Professional Documents
Culture Documents
THIS ALLOCATION SPECIFICATION IS PREPARED TO DIRECT THE POTENTIAL INVESTORS. IN CASE OF DISAGREEMENT, TURKISH TEXT IS TAKEN INTO CONSIDERATION.
CONTENTS
1-
PUBLIC IMMOVABLE ALLOCATION ANNOUNCEMENT BY THE MINISTRY OF CULTURE AND TOURISM 2013/1...... LIST OF PUBLIC IMMOVABLES TO BE ALLOCATED List of Public Immovable within and outside the Culture and Tourism Conservation and Development Regions/Sub-Regions, Tourism Areas and Centers .................... APPLICATION DOCUMENTS AND GENERAL CONDITIONS FOR PUBLIC IMMOVABLE ALLOCATION ...................................................... ANNEXES ........ LETTER OF APPLICATION .....
6-7
2-
8-17
34-
18-24
25 26
STATEMENT..............................
27
28
29
30
DEFINITE LETTER OF GUARANTEE UNLIMITED IN TIME FOR DEFINITE ALLOCATION... THE LIST OF THE CITIES WITHIN THE SCOPE OF THE LAW OF INCENTIVES OF INVESTMENTS AND EMPLOYMENT, AND RELATED ALTERATIONS OF NUMBER 5084 ........ DETAILED INFORMATION AND SPECIAL CONDITIONS FOR PUBLIC IMMOVABLE TO BE ALLOCATED WITHIN CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION AND TOURISM AREAS AND CENTERS..................................................................................................................... Adana Yumurtalk Tourism Center Adana, Yumurtalk, Kemalpaa Neighbourhood, atalbk Location .... Afyonkarahisar Heybeli Thermal Tourism Center Afyonkarahisar, Bolvadin, Gzszl Village ....... Afyonkarahisar mer Gecek Thermal Tourism Center Afyonkarahisar, Center, akr Village ........................ Afyonkarahisar mer-Gecek Thermal Tourism Center Afyonkarahisar, Center, Demirevre Village ....... Ankara Haymana Thermal Tourism Center Ankara, Haymana, Medrese Neighbourhood ......... Antalya Alanya ncekum Tourism Center Ankara, Alanya, ncekum Town ........... South Antalya Tourism Area Antalya, Kemer, Kemer Neighbourhood .. Artvin Kafkasr Culture and Tourism Conservation and Development Region Afyonkarahisar, Center, Balcolu Neighbourhood, Kafkasr Location .....
31
32
5.
33
6-
Aydn Didim Culture And Tourism Conservation And Development Region Aydn, Didim, Didim Neighbourhood, Kocaharp Location .... Bursa Mustafakemalpaa Tmbldek Thermal Tourism Center Bursa, Mustafakemalpaa, Ltfiye, Kmrckad, ap, Snlk, Muradiyesarn Villages... anakkale Ezine Kestanbol Thermal Tourism Center anakkale, Ezine, Akakeili Neighbourhood, Bakacak Location ... anakkale Geyikli Tourism Center anakkale, Ezine, Geyikli Town, Kprba Location ankr-Ilgaz-Kadnayr-Yldztepe Culture and Tourism Conservation and Development Region ankr, Ilgaz, Cmert Village, Kyst Location......... Denizli Thermal Culture and Tourism Conservation and Development Region (Akky Glemezli Zone) Denizli, Pamukkale, emeba Village, merlen Sarmustafayk Location Erzincan ErganDa Culture and Tourism Conservation and Development Region Erzincan, Center, Trkmenolu-Yaylaba Villages Eskiehir Mihalgazi Sakarlca Thermal Tourism Center Eskiehir, Mihalgazi, Sakarlca Village....... Gmhane Zigana Winter Sports Tourism Center Gmhane, Torul, Kalkanl Village, akmakkaya Location..... Hatay skenderun Shore Tourism Center Hatay, skenderun, Akal Town............ zmir zdere Kesre Tourism Center zmir, Menderes, zdere Town, Gztepe Location.... zmir Seluk Pamucak Tourism Center zmir, Seluk, Seluk Village, Pamucak Location ... Katerina Villa-iman Villa Kars Sarkam Sphan Cbltepe Balklda amurluda Tourism Center Kars, Sarkam, nn Neighbourhood, ehitler Street.... Kocaeli Glck Summer Thermal Tourism Center Kocaeli, Glck, Hasaneyn-Hisarn Villages, Yazlk Neighbourhood, YasakdzKadrga Location...... Ktahya Gediz Ilcasu Thermal Tourism Center Ktahya, Gediz Ilca Location ........... Mula, Bodrum Yalkavak Gndoan Gltrkbk Tourism Center Mula, Bodrum, Gndoan Town, Trkbk Village, Mezgit Location ... Ordu Aybast Toygar Kabaktepe Tourism Center Ordu, Aybast, Toygar Village, Kabaktepe Location .. Uak Banaz Hamamboaz Thermal Tourism Center Uak, Banaz, Hasanky Village...................... DETAILED INFORMATION AND SPECIAL CONDITIONS FOR PUBLIC IMMOVABLE TO BE ALLOCATED OUTSIDE CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGIONS,TOURISM AREAS AND CENTERS
176
Mula, Center, enyayla- Ylanl Village Ardovas Location...... 183-187 Mula, Fethiye, Kayaky Village, Levissi Location . 188-199 Abdullahpaa Villa Sivas, Divrii, Ceditpaa Neighbourhood, Paa Camii Street...... 200-208
PUBLIC IMMOVABLE ALLOCATION ANNOUNCEMENT BY THE MINISTRY OF CULTURE AND TOURISM 2013/1
Public immovables specified in the present specification are to be allocated to local and foreign investors for tourism investments pursuant to the provisions of Tourism Incentive Law No.2634 and Article 8 of the Regulations for Public Immovable Allocation for Tourism Investments, enacted on the basis said law. 1) Potential investors are requested to submit the required information and documents in accordance with Article 10 of the Regulations For Public Immovable Allocation For Tourism Investments and Public Immovable Allocation Announcement and Specification For Tourism Investors-2013/1 by 16:30 Pm, on 15/03/2013 at latest in person to Ministry of Culture and Tourism General Document Service, (Tourism Bureau AG Floor) smet inn Bulvar No: 5 06100 Emek - Ankara. Submissions by mail shall not be taken into consideration. 2) All information and documents to be submitted by investors shall be in Turkish. All information and documents can be submitted in foreign language providing that the Turkish translations there of are presented with certification by a Turkish consulate abroad or a respective consulate in Turkey. The certified translation text shall be taken as the basis in evaluation. 3) Investors can apply for several parcels. However, a separate file shall be prepared for each parcel and the related information and documents defined in the Allocation Specification shall be enclosed into the application file. 4) The applications to the Ministry shall be evaluated by the financial adequacy in accordance with the Article 11 of the Regulations for Public Immovable Allocation For Tourism Investments and the matters within the scope of the Public Immovable Allocation Specification. 5) A negotiation for a direct contribution of investors to social and technical infrastructure shall be held in between the qualified investors for the parcels having several applications. In the parcels with only one application, a direct contribution to be determined by the Land Allocation Commission for the realization of social and technical infrastructure in relation with the type of investment and region shall be held. 6) The Guarantee requested by the Ministry shall be submitted in the form of Definite Letter of Guarantee Unlimited in Time or paid to the bank account number of T.R. Central Bank of Ankara Branch of TR370000100100000350121007 IBAN 7) The Ministry shall return the Nagotiation Guarantee in case of not giving the permission of preliminary permit. 8) In the event non-allocation of the parcels applied by the investors, the Ministry can recommend one or more the parcels which are not allocated in the same announcement according to the characteristics of the investments and the investors. 9) Public Immovable Allocation Announcement and Specification For Tourism Investors (2013/1) containing detailed explanations and information on the subject immovables of the allocation can be purchased from DSMM (Dner Sermaye letmesi Merkez Mdrlg) Cumhuriyet Bulvari Fevzipaa Neighbourhood, No: 4 06050 Ulus/Ankara (Phone: +90 312 3094953). 5.000 TL (Five Thousand Turkish Liras) Fee of the booklet will be paid to TR750001001233034831705005 IBAN (The Institution Revenue Code: 70-00-01) at T.C Ziraat Bank Heykel Branch, and the note fee for the 2013/1 Allocation Specification and Name/Title, address and telephone number of the Investor shall be written in the explanation section.For the acceptance of the approval, the signed statement in which the conditions are accepted by the investors and the inclusion of the bank receipt have to be given to the Ministry. 10) Detailed information can be obtained during the application phase from Ministry of Culture and Tourism, General Directorate of Investments and Establishments, Department of Land rd Allocation, smet Inn Bulvari No:5, 3 Floor, 06100, Emek - Ankara (Phone: +90 312 2129189).
11) Public Immovable Allocation Announcement and Specification for Tourism Investors2013/1) can also be obtained from web address: www.kulturturizm.gov.tr at 30/01/2013 Booklet sales will be started at 15/02/2013 from the address of DSMM, mentioned above. 12) In the event that information and documents requested with this specification are deficient or inadequate, application shall be regarded as invalid. 13) The provisions of the Regulations for Public Immovable Allocation for Tourism Investments and Public Immovable Allocation Announcement and Specification for Tourism Investors-2013/1 are applied for the allocations within the scope of this announcement.
PUBLIC IMMOVABLE WITHIN CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGIONS TOURISM AREAS AND CENTERS
ROW NU. ALLOCATION SITE OWNERSHIP STATUS TYPE OF FACILITY APPROXIMATE CAPACITY LOT PARCEL SPECIAL PARCEL
ADANA YUMURTALIK TOURISM CENTER Adana, Yumurtalk, Kemalpaa Neighbourhood, atalbk Location Adana, Yumurtalk, Kemalpaa Neighbourhood, atalbk Location
Treasury
1000 Beds
239
22
Treasury
1000 Beds
239
22
Treasury
Hotel
250 Beds
103
Treasury
Hotel
200 Beds
152
Forest
Hotel
500 Beds
Treasury
Hotel
300 Beds
181
Forest
300 Beds
Treasury
148
Forest
Hotel
250 Beds
10
Treasury
400 Beds
13001
11
Forest
Hotel
300 Beds
12
Forest
Hotel
300 Beds
13
Forest
14
Forest
15
Forest
Hotel
300 Beds
16
Forest
Hotel
300 Beds
ANAKKALE EZNE KESTANBOL THERMAL TOURISM CENTER anakkale, Ezine, Akakeili Neighbourhood, Bakacak Location
17
Treasury
Hotel
150 Beds
84
ANAKKALE GEYKL TOURISM CENTER anakkale, Ezine, Geyikli Town, Kprba Location anakkale, Ezine, Geyikli Town, Kprba Location anakkale, Ezine, Geyikli Town, Kprba Location anakkale, Ezine, Geyikli Town, Kprba Location anakkale, Ezine, Geyikli Town, Kprba Location
18
Treasury
Hotel
130 Beds
5657
19
Treasury
Hotel
120 Beds
5657
20
Treasury
Hotel
110 Beds
5657
21
Treasury
Hotel
70 Beds
5657
22
Treasury
Hotel
90 Beds
5657
10
23
Treasury
Pension
35 Beds
5657
24
ankr, Ilgaz, Cmert Village, Kyst Location ankr, Ilgaz, Cmert Village, Kyst Location ankr, Ilgaz, Cmert Village, Kyst Location ankr, Ilgaz, Cmert Village, Kyst Location
Forest
Hotel
150 Beds
105
25
Forest
Hotel
170 Beds
105
26
Forest
Daily-Use Facility
105
27
Forest
Daily-Use Facility
105
DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION (AKKY GLEMEZL ZONE)
28
Treasury
18 Holes G1
300 Beds
222-15
29
Treasury
Hotel
500 Beds
223-1443
30
Treasury
Hotel
500 Beds
223-14431358
31
Treasury
Hotel
200 Beds
1358
11
32
Denizli, Pamukkale, emeba Village, Sarmustafayk Location Denizli, Pamukkale, emeba Village, merlen Location Denizli, Pamukkale, emeba Village, Sarmustafayk Location
Treasury
Hotel
250 Beds
1358
33
Treasury
Thermal Cure
7.592,85 m2 Closed Construction Area 3.317,94 m2 Closed Construction Area 7.799,67 m2 Closed Construction Area
223-1443
34
Treasury
Thermal Cure
1357
35
Treasury
1357-1443
ERZNCAN ERGAN DAI CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION
36
Treasury
Hotel
800 Beds
328
37
Treasury
Hotel
1000 Beds
132
38
Treasury
Hotel
200 Beds
130
39
Treasury
Hotel
150 Beds
129
40
Foresty
Hotel
100 Beds
1170
GMHANE ZGANA WINTER SPORTS TOURISM CENTER Gmhane, Torul, Kalkanl Village akmakkaya Location 95 m2 Closed Construction Area
41
Treasury
Daily-Use Facility
115
12
42
Gmhane, Torul, Kalkanl Village akmakkaya Location Gmhane, Torul, Kalkanl Village akmakkaya Location
Treasury
Hotel
200 Beds
115
43
Treasury
Daily-Use Facility
105
HATAY SKENDERUN SHORE TOURISM CENTER 44 Hatay, skenderun, Akal Town Hatay, skenderun, Akal Town Hatay, skenderun, Akal Town Treasury Hotel or Holiday Village 800 Beds 516 1
45
Treasury
250 Beds
516
46
Treasury
300 Beds
515
47
Treasury
Daily-Use Facility
688,7 m Closed Construction Area 644,1 m Closed Construction Area 511,6 m Closed Construction Area 377,3 m Closed Construction Area
516
48
Treasury
Daily-Use Facility
516
49
Treasury
Daily-Use Facility
515
50
Treasury
Daily-Use Facility
515
ZMR ZDERE-KESRE TOURISM CENTER zmir, Menderes, zdere Town , Gztepe Location
51
Treasury
300 Beds
7568
ZMR SELUK PAMUCAK TOURISM CENTER zmir, Seluk, Seluk Village, Pamucak Location
52
Treasury
400 Beds
3107
10
13
53
Treasury
300 Beds
3102
54
Treasury
24
1-2-3-4-56 1
75
10-11-12
55
Kocaeli, Glck, Yazlk Neighbourhood, Kadrga Location Kocaeli, Glck, Hasaneyn-Hisarn Villages, Yasakdz Location
Foresty
Hotel
200 Beds
56
Foresty
Hotel
300 Beds
57
Foresty
Hotel
150 Beds
1542
58
Treasury
Boutique Hotel
80 Beds
837
14
Rural Tourism Facility Or 59 Ordu, Aybast, Toygar Village, Kabaktepe Location Foresty Holiday Village Or Plateu House UAK BANAZ HAMAMBOAZI THERMAL TOURISM CENTER Uak, Banaz, Hasanky Village Uak, Banaz, Hasanky Village Uak, Banaz, Hasanky Village 250 Beds 1
60
Foresty
Hotel
600 Beds
61
Foresty
Hotel
600 Beds
15
62
Foresty
Hotel
500 Beds
18
15
PUBLIC IMMOVABLE OUTSIDE CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGIONS TOURISM AREAS AND CENTERS
ROW NU. ALLOCATION SITE OWNER SHIP STATUS TYPE OF FACILITY APPROXI. CAPACITY LOT PARC EL SPECIAL PARCEL
63
Treasury
120 Kuver
677
61
63 Mersin, Tarsus, Sofular Neighbourhood, 43rd Street Special Facility (Accomodation +EatingDrinking) 64 26 Beds 677 70 2
64
Treasury
1 Mersin, Tarsus, Sofular Neighbourhood, 37th Street Special Facility (Accomodation +EatingDrinking+Sales Unit)
65
Treasury
10 Beds
121 2
66
Foresty
G1
16
4 149 6 10 149 67 Mula, Fethiye Kayaky Village Levissi Location Treasury Special Accomodation Facility 300 Beds 11 1 3 1 1 2 4 1 2 1
157 ABDULLAHPAA VILLA SVAS DVR CEDTPAA NEIGHBOURHOOD PAA CAM STREET
68
295
