Professional Documents
Culture Documents
Ref. no. Kit no. Option no. Time Group Issuer Date Page
21 A 1002385
Product
11715973
11891443
7h
Subject
900
BHL
20060109
1/12
BL70
Qty. 1 1 1 1 2 4 2 1 9 1 2 2 2 2 3 2 2 2 1 3 1
Designation Installations instruction Valve Solenoid valve Lever Distance sleeve Six point socket screw Coupling Hood Coupling Cover plate Flange nut Flange screw Flange locknut Allen head screw Flange screw Coupling Six point socket screw V-coupling T-coupling T-coupling Bracket
www.volvo.com
Printed in Sweden
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
2/12
Kit list
Part no. 11884833 11884284 11885955 11885956 11885957 11885958 11885959 11884832 11884415 11886657 1589502 969278 11884285 11882865 11885734 4881440 11882298 11882299 11881053 11886641 11886664 11886730 935756 13933864 Qty. 1 1 1 2 1 1 1 1 1 1 1 2 1 1 1 5 1 1 2 1 1 1 1 4 Designation Tube Hose Hose Hose Hose Hose Hose Tube Hose Decal Foot switch Six point socket screw Hose Switch Symbol Cable tie Female coupling Male coupling with eliminator Clamp Hose Hose Cable harness Plug V-coupling
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
3/12
Work description
Tools: 14360000 Vacuum pump
Use cable ties part no. 4881440 to clamp assembled hoses on suitable places. 1 2 Remove the floor mat and operators seat. Remove the plates 1 and 2. Connect the vacuum pump, See Service Manual BL70.
Fit the valve 2 on the frame with the flange screws 4 (3 pcs). Fit the v-couplings 1, 3, 6 and the coupling 5 on the valve. Fit the hose 7 and route the hose against the working pump. Designation V-coupling Valve V-coupling Flange screw Coupling Hose Quantity 2 1 1 3 1 1 Pos. in Fig. 2 1, 6 2 3 4 5 7
Remove existing plug and fit the v-coupling 1. Fit the hose (hose 7 in step 3). Quantity Pos. in Fig. 3 1 1
1003391
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
4/12
Fit the hose 1 and route the hose against the boom. Quantity Pos. in Fig. 4 1 1
Fig. 4 Valve
Fit the coupling 2 and the hose 1. Route the hose against the boom. Quantity Pos. in Fig. 5 1 1 1 2
Fig. 5 Valve
Fit the hose 1 and route the hose against the main filter. Quantity Pos. in Fig. 6 1 1
Fig. 6 Valve
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h 8
900
BHL
20060109
5/12
Release the hose 3 and remove the coupling 4. Remove existing plug and fit the v-coupling 2 and the hose 1 (hose 1 in step 7). Re-fit the coupling 4 and hose 3. Quantity Pos. in Fig. 7 1 2
Fit the v-coupling 1 and the coupling 3. Fit the hose 2 (to solenoid valve) and hose 4 (to LS-pressure). Route the hose 4 against the pressure limiting valve. Designation V-coupling Hose Coupling Hose Quantity 1 1 1 1 Pos. in Fig. 8 1 2 3 4
10
Release existing hose and fit the t-coupling 1. Fit the hose 2 (hose 4 in step 9) and re-fit existing hose. Quantity Pos. in Fig. 9 1 1
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
6/12
11
Fig. 10 Valve
12
Fit the lever 2 on the bracket 1 with the allen head screws 3 and flange nuts. Fit four couplings part no. 13933858 on the lever and fit the hoses 4 and 5. Designation Bracket Lever Allen head screw Flange nut Hose Hose Quantity 1 1 2 2 1 1 Pos. in Fig. 11 1 2 3 4 5
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
7/12
13
Fit three couplings part no. 13933858 on the solenoid valve 2 and the t-coupling 3. Fit the hose 1 (hose 5 in step 12) to the solenoid valve (port 2). Fit the hose 7 (hose 4 in step 12) to the t-coupling (port 3). Fit the hose 4 (from upper side of valve) and hose 5 (from underneath of valve) to the lever. Fit the hose 6 on the solenoid valve (port 1). Designation Solenoid valve T-coupling Hose Quantity 1 1 1 Pos. in Fig. 12 2 3 6
Fit the coupling 1 and the hose 2 (hose 6 in step 13) on the safety accumulator NOTE! T-coupling part no.13933860 maybe have to be assembled if other options are assembled. Quantity Pos. in Fig. 13 1 1
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
8/12
15
Fit the solenoid valve on the cover plate 1 with the flange screws 2 (distance sleeves between plate and valve) and flange locknut. Fit the hose 3 to the t-coupling and route the hose against the drain line on right hand side. Connect cable harness (11886730) marked X 73 in one end to existing connector marked X 73 and connect the other end marked X 345 to the solenoid valve. Designation Cover plate Flange screw Flange locknut Hose Distance sleeve Cable harness Quantity 1 2 2 1 2 1 Pos. in Fig. 14 1 2 3
16
Fit the hose 2 (hose 3 in step 15) to the drain line 1. NOTE! T-coupling part no.13933859 and plug part no. 935756 maybe have to be fitted, depends if other options drain hoses are assembled to the drain line.
1005262
17
Fit the bracket to the cover plate with the six point socket screws 4. Fit the cover plate and the plate over the working pump with existing screws. Designation Six point socket screw Quantity Pos. in Fig. 16 4 1
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h 18
900
BHL
20060109
9/12
Connect the existing connection X 203 from the operators cab to the foot switch 1 and fit the switch in the cab floor. Designation Foot switch Six point socket screw Quantity Pos. in Fig. 17 1 1 2
1003414
19
Cut out a recess for the lever/bracket in the floor mat according to the measurement in figure 18.
20
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
10/12
21
Fit the hood 2 with the six point socket screws 1. Quantity Pos. in Fig. 20 2 1 1 2
Part no. Designation 971306 Six point socket screw 11886646 Hood
Fig. 20 Lever
22
Remove the instrument panel from right hand side panel. Remove the blind plate 1.
23
Take out the connector 1 marked X 136 and connect the switch 2. Fit the symbol 3 on the switch and press down the switch. Re-fit the instrument panel. Quantity Pos. in Fig. 22 1 2 1 3
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h 24
900
BHL
20060109
11/12
Route the two hoses in the existing clamps (2 clamps). The upper hose 1 from the valve (port A1) and the lower hose 2 from the valve (port B1).
1003405
25
Fit the hammer tubes underneath the existing tubes using the existing clamps. Quantity Pos. in Fig. 24 1 1 1 2
1003409
Fig. 24 Boom
26
1007420
Fig. 25 Boom
Ref. no.
Kit no.
Option no.
Time
Group
Issuer
Date
Page
21 A 1002385
11715973
11891443
7h
900
BHL
20060109
12/12
27
Connect the tubes to the hoses from the machine. Hose 1 from port B1 and hose 2 from port A1.
1003410
Fig. 26 Boom
28
Fit the couplings 1 on the tubes. Fit the couplings 2 and 3 on the couplings. Quantity Pos. in Fig. 27 2 1 1 2 1 3
1003412
Part no. Designation 11881382 Coupling 11882299 Male coupling with eliminator 11882298 Female coupling 29
Fig. 27 Boom