You are on page 1of 40

A400M ACMT F&E

April 2004

Presented by

Sven-Olaf Schulze
Component Integration Manager Forward Fuselage Chief Engineer Team ACMT F&E

Systems Engineering in der Entwicklung des Airbus A400M


DGLR/GfSE Vortrag am 15.04.2004 in Hamburg

Systems Engineering in der Entwicklung des A400M- DTDUE

Scope
Airbus A400M
4Market 4Performance 4Contract

/ Workshare

Systems Engineering A400M practice


4A400M
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Teams

4Tools 4Requirements

Management 4Trades (Nose Landing Gear) 4Change Management (Mezzanine) 4Cultural aspects

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 2

Scope
Airbus A400M
4Market 4Performance 4Contract

/ Workshare

Systems Engineering A400M practice


4A400M
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Teams

4Tools 4Requirements

Management 4Trades (Nose Landing Gear) 4Change Management (Mezzanine) 4Cultural aspects

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 3

Airbus Product Family

Commercial Aircraft
500 600

Freighter and Military Aircraft

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

1970

1975

1980

1985

1990

1995

2000

2005

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 4

Scope
Airbus A400M
4Market 4Performance 4Contract

/ Workshare

Systems Engineering A400M practice


4A400M
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Teams

4Tools 4Requirements

Management 4Trades (Nose Landing Gear) 4Change Management (Mezzanine) 4Cultural aspects

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 5

Combining Tactical and Strategic Capability


Payload
Strategic Airlifters C-17, C-5, C-141 An-124

Large Load & volume


capacity

Long range High cruise speed


AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Short, austere airfield


capability

Medium Tactical Transports C-130, C-160, An-12, IL-76/78, C-1

Autonomous ground
operation

Low level tactical flight


Range

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 6

A400M Programme vs. Competition


Altitude* (ft)
32 000

30 000

A400M

28 000

C-130J
26 000

C-17

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

24 000

22 000

C-130H C-160

20 000 200 250 300 350 400 450 500

* Initial cruise altitude from take-off at MTOW


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004

Speed (KTAS)

Page 7

A400M Programme Performance

Berlin

Khartoum

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Maputo

4550 km, 30 t 6600 km, 20 t 9100 km, Ferry C130H Hercules


Systems Engineering in der Entwicklung des A400M- DTDUE

4150 km, 16 t
April 2004 Page 8

A400M Programme Launch Base


Germany 60 France 50 Spain 27 U.K. 25 Turkey 10 Belgium + Lux. 8

25 8 50
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

60

27 10

A launch base of 180 aircraft for seven Nations


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 9

Industrial Contracts
Shareholders

DPP Co-operation Agreement

CASA

Articles of Association Launch


OCCAR
Organisation for Joint Armaments cooperation --------------Organisme Conjoint de Coopration en matire d'Armement
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Third Parties

SubContracts Industrial Agreements


De vel op me nt Ma nag em ent Co ntr act

Engine Engine Manufacturer Manufacturer Propeller Propeller Manufacturer Manufacturer

Contract

...

Industrial Partners
Management CASA

Airbus manages on behalf of Airbus Military (AMSL) the A400M development.


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 10

Industrial Workshare

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Airbus Germany Airbus France Airbus UK EADS MTAD EADS Military Aircraft EADS Sogerma EADS Socata TAI Flabel EADS Defence & Security Systems
Final assembly line (FAL) at EADS MTAD Integrated Fuselage Assembly (IFA) at Airbus Deutschland High lift assembly at Airbus Deutschland

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 11

A400M main data


Ca. 50% payload of C-17 at
33% Life Cycle Cost Replaces C130 (Hercules) and C160 (Transall) Ca. twice the the carrying capability of C130 at comparable Life Cycle Cost Market potential of 380 A/C
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

A400M C-17 C-160 C-130J

Cargo Hold cross section First delivery First flight


2006 2007
F UK TU L

Planning
Offer Release
1999 2000 2001

Contract Validity
2002 2003 2004 2005

2013

2008 2009 2010 2011


D SP

2012
B
2018

Intergovernmental MOU

Seven Nations will purchase the A400M as a replacement for their current transport fleet with a payload of 15-20 t.
Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 12

Scope
Airbus A400M
4Market 4Performance 4Contract

/ Workshare

Systems Engineering A400M practice


4A400M
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Teams

4Tools 4Requirements

Management 4Trades (Nose Landing Gear) 4Change Management (Mezzanine) 4Cultural aspects

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 13

Systems-Engineering
Covers the hole Life-Cycle Constraints for a Systems-Engineer
4Time 4Cost 4Budget 4Quality 4Safety
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

4Contacts

Costumer requirements as the centre of development Use of processes, methods and tools to cope with increase
of complexity Effective use of interdisciplinary teamwork

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 14

What is a system (An example)


Task description
4The

costumer wants to make coffee with a repeatable quality

The system
Coffee-machine Procedure Water
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

A Subsystem

Cup Milk Sugar Spoon

Power Powder

Filter

Trained Personal

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 15

Systems Thinking?