YALOVA FTLKKY STELER NEIGHBOURHOOD KURUEME LOCATION Yalova iftlikky Siteler Neighbourhood i Kurueme Location
69
Treasury
750 Beds
3318
17
1) DOCUMENTS AND INFORMATION TO BE SUBMITTED BY THE INVESTORS: a) Letter Of Application (ANNEX-1) b) Statement and Its Enclosure of Investor Information Form (ANNEX-2a, ANNEX-2b): All the information about the requested public immovable and the proposed facility on the parcel shall be stated completely, c) Trade Registered Gazette or those in the audience which is approved by the notary public, stating last partnership structure of corporate bodies. In case of the fact that the entrepreneurs are foreign real or corporate bodies, the document displaying the partnership composition of the corporate body shall be taken by the authorized institutions of their countries. The original copy and Turkish translated copy of this document that have been approved by Turkey Embassy or Consulate General, determining that it is prepared by the authorized institution in respect of the legislation of that country, shall be submitted to the Ministry. d) Financial report prepared by a financial consultant or by institutions having an independent control authority: Investors applying as either real bodies, corporate bodies or joint ventures; shall submit a Financial Evaluation Report indicating their industrial and commercial relations, tourism activities, assets, cash situation (financial possibilities), tax payments and participations. It is written as; It has been determined that ... has its financial capacity to realize ..% of the total investment cost of the facility applied in ...... Province, .. Sub-province, ... Village/District, . Location, .. Lot/Parcel with a capacity of .. and type/class of..by means of its equity capital and prepared by a financial consultant or by institutions having an independent control authority, in order to prove their qualifications in terms of realization of the intended investments. (In case of the equity capital lower than the 50 %, the applications shall not be taken into the consideration.) In case of the fact that the entrepreneurs are foreign real or corporate bodies, financial evaluation report - to be prepared by the entrepreneurs as per this clause - shall be prepared either by a financial consultant or by institutions having an independent control authority. Alternatively, the entrepreneurs shall have the financial evaluation reports made to the institutions entitled audit authority as per the legislation of their countries. The original copy and Turkish translated copy of the report that have been approved by Turkey Embassy or Consulate General, determining that it is prepared by the authorized institution in respect of the legislation of that country, shall be submitted to the Ministry.
18
e) Letter Of Commitment: The investors letter of commitment which is written with a statement of I agree and accept act in compliance with all the provisions of the Public Immovable Allocation Announcement and Specification for Tourism Investors 2013/1 and special conditions determined in the information sheet and to meet the amount to be determined by the Ministry in order to realize whole or part of the social and technical infrastructure - to be realized in the allocated immovables according to the qualification of the region or the project in which the investment will be realized - or in order to meet its cost shall include the decision of company board of directors, approved by the Notary Public for the application of corporate bodies. f) A work partnership or consortium contract, approved by the notary public, in case of joint ventures application:
In case of joint ventures application as a work partnership or as a consortium; a copy of the partnership contract indicating the equity capital ratio of the partners and approved by the notary public or a copy of the consortium contract which also indicates the equity capital ratio of the partners and approved by the notary public shall be submitted. The pilot partner in partnership contracts, and coordinator partner in the consortium agreements is defined and a sample of the work-partnerships or the consortium contracts, approved by the notary public, shall be submitted to the Ministry. For all kinds of procedures, request or notifications of the Ministry, the addressed person is the pilot or the coordinator. The notifications to the pilot partner in partnership contracts and coordinator partner in the consortium agreements shall be accepted as the notifications to the joint ventures. In the work partnership agreements and contracts, it shall be stated that the real and corporate bodies are to be responsible for realization of their commitment as cooperative and successively. On the other hand, in the consortium agreements and contracts, the real and corporate bodies shall clarify which part of the work they commit and they realize their commitment with the coordinator partner. In case of the breaking down the partnership, the pilot or the coordinator will continue to the allocation period, if the pilot or the coordinator proves that it will be able to complete the investment with the 50% of its own equity capital. Other partners cannot participate in the allocation period in any wise. g) Bank Deduction For The Specification: The bank deduction which the price of the Public Immovable Allocation Announcement and have been paid to the Specification for Tourism Investors 2013/1 TR750001001233034831705005 IBAN (The Institution Revenue Code: 70.00.01) at T.C. Ziraat Bankas Heykel ubesi (T.C Ziraat Bank Heykel Brunch). The applications for the allocation of public immovables to the Ministry shall be concluded by the Land Allocation Commision within 6 (six) months of duration following the submission of all the information and documents, determined in the Allocation Specification, to the Ministry. It can be extended by the Ministry in case it is required. 2) EVALUATION OF THE BID PROPOSALS: The applications to the Ministry shall be evaluated as a matter of financial efficiency within the context of Tourism Incentive Law No.2634 and of the sentences of the Regulations for Public Immovables Allocation for Tourism Investments and of the subjects determined in this specification. A negotiation for a direct contribution of investors to social and technical infrastructure shall be held in between the qualified investors for the parcels having several applications. The regulations and procedures for the negotiation are identified by the Land Allocation Commission and notified to the investors. The Guarantee for Negotiation (Guarantee: as in the form of Definite Letter of Guarantee Unlimited in Time or the cash money in Turkish Lira Currency paid to the accounting number of T.C. Merkez Bankas Ankara ubesi- (T.R. Central Bank-Ankara Branch) TR370000100100000350121007 IBAN (ANNEX-3) (according to the regulations and procedures for the negotiation) with a total amount of the first proposed contribution and a Letter of Commitment,
19
approved by the notary public, concerning the acceptance of these rules and procedures shall be submitted to the Ministry by the investors at the negotiation phase. It is required that the investor shall submit a definite letter of guarantee unlimited in time - for the difference between his proposal at the beginning of the negotiation and the one at the end of the negotiation- and the delivery receipt of it shall be submitted to the Ministry within thirty (30) days. The letter of guarantee for contribution for the social and technical infrastructure submitted by the other entrepreneurs attending to the negotiation shall be given back. The investor who offered the highest contribution and fulfill its obligations shall be qualified for the preliminary permit by the Land Allocation Commission. If the investor, giving the highest offer, gives up his commitment or does not submit additional letter of guarantee due to the causes except for compulsory or public-oriented ones, the additional guarantee taken in order to join the negotiation shall be converted to cash and foreclosed to the treasury. At this point, the Ministry offers to the investor - who proposed the second highest contribution for the social and technical infrastructure to submit the guarantee with the amount offered for social and technical infrastructure at the end of the negotiation within thirty days following written notification date. After these liabilities are met, the preliminary permit can be given to the investor by the Land Allocation Commission. If the investor who proposed second highest contribution for social and technical infrastructure does not accept the offer of the Ministry, the immovable for the allocation shall be offered to the other investors in order. After the decision of final allocation of the Land Allocation Commission, it is requested from the investor who granted for the preliminary permit, to pay a contribution for social and technical infrastructure as cash to the account number of DSIMM (Dner Sermaye Iletmesi Merkez Mdrlg) in 30 (thirty) days. After receiving the bank receipt that the amount has paid to the bank, the notification of final allocation has done. If the guarantee is in the form of the letters of guarantee taken at the negotiation shall be return back to the investor. If the amount is not paid in due time, the preliminary permit shall be cancelled by the Ministry. The guarantee for the preliminary permit and the one for the negotiation shall be converted to the cash and foreclosed to the treasury. The parcels with only one application shall be evaluated and concluded by the Land Allocation Commission. In this situation, a direct contribution of the investor (determined by the commission) could be requested for social and technical infrastructure according to the properties of the project. At the end of the evaluation of the applications, the Ministry is free with regard to whether the allocation of the immovable in this Specification is realized or not. In the event non-allocation of the parcels applied by the investors, the Land Allocation Commission can recommend one or more parcels of the lots same announced for the allocation according to the investors who will have assistance for the development of the tourism.
3) REQUIREMENTS OF THE INVESTORS GRANTED FOR THE ALLOCATION : THE PERIOD OF PRELIMINARY PERMIT: The investor is granted for the preliminary permit - not longer than six months term in the areas not having approved implementation plan and not longer than four months term in the areas having approved implementation plan - for mapping and planning works, confirmation procedures, incorporating a tourism-oriented joint-stock company and for the other procedures against the preliminary permit fee. In order that the preliminary permit comes into force within the one month period after the announcement;
20
a) Delivery receipt relating to the guarantee (Guarantee can both definite letter of guarantee unlimited in time or cash money. The money shall be paid to the accounting number of T.C. Merkez Bankas Ankara ubesi ( T.R. Central Bank of Ankara Branch), at an amount of 5% (five percent) for the winter and thermal tourism allocations and the allocations of registered culture properties and preservation areas 1% (one percent) of the total investment cost shall be paid to (ANNEX-4.) b) The Letter of Commitment for Preliminary Permit approved by the Notary Public, c) The receipt copy relating to annual preliminary permit (one per thousand (0,1%) of total investment cost) fee being paid into account of relevant accounting unit, (The Preliminary Permit Fee is (one per thousand (0,1%) of total investment cost. However, nd 50% of discount shall be applied in the preliminary cost for the cities within the scope of the 2 article of the Law of Incentives of Investments and Employment, and Related Alterations numbered 5084. The list of cities within the scope of 5084 is given in the ANNEX-6.) Preliminary Permit begins on the submission date of these documents above to the Ministry. Unless these requirements are met, the request of the investor for preliminary permit is regarded as invalid. The Guarantee for the share taken at the phase of the negotiation shall be converted to the cash and foreclosed to the treasury. In case of an offer in order to be extended the preliminary permit period by the investor and of the acceptance of this offer by the Ministry, preliminary permit periods could be extended in six each months periods in the areas not having approved implementation plan and in four each months periods in the areas having approved implementation plan and against its fee at the most four times. If there are reasons derived from compulsory or public-oriented ones and from the administrative and judicial disputes acceptable by the Ministry, preliminary permit period is frozen and preliminary permit fee is not taken for the frozen period. In the event of preliminary permit procedures being completed before given or indulged preliminary permit period, preliminary permit fee delivered as cash shall be deducted from definite allocation cost. Within the period of Preliminary Permit, the investor: a) Prepares 1/1.000 scale Implementation Plans of the investment areas (if there is any plans this areas) and submits them to the Ministry for approval. Realizes allotment, integration, relinquishment and similar operations of the immovable subject to the preliminary permit, b) In case of determining the area of the allocation land by the land registry and cadastre office, the application layout by directorate of land and cadastre; on the other hand in case of not obtaining the
application layout in forest areas the scale layout and the tree layout shall be prepared and approved by the related Forest Directorate and shall be submitted to the Ministry together with the Preliminary Permit paper.
