Rate Analysis

(A) Provding and fixing of 75 mm dia P.V.C. bend/Elbow at required degree.

Cost of 75 mm dia bend - 1No @ Rs. 55.00/Each Cartage of matenal at sitc L.S. Mason, labour, material etc. per fixing L.S.
Total Rs.

55.00 5.00 15.00 75.00(A) 0.75 75.75(B) 7.57 83.32

Add 1% water charges on (A) Add contractor's Profit @ 10% on 10% on (B)
Total Rs. Say Rs. 83.00 Each

(B) Provding and fixing of 75 mm dia doar bend Cost of 75 mm dia door bend - 1No @ Rs. 75.00/Each Cartage of matenal at sitc L.S. Mason, labour, material etc. for fixing L.S. Total Rs. Add 1% water chargs an (A) Total Rs. Add 10% contractor's profit Total Rs. 95.95(B) 9.59(B) 95.00(A)

75.00 5.00 15.00 0.95

105.54

Say Rs. 105.00/ Each

Junior Engneer Maint. Div- No. 2(Civil) L.N.V. LUCKNOW

Assistant Engneer Maint. Div- No. 2 (Civil) L.N.V. LUCKNOW

Exeutive Engneer Maint. Div- No.2(Civil) L.N.V. LUCKNOW

vil)

Rate Analysis
Based on DSR 13.26 (A) FINISHING wall with 1mm thick birla putty of approved brand

Taking 10.00 sqm area 1mm thick Birla putty Mason, Beldar Scaffolding &sundries Unit QTY RATE kg 5.00 40.00 no 0.91 260 no 0.91 170 L.S AMOUNT 200.00 236.60 154.70 84.00 Total Rs. 675.30 10.13 685.43 68.54 753.97 Say Rs. Total Rs.
77.00 sqm

Add 1.5% water charges on (A) 675.3X1.5/100 Add contractor's Profit @ 10%
Hence rate per sqm 753.97/10 77.39

Junior Engneer

Assistant Engneer

Exeutive Engneer

Rate Analysis
Based on DSR 13.48.1
FINISHING wall with anti fungal weather proof paint such as apex ultima of asian paints or equivalent of other makes of reputed make two coats of cement primer of approved quality including cost all material ,labour,T/P required for praper complation of the work Take an area 100.00 sqft MATERIAL Cement primer Apex ultima paint LABOUR Painter grade1 coolis Bhisti Scaffolding &sundries Brush sand paper etc. Add for sundries Add 1.5% water charges on =(890.47.3X1.5/100)
Total Rs.

unit lit lit

qty

Rate 0.75 120.0 1.75 281

no no no n0 L.S L.S

0.6 0.3 0.3 0.05 7.15 8.06

292 170 170 235 1.3 1.3


Total Rs.

Add contractor's Profit @ 10%


Total Rs. Hence rate per sqm 994.21X10.76/100

Say Rs. 107.00 sqm JE


JE AE EE

AMOUNT 90.00 491.75

175.20 51.00 51.00 11.75 9.30 10.48 890.47 13.36 903.83 90.38 994.21 106.98

Rate Analysis
Supply and fixing Salwood wrought framed and fixed i/c simple moulding straight work as in CHOUKHAT frame i/c supply of all materials ,labour T&P etc.required for praper completion of the work.

Based on Item no 403


MATERIAL cost of Sol wood (i/c wastage@5% LABOUR Corpainter mistri Corpainter Beldar Add for sundries Add contractor's Profit @ 10%
Total Rs. Hence rate per cum2431.9X35.31

unit Markt rate 44000/35.31 cft

qty 1.6

Rate 1246.1

no no no L.S

Jan-00 0.5 0.25 1.5

290 260 170 17.61


Total Rs.

Say Rs. 85842.00 cum

JE

AE

EE

AMOUNT 1993.77

17.40 130.00 42.50 26.42 2210.08 221.01 2431.09 85841.79