2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Motorways & Ring Roads to reduce traffic congestion Long and/or Deep Road Tunnels to connect populations By-Pass Historic, Cultural, Scenic, & Congested Locations Underground Parking Mass Transit Systems Public Utilities & Flood Control City Center Revitalization
Construction Method is Affected by the Purpose and Numerous other Factors, Especially the Geology
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Technical Feasibility
Urban or Rural Number of Lanes ~ Tunnel Size Length Safety & Environmental Constraints
Modern Technology Results in Tunnels Better, Faster, Cheaper, Safer Quality Mechanization of the construction process
Innovations Provide our Industry with More Choices than just the traditional Choice Between Conventional vs Mechanized. In Continuous State of Change
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Type, cross-section size and length of the tunnel Location and surrounding environment of the tunnel. Potential for Public Disruption Local tradition and experience, schedule, type of contract and contractual stability Cost & Schedule
Must Predict Productivity Labor & Material Costs
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Select Con
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Var
SB
NB
53'
53'
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Tunnel Size
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
A86 in Paris
11.6 m diameter for 4, possibly ultimately, more lanes!! - small vehicles only, 3m clearance
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Tunnelling in Soft Ground (Soils) Conventional CC Cut-and-Cover Immersed & Other Conventional Tunnelling Tunnelling Methods
2nd
Cut-and-Cover vs Tunnel
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Cut-and-Cover
Difficult to build from surface Urban constraints (alignments defined by demand and interferences) Cost of relocation Construction costs Cost of Public Disruption
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Conventional Tunnelling
Tunnelling in Soil
Conventional
Tunnelling
Mechanized
Tunnelling
Door
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Mechanized Tunnelling
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
EPB vs Slurry
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Other Issues
Prediction of Rate of Advance Abrasion and/or Clogging=maintenance or repair in Interventions Plant Size & Muck disposal issues
Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires 2nd
Tunnelling in Rock
Drill and Blast
Tunnelling Methods
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Drill and Blast Technology Has Improved Extending Range of Drill & Blast Projects
Almost no mobilization time. Often Still Used for Shorter Projects with variable ground & changing cross section in remote areas without power
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Good for Geometric flexibility Adaptable to broad range of ground conditions Temporary exposure to unsupported ground Contractual flexibility Lower mobilization & plant costs Suitable for political risk or lack of contractual stability Lower costs for short tunnels & where labor is inexpensive Often slow but not expensive
New Technology is adaptable to more ground conditions Less disturbance to the remaining ground Better and more regular quality (industrial process) Mechanization better for workers Safer because generally under protective shield Faster rate of advance Significant mobilization & Plant increasing Cost & Schedule Costs and schedule more favorable for longer tunnels
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Final Remarks
Significant increase of the demand of underground structures everywhere Two Basic Issues are
Technical Feasibility Cost & Schedule
Underground structure feasibility depends on global cost analyses (construction costs + indirect benefits) Road Tunnels demand a large cross section
Trend is toward larger diameters
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Conclusions
Construction methods and technology depend on geology, tunnel location, size, local tradition etc.
A large number of factors must be considered Not just a decision between conventional & mechanized
Combination of mechanized and sequential excavation methods or Special Methods may be beneficial
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Conclusions
Mechanized tunnelling for long tunnels and urban areas (industrial process, quality and control of costs and schedule)
Trend is for greater innovation giving greater applicability and use of mechanized in the future.
Conventional tunnelling for short tunnels and variable conditions (geometry, geology and political flexibility, and inexpensive labour)
2nd Seminario Internacional de Tuneles y aplicaciones ITS 26 de Marzo de 2010 Buenos Aires
Mucho Gracias