c) Incorporates a joint-stock company, of which fields of activity includes tourism, pursuant to the provisions of the Turkish Law of Commerce; c.1) The incorporated joint-stock company has to have an amount of capital at least 51% (fifty-one percent) of the total investment cost of the immovable for which have been granted the preliminary permit. c.2) The share of real or corporate bodies in the joint-stock company, who have been granted the preliminary permit, cannot be below 51% (fifty-one percent). c.3) For the joint-ventures, joint stock company to be incorporated shall comply with consortium contract submitted to the Ministry. d) Obtains Tourism Investment Certificate in accordance with the Regulations on Certification and Qualifications of Tourism Facilities, e) Obtains necessary permissions in accordance with the Regulations of Environmental Impact Assessment (EIA), within the areas where EIA Report has to be prepared,
21
f) Submits the site plan which shall be the base of leasing cost calculations, together with the documents requested in preliminary permit, in the events that total investment cost is calculated by square meter, Unless the investor meets the liabilities for the reasons except for compulsory or publicoriented in the period of preliminary permit, the preliminary permit shall be cancelled by the Ministry. In this case, preliminary permit fee collected as cash will not returned and the guarantee taken at the negotiation phase will be converted to the cash in consultation and foreclosed to the treasury. Unless the investor meets the requirements for the reasons compulsory or public-oriented, within given or extended periods of preliminary permit; upon request of the investor, preliminary permit is cancelled by the Ministry and the guarantee will be returned without interest. THE PERIOD OF DEFINITE ALLOCATION: The investor taken Investor Investment Certificate by fulfilling the liabilities of preliminary permit period is qualified for the definite allocation by means of the decision of Land Allocation Commission. In order to validate the definite allocation within the 1 (one) month time duration after the definite allocation notification letterl; a) Delivery receipt relating to the guarantee (Guarantee can both definite letter of guarantee unlimited in time or cash money. The money shall be paid to the accounting number of TR370000100100000350121007 IBAN of T.C. Merkez Bankas Ankara ubesi ( T.R. Central Bank of Ankara Branch),, at an amount of 10% (ten percent) for the winter and thermal tourism allocations and the allocations of registered culture properties and preservation areas 2% (two percent) of the total investment cost (ANNEX-5.) b) A copy of the company board of directors decision, relating to definite allocation conditions being accepted and committed, approved by the Notary Public, have to be submitted to the Ministry by the investor within one-month term following the registered notification date of the definite allocation decision to the investor. After submission of these documents to the Ministry; the easement including the independent and continual right of construction, leasing or land rights shall be demanded from the Ministry of Finance by the Ministry and Guarantee for Preliminary Permit is returned. The investors can be qualified for the allocation to 49 years or 20 years by means of the decision of Land Allocation Commission. Definite allocation comes into force as from the notification date. It is compulsory to grant an easement and begin the construction in a year period of time after the notification of definite allocation. In case of not beginning the construction, the penal act shall be rd applied according to the law of 32 and 33 articles. The additional period of starting to the construction shall be given upmost 2 years; a) Within this period, in case of not completing the 15% of the investment definite allocation shall be cancelled and definite letter of guarantee unlimited in time shall be converted to the cash and foreclosed to the treasury. The investor cannot claim any right and charge for these items. b) However in case of proving that the minimum 15% of the construction has been completed, additional period could be given to the investor provided that not to be exceeded the investment period foreseen at the beginning. . If the investment cannot be completed in this additional period, the allocation shall be cancelled and the definite letter of guarantee unlimited in time shall foreclosed to the treasury. The investor cannot claim any right and charge for these items. Buildings, facilities and outbuildings on the immovable, where the allocation has been cancelled or the allocation term has expired, shall be foreclosed to the treasury without charge. The investor cannot claim any right nor charge for these items. However the allocation period is frozen, in the events that the investment cannot be started or realized because of the compulsory or public-oriented reasons, which interfere the operations of development plan decisions and architectural project preparation; such as, Environmental Impact
22
Analysis (EIA) report or the determination of conservation sites, and which derived from the administrative and judicial disputes acceptable by the Ministry. The period passed between the Date of Commissions Decision about freezing the allocation period and the Date of Commissions Decision about starting the frozen period shall be added to the allocation period and utilization fee are not paid for this period of time. Moreover, in case of request of the investor documenting the liabilities cannot be completed because of the reasons except for his own defect and derived from compulsory or public-oriented ones and from the administrative and judicial disputes acceptable by the Ministry, the definite allocation shall be cancelled and the guarantee shall be returned. In this case, the utilization fees until the annulment date of the definite allocation shall be collected. The allocation for the investor, who has not been able to meet the requirements of the definite allocation, is cancelled by the Ministry and the performance securities are foreclosed to the treasury. In this case, all sorts of buildings and facilities on the immovable are foreclosed to the treasury without charge. The investor cannot claim any right and charge for these items. OTHER CONTRIBUTIONS: a) Public lands which shall be allocated according to the Regulations for Public Immovable Allocation for Tourism Investments; a.1.) First year use fee is five per thousand (0,5%) of total investment cost. This ratio shall be 2,5% of total investment cost for winter and thermal tourism. a.2.) The use fee is determined by the article named The Fee of Building Allocation of the Regulation in case of a building(s) is(are) placed on the land. a.3.) After the operating the facilities on the land, the fee of 1% of the annual management business proceed shall be paid to Treasury. This fee shall be 0,5% for the winter and thermal tourism allocations and the allocations of registered culture properties and preservation areas. b) The fees in the previous item (a) and its sub-items of (a1), (a2), (a3) shall be applied with a 50% of discount for the allocations in the cities within the scope of the law of 5084 or for the allocation realized for winter or thermal purpose. Besides this discount for the winter and thermal tourism allocations, the first year use values and the second and third year use values according to the ender specifications 70% of discount shall be applied. Besides, the allocation which shall be both for winter or for thermal use, and within the scope of the law number 5084 the both two discount rate shall be applied. c) The infrastructure constructions will not commence until the projects belonging to the infrastructure facilities, which shall be realized by the investors or to which the investors shall contribute, are approved by the Ministry or relevant public institutions. d) The investor shall take all the measures (including noise) to prevent disturbance of the facilities in operation in neighbouring parcels during the construction. e) Environmental pollution shall be avoided. f) At the evaluation phase of the allocation applications, during preliminary permit and definite allocation periods, in the event of the realization of facility becoming impossible due to disputes emerging from the related local administrations and the public institutions (Plan approval, land ownership disputes, construction and housing license problems and/or determination as an area of conservation) the investor shall commit not to request any indemnity. The Ministry shall not be responsible against the investor, except for returning of the guarantee to the investor. g) All annual payments and shares to be collected from the annual income for the allocated immovable shall be paid in times as stated in the principles and fundamentals of the agreement to be signed with the Ministry of Finance. h) On annulment of the preliminary permit or allocation due to lack of conformity with the conditions (preliminary permit, definite allocation and agreement conditions) defined by the Ministry, the allocated public immovable (together with all constructed items, notwithstanding their phase) shall be foreclosed to the treasury without the need of a court sentence or official notification. The phase of
23
the construction is required to be defined by the courts, by the Ministry of Culture and Tourism or the Ministry of Finance. All materials that are not used in the construction but stored on the immovable shall be returned to the investor providing that the transfer costs are paid by the investor. The investor cannot claim any indemnity or other rights from the Ministry and the letter of guarantee shall be converted to cash and foreclosed to the treasury. i) In case of the allocation to be realized in the area forest status, the plantation fee which will be 3 times bigger of the forest land subject to allocation and the maintenance fee for 3 years of this area have to be paid in the account of General Directorate of Forest as required by Law No. 5761 in the preliminary permit period. Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total investment which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. j) For the matters that are not defined in this Specification, the provisions of the Regulations for Public Immovable Allocation for Tourism Investments shall be taken into consideration. In case of being the matters that are not defined in the regulation aforesaid, the decisions of the Land Allocation Commission shall be taken into consideration. k) In case of application to the adjacent parcels by the same entrepreneur and taking them by him in the negotiation phase, the parcels can be reunion by the plan conditions in case of a demand l) In case of building Thermal Toursim Facility on the parcels subject to allocaion in Thermal Toursim Centers, it is possible to utilize from the discounts within the scope of Regulations for Public Immovable Allocation for Tourism Investments
24
ANNEXES
25
ANNEX-1
LETTER OF APPLICATION
To: MINISTRY OF CULTURE AND TOURISM General Directorate of Investments and Establishments ANKARA
The application file prepared for the parcel that has been announced to the public with the Specifications for Public Immovable Allocation Conditions to Potential Investors (2013/1) by your Ministry is submitted within the annex.
26
ANNEX-2a
STATEMENT
To: MINISTRY OF CULTURE AND TOURISM General Directorate of Investments and Establishments ANKARA I (We), the undersigned, hereby declare that I (We) have read, agreed and based our application upon the conditions on the general guidelines stipulated in the Public Immovable Allocation Announcement and Specification for Tourism Investors (2013/1) and special conditions determined for the subject immovable of allocation, provided by your General Directorate and prepared in connection with the announcements published in the press and Official Gazette for public immovable allocation to the potential investors by your Ministry, and I (we) further affirm that I (we) shall accept the Preliminary Permit and Definite Allocation Conditions to be designated by the Ministry.
NAME, FAMILY NAME SIGNATURE, DATE (SEAL OF THE FIRM)
LEGAL ADDRESSES (Give Full Address) : (The Ministry will immediately be informed of any changes in address) TELEPHONE:.FAX:E-MAIL:
PUBLIC IMMOVABLE APPLIED FOR : PROVINCE SUB PROVINCE DISTRICT VILLAGE / NEIGHBOURHOOD LOCATION LOT / PARCEL NO :............................................................................... : : : : :
TYPE OF INVESTMENT TO BE DEVELOPED : CATEGORY OF THE INVESTMENT :. CLASS OF THE INVESTMENT CAPACITY OF THE INVESTMENT :.. :.
:TL
A) Equity Ratio : .............................% B) Estimated Foreign Capital Ratio : % ENCLOSURES c) Number of Files:.
(every single document in the files has to be submitted in the order of the article Documents and Information to be Submitted by the Investors.) 2) Supplementary Form of the Entrepreneur to the Statement
27
ANNEX-2b
28
ANNEX- 3
To: MINISTRY OF CULTURE AND TOURISM General Directorate of Investments and Establishments ANKARA
[the name of the bank or special financial institution] guarantees the amount of definite letter of guarantee unlimited in time for negotiation that is .TL [the amount of the letter of guarantee for application] which [the name of the entrepreneur] have to submit in order to participate the negotiation of the public immovable - situated in . City, . Province, . Village/Neighbourhood, .. Location, on Lot no. .., Parcel no. ., having the capacity of and announced by your administration - by fulfilling the conditions of Tourism Incentive Law No.2634. Regulations for Public Immovable Allocation for Tourism Investments and Public Immovable Allocation Announcement and Specification for Tourism Investors 2013/1. In the event of the existence the situation that the definite letter of guarantee unlimited in time being foreclosed within the framework of the Tourism Incentive Law No.2634. Regulations for Public Immovable Allocation for Tourism Investments and Public Immovable Allocation Announcement and Specification for Tourism Investors 2013/1; We, as the authorized and responsible representative entitled to sign of [the name of the bank or special financial institution], declare and pledge on behalf and account of [the bank or special financial institution] that we shall draw up a protest regardless of taking permission of the authorized and aforesaid person/firm and we shall pay the amount written above in cash and completely with its legal interest together belonging to the days from the request date to the payment date on your first written request without delay, regardless of considering any disagreement appearing between the aforesaid person/firm and your administration and legal consequences of this disagreement to the order of your administration. The present letter of guarantee is definite and unlimited in time.
[the name of the bank or special financial institution] [the branch name of the bank or special financial institution] Branch Name, Title and Signature of Authorities of [the bank or special financial institution]
NOTE: For the letters of guarantee to be submitted according to the counter guarantees of the foreign banks or similar credit institutions, the name of foreign banks or credit institutions and the guarantee being with counter guarantee shall be determined. If the currency unit as the base to the offer is Turkish Currency, the letters of guarantees to be submitted as per the counter guarantees shall be arranged at Turkish Currency.
29
ANNEX- 4
To: MINISTRY OF CULTURE AND TOURISM General Directorate of Investments and Establishments ANKARA
Announced by your administration; situated in . City, . Province, . Village/Neighborhood, .. Location, on Lot no. .., Parcel no.and given the preliminary permit . [name of the entrepreneur], by fulfilling the conditions of Tourism Incentive Law No.2634. Regulations for Public Immovable Allocation for Tourism Investments and Public Immovable Allocation Announcement and Specification for Tourism Investors 2013/1 and conditions of preliminary permit Regulations. We, as the authorized and responsible representative entitled to sign of [the name of the bank or special financial institution], declare and pledge on behalf and account of (amount of preliminary permit)[the bank or special financial institution] that; we shall draw up a protest regardless of taking permission of the authorized and aforesaid person/firm and we shall pay the amount written above in cash and completely with its legal interest together belonging to the days from the request date to the payment date on your first written request without delay, regardless of considering any disagreement appearing between the aforesaid person/firm and your administration and legal consequences of this disagreement to the order of your administration. The present letter of guarantee is definite and unlimited in time.
[the name of the bank or special financial institution] [the branch name of the bank or special financial institution] Branch Name, Title and Signature of Authorities of [the bank or special financial institution]
NOTE: For the letters of guarantee to be submitted according to the counter guarantees of the foreign banks or similar credit institutions, the name of foreign banks or credit institutions and the guarantee being with counter guarantee shall be determined. If the currency unit as the base to the offer is Turkish Currency, the letters of guarantees to be submitted as per the counter guarantees shall be arranged at Turkish Currency.
30
ANNEX- 5
To: MINISTRY OF CULTURE AND TOURISM General Directorate of Investments and Establishments ANKARA
Announced by your administration; situated in . City, . Province, . Village/Neighborhood, .. Location, on Lot no. .., Parcel no.and given the preliminary permit . [name of the entrepreneur], by fulfilling the conditions of Tourism Incentive Law No.2634. Regulations for Public Immovable Allocation for Tourism Investments and Public Immovable Allocation Announcement and Specification for Tourism Investors 2013/1 and conditions of Definite Allocation Regulations. We, as the authorized and responsible representative entitled to sign of [the name of the bank or special financial institution], declare and pledge on behalf and account of [the bank or special financial institution] that; we shall draw up a protest regardless of taking permission of the authorized and aforesaid person/firm and we shall pay the amount written above in cash and completely with its legal interest together belonging to the days from the request date to the payment date on your first written request without delay, regardless of considering any disagreement appearing between the aforesaid person/firm and your administration and legal consequences of this disagreement to the order of your administration. The present letter of guarantee is definite and unlimited in time.
[the name of the bank or special financial institution] [the branch name of the bank or special financial institution] Branch Name, Title and Signature of Authorities of [the bank or special financial institution]
NOTE: For the letters of guarantee to be submitted according to the counter guarantees of the foreign banks or similar credit institutions, the name of foreign banks or credit institutions and the guarantee being with counter guarantee shall be determined. If the currency unit as the base to the offer is Turkish Currency, the letters of guarantees to be submitted as per the counter guarantees shall be arranged at Turkish Currency.
