PP4 Long Quiz Name: ONGCHUAN, KENNETH C.

1. In which part of the Specifications Section Format does Scope belong? a. b. c. d. 2. General Products Execution None of the above 9. b. c. d. Products Execution None of the above

5AR - 4

In which part of the Specifications Section Format does Cleaning belong? a. b. c. d. General Products Execution None of the above

In which part of the Specifications Section Format does Requirements of Regulatory Agencies belong? a. b. c. d. General Products Execution None of the above

10. In which part of the Specifications Section Format does Alternates belong? a. b. c. d. General Products Execution None of the above

3.

In which part of the Specifications Section Format does Materials belong? a. b. c. d. General Products Execution None of the above

11. The phrase furnish and install in technical specifications shall be understood as to ___ a. b. c. d. Purchase Provide Preferred None of the above

4.

In which part of the Specifications Section Format does Equipment belong? a. b. c. d. General Products Execution None of the above

12. If there will be variance between the Specifications and the Drawings, the provision of the ___ shall govern. a. b. c. d. Supplemental Contract Service Contract Specifications All of the above

5.

In which part of the Specifications Section Format does Preparation belong? a. b. c. d. General Products Execution None of the above

13. A Closed Specification which means that one product brand is specified. a. b. c. d. Open-product Multi-product Single-product None of the above

6.

In which part of the Specifications Section Format does Installation belong? a. b. c. d. General Products Execution None of the above

14. In which part of the 16 Divisions of the Specifications does the work item for providing a Closed Circuit Television System (CCTV) belong? a. b. c. d. Div. # 16 : Electrical Div. # 11: Equipment Div. # 15: Mechanical Div. # 9: Finishes

7.

In which part of the Specifications Section Format does Protection belong? a b. c. d. General Products Execution None of the above

8.

In which part of the Specifications Section Format does Fabrication belong? a. General

15. In which part of the 16 Divisions of the Specifications does the work item for providing Built-in Closets and Cabinets using special boards and hardware belong to? a. Div. # 10 : Specialties b. Div. # 13: Special Construction

PP4 Long Quiz Name: ONGCHUAN, KENNETH C.


c. Div. # 12: Furnishings d. Div. # 11: Equipment 16. Contract Specifications must be ____ and ____ worded, and must state exactly what will be required from the Contractor. a. b. c. d. possible and correctly clearly and concisely correctly and completely possible and completely c. d. Contract General Requirement

5AR - 4

2.

Type of specification, the results of the product, rather than the product itself are specified. a. b. c. d. Descriptive Specification Brand Specification Performance Specification Open Specification

17. In lieu of the word replace, the specification writer shall use the words: 3. a. b. c. d. remove existing and provide new remove and rework replace and install new rework and renew Type of specification implies a description, gives a description of the product. a. b. c. d. Descriptive Specification Performance Specification Brand Specification Open Specification

18. In Specification Writing, ____ shall be spelled out completely the first time it is used in each specification section. 4. a. b. c. d. abbreviation acronym a and b None of the above

Type of specification, single product & fine multi product, usually brand-name specifications and basically where materials is required to match existing materials. a. b. c. d. Open Specification Brand Specification Descriptive Specification Closed Specification

19. In Specification Writing, the specification writer uses ____ whenever expressing a binding provision. a. b. c. d. will shall should would

5.

The phrase or equal, means that the item specified by brand-name is established as a standard and any manufacturer with an equal product may bid. a. Open Specification b. Closed Specification c. Brand Specification d. Descriptive Specification

20. An arrangement of data in lines and columns and should be used when data can be presented more clearly this way than by text. a. b. c. d. table figure drawings illustrations

6.

A product may be required with specific physical characteristics & also may be required to perform to a particular standard. a. b. c. d. Brand Specification Open Specification Closed Specification Combination Specification

21. In which part of the 16 Divisions of the Specifications does the work item for providing an Elevator belong? a. b. c. d. 1. Div. # 14 : Conveying Systems Div. # 11: Equipment Div. # 15: Mechanical Div. # 13: Special Construction

7.

Specifications are divided into how many division? a. b. c. d. 15 16 17 18

A writer documents describing in detail the scope of work, materials to be used, method of installation, & quantity of workmanship for a parcel of work to be placed under contract. a. b. Specification General Condition 8.

Includes most Requirements that Apply to the job as a worker or to several of the

PP4 Long Quiz Name: ONGCHUAN, KENNETH C.


technical sectors, & especially the requirements, Sometimes referred to as Special Conditions a. b. c. d. 9. General Requirements Site Work General Condition Specialties

5AR - 4
literature and catalogs and its knowledge in various ______ used in his periodically updated, & he generates the specification. a. b. c. d. Codes Constitutions Contracts P.D.

Includes interior finishes not traditionally of work of the carpentry trade a. b. c. d. Painting Finishes Equipment Masonry

15. Professionals who write specification a. b. c. d. A degree in the required discipline & eventual professional registration College level Draftsman Experience Supervisor

10. Includes most materials traditionally installed by mason: exceptions are paint & interior flooring a. b. c. d. Masonry Finishes Painting Concrete

16. Includes factory assembled, pre finished items a. b. c. d. Draftsman Specialities Doors & Windows Equipment

11. Includes most subject dealing with sites, preparation & development. Site Utilities in division 15 & 16 must be coordinated with these sub-divisions a. b. c. d. Site Work General Requirement Finishes Masonry

17. Includes on-site construction consisting of items trait normally would fall under several other divisions but require control that can be attained only by all parts in a single section. a. b. c. d. General Requirements Special Construction General Conditions Site Work