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Innovation Associates/Taken from James Martin Seminar How to implement SE


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 16

Disciplines and their solutions

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

The best possible solution for the costumer

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 17

Scope
Airbus A400M
4Market 4Performance 4Contract

/ Workshare

Systems Engineering A400M practice


4A400M
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Teams

4Tools 4Requirements

Management 4Trades (Nose Landing Gear) 4Change Management (Mezzanine) 4Cultural aspects

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 18

Aircraft Component Management Team - ACMT


ACMT
Teams, integrated by AIRBUS and nonAIRBUS personnel, collocated in one site. 4Responsible of the full development of an aircraft component. 4Cross-National authority.
Fuselage ACMT
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

4Multidiscipline

Engineering

Wing ACMT Systems ACMT Military Systems ACMT Power plant ACMT Final Assembly Line ACMT
Systems Engineering in der Entwicklung des A400M- DTDUE

Manufacturing Business Control Logistics

Product Support Risk Analysis Configuration Control

Other Teams

April 2004

Page 19

Development Tools and DMU


All partners are using the interconnected development tools to support a fast and easy data transfer
4 Computer Aided Design Tool : CATIA V.5 4 Product Definition Management Tool: WINCHILL 4 Digital Mock-up: DVISE

Advantages of 3D digital mock-up


4Real engineering data for the whole aircraft
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

4Allowing concurrent product development 4Providing rapid solutions to engineering, operational and maintenance activities 4Allows space allocation and system interfaces to be studied without the need for costly physical mock-ups
Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 20

A400M Programme requirements

14.7 m

42.2 m

Four 10 000 shp class Turboprop Engines High Speed Cruise Mach 0.68 to M 0.72
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Initial Cruise Height @ MTOW 31,000 feet


42.4 m

Cruise Ceiling 39,000 feet Ferry Range 4900 nm Maximum payload 37 tonnes MTOW 130 tonnes

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 21

A400M Programme Cargo Hold Capability req.

GTK

2 Helicopters (Tiger)

Mobile Crane

MLRS

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Pallet loading capability


5 u. 7 t Trucks

Fla Rak System PATRIOT

Paratroop transport Troop transport


April 2004 Page 22

Systems Engineering in der Entwicklung des A400M- DTDUE

F&E Requirements Cascade


Function
A400M Contract Ex A, Ex P Top Level Aircraft Requirements Top Level Supportability Requirements FRD Air to Air Refuelling FRD Low Level Flight FRD Transport Aerial Delivery

procedures, methods, design principles, etc...

To be referred to the approbriate level

Top Level Structural Req. Doc. F&E


First Issue
Applicable Documents Constrains Trade Off Supportability

Ref.

Level 1

Products

Interface doc. Interface doc. Interface Doc.

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Structural Req. Doc.

Structural Req. Doc.

Structural Req. Doc.

Ref.

Level 2
Sub.- Spec. Sub.- Spec. Sub.- Spec.

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 23

Requirement Management
Structural Req. Doc. Nose Fuselage Fwd Center Fuselage Center Fuselage Sponson MLG Doors Ice Shield Wing Fairing Rear Fuselage
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Partner Airbus France TAI Airbus Deutschland Socata Sonaca Airbus Deutschland Airbus France Airbus Deutschland Sogerma Airbus Deutschland TAI TAI /Airbus France Airbus Deutschland MTAD Spain Airbus Deutschland MTAD Spain

Requirements
4ACMT

F&E compl.: 1700

Ex. A requirements: 900 National Options Supportability req. Certification req. Constraints

Ramp Cargo Door Tailcone Doors & Hatches Vertical Tailplane Horizontal Tailplane Cargo Hold Landing Gear

Tool
4Commercial 4Harmonized

Airbus Process is used

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 24

Trade: Nose Landing Gear


Nose Landing Gear work share

Germany
4Overall

F&E structural design 4Aerodynamics

France
4NLG
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Bay 4NLG Doors 4Cockpit Control

Spain
4LG

Systems 4LG Structure 4FAL


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 25

NLG Requirements & Constraints


Maintenance Contract
Top level A/C Requirements

On field Special tools Cost Time

Workshare Schedule CSA

Performance reg. Operational reg. Functional reg.