31
ANNEX- 6
THE LIST OF THE CITIES WITHIN THE SCOPE OF THE LAW OF INCENTIVES OF INVESTMENTS AND EMPLOYMENT, AND RELATED ALTERATIONS NUMBER 5084
Krehir Sinop Giresun Amasya Uak Malatya Sivas Tokat Diyarbakr Afyonkarahisar Batman Erzincan
Osmaniye Dzce ankr Siirt Gmhane Ordu Erzurum Bartn Bayburt anlurfa Mardin Aksaray
Adyaman Kars Van Idr Yozgat Ardahan Hakkari Bingl Bitlis rnak Mu Ar
Kilis Tunceli Kastamonu Nide Kahramanmara orum Artvin Ktahya Trabzon Rize Elaz Karaman Nevehir
32
DETAILED INFORMATION AND SPECIAL CONDITIONS FOR PUBLIC IMMOVABLE TO BE ALLOCATED WITHIN CULTURE AND TOURISM CONSERVATION, DEVELOPMENT REGION AND TOURISM CENTER
33
34
INFORMATION SHEET: ALLOCATION SITE ADANA YUMURTALIK TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION OWNERSHIP STATUS : Adana : Yumurtalk : Kemalpaa : atalbk : Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 16.02.2011 146 ALLOCATION PERIOD PLANNING STATUS 1/ 25.000 SCALE : Adana Yumurtalk Karata Environment Master Plan Revision (Approval Date: 02.03.2011) : Tourism Facility Area : 49 Years
PLAN DECISION
SPECIAL PARCEL
AREA (M2)
CONST. RATIO
MAX. HEIGHT
CAPACITY
Hotel 1 128.000
0,50
18,50 (5 Floor) 1000 beds 10,50 (3 Floor) 18,50 (5 Floor) 1000 beds 10,50 (3 Floor)
Holiday Village
0,50
0,50
0,50
INFRASTRUCTURE STATUS Subject areas of allocation are located in the boundaries of the contiguous areas of Adana VillageYumurtalk Sub-province Kemalpaa Neighbourhood- Bolvadin Municipality. Parcel is 3 km. away from Yumurtalk sub-province, 80 km. from Adana Village and 85 km. to the airport. The parcels are placed on the sea-side. The sea-side of the special parcel 1 is approximately 500 mt., and of the special parcel 2 is approximately 450 mt. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. exist in the plot. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
35
EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 and 3830/3621 Shore Law are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 2) 239 lo 22 parcel is 253.856,52 m The special parcel 1 is 128.000 m and the special parcel 2 125.000 according to the environment master plan in scale of 1/25.0000. The lost according to the Shore Law in these areas are not considered. 3) In regard with the Shore Law with number 3830/3621. The exact area of the allocation land is going to be determined according the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized after this. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the articles of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) One administrative building, one bedroom, one purification unit, food lounge, kitchen, basketball and volleyball and youth camping which are allocated to the repealed Ministry of Tourism are found on the special parcel 1 subject to allocation. 6) The pavements and the belongings/objects within the social building shall be returned back to the related institution. Besides, the debris value for the buildings on the special parcel 1 subject to allocation shall be paid to the related institution by the investor. 7) In case of constructing new building after the destruction of the previous building on the special parcel 1 subject to allocation, first year use value as the 0,5% of the total investment cost of the st immovable subject to allocation, according to the clause (a) of the 21 Article of the Regulations of the Land Allocations of the Public Immovable, is going to be paid to Ministry of Finance and 1% annual of the business proceeds shall be paid after the operations of the facility. 8) In case of taking more than one parcel of the same investor, the parcels shall be combined as one parcel in case of a demand. In this situation, the total bed capacity shall be the sum of the bed capacity of each parcel. 9) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table:
2. 2,,
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
36
1/ 25.000 SCALE FRGYA REGION AFYONKARAHSAR HEYBEL THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
37
1/ 5.000 SCALE AFYONKARAHSAR HEYBEL THERMAL TOURISM CENTER REVISION AND ADDITIONAL MASTER PLAN
38
1/1000 SCALE AFYONKARAHSAR HEYBEL THERMAL TOURISM CENTER REVISION AND ADDITIONAL IMPLEMENTATION PLAN
39
INFORMATION SHEET: ALLOCATION SITE AFYONKARAHSAR HEYBEL THERMAL TOURISM CENTER PROVINCE : Afyonkarahisar SUB-PROVINCE : Bolvadin VILLAGE/NEIGHBOURHOOD : Gzszl OWNERSHIP STATUS : Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 09.07.1999 22112
ALLOCATION PERIOD
: 49 Years
PLANNING STATUS 1/ 25.000 SCALE : Frigya Region Afyonkarahisar Heybeli Thermal Tourism Center Environment Master Plan (Approval Date: 25.09.2008) : Afyonkarahisar Heybeli Thermal Tourism Center Revision and Additional Master Plan (Approval Date: 02.07.2009) : Afyonkarahisar Heybeli Thermal Tourism Center Revision and Additional Implementation Plan (Approval Date: 02.07.2009)
1/ 5.000 SCALE
1/ 1.000 SCALE
PLAN DECISION
LOT
PARCEL
AREA (m)
CONST. RATIO
MAX. HEIGHT
NO. OF STOREYS
CAPACITY
103
15.483,19
Hotel
0,90
19,50
250 Beds
INFRASTRUCTURE STATUS Lot 103 parcel 1 is situated 23 km far away the city center Afyonkarahisar and 25 km far away from Bolvadin sub-province. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. does not exist in the plot. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
40
EXPLANATION AND GENERAL CONDITIONS 1) 18 item application according to the plot and land arrangements of the Construction Law number 3194 has been done in subject areas of allocation. 2) The Geothermal Spring is allocated to Bolvadin Municipality by the Afyonkarahisar Special Province. 3) 7 lt/sec geothermal water shall be allocated for 250 bed capacity in the 103 lot, 1 parcel subject to allocation by Bolvadin Municipality. 4) a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 7) The named Tourism Center is located in 3 degree Natural Site, therefore in all construction and plan-project issues, the permission shall be gotten from Natural Asset Preservation General Directorate. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
rd th
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
41
42
43
44
INFORMATION SHEET:
ALLOCATION SITE AFYONKARAHSAR MER-GECEK THERMAL TOURISM CENTER PROVINCE : Afyonkarahisar SUB-PROVINCE : Center VILLAGE/NEIGHBOURHOOD : akr
OWNERSHIP STATUS
: Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 06.12.2012 - 1149
ALLOCATION PERIOD
: 49 years
PLAN DECISION
SPECIAL PARCEL
AREA (M2)
CONST. RATIO
CAPACITY
12.800
Hotel
0.60
200 Beds
INFRASTRUCTURE STATUS Subject area of allocation is situated 7 km far away the city center. Urban infrastructure such as drinking and serving water, and sewage system exist in the plot. Urban infrastructure services shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) The special parcel 1 subject to allocation is made up of lot 1 parcel placed in the use of the Tourism Facility Area. 12.800 m of the cadastral parcel of 152
2
2) The exact area of the allocation lands are given approximately. The exact areas are going to be determined after the required leaving, subdivision, and joining etc. by the investor according to the Implementation Plan in scale of 1/1.000 during the preliminary permit and the definite allocation is going to be realized afterwards.
45
3) The Geothermal Spring has been allocated to Afyon Geothermal Facilities Tourism Ind. Trade Incorporated Business (AFJET) by Afyonkarahisar Special Province. 4) 2,8 lt/sec. geothermal water shall be allocated for 100 bed capacity in the Special Parcel number 1 subject to allocation by Afyon Geothermal Facilities Tourism Ind. Trade Incorporated Business (AFJET). 5) In case of constructing thermal facility according with accommodation facilities on special parcel number 1 subject to allocation; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 7) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
66.336,00
200
13.267.200,00
46
47
48
INFORMATION SHEET: ALLOCATION SITE AFYONKARAHSAR MER-GECEK THERMAL TOURISM CENTER PROVINCE : Afyonkarahisar SUB-PROVINCE : Center VILLAGE/NEIGHBOURHOOD : Demirevre Village OWNERSHIP STATUS : Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry / 08.09.2006 - 751 ALLOCATION PERIOD PLANNING STATUS 1/ 25.000 SCALE : mer -Gecek (Afyonkarahisar) Environment Master Plan (Approval Date: 02.06.2008) : Health Facility Area : 49 Years
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
CAPACITY
129.540
Hotel
0,30
500 beds
INFRASTRUCTURE STATUS Areas subject to allocation are located in the boundaries of the contiguous areas of Afyonkarahisar Municipality. The area is placed on Afyonkarahisar- Izmir on the road and 1 km from Ktahya Province of the ways, Afyonkarahisar city center is 6 km. distance. Urban infrastructure such as drinking and usage water, sewage system, telecommunication, electricity etc. does not exist in the plot. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 2) The exact area of the allocation land is going to be determined by the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000. The maximum number of floors and building height are going to be determined in the sub-scale plans.
49
3) The Geothermal Spring has been allocated to Afyon Geothermal Facilities Tourism Ind. Trade Incorporated Business (AFJET) by Afyonkarahisar Special Province. 4) 7 lt/sec. geothermal water shall be allocated for 500 bed capacity in the Special Parcel number 1 subject to allocation by Afyon Geothermal Facilities Tourism Ind. Trade Incorporated Business (AFJET). 5) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 6) a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 7) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 8) All the opinions that have to be taken and the surveys that has to be done determined in the Environment Master Plan in scale of 1/25.000 and in the construction statute, are going to be done by the investor for the subject to allocation. 9) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed the ratio 0,30 (E). 10) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 11) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 12) The application is going to be done by determining the facility class and type together with health facility, defined according to construction need program of Health Ministry, and with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
th
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
50
51
1/ 25.000 SCALE ANKARA - HAYMANA THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
52
53
INFORMATION SHEET: ALLOCATION SITE ANKARA HAYMANA THERMAL TOURISM CENTER PROVINCE : Ankara SUB-PROVINCE : Haymana VILLAGE/NEIGHBOURHOOD : Medrese OWNERSHIP STATUS : Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance/ 20.12.2011-1286 ALLOCATION PERIOD PLANNING STATUS 1/ 25.000 SCALE : Ankara - Haymana Thermal Tourism Center Environment Master Plan (Approval Date: 14.10.2008) : Ankara - Haymana Thermal Tourism Center Master Plan (Approval Date: 11.03.2010) : 49 Years
1/5.000 SCALE
: Tourism Facility Area LAND USE STATUS Hotel CONST. RATIO 0.90 CAPACITY
300 beds
If the thermal cure establishment is built within the accommodation establishment the Construction Ratio will be applied as 1.
INFRASTRUCTURE STATUS Allocation of the subject parcels, located within the boundaries of Ankara-Haymana Municipality, and 9 km. to district centers. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. does not exist in the plot. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made. EXPLANATION AND GENERAL CONDITIONS 1) The special parcel no 1 subject to allocation is composed of the 158.000 m part of 1.685.060 m2 area which is 181 block 1 parcel which is placed in Tourism Facility Use in Environment Master Plan. 2) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry of Culture and Tourism.
2
54
3) The Geothermal spring is allocated to Haymana Municipality by the Ankara Special Province. 4) 400 lt/day for 300 bed capacity, shall be taken of total 120.000 lt. geothermal water shall be allocated in the Special Parcel Number 1 subject to allocation by the Council decision of Haymana Municipality. 5) The maximum number of floors and building height are going to be determined in 1/1000 scale implementation plans. 6) All the opinions that have to be taken and the surveys that has to be done determined in the Master Plan in scale of 1/5.000 and in the development law, are going to be done by the investor for the subject to allocation. And the applications in the area the rules in the plans, plan notes and survey sahll be ruled. 7) The area of the special parcels is given approximately. The exact area of the allocation lands is going to be determined after the procedures of the required leaving joining and subdivision etc are done by the investor in line with the Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized afterwards. 8) The current land use maps of the area subject to the allocation were prepared. 9) In case of a thermal accommodation facility together with thermal facility is realized on the special parcels subject to allocation number 1; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 10) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 11) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 12) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table: Total investment cost = Bed capacity x unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
55
56
57
58
OWNERSHIP STATUS
: Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Agriculture, Forestry and Rural Affairs / 16.01.1987- 176
: 49 Years
: ncekum (Antalya) Tourism Center Implication Plan Revision (Approval Date: 05.07.2011)
PLAN DECISION
H MAX (m)
CONS. RATIO
CAPACITY
INFRASTRUCTURE STATUS Allocation of the subject parcel which is located in Alanya sub-province, ncekum Neighbourhood and is 25 km to province center. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. shall be used. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
59
1) The area of the parcel is given approximately. The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000 and the final allocation shall be realized thereafter. 2) Building maximum height shall be 5 floors in case of n case of constructing and 2 floor in case of constructing holiday village. 3) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 4) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 5) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed the ratio 0,30 (E). 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to articles of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 7) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
th
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
60
61
62
INFORMATION SHEET: ALLOCATION SITE SOUTH ANTALYA TOURISM AREA PROVINCE : Antalya SUB-PROVINCE : Kemer VILLAGE/NEIGHBOURHOOD : Kemer
OWNERSHIP STATUS
: Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance/ 15.02.2012-169
ALLOCATION PERIOD
: 20 Years
PLANNING STATUS
1/5.000 SCALE
: Kemer (Antalya) Master Plan (Approval Date: 19.09.2002) : Kemer (Antalya) Implementation Plan (Approval Date: 19.11.2003)
1/ 1.000 SCALE
PLAN DECISION
LOT
PARCEL
AREA (m)
H MAX. (MT)
CONST. RATIO
CAPACITY
148
11.119
4,50 (1 Floor)
0,05
INFRASTRUCTURE STATUS Allocation of the subject parcel is located 7 km to Kemer sub-province center. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. shall be used. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
63
1) The area of the parcel is given approximately. The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000 and the final allocation shall be realized thereafter. 2) The parcel has 55mt. vista to the sea. 3) The determined closed area of the daily use facility which will be going to be built shall be informed to Ministry by its site plan. The rent value of this closed area shall be added to rent value. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to articles of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
LOT / PARCEL Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost) 6.177,00 TL/m 13,00 TL/m
148 / 6 11.119 m
144.547 TL
: :
The maximum area of 148 lot 6 parcel is maximum 556 m in approved implication plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
64
65
66
INFORMATION SHEET: ALLOCATION SITE ARTVN KAFKASR CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION : Artvin : Center : Balcolu : Kafkasr
OWNERSHIP STATUS
: Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry / 21.12.2006- 1024
ALLOCATION PERIOD
: 49 Years
PLANNING STATUS : Artvin Kafkasr Tourism Center Master Plan (Approval Date: 22.06.1994) : Artvin Implementation Plan (Approval Date: 20.09.1994)
1/5.000 SCALE
1/ 1.000 SCALE
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
CAPACITY
22.084
Hotel
0,30
250 Beds
INFRASTRUCTURE STATUS Allocation of the subject parcel is located 7 km to Artvin province center. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. shall be used. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
67
1) The area of the parcel is given approximately. The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000 and the final allocation shall be realized thereafter. 2) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 3) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 4) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed the ratio 0,30 (E). 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the articles of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
th
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
68
69
1/25.000 SCALE DDM (AYDIN) CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION ENVIRONMENT MASTER PLAN REVISION
70
INFORMATION SHEET: ALLOCATION SITE AYDIN DDM CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION : Aydn : Didim : Didim Neighbourhood : Kocaharp
OWNERSHIP STATUS
: Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance/ 05.05.2011-541 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE :Didim (Aydn) Culture And Tourism Conservation And Development Region Environment Master Plan Revision (Approval Date: 05.07.2010) : 49 Years
PLAN KARARI :
SPECIAL PARCEL
PARCEL
AREA (m)
CONST. RATIO
CAPACITY
0,50
400 Beds
INFRASTRUCTURE STATUS The area subject to allocation, which is within the borders of the Didim Municipality, is at a distane approximately 4.5 km. to Didim sub-province City Center. Urban infrastructure such as drinking and usage water, sewage system, telecommunication, electricity etc. does not exist in the special parcel number 1. However, sewage system for the settled units around the parcel has been laid down which is passing within the special parcel 1 subject to allocation. Urban infrastructure services that is inefficient for the requirements or which require shall be realized by municipality, the related public institutions and/or the investors or the required financal contribution shall be made.