12. Includes most items not really associated with installation & preventing the passage of water or water vapor, exceptions are paint water stops & joints installed in concrete or masonry & gaskets, & sealants a. b. c. d. Specialties Equipments Finishes Thermal & Moisture Protection

18. Includes most items that have been traditionally associated with the mechanical trades ; plumbing ; testing ; testing ; ventilating ; air conditioning & fire protection a. b. c. d. Plumbing Mechanical Air Conditioning Fire Protection

19. Includes most items placed in the finished building a. b. c. d. Finishes Carpentry Specialties Furnishings

13. The only professional member of the team, who can coordinate all the drawings with the specifications, he can see to it that there are no duplications between the two documents and that there is standardization of the information between them. a. b. c. d. Architect Engineer Contractor Specification Writer

20. 3 basic parts of the section format are the follows, part 1 General, part 2 Products, and part 3 a. b. c. d. Execution Construction Planning Scheduling

14. A professional specification writer maintains a good literary of technical documents, extensive collection of manufacturers

PP4 Long Quiz Name: ONGCHUAN, KENNETH C.


a. 21. Specifications should be done according to the following except: a. b. c. d. Specifications should be prepared by a lawyer Specifications should be easily understood Specifications should be readily interpreted Specifications should have firm legal basis b.

5AR - 4
Finishes Specialties Equipment Furnishings Masonry Doors and Windows Thermal and Moisture Protection Specialties Finishes Specialties Electrical Mechanical Equipment Electrical Mechanical Conveying Systems

c. d.

26. According to the Uniform Construction Index, which of the following is NOT arranged in proper ascending order from Division 1 onwards: a. b. General Requirements Site Work Electrical Mechanical Site Work Wood and Plastics Equipment Mechanical Finishes Equipment Special Construction Conveying Systems Concrete Metals Wood and Plastics Doors and Windows

22. The following are valid reasons for following the uniform construction index except: a. b. c. d. Specifications can be easily prepared via cut-and-paste Specifications lessens the chance for omissions or duplications Specifications facilitates the location of items in the same place Specifications provide an outline which can serve as a check list during the design development stage

c. d.

27. In the outline of the Three-Part Section Format, which of the following is NOT included in Part 1 - General a. b. c. d. Submittals Scope Fabrication Alternates

23. According to the Uniform Construction Index, which of the following is arranged in proper ascending order from Division 1 onwards: a. b. c. d. Masonry Wood and Plastics Doors and Windows Specialties Masonry Concrete Equipment Furnishings Concrete Masonry Specialties Finishes Furnishings Equipment Doors and Windows Thermal and Moisture Protection

28. In the outline of the Three-Part Section Format, which of the following is NOT included in Part 2 Products a. b. c. d. Source of Quality Control Materials Fabrication Protection

24. According to the Uniform Construction Index, which of the following is arranged in proper ascending order from Division 1 onwards: a. b. Metals Doors and Windows Mechanical Electrical General Requirements Site Work Mechanical Conveying Systems - Electrical Site Works Wood and Plastics Doors and Windows Thermal and Moisture Protection Masonry Equipment Electrical Mechanical

29. In the outline of the Three-Part Section Format, which of the following is NOT included in Part 3 - Execution a. b. c. d. Product Handling Field Quality Control Condition of Surfaces Cleaning

c.

30. Elements of specification composition shall include the following EXCEPT a. b. c. d. Architectural and Engineering Design Materials and Workmanship Inspection and Tests Supplementary Contractual Requirements

d.

25. According to the Uniform Construction Index, which of the following is arranged in proper ascending order from Division 1 onwards:

PP4 Long Quiz Name: ONGCHUAN, KENNETH C.


31. The 2004 MasterFormat developed by the CSI and the CSC has ___ Divisions. a. b. c. d. 49 16 32 24 a. b. c. d. Three (3) Sets One (1) Set Two (2) Sets Four (4) Sets

5AR - 4

39. All construction permits and licenses necessary for the execution of the work shall be secured by the ____________. a. b. c. d. Owner Architect Contractor Owners Representative

32. Which of the following is NOT considered a Division in the 2004 MasterFormat a. b. c. d. Furniture Communications Transportation Waterway and Marine

40. Construction Detailed Drawings shall be furnished by the ___________. a. b. c. d. Foreman Architect Contractor Sub-contractor

33. _________ is a person, firm or corporation who provides the guarantee for the Contractors Bonds a. b. c. d. City Hall Surety Owner Sub-Contractor

41. The Owner shall be responsible for the establishment of the following EXCEPT: a. b. c. d. Lot Lines Easements Grade Lines and Levels Boundary Lines

34. An Advertisement/Invitation to Bid should include the following EXCEPT: a. b. c. d. Scope of Project Nature of the Proposed Project Instruction to Bidders Bid Bulletin

42. Submission of Shop Drawings shall be accompanied by a Letter of Transmittal prepared in ____________. a. b. c. d. Single Copy Duplicate Triplicate No need to prepare Letter of Transmittal

35. Ownership of the Contract Documents, Drawings, Specifications and Models furnished by the Architect for a particular project shall be property of the _______. a. b. c. d. Owner Architect Contractor Office of the Building Official

36. The responsibility to clarify the meaning of the Drawings and Specifications shall be borne by the ___________. a. b. c. d. Owner Architect Contractor Owners Representatives

37. Shop Drawings shall be furnished by the ________. a. b. c. d. Architect Contractor Specifications Writer Foreman

38. Shop Drawings shall be submitted for approval should be in ______ set/s.