Weight

Systems
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Production

Electric Hydraulic Certification Electronic

Facility Interfaces Design Concept

Support

Safety

Quality
April 2004 Page 26

Survivability to a shot
Systems Engineering in der Entwicklung des A400M- DTDUE

Multidisciplinary Interfaces

MLG Doors

Cargo Handling Electronic Equipment

Lights
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

NLG Core Team NLG Core Team

Loads

FAL

Aerodynamic Shape

Integration & Overall structural Design


Systems Engineering in der Entwicklung des A400M- DTDUE

Hydraulic
April 2004 Page 27

Trade off process & dependency


Know How NLG study
Requirements & Constraints

Know How

Supplier

NLG Bay Eg. tyres study

Supplier

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Focused: Weight Design Free fall emergency Kinematics Damages


Systems Engineering in der Entwicklung des A400M- DTDUE

Trade off

Focused: Weight Design Envelope (installation) Damages Aerodynamic


April 2004 Page 28

Decision

Change Management Prozess


The Change Process consists of 4 Phases:

Initiate Change

Evaluate Impact

Investigate Impact/Sol. Decision

Implement Solution

INITIATION
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

EVALUATION

INVESTIGATION

IMPLEMENTATION

Acceptance of Request

Agreement to Launch Investigation

Implement a Solution

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 29

Initiation Phase
Basis
4Clear

Concept available

Identification
4Mechanical

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

interference between air cooling ducts and the main electric power centres 4Unacceptable access to wirings 4A request for about 30% more volume for Electric Power Centres

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 30

Impacted partners and their disciplines


IFA / Airbus-D

System / div. Partner

Structure / TAI

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Structure / Airbus-F

Cargo Hold / Airbus-D

FAL / MTAD
Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 31

The developed solution


Integrated Systems

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Mezzanine

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 32

Topic to be looked at
Structure
4Interfaces 4Tolerances 4Floor

attachment concept

4Assembly

Certification
AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

4Evacuation

System installation
4EMI 4Airconditioning

Aerial delivery of paratrooper


Systems Engineering in der Entwicklung des A400M- DTDUE April 2004 Page 33

Cultural aspects
4Responsibilities 4Confidence

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 34

This document and all information contained herein is the sole property of AIRBUS DEUTSCHLAND GmbH. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS DEUTSCHLAND GmbH. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS DEUTSCHLAND GmbH will be pleased to explain the basis thereof.

AIRBUS DEUTSCHLAND GmbH. All rights reserved. Confidential and proprietary document.

Systems Engineering in der Entwicklung des A400M- DTDUE

April 2004

Page 35

Gesellschaft fr Systems Engineering e.V. German Chapter of INCOSE

Darstellung der GfSE e.V.

Vortrag vom 15.04.2004 in Hamburg mit der DGLR

Gesellschaft fr Systems Engineering e.V. German Chapter of INCOSE

S.-O. Schulze, 15.04.2004

http://www.gfse.de

Gesellschaft fr Systems Engineering e.V. German Chapter of INCOSE

berblick
Unsere Ziele
Frderung von Wissenschaft und Bildung auf dem Gebiet des Systems Engineering Wissens- und Erfahrungstransfer zwischen Industrie, Forschung und Lehre gezielte Anste zur Verbesserung des Entscheidungsprozesses Stellung der deutschen Wirtschaft im internationalen Wettbewerb strken

Wer wir sind


Mittelstndische und Grounternehmen Automobilbau Elektrotechnik Luft- und Raumfahrt Stahl- und Schiffbau Telekommunikation Softwareentwicklung Hochschulen

Was wir tun


Fachvortrge Seminare Foren und mehr

Mitgliedschaft
Persnlich Firmen und Kooperative

S.-O. Schulze, 15.04.2004

http://www.gfse.de

Gesellschaft fr Systems Engineering e.V. German Chapter of INCOSE

Vorankndigung

Donnerstag, 27.05.2004 in Hamburg

Vom Concept of Operations zur Requirement Baseline


Herr Hoppe
Blohm & Voss Hamburg

Informationen und Formulare unter: www.GfSE.de

S.-O. Schulze, 15.04.2004

http://www.gfse.de

Gesellschaft fr Systems Engineering e.V. German Chapter of INCOSE

S.-O. Schulze, 15.04.2004

http://www.incose.org/symp2004/ http://www.incose.org/symp2004/ http://www.gfse.de

You might also like