71
EXPLANATION AND GENERAL CONDITIONS 1) The area subject to allocation is placed in the 2nd sub region of Culture and Tourism Conservation and Development Region which is defined in the Aydn Didim Culture and Tourism Conservation and Development Region Environment Master Plan in scale of 1/25.000. 2) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 3) The area of parcel with number 13001 is 322.250 m and Special Parcel Number 1 is of 111.100 m2, (approximately) according to the Environment Master Plan in scale of 1/25.000. The losts according to the Shore Law in these areas are not considered. 4) In regard with the Shore Law with number 3830/3621. The exact area of the allocation land is going to be determined according the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized after this. 5) The availability to 13001 parcel is obtained by the road passing through the pasture. The value of planting/grass that is defined according to the Pasture Law and its application regulations shall be paid by the entrepreneur to the related institution. 6) Suitable solutions are going to be proposed according to the topography, natural plantation and environmental characteristics in the Master Plans in scale of 1/5.000, Implementation Plans in scale of 1/1.000 and in architectural projects. 7) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
72
1/25000 SCALE BURSA MUSTAFA KEMAL PAA TMBLDEK THERMAL TOURISM CENTER ENVIRONMENTAL MASTER PLAN
73
INFORMATION SHEET: ALLOCATION SITE BURSAKEMA PAA TMBLDEK THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE OWNERSHIP STATUS : Bursa : Mustafakemalpaa : Ltfiye-Kmrckad-ap-Snlk-Muradiyesarn : Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE - NO. The Repealed Ministry of Environment and Forestry / 16.07.2010-510 ALLOCATION PERIOD : 49 Years
PLANNING STATUS 1/ 25.000 SCALE : Bursa Mustafakemalpaa Tmbldek Thermal Tourism Center Environment Master Plan (Approval Date: 29.12.2006) : Bursa Mustafakemalpaa Tmbldek Thermal Tourism Center Environment Master Plan Item Revision (Approval Date: 23/12/2010)
1/ 25.000 SCALE
PLAN DECISION
SPECIAL PARCEL 1
Hotel
682.000
Hotel Golf Facility + Accomodation (Hotel or Holiday Village) Golf Facility + Accomodation (Hotel or Holiday Village) Hotel
0.30
G1
1.526.781,67
0.06 420 Beds 18 Hole Golf 0.06 420 Beds 0.30 300 Beds
G2
1.302.704,75
724.000
565.000
Hotel
0.30
300 Beds
74
INFRASTRUCTURE STATUS Bursa Mustafakemalpaa Thermal Tourism Center is placed 10 km far from the center of SubProvince of Mustafa Kemal Paa. Urban infrastructure such as drinking and usage water, sewage system, telecommunication, electricity shall be used. Urban infrastructure services that is inefficient for the requirements or urban infrastructure services that have to be required shall be realized by municipality, the related public institutions and/or the investors or the required financial contribution shall be made. EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Conservation and Development Regions and Tourism Centers; and according to the development statue, and are going to be submitted for the approval of the Ministry. 2) The exact area of the allocation land is going to be determined by the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000. The maximum number of floors and building height are going to be determined in the sub scale plans. 3) The Geothermal spring is allocated to Mustafa Kemal Paa Municipality by the Bursa Special Province- Health and Environment. 4) By the council decision of Mustafa Kemal Paa Municipality; 3 lt/sec geothermal water shall be allocated for 300 bed capacity in the special parcel number 1, 3 lt/sec geothermal water shall be allocated for 300 bed capacity in the special parcel number 2, 4,2 lt/sec geothermal water shall be allocated for 420 bed capacity in the special parcel number G1, 4,2 lt/sec geothermal water shall be allocated for 420 bed capacity in the special parcel number G2, 3 lt/sec geothermal water shall be allocated for 300 bed capacity in the special number 4, and 3 lt/sec geothermal water shall be allocated for 300 bed capacity in the special parcel number 5 subject to allocation 5) Golf Club Building shall be built at maximum 6.000 m construction area on G1 and G2 Special Parcels as the 18 Hole Golf Area subject to allocation. 6) In case of building golf club building, cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 7) In case of constructing accommodation units with the thermal facility on the special parcels 1-2-G1G2-4-5; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. Maximum 2 floor high limitation is ruled in the area of first degree preservation area for the named parcel. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the ministry of health which was published in Official Gazette in 24.07.2001 with 24472 number. 8) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities.
75
9) All the opinions that have to be taken and the surveys that has to be done determined in the Environment Master Plan in scale of 1/25.000 and in the development statute, are going to be done by the investor for the subject to allocation. 10) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 11) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 12) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 13) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
th
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
76
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost) 6.177,00 TL/m 38,00 TL/m
G1 1.526.781,67 m
58.017.703,46 TL
The maximum closed area of the Special Parcel number G1 is 6.000 m in the Implementation Plan. The closed areas of the golf facilities on special parcel G1 shall be submitted to the Ministry with the site plan during the preliminary permit by the investor. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
zel Parsel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost) Kapal Alan Birim Maliyeti Ak Alan Birim Maliyeti : : 6.177,00 TL/m 38,00 TL/m
G2 1.302.704,75 m
49.502.780,50 TL
The maximum closed area of the Special Parcel number G2 is 6.000 m in the Implementation Plan. The closed areas of the golf facilities on special parcel G2 shall be submitted to the Ministry with the site plan during the preliminary permit by the investor. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
77
78
79
1/25.000 LEKL ANAKKALE EZNE KESTANBOL THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
80
INFORMATION SHEET:
ALLOCATION SITE ANAKKALE EZNE KESTANBOL THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION OWNERSHIP STATUS : anakkale : Ezine : Akakeili : Bakacak : Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance /20.03.2012-397 ALLOCATION PERIOD PLANNING STATUS 1/25.000 : anakkale Ezine Kestanbol Thermal Tourism Center Environment Master Plan (Approval Date: 16.08.2010) : 49 Years
PLAN DECISION
PARCEL
AREA (m)
CONST. RATIO
H MAX (M)
CAPACITY
84
13.434
Hotel
0,60
19,50 (5 Floor)
150 Beds
If the thermal cure establishment is built within the accommodation establishment the Construction Ratio will be applied as 0,70.
INFRASTRUCTURE STATUS Allocation of the subject area, located within the boundaries anakkale Province, Ezine Sub-province, Akakeili Villageand 18 km. to district centers. Parcel is located within the shore ky bandnda yer almaktadr. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. exist in the plot. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the municipality, the related public institutions and/or the investors; or the required financial contribution shall be made.
81
EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 and 3830/3621 Shore Law are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 2) The geothermal water amount shall be defined for the parcel number 84 subject to allocation by the anakkale Special Province when the water distribution planning realized. 3) The parcel number 84 subject to allocation is the whole cadastral. The lost according to the Shore Law in these areas are not considered. 4) The exact area of the allocation lands are going to be determined after the required leaving, subdivision, and joining etc. by the investor according to the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the 3830/3621 Shore Law are going to be prepared by the investor and the definite allocation is going to be realized afterwards. 5) ) In case of building thermal facility together with the accommodation facility on parcel 84 number subject to allocation; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities 7) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
9.950.400,00 7.378.950,00
82
83
TAHSSE KONU 6 NOLU ZEL PARSEL TAHSSE KONU 5 NOLU ZEL PARSEL
TAHSSE KONU 3 NOLU ZEL PARSEL TAHSSE KONU 4 NOLU ZEL PARSEL
84
INFORMATION SHEET: ALLOCATION SITE ANAKKALE GEYKL TOURISM CENTER PROVINCE SUB-PROVINCE TOWN LOCATION OWNERSHIP STATUS : anakkale : Ezine : Geyikli : Kprba : Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 16.02.2011-147 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE 1/5.000 SCALE 1/1.000 SCALE : South anakkale Coastal Zone Environment Master Plan (Approval Date: 18.12.1992) : anakkale Ezine Geyikli Coastal Zone Additional Master Plan Revision (Approval Date: 16.01.2006 ) : anakkale Geyikli Additional and Revision Master Plan (Approval Date: 16.01.2006 ) : 49 Years
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
NO. OF STOREYS
CAPACITY
8.600
Hotel
0.30
130 beds
8.000
Hotel
0.30
4.5
120 beds
7.400
Hotel
0.30
4.5
110 beds
4.800
Hotel
0.30
4.5
70 beds
5.900
Hotel
0.30
4.5
90 beds
3.900
Pension
0.20
4.5
35 beds
85
INFRASTRUCTURE STATUS The area subject to allocation is placed 24 km. the junction located at the 30km. of anakkale zmir road, 4 km away from Geyikli town center, 400mt away from the Bozcaada transfer dock, 200 mt from the sea. Services such as electricity, telephone, water exist in the area subject to allocation. Sewage Network Plan has been prepared and included in 2009 Ministry Investment Plan. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, Governorship and/or investors with the financial contribution of the investors. In case of necessity, the facilities of telecommunication and electrification that are the requirements of the operation period shall be realized by the investor. EXPLANATION AND GENERAL CONDITIONS 1) The area subject to the allocation -in which the Special parcels 1, 2, 3, 4, 5 and 6 are placed- is placed within the borders of Geyikli Municipality and is placed as a backwater forming the discharge of amoba Stream between the Ezine- amoba Village and Kumburun Village. 2) The all applications on the special parcels of 1, 2, 3, 4, 5, 6 subject to allocation within the Special Project Area shall not put an obstacle for the flow of amoba River, for the combination of backwater with the sea and shall be taken the precautions for the possible flows of the river 3) The special parcels of 1, 2, 3, 4, 5, 6 subject to allocation are formed by the parts which are placed in the Tourism Facility Area, Prior Use Area and Pension usages of the cadastral parcel number 2 5657 with area of 120.272 m in the Implementation Plan 4) The area of the special parcels is given approximately. The exact area of the allocation lands is going to be determined after the procedures of the required leaving joining and subdivision etc are done by the investor in line with the Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized afterwards. 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost and definite letter of guarantee unlimited time, which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
49.193,00
130
6.395.090,00
49.193,00
120
5.903.160,00
49.193,00
110
5.411.230,00
86
49.193,00
70
3.443.510,00
49.193,00
90
4.427.370,00
15.593,00
35
545.755,00
87
88
1/5.000 SCALE ANKIRI - ILGAZ - KADINAYIRI YILDIZTEPE CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT 1ST PART MASTER PLAN
89
1/1.000 SCALE ANKIRI - ILGAZ - KADINAYIRI YILDIZTEPE CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT 1ST PART IMPLEMENTATION PLAN
90
INFORMATION SHEET: ANKIRI - ILGAZ - KADINAYIRI YILDIZTEPE CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION OWNERSHIP STATUS ALLOCATION PERIOD: : ankr : Ilgaz : Cmert Village : Kyst : Forest 49 years (Accommodation Facility Area) 20 years (Daily Use Facility Area)
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry / 10.02.2006 - 57
PLANNING STATUS 1/5.000 : ankr - Ilgaz - Kadnayr Yldztepe Yldztepe Culture and Tourism Conservation st And Development Region 1 Part Master Plan (Approval Date: 28.07.2010) : ankr - Ilgaz - Kadnayr Yldztepe Culture and Tourism Conservation And st Development Region 1 Part Implication Plan (Approval Date: 28.07.2010 )
1/ 1.000
PLAN DECISION
SPECIAL PARCEL NO
AREA (m)
EMSAL
FLOOR
CAPACITY
1 2
Hotel Hotel
13.831,75 15.847,50
0,30 0,30
3 3
10.316,60
0,30
Hmax=7.50 (2 Floors)
5.675,90
0,30
Hmax=7.50 (2 Floors)
91
INFRASTRUCTURE STATUS Bland Energy Carrying Line, which is branched from double energy line and swallows type, comes from ankr Transformer Center and Kurunlu Transformer Center in the parcel subject to allocation. There are 5 columns on the parcel. Urban infrastructure such as drinking and usage water, sewage system, telecommunication, electricity shall be used. .Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Governorship, related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATIONS: 1) In the parcel subject to allocation is allocated to ankr province; a) The chair lift of 1000 person/hour capacity and 1545 mt. length, b) The chair lift of 800 person/hour capacity and 752 mt. length length is given as a preliminary permit to ankr Special Province. 2) Incorporation of Joint Stock Company shall be compulsory for the allocated firms, as it is the case in other Winter sports Tourism Centers for completion of the inefficient infrastructure investments, operation of mechanical facilities and acting in coordination. Becoming a shareholder of said company shall be compulsory in the event of incorporation of the company as stipulated by the Governorship. The allocation procedures for the potential investors failing to become a shareholder of the company or fulfilling the shareholders requirements in the preliminary permit period. 3) The special parcel no.1 is; approximately 13.831,75m , the special parcel number 2 is 2 approximately 15.847,50 m of land placed within the Accommodation Facility Area of 105 lot 1 parcel. 2 The special parcel no.3 is; approximately 10.316,60m , the special parcel number 4 is approximately 2 5.675,90 m of land placed within the Daily Use Area of 105 lot 1 parcel. 4) The area of the special parcels 1-2-3-4 are given approximately. The exact area of the allocation lands is going to be determined after the procedures of the required leaving joining and subdivision etc are done by the investor in line with the Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized afterwards. 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) The closed areas of the daily use facilities on the parcels 3-4 subject to allocation shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 7) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed the ratio 0,30 (E). 8) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 9) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area.
