&S
Product Quality
Enviro
0%
Production Cost
Electrical Energy
Maintenance
Thermal Energy
Each performance index integrates one or several relevant indicators depending on the considered manufacturing index, most of these individual indicators are reported in 15A (Production Cost Report), ATR (Annual Technical Report), GMR (General Management Report) or PEP (Plant Environmental Profile). Details about the definition and the calculation of performance indices as well as on the rating criteria are presented in the Annex. A ranking has been made for each plant and for each of the performance indices (see page 5), this refers to the 97 plants considered in the analysis. For the Product Quality Index, the ranking was made for 94 plants as quality data were not available for the 3 plants in Australia. A ranking of the plants according to the overall performance index has also been made; the results will be released in May 2011.
Page 5
Performance Profile and Ranking 2010 (out of 97 cement plants) Plant X Index Ranking
75
black 82
Production Capacity Index Product Quality Index Production Cost Index Maintenance Index Thermal Energy Index Electrical Energy Index Enviro Index OH&S Index
57%
53
85%
71
53 71
85
75% 30%
36
85 36
26
57% 82%
22
26 22
47
87% 95%
47 black
71%
70
Page 6
3.
Page 7
Annex: Cement Manufacturing Performance Indices (2010) Definitions and Rating Criteria
Page 8
Page 9
*different proportional scaling of Index between 100 and 50 %, 50 and 0 % Low potential > 90 %
Quality Index
Set of indicators used for index calculation
Customer complaints [ratio actual vs. target] Product performance benchmarking against competitors [%] Compliance to internal product specification [%] Product uniformity (Coefficient of variation early strength*) [%] OR 2-day <1 1-2 >2
*linear scaling
95 95-85 < 85
95 95-75 < 75
Reporting period spans from December previous year to November current year
Page 10
*different linear scaling of Index between 100 and 90 %, 90 and 50 %, 50 and 0 % Low potential > 90 %
Maintenance Index
Set of indicators used for index calculation
Kiln MTBF1 per plant [hours]
400* 300** 250 < 400* 125 < 300** < 250* < 125**
15 5 < 15 # <5#
*Wet Kiln, **Other Kilns, ***Ball Mill incl. Roller Press as pre-grinder, ****Other Mills incl. Roller Press as finish grinder and
Horizontal Roller Mills, *****with linear scaling, quadratic scaling
Page 11
Kiln system specific guide values***: range minimum range maximum AVG range minimum** AVG range maximum**
100* 0 100* 0
*proportional scaling per kiln, in case of more than one kiln clinker production volume weighted average value to be calculated, ** average of the three plants with the highest and lowest specific cost of thermal energy
***guide values [MJ/t clin]: Short Dry Kiln with Grate Preheater (Lepol): Short Dry Kiln with 2 Stage Suspension Preheater: Short Dry Kiln with 3 Stage Suspension Preheater with Precalciner: Short Dry Kiln with 4 Stage Suspension Preheater / with Precalciner: Short Dry Kiln with 5 Stage Suspension Preheater / with Precalciner: Short Dry Kiln with 6/7 Stage Suspension Preheater / with Precalciner: Shaft Preheater with 1/2 Cyclone Stages: Long Dry Kiln: Long Wet Kiln: Shaft Kiln: Consideration of impact of bypass rate on kiln heat consumption: -10 MJ/t clin/%bypass for precalciner kilns -20 MJ/t clin/%bypass for preheater kilns without calciner 3300-4500 3700-5200 3350-4700 3200-4400 3100-4000 3050-3800 3500-5000 4000-5800 5200-7600 3300-4200
Ratio actual consumption / plant specific reference value* Comparison between actual cost and reference range: AVG Minimum**** AVG Maximum****
100*** 0
**Score = 100% if actual consumption / plant specific reference value < 0.9 **Score = 0% if actual consumption / plant specific reference value > 1.3
***Score = 100% if actual cost < AVG Minimum ***Score = 0% if actual cost > AVG Maximum ****Average of the three plants with the highest and lowest specific cost of electrical energy
Page 12
Enviro Index
Set of indicators used for index calculation Rating Criteria Scores per indicator [%] 100* 0 -20 -20
100% 0%
Non-compliance
ORM compliance
*proportional scaling
Non-compliance
OH&S Index
Set of indicators used for index calculation
Lost time injury frequency rate (LTIFR) [#/h] Injuries** causing death or permanent disability [#] *different proportional scaling
Rating Criteria
Group standard, <2
Index Calculation
# Injuries** causing death or permanent disability>0 : OH&S Index=0% # Injuries** causing death or permanent disability=0: OH&S Index=100-5*LTIFR %*
Group standard, 0