You are on page 1of 5

Omo kuraz sugar plant power transmission project

5.1.4 SCHEDULE OF PRICES SUPPLY AND ERECTION 5.1.A Omo Kuraz Sugar Plant (TP-6) 132/15 kV substation
Supply FOB Item Description Reference (B1 Scope Unit
of supply)

Sea Transportation Local Foreign Local Foreign

Est. Qty.

Foreign
Unit Price

Foreign ) Amount ( )

Inland transport Local Amount (BIRR)

Insurance

Civil Works Local Foreign Local Foreign

Erection, Test & Commissioning Local Foreign Local Foreign

TOTAL Local Foreign

Local Amount (BIRR)

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Amount (BIRR) ( )

(
1.0 1.1 132 kV CAPACITOR BANK 132 KV, 15 MVAr capacitor bank complete with all accessories B1.3.14 lot 1

SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES 2.0 2.1 SPARE PARTS 132 KV BUS BAR CAPACITOR BANK lot lot

2.1.1 capacitor unit of each type 2.1.2 insulators of each type SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES

2 2

TOTAL (to Summary of Prices) VAT (15 % Value Added Tax) TOTAL Including VAT
NB:- 1) The column designated as 'civil works' shall include the costs of civil design, materials and civil construction 2) Lump sum price for any type of work is not acceptable. The price should be filled for each item in the above price table 3) 15 % VAT is applicable on locally purchased or supplied goods, civil works, erection, test and commissioning portion. -------------------------------------

__________________________________________ Contractor,s Stamp and Signature

Page 5 - 3

Omo kuraz sugar plant power transmission project

5.1 SCHEDULE OF PRICES SUPPLY AND ERECTION 5.1.C Omo Kuraz Sugar Plant (TP-4) 132/15 kV substation
Supply FOB Item Description Reference (B1 Scope Unit
of supply)

Sea Transportation Local Foreign Local Foreign

Est. Qty.

Foreign
Unit Price

Foreign ) Amount ( )

Inland transport Local Amount (BIRR)

Insurance

Civil Works Local Foreign Local Foreign

Erection, Test & Commissioning Local Foreign Local Foreign

TOTAL Local Foreign

Local Amount (BIRR)

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Amount (BIRR) ( )

(
1.0 1.1 132 kV CAPACITOR BANK 132 KV, 15 MVAr capacitor bank complete with all accessories B1.5.15 lot 1

SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES 2.0 2.1 SPARE PARTS 132 KV BUS BAR CAPACITOR BANK lot lot

2.1.1 capacitor unit of each type 2.1.2 insulators of each type SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES

2 2

TOTAL (to Summary of Prices) VAT (15 % Value Added Tax) TOTAL Including VAT
NB:- 1) The column designated as 'civil works' shall include the costs of civil design, materials and civil construction 2) Lump sum price for any type of work is not acceptable. The price should be filled for each item in the above price table 3) 15 % VAT is applicable on locally purchased or supplied goods, civil works, erection, test and commissioning portion. -------------------------------------

_____________________________________ Contractor's Stamp and Signature

Page 5 - 22

Omo kuraz sugar plant power transmission project

5.1.4 SCHEDULE OF PRICES SUPPLY AND ERECTION 5.1.E Omo Kuraz Sugar Plant (TP-2) 132/15 kV substation
Supply FOB Item Description Reference (B1 Scope Unit
of supply)

Sea Transportation Local Foreign Local Foreign

Est. Qty.

Foreign
Unit Price

Foreign ) Amount ( )

Inland transport Local Amount (BIRR)

Insurance

Civil Works Local Foreign Local Foreign

Erection, Test & Commissioning Local Foreign Local Foreign

TOTAL Local Amount ) (BIRR)

Local Amount (BIRR)

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) ( )

Unit Price (BIRR) ( )

Amount (BIRR) (

(
1.0 1.1 132 kV CAPACITOR BANK 132 KV, 15 MVAr capacitor bank complete with all accessories B1.7.15 lot 1

SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES 2.0 2.1 SPARE PARTS 132 KV BUS BAR CAPACITOR BANK lot lot

2.1.1 capacitor unit of each type 2.1.2 insulators of each type SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES

2 2

TOTAL (to Summary of Prices) VAT (15 % Value Added Tax) TOTAL Including VAT
NB:- 1) The column designated as 'civil works' shall include the costs of civil design, materials and civil construction 2) Lump sum price for any type of work is not acceptable. The price should be filled for each item in the above price table 3) 15 % VAT is applicable on locally purchased or supplied goods, civil works, erection, test and commissioning portion. ----------------------------------

________________________________________ Contractor's Stamp and Signature

Page - 43

Omo kuraz sugar plant power transmission project

TOTAL Foreign Amount ( )

----

________________________________________ Contractor's Stamp and Signature

Page - 44

Omo Kuraz Sugar Plant Power Transmission Project

Schedules

5.1 SCHEDULE OF PRICES


SUPPLY AND ERECTION SUMMARY OF PRICES 5.1.H Miscellaneous
SUPPLY (FOB) Item Description Reference Unit Est. Qty Local Unit Price (BIRR)
1.0 1.1 FACTORY TEST WITNESSING Factory test witnessing as per clause 3.28 of part A3, page A3-22 Part - A3, clause 3.28 Lot 1

Inland transport Foreign Amount ( ) Local Amount (BIRR)

Sea transport Local Amount (BIRR)

Insurance Local Amount (BIRR) Local Amount (BIRR)

TOTAL Foreign Amount ( )

Foreign Unit Price ( )

Local Amount (BIRR)

SUB-TOTAL CARRIED OUT TO SUMMARY OF PRICES

TOTAL (to Summary of Prices) VAT (15 % Value Added Tax) TOTAL Including VAT
NB:- 1) The column designated as 'civil works' shall include the costs of civil design, materials and civil construction 2) Lump sum price for any type of work is not acceptable. The price should be filled for each item in the above price table 3) 15 % VAT is applicable on locally purchased or supplied goods, civil works, erection, test and commissioning portion. ----------------