th 2
92
In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 10) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
9.950.400,00 7.378.950,00
11.277.120,00 8.362.810,00
3 10.316,60 m 134.115,80 TL
The maximum closed area of the Special Parcel number 3 is 3.095 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
93
4 5675,90 m 73.786,70 TL
The maximum closed area of the Special Parcel number 4 is 1.702,77 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
94
DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION (Akky Glemezli Zone)
PROVINCE: Denizli SUB-PROVINCE: Pamukkale VILLAGE/NEIGHBOURHOOD: Glemezliemeba Village LOCATION: merlen- Sarmustafayk
Specal Parcel 2 Subject To Allocaton Specal Parcel 3 Subject To Allocaton Specal Parcel 6 Subject To Allocaton
1/ 25.000 SCALE DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION AKKY GLEMEZL ZONE ENVIRONMENT MASTER PLAN REVISION
95
DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION (Akky Glemezli Zone)
PROVINCE: Denizli SUB-PROVINCE: Pamukkale VILLAGE/NEIGHBOURHOOD: Glemezliemeba Village LOCATION: merlen- Sarmustafayk
1/ 5.000 SCALE DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION AKKY GLEMEZL ZONE MASTER PLAN REVISION
96
INFORMATION SHEET: DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION AKKY GLEMEZL ZONE PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION : Denizli : Pamukkale : Glemezli- emeba Village : merlen- Sarmustafayk
OWNERSHIP STATUS : Treasury THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: 222-15-223 parcels : The Ministry of Finance / 05.05.2011- 542 1358 parcel : The Ministry of Finance / 20.03.2012- 396 1443 parcel : The Ministry of Finance / 20.03.2012-395 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE : Denizli Thermal Culture and Tourism Conservation and Development Region Akky Glemezli Zone Environment Master Plan Revision (Approval Date: 27.09.2011) : Denizli Thermal Culture and Tourism Conservation and Development Region Akky Glemezli Zone Master Plan Revision (Approval Date: 01.11.2011) : 49 Years (Tourism Facility Area- Sport Facility Area) 20 Years (Daily Use Facility Area- Thermal Cure Facility Area)
1/5.000 SCALE
PLAN DECISION
Sport Facility Area Tourism Facility Area Thermal Cure Facility Area Daily Use Facility Area
PARCEL
SPECIAL PARCEL
AREA (m)
CONST RATIO
HMAX (m)
CAPACITY
222,15
G1
631.149,46
223,1443
101.258,35
* *
0.80
500 Beds
223, 1443,1358
105.618,07
Hotel
0.80
19.50 mt (5 Floor)
500 Beds
97
CADASTRAL PARCEL
SPECIAL PARCEL
AREA (m)
CONST RATIO
HMAX (m)
CAPACITY
1358
22.616.29
Hotel
* *
0.80
19.50 mt (5 Floor)
200 yatak
1358
33.466,27
Hotel
0.80
19.50 m (5 Floor)
250 yatak
223, 1443
37.964,24
0.20
7.50 mt
1357
16.589,72
0.20
7.50 mt
1357,1443
77.996,66
7.50 mt 0.10
**
( ) In case of building Thermal Cure Facility together with Accomodation Facility, the construction ratio shall be 0.90 ( ) In case of building Thermal Cure Facility together with Daily Use Facility, the construction ratio shall be 0.15.
**
INFRASTRUCTURE STATUS The parcels subject to allocation is in Glemezli at a distance 5 km. to Pamukkale County, and 13 km. to Pamukkale Travertine within the borders of Glemezli Municipality. Glemezli is placed 33 km. away from Denizli City Center and 93 km. to ardak Airport. Glemezli geothermal area which is high in thermal tourism potential with its hot spring waters, is far away from 14 km. to most developed regions of thermal tourism of both Pamukkale and Hieropolis Antique City. The half hour distance to the natural and cultural tourism values placed at PamukkaleKarahayt Region, Denizli City Center and Honaz Mountain National Part at the South creates important advantages of the combination of thermal tourism with the alternative tourism opportunities. In the area subject to allocation, services such as electricity, telephone, water are found and sewage is done by septic tanks. The demands that cannot be solved or the urban infrastructure services that have to be renovated are going to be realized by municipality, related public bodies and/or investors and the required earthly contribution is going to be provided.
98
EXPLANATION AND GENERAL CONDITIONS 1) - Special Parcel 1 is approximately 631.149,46 m2 and formed as the 13.800 m2 area of cadastral parcel 15 and 617.349,46 m2 of the cadastral parcel 222 within the use of Sport Facility Area (Golf Facility) - Special Parcel 2 is approximately 101.258,35 m2 and formed as the 13.199,37 m2 area of cadastral parcel 223 within the use of Tourism Facility Area and 88.058,98 m2 of the cadastral parcel 1443 within the use of Tourism Facility Area. - Special Parcel 3 is approximately 105.618,07 m2 and formed as the 22.352,86 m2 area of cadastral parcel 223 within the use of Tourism Facility Area, 81.799,64 m2 of the cadastral parcel 1443 within the use of Tourism Facility Area and 1.465,57 m2 of the cadastral parcel 1538 witihn the use of Tourism Facility Area. - Special Parcel 4 is approximately 22.616,29 m2 of the cadastral parcel 1358 within the use of Tourism Facility Area. - Special Parcel 5 is approximately 33.466,27 m2 of the cadastral parcel 1358 within the use of Tourism Facility Area. - Special Parcel 6 is approximately 37.964,24 m2 and formed as the 22.862,16 m2 area of cadastral parcel 223 within the use of Thermal Cure Facility Area and 15.102,08 of the cadastral parcel 1443 within the use of Thermal Cure Facility Area. - Special Parcel 7 is approximately 16.589,72 m2 of the cadastral parcel 1357 within the use of Thermal Cure Facility Area. - Special Parcel 8 is approximately 77.996,66 m2 and formed as the 2.712 m2 area of cdastral parcel 1357 within the use of Daily Use Facility Area and 75.284,04 m2 of the cadastral parcel 1443 within the use of Daily Use Facility Area.
2) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 3) The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000 during the preliminary phase. The Definite allocation is going to be realized after the required leaving, subdivision, and joining by the investors and the final area shall be realized. 4) By Denizli Special Province; Maximum 3 Lt/Sec. for 300 bed capacity in G1 Special Parcel, Maximum 5 Lt/Sec. for 500 bed capacity in Special Parcel Number 2, Maximum 5 Lt/Sec. for 500 bed capacity in Special Parcel Number 3, Maximum 2 Lt/Sec. for 200 bed capacity in Special Parcel Number 4, Maximum 5 Lt/Sec. for 250 bed capacity in Special Parcel Number 5, Maximum 5 Lt/Sec. for 7.592,85 m2 closed construction area inSpecial Parcel Number 6, Maximum 2,5 Lt/Sec. for 3.317,94 m2 closed construction area inSpecial Parcel Number 7, Maximum 5 Lt/Sec. for 7.799,67 m2 closed construction area inSpecial Parcel Number 8.
Geothermal water shall be allocated to the investor by its cost. The investors shall sign a contract with Denizli Special Province by the decision of Denizli Special Council. 5) the 6.380,75m2 area iin Special Parcel number 2, the 11.197,50 m2and 830,07 m2 areas in Special Parcel number 3;and the area of 8.476,09m2 areain special parcel number 8 where the boundries are indicated in Master Plan in scale of 1/5000 shall be indicated as areas of no application, therefore any construction shall not be allowed. 6) The areas subject to allocation are placed within the Important Areas 2 (A2) and the applications on the site shall be done according tor the plan conditions of Geological Condition
99
7) Golf Club Building shall be built at maximum 6.000 m construction area on G1 Special Parcel as the 18 Hole Golf Area subject to allocation. 8) In case of building Golf club Building, cure center, health and thermal facility on parcels subject to allocation, other than the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 9) In case of building accommodation facility together with thermal facility on special parcels 2-3-4-5subject to allocation and in case of building daily use facility together with thermal cure facility on special parcel 6-7; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 10) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 11) All the opinions that have to be taken and the surveys that has to be done determined in the Environment Master Plan in scale of 1/25.000 and in the development statute, are going to be done by the investor for the subject to allocation. 12) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel 5 Star Holiday Village
100
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost) 6.177,00 TL/m 38,00 TL/m
G1 631.149,46 m
23.983.679,48 TL
The maximum closed area of the Special Parcel number G1 for the required Golf Club Building is 6.00 m in the Implementation Plan. The closed areas of the Golf Club Building on Special Parcel number G1 shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be recalculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
101
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
6 37.964,24 m
493.535,12 TL
The maximum closed area of the Special Parcel number 6 is 7.592,85 m in the Implementation Plan. The closed areas of the daily use facilities on special parcel shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
7 16.589,72 m
215.666,36 TL
The maximum closed area of the Special Parcel number 7 is 3.317,94 m in the Implementation Plan. The closed areas of the daily use facilities on special parcel shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be recalculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
102
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost) 6. 177,00 TL/m 13,00 TL/m
8 77.996,66 m
1.013.956,58TL
The maximum closed area of the Special Parcel number 8 is 7.799,67 m in the Implementation Plan. The closed areas of the daily use facilities on special parcel shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
103
DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION (Akky Glemezli Zone)
PROVINCE: Denizli SUB-PROVINCE: Pamukkale VILLAGE/NEIGHBOURHOOD: Glemezliemeba Village LOCATION: merlen- Sarmustafayk
104
DENZL THERMAL CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION (Akky Glemezli Zone)
PROVINCE: Denizli SUB-PROVINCE: Pamukkale VILLAGE/NEIGHBOURHOOD: Glemezliemeba Village LOCATION: merlen- Sarmustafayk
PAMUKKALE
105
AND
TOURISM
Allocation Site 328 Lot 1 Parcel Allocation Site 132 Lot 1 Parcel
1/25.000 SCALE ERZNCAN ERGAN DAI CULTURE AND TOURISM CONSERCVATION AND DEVELOPMENT REGION ENVIRONMENT MASTER PLAN REVISION
106
AND
TOURISM
1/5.000 SCALE ERZNCAN ERGAN DAI CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION MASTER PLAN REVISION
107
AND
TOURISM
1/1.000 SCALE ERZNCAN ERGAN DAI CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION IMPLEMENTATION PLAN REVISION
108
INFORMATION SHEET: ALLOCATION SITE ERZNCAN ERGAN DAI CULTURE AND TOURISM CONSERVATION AND DEVELOPMENT REGION PROVINCE SUB-PROVINCE VILLAGE : Erzincan : Merkez : Trkmenolu, Yaylaba Villages
OWNERSHIP STATUS
: Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance: 11.12.2012 tarih ve 1179 sayl Olur. ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE :Erzincan Ergan Da Culture And Toursm Conservation And DevelopmentRegon Envronment Master Plan Revson (Approval Date: 16.01.2009) :Erzincan Ergan Da Culture And Toursm Conservation And DevelopmentRegon Master Plan Revson (Approval Date: 16.01.2009) :Erzincan Ergan Da Culture And Toursm Conservation And DevelopmentRegon Implementation Plan Revson (Approval Date: 16.01.2009) : 49 Years
1/5.000 SCALE
1/5.000 SCALE
PLAN DECISION
LOT/ PARCEL
AREA (M2)
CONS. RATIO
H MAX (m)
CAPACITY
328/1
Otel
29.439,28
1.50
132/1
Otel
35.050,57
1.50
800 Yatak
1000 Yatak
130/1
Otel
22.169,87
0.50
200 Yatak
129/1
Otel
14.776,13
0.50
3 Kat hmax=9.50
150 Yatak
109
INFRASTRUCTURE STATUS The parcels subject to allocation are placed 12km to Erzincan Province and 10 km to Erzincan Airport. The drinking-use water and electricity exist in the special parcels subject to allocation. The existing urban infrastructure services of drinking and serving water, electrification and telecommunication exist in the parcel. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) In the parcel subject to allocation; the gondola of 8 cabinet of 750 person/hour capacity and 1850 mt. length, and the chair lift with 4 cabinet of 1500 person/hour capacity and 2662 mt. Length are going to be operated in the year of 2013. 2) Incorporation of Joint Stock Company shall be compulsory for the allocated firms, as it is the case in other Winter sports Tourism Centers for completion of the inefficient infrastructure investments, operation of mechanical facilities and acting in coordination. Becoming a shareholder of said company shall be compulsory in the event of incorporation of the company as stipulated by the Governorship. The allocation procedures for the potential investors failing to become a shareholder of the company or fulfilling the shareholders requirements in the preliminary permit period. 3) The area sizes subject to the allocation have been given approximately. The exact area of the parcel is going to be determined after the procedures of subdivision leaving etc. accord the Implementation plan in scale of 1/1000, and the definite allocations going to be realized afterwards. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4Star Hotel 3Star Hotel
SORT AND TYPE OF FACILITY 5 Star Hotel 4Star Hotel 3Star Hotel
110
66.336,00 49.193,00
200
13.267.200,00 9.838.600,00
66.336,00 49.193,00
150
9.950.400,00 7.378.950,00
111
1/ 25.000 SCALE ESKEHR MHALGAZ SAKARIILICA THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
112
1/ 5.000 SCALE ESKEHR SAKARIILICA THERMAL TOURISM CENTER MASTER PLAN REVISION
113
1/ 1.000 SCALE ESKEHR SAKARIILICA THERMAL TOURISM CENTER IMPLEMENTATION PLAN REVISION
114
INFORMATION SHEET: ALLOCATION SITE ESKEHR MHALGAZ SAKARIILICA THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE : Eskiehir : Mihalgazi : Sakarlca
OWNERSHIP STATUS : Forest THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry / 17.04.2006-166
: 49 Years
: Eskiehir Mihalgazi Sakarlca Thermal Tourism Center Environment Master Plan (Approval Date: 25.09.2008) : Eskiehir Sakarlca Thermal Tourism Center Master Plan Revision (Approval Date: 25.07.2006) : Eskiehir Sakarlca Thermal Tourism Center Master Plan Revision Plan Note Revision (Approval Date: 23.10.2009) : Eskiehir Sakarlca Thermal Tourism Center Implementation Plan Revision (Approval Date: 25.07.2006) : Eskiehir Sakarlca Thermal Tourism Center Implementation Plan Revision Plan Note Revision (Approval Date: 23.10.2009) : Tourism Facility Area
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
NO. OF STOREYS
CAPACITY
10.750
0,30
Hotel
11,00
100 Beds
INFRASTRUCTURE STATUS The area subject to allocation is placed on the road of Eskiehir City, Sakarlca District and 35 km. to Eskiehir City Center. The area subject to allocation is placed within the borders of Sakarlca Municipality. In the area, services such as electricity, telephone, water are found and sewage is done by septic tanks. The demands that cannot be solved or the urban infrastructure services that have to be renovated are going to be realized by municipality, related public bodies and/or investors and the required earthly contribution is going to be provided.
115
EXPLANATION AND GENERAL CONDITIONS 1) The Special Parcel number 1 is left over from the parcel number 1770. The10.750 m2 area in the use of tourism, of the 15.137 m forest area, is allocated to the Ministry. The exact area of the special Parcel Number 1 is going to be determined after the relinquishment, joining etc. according to the Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized afterwards. 2) In Special Parcel Number 1, minimum 2.00 lt7sec geothermal water for 100 bed capacity is going to be allocated by Eskiehir Special Province.
3) In case of a thermal accommodation facility together with thermal facility is realized on the special parcel subject to allocation number 1; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) In case of building cure center on special parcel 1 subject to allocation, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 6) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 7) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 8) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 9) The parcels subject to allocation is placed in 2 degree Natural Site areas. It has to be taken the permission of Natural Assets Preservation General Directorate before any physical application or giving construction license should. 10) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
nd th
116
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
6.633.600,00 4.919.300,00
117
ALLOCATION SITE SPECIAL PARCEL NO 6 1/ 1.000 SCALE ZGANA (GMHANE) SKI CENTER IMPLEMENTATION PLAN
118
INFORMATION SHEET: ALLOCATION SITE: GMHANE ZIGANA WINTER SPORTS TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE LOCATION : Gmhane : Torul : Kalkanl Village : akmakkaya
OWNERSHIP STATUS : Treasury THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 26.02.1997- 7426
ALLOCATION PERIOD
PLANNING STATUS 1/25.000 SCALE 1/5.000 SCALE 1/1.000 SCALE :Gmhane Zigana Ski Center Environment Plan (Approval Date: 27.2.1996) :Gmhane Zigana Ski Center Master Plan (Approval Date: 27.2.1996) :Zigana (Gmhane) Ski Center Implementation Plan (Approval Date: 4.6.1996)
PLAN DECISION
SPECIAL PARCEL
AREA (M )
NO. OF STOREYS 1 3 1
2 3 6
INFRASTRUCTURE STATUS The area subject to allocation is located 50 km from Gmhane city center. Urban infrastructures such as road, telecommunication, electricity etc. exist in the plot. The 30 ton water depot existing in area was built by Ministry of Youth and Sports to the Ski House. Drinking and serving water systems do not exist in the area for the new establishing facilities. Drainage in the form of septic tank belongs to the Ski House. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Governorship, related public institutions and/or the investors or the required financial contribution shall be made.
119
EXPLANATION AND GENERAL CONDITIONS 1) The teleski of 750 person/hour capacity and 650mt. length; 350 mt. Baby Lift and 150 persons ski house are allocated to rent Gmhane Youth and Sport Province Directory for 29 years of special management. 2) Incorporation of Joint Stock Company shall be compulsory for the allocated firms, as it is the case in other Winter sports Tourism Centers for completion of the inefficient infrastructure investments, operation of mechanical facilities and acting in coordination. Becoming a shareholder of said company shall be compulsory in the event of incorporation of the company as stipulated by the Governorship. The allocation procedures for the potential investors failing to become a shareholder of the company or fulfilling the shareholders requirements in the preliminary permit period. 3) The number of floors shall be 1 floor with max h: 4.50 at daily use facility areas. 4) The Special parcel 2 subject to allocation consists of 1.900 m remaining Daily Facility Area Usage 2 part of 115 block, parcel number 1 with the area of 68.393,69 m , the special parcel 3 consists of 14.500 m remaining daily facility area usage part and the special parcel 6 consists of 4.200 m 2. remaining daily facility area usage part of 115 block, parcel number 2 with the area of 4.700,12 m . 5) The surface areas of special parcels 2-3-4-6 subject to allocation were given approximately. The definite surface areas shall be determined after the formation of the percolations according to the 1/1000 scale Implementation Plan, and the definite allocation shall be made thereafter. 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 7) The closed areas of the daily use facilities on the parcels 2-6 subject to allocation shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
13.267.200,00 9.838.600,00
120
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
2 1.900 m 24.700,00 TL
The maximum closed area of the Special Parcel number 2 is 95 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
6 4.200 m 54.600,00 TL
The maximum closed area of the Special Parcel number 6 is 210 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
121
THE GENERAL VIEW OF SPECIAL PARCELS SUBJECT TO ALLOCATION FROM THE GMHANE LMN LAKE
122
SPECIAL PARCEL 2
SPECIAL PARCEL 3
SPECIAL PARCEL 2
SPECIAL PARCEL 3
123
SPECIAL PARCEL 6
124
1/5.000 SCALE SKENDERUN SHORE TOURISM CENTER AKALI MASTER PLAN FOR CONSERVATION
125
INFORMATION SHEET: ALLOCATION SITE HATAY SKENDERUN SHORE TOURISM CENTER PROVINCE SUB-PROVINCE TOWN OWNERSHIP STATUS : Hatay : skenderun : Akal : Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 18.09.2010 - 930 ALLOCATION PERIOD : 49 Years (Accommodation Facility Area) : 20 Years (Daily Use Facility Area)
PLANNING STATUS 1/25.000 SCALE : skenderun Shore Toursim Center Akal Location skenderun Bay and nearby Environment Master Plan Revision (Approval Date: 10.01.2011) : skenderun Shore Toursim Center Akal Master Plan (Approval Date: 10.01.2011) : Tourism Facility Area Daily Use Facility Area LAND USE STATUS CONST. RATIO
1/5.000 SCALE
PLAN DECISION
SPECIAL PARCEL
AREA (m)
H MAX (m)
CAPACITY
0,30
0,30
0,30
126
SPECIAL PARCEL
AREA (m)
H MAX (m)
CONST. RATIO
CAPACITY
13.774
4,50
0,05
688,7 m . Closed Const. Area 644,1 m . Closed Const. Area 511,6 m . Closed Const. Area 377,3 m . Closed Const. Area
2 2 2
12.882
4,50
0,05
10.231
4,50
0,05
7.546
4,50
0,05
INFRASTRUCTURE STATUS The parcels subject to allocation are 20km. away from the sub-province and placed 700m. west of skenderun- Arsuz road. The existing urban infrastructures services such as drinking-serving water, sewage system, electrification, telecommunication etc. do not exist in the parcel whereas exist in the nearby cooperation houses. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) The cadastral parcel of approximately 631.407 m area is composed of as special parcel 1 of approximately 284.109 m, special parcel 2 of approximately 46.991 m in tourism facility area use, special parcel 4 of approximately 13.774 m and special parcel 5 of approximately 12.882 m in daily use facility. The cadastral parcel 515 of approximately 246.004 m area is composed of as special parcel 3 of approximately 51.448 m, in tourism facility area use, special parcel 6 of approximately 10.231 m and special parcel 7 of approximately 7.546 min daily use facility. The lost by the Shore Law in the determination of these areas are not taken into consideration. 2) The holiday villages are placed around the nearby of the parcels. 3) Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 and Master Plan in scale of 1/5.000 is going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be submitted for the approval of the Ministry. 4) The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000. The Definite allocation is going to be realized after the required leaving, subdivision, and joining etc. construction applications done by the investor.
127
5) The closed areas of the daily use facilities on the special parcels 4-5-6-7 subject to allocation shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 7) The parcels subject to allocation is placed in 3 degree Archeological Site areas. It has to be taken the permission of Adana Regional Conservation Council of Cultural and Natural Properties before any physical application or giving construction license should. 8) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
rd
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
128
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
4 13.774 m 179.062 TL
The maximum closed area of the Special Parcel number 4 is 688,7 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
5 12.882 m 167.466 TL
The maximum closed area of the Special Parcel number 5 is 644,1 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
6 10.231 m 133.003 TL
The maximum closed area of the Special Parcel number 6 is 511,6 m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
129
Special Parcel Total Area (m) TOTAL INVESTMENT COST (TL) (Total Area X Open Area Unit Cost)
7 7.546 m 90.098 TL
The maximum closed area of the Special Parcel number 7 is 377,3m in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment shall be revised.
130
131
132
INFORMATION SHEET: ALLOCATION SITE ZMR ZDERE KESRE TOURISM CENTER PROVINCE SUB-PROVINCE TOWN LOCATION : zmir : Menderes : zdere : Gztepe
OWNERSHIP STATUS
: Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 20.12.2011 1288
: 49 Years
: Seferihisar Dilek Yarmadas Master Plan (Approval Date: 01.05.1985) : Seferihisar Dilek Yarmadas Shore Region Revision Master Plan Revision Plan Notes (Approval Date: 12.02.2002)
1/25.000 SCALE
PLAN DECISION
PARCEL
AREA (M2)
CONST. RATIO
H MAX ( MT )
CAPACITY
7568
16.152
Hotel
0,45
(5 Floor)
300 Beds
INFRASTRUCTURE STATUS The parcel subject to allocation are placed within the city center of zmir, Menderes sub-province. Parcel is placed 35 km. far away from the Menderes sub-province, 60 km to zmir and 40 km to the airport. The sewage system does not exist in the parcel subject to allocation. However, the central purification system shall be finished and in 2013 the sawage system of all facilities in the area sshall be combined to this system. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
133
EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 and 3830/3621 Shore Law are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Preservation and Development Regions and Tourism Centers; and according to the development statute, and are going to be revised and be submitted for the approval of the Ministry. 2) The exact area of the allocation land is going to be determined by Master Plan revision in scale of 1/5.000 consistent with Implementation Plan in scale of 1/1.000. The Definite allocation is going to be realized after the required leaving, subdivision, and joining etc. construction applications done by the investor. 2) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 3) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost and definite letter of guarantee unlimited time, which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
134
135
136
137
INFORMATION SHEET: ALLOCATION SITE ZMR SELUK PAMUCAK TOURISM CENTER PROVINCE SUB-PROVINCE LOCATION OWNERSHIP STATUS : zmir : Seluk : Pamucak : Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: 3107 Lot 2 Parcel: The Ministry of Finance / 06.02.2009 5065 3102 Lot 2 Parcel: The Ministry of Finance/ 30.03.2009 6804
: 49 Years
: Seluk (Pamucak) Master Plan (Approval Date: 08.02.2011) : Seluk (Pamucak) Implementation Plan (Approval Date: 08.02.2011) : Tourism Facility Area
1/1.000 SCALE
PLAN DECISION
SPECIAL PARCEL
PARCEL
AREA (M2)
CONST. RATIO
H MAX ( MT )
CAPACITY
0,45
0,25
(2 Floor)
0,45
0,25
(2 Floor)
INFRASTRUCTURE STATUS The parcels subject to allocation are placed within the city center of zmir and at 9 km. far away from the Seluk sub-province the center. The special parcel number 10 has 130 meter vista to the sea. Within the scope of the Seluk Pamucak Toursim Center Infrastructure Application Project by the Ministry, 3 well, 3.000m3 water storage, 17.200 transmission line, water buffet service station and pumps have been done. nd According to the 2 Greater City Municipality Law with 5216 number amended at 23.07.2004; the drinking and use water facilities are transferred to ZSu as sub-province Seluk belonged to zmir
138
Greater City Municipality. The bidding of the renovation of the transmission line has been completed and in the phase of contract. The existing urban infrastructures services such as drinking-serving water, sewage system, electrification, telecommunication etc. do not exist in the parcel whereas exist in the nearby cooperation houses. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) The special parcel 10, approximately 80.065 m area, is formed from the parcel of 3107 lot 2 parcel of 161.233 m as Tourism Facility Area use. The special parcel 1 approximately 80.065 m area is formed from the parcel of 3102 lot 2 parcel of 65.834 m. 2) The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000. The Definite allocation is going to be realized after the required leaving, subdivision, and joining etc. construction applications done by the investor. 3) The firms which had preliminary permission from the Ministry have been established Pamucak Yatrmclar n. Tur Ortak Giriim San. ve Tic Stock Company-PATUYAB at Konakl Region within the Tourism center. The new investors have to be partner to this firm as paying the sharing payments and capital fee. The final allocation shall not be realized in case of not completing these eligibilities during the preliminary permission. 4) The Ministry has the only duty turning back of the definite letter of gurantee unlimited in time in case of cancellation of final allocation because of not joining to Pamucak Yatrmclar n. Tur Ortak Giriim san. ve Tic Stock Company-PATUYAB In case of this situation, the investor has no claim to declare. 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost and definite letter of guarantee unlimited time, which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
139
140
1/25.000 SCALE SARIKAMI (CIBILTEPE) SKI CENTER ENVIRONMENT MASTER PLAN REVISION
141
INFORMATION SHEET: ALLOCATION SITE KARS SARIKAMI WINTER SPORTS TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD STREET : Kars : Sarkam : nn Mahallesi : ehitler Street
OWNERSHIP STATUS
: Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance/ 23.11.2011-1188 ALLOCATION PERIOD : 49 Years
PLANNING STATUS 1/25.000 SCALE: Sarkam (Cbltepe) Ski Center Environment Master Plan Revision (Approval Date: 13.04.2010)
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
CAPACITY
40.804
0,10
INFRASTRUCTURE STATUS Sarkam region is important region of first degree for winter sports ve winter tourism. Sarkam Ski Center is the biggest ski ring of Turkey and 3rd ski ring of the world. The special parcel 2 subject to allocation, which exists on the west side of Sarkam sub-province, is situated 4km far away from Cbltepe Ski Center, 2,5 km. far away from city center and reached by the forest road at the and of the Emek Street of Kazm Karabekir neighbourhood. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. exist in the plot. Urban infrastructure services shall be realized by the municipality, the related public institutions and/or the investors shall be made.
142
EXPLANATION AND GENERAL CONDITIONS 1) The special parcel 1 subject to allocation 24 block number 2 and 3 cadastral parcels placed Katerina and iman Villas, 24 block number 1, 4, 5, 6 cadastral parcels and 75 block number 10,11,12 cadastral parcels. 2) According to the construction rate of 0.10 within the special parcel number 1 subject to allocation. Katerina and iman Villas is going to be restored with the functions of accommodations and eatingdrinking; besides accommodation units of so beds shall be designed. The facility shall serve high quality standard and quality for management and service. 3) Due to the Katerina and iman Villas, placed on block 24 and number 2 and 3 parcels, which are st labeled as 1 group cultural asset according to the decisions of Erzurum Cultural and Natural Heritage Conservation Council with date of 17.03.1989 and number of 136, and with date of 09.11.1989 and number of 189, permission of the related Cultural and Natural Asset Conservations for all the applications before the construction and council physical practices had to be taken. 4) During the preliminary permission period, 1/5000 scale Master Plan and 1/1000 scale Implementation Plan in suitable with 1/25000 scale Environmental Master Plan shall be prepared by the investors, by the decisions of related Regional Conservation Council of Cultural and Natural Properties and shall be submitted to the Ministry. 5) The allotment in the special parcel 1 shall be realized by the investor. The exact area of parcel is going to be determined after the procedures of allotments leaving etc. according to the implementation plan in scale of 1/1000, and the definite allocation is going to be realized afterwards. 6) The site plan as a preliminary project of the tourism facility in special parcel number 1 according to the implementation plan is going to be submitted to the Ministry after the approval of the related Conservation Council. 7) The total bed capacity and closed area of the restoration in the area shall be realized in the preliminary permission period. 8) Tourism Investment Certificate and Tourism Operation Certificate shall be obtained according to the Regulations Regarding Certifications and Qualifications of Tourism Facilities. 9) Before the definite allocation for the investor having the preliminary permit, new total investment cost, definite guarantee amount and the annual rent cost shall be calculated on the basis of the restoration project. After the submission of the definite letter of quarantine calculated cost to be determined and the letter of performance security approved by the notary public concerning the payment of annual leasing cost to the Ministry; after completing the other duties definite allocation shall be realized by the Ministry and the easement right shall be established by the Ministry of Finance. 10) a) For the registered buildings, 0,5% of the total investment cost, according to the clause (a) of nd the 22 Article of the Regulations of the Land Allocations of the Public Immovables, is going to be paid to Ministry of Finance and 0,5% annual of the Business Proceeds shall be paid after the operations of the facility. However, 50% of a discount shall be applied in the annual rent cost as Kars nd Province is within the scope of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations number 5084. b) The use cost, for the 50 beds accommodations unit within the allocation parcel, which is the 0,5% of the unit costs of following the definite allocations shall be paid and 1% of annual rent of the operation income shall be paid after the operation of the facility. However, 50% of a discount shall be nd applied in the annual rent cost as Kars Province is within the scope of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations number 5084.
143
In addition to this reduce in the clauses of (a) and (b) according to the clause (a) of the 21 Article of the Regulations of the Land Allocations of the Public Immovables, the first year use rent value shall be cut 70%
st
SPECIAL CONDITIOS FOR RE-FUNCTIONING OF THE REGISTERED BUILDINGS OF THE KATERNA AND MAN VILLAS PLACED ON THE SPECIAL PARCEL NUMBER 1 The investor who has an application should follow the following special conditions besides the conditions defined in the General Conditions for the Public Land Allocation. 1) The south part of the subject land allocation has a Saram Forest view and north part of it has cer workshops view. In order not to spoil the natural and cultural value of the parcel environmental design is considered and especially the architectural silhouette of Katerina Villa is presented. The new buildings in this region shall be designed according with the harmony of the registered buildings. 2) Katerina Villa which has not a historical construction record, is thought as built during the period of nd Russian Czar Nikola 2 between 1900-1902 years has a rectangular plan and built totally as wooden. Only the main part namely the main entrance of which has the column is constructed by stone. The basement floor and the foundation walls placed on the right and left side of the main part are made up of wood: In the construction of villa nail had not been used and the heating system was a kind of stove which had been used widely in Russian Architecture. It is going to be restored with accommodation usage. The physical alterations according to the functional requirements shall be determined by the restoration project. 3) iman Villa, placed near by the Katerina Villa, has approximately 312 m closed construction area. Villa, which has a rectangular plan, has been built as a guest house. The foundation walls were built as stone and facade walls were wooden like as in the Katerina Villa. It is going to be restored with the functions of eating and drinking. The physical alterations according to the functional requirements shall be determined by the restoration project. 4) Before beginning the project phase (restoration) the investor qualified for preliminary permit shall take sufficient number of digital photographs and record videos concerning the actual conditions, exterior elevations, interior spaces, and the details of the buildings in a month beginning from qualifying the preliminary permit. The investor shall sign a statement with the authorized representatives of Kars Provincial Directorate of Culture and Tourism. Three copies of photographs in the mediums of cd and paper shall be submitted to General Directorate of Cultural Properties and Museums of the Ministry, Kars Provincial Directorate of Culture and Tourism and Kars Regional Conservation Council of Cultural and Natural Properties, together with the video tapes in the annex of the statement. Then, Public Land Allocation Department of General Directorate of Investments and Establishments of the Ministry shall be informed about the submission. This procedure shall be repeated after completing the phase of the restoration. 5) The investor is responsible for examining the building massively, every space of the building in general and every component of the building in detail during and after preliminary restoration applications; getting the necessary samples, making the necessary measures, tests and analyses for determining material deteriorations and static problems in the course of time; suspending ventilating, constructing temporary covers in spaces significant and dangerous in terms of static and endurance and all the precautions relevant the fire and safety shall be taken by the investor. 6) The investor to be qualified for allocation shall prepare Restoration Project, Static-Strengthening Report (Civil Engineering), material Deterioration Report (Building Chemistry), Electrical Accessories and Installation Report (Electrical Engineering), Conservation and Renovation principles Report, Preliminary projects of Architecture and Landscape Design indicating new utilities of the building in the period of preliminary permit. Projects and reports shall be submitted to the Related Regional Conservation Council. In case of necessity, additional information, documentation and modification shall be submitted to the Council. Following the approval, application could begin.
2
144
7) The buildings shall be restored in compliance with the original architectural characteristics and historical environment. The original architectural characteristics of interior spaces shall be preserved as much as possible by having the new utilities into consideration. Exterior elevations shall be restored in completely accordance with the original. All applications shall be made in compliance with the decisions of related Conservation Council. 8) The registered buildings should be insured according to the theft, fire, vandalism and natural disasters. The sample of insurance should be submitted to the Ministry. REGISTERED BUILDINGS IN THE PARCEL:
BLOCK 24 PARCEL:2 KATERNA VILLA BLOCK 24 PARCEL:3 MAN VILLA APPROXIMATELY CLOSED CONSTRUCTION RESTORATION AREA
FLOOR NUMBER: BASEMENT + 1 FLOOR APPROXIMATELY CLOSED CONSTRUCTION AREA: 860 M2 FLOOR: 1 FLOOR APPROXIMATELY CLOSED CONSTRUCTION AREA: 312 M2 TOTAL : 1172 M2
9) Total Investment Cost is calculated according to the unit cost of restoration closed and open construction area and according to the unit cost of 2013 year of the type of the facility and type unit cost which are given following formula shown in the table. (In special Accommodation Facilities, the unit cost is taken as a five star hotel unit cost)
Special Parcel Total Area of the Cadastral Parcel 2 and 3 of Plot 24 within the scope of the special parcel number 1 which Katerin and iman Villas are placed. Closed Area (m) Open Area (m) (Total Area of the Cadastral Parcel 2 and 3 of Plot 24 Closed Area)
6.351 m
1.172 m
5.179 m
Open Area Restoration Investment Cost (Open Area X Unit Cost) (I)
813.103 TL
3.099.940 TL
3.913.043 TL
: :
145
Special Parcel Total Area of the Cadastral Parcel 2 and 3 of Plot 24 within the scope of the special parcel number 1 which Katerin and iman Villas are placed. Closed Area (m) Open Area (m) (Total Area of the Cadastral Parcel 2 and 3 of Plot 24 Closed Area) Open Area Restoration Investment Cost (Open Area X Unit Cost) (I) Closed Area Restoration Investment Cost (Closed Area X Unit Cost) ( II ) UNIT COST of 5* Hotel (TL/Bed) CAPACITY (Bed) ACCOMODATION FACILITY INVESTMENT COST TOTAL INVESTMENT COST (TL) ( I+II+III )
6.351 m
1.172 m
5.179 m
813.103 TL
3.099.940 TL
8.712.893 TL
Closed Area Unit Cost : 2.645 TL/m 2 Open Area Unit Cost : 157 TL/m * Specia Accomodation Facility Unit Cost (5 Hotel Unit Cost) : 95.997 TL/Beds
146
MAN VILLA
KATERNA VILLA
147
SPECIAL PARCEL 1
CER WORKSHOPS
KATERNA VILLA
KATERNA VILLA
KATERNA VILLA
MAN VILLA
MAN VILLA
151
1/25.000 SCALE KOCAEL GLCK SUMMER THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
152
INFORMATION SHEET: ALLOCATION SITE KOCAEL GLCK YAZLIK THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION OWNERSHIP STATUS : Kocaeli : Glck : Hasaneyn - Hisarn Village, Yazlk Neighbourhood : Yasakdz - Kadrga : Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry / 11.01.2010 -15 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE : Kocaeli Glck Summer Thermal Tourism Center Environment Master Plan (Approval Date: 19.12.2008) : Health and Tourism Facility Area LAND USE STATUS CONST. RATIO CAPACITY : 49 Years
AREA (m)
220.000
Hotel
0.30
200 beds
414.000
Hotel
0.30
300 beds
INFRASTRUCTURE STATUS Kocaeli Glck Summer Thermal Tourism Center is nearly 10 km far away Glck city center. The special parcel number 1 subject to allocation is placed 2.5 km south of Yazlk Junction which is placed at 12 km. of izmit-Glck Junction; where the special parcel 3 is placed 5 km south of Yazlk Junction which is placed at 15 km. of izmit- Glck Junction The existing urban infrastructure services such as drinking-serving water, sewage system, electrification, telecommunication etc. are going to be used. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Conservation and Development Regions and Tourism Centers; and according to the development statue, anda re going to be submitted for the approval of the Ministry.
153
2) The exact area of the allocation land is going to be determined by the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000. the maximum number of floors and building height are going to be determined in the sub scale plans. 3) In Special Parcel Number 1, minimum 1,4 lt/sec geothermal water for 200 bed capacity and in special parcel number 3, 2,1 lt/sec geothermal water for 300 bed capacity shall be allocated by the Kocaeli Special Province. 4) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 5) a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. Maximum 2 floor high limitation is ruled in the area of first degree preservation area for the named parcel. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the Ministry of Health which was published in Official Gazette in 24.07.2001 with 24472 number. 6) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 7) All the opinions that have to be taken and the surveys that has to be done determined in the Environment Master Plan in scale of 1/25.000 and in the development statute, are going to be done by the investor for the subject to allocation. 8) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed 0,30 (E). 9) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 10) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 11) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment which is calculated according to the formula given below is shown in the table:
th
154
= Bed capacity X Unit cost of 2013 year according to type of the facility
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
155
SEA
SPECIAL PARCEL 1
DENZ
156
1/ 25.000 SCALE KTAHYA-GEDZ ILICASU THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN
157
158
1/1.000 SCALE GEDZ ILICASU THERMAL TOURISM CENTER MASTER PLAN REVISION
159
INFORMATION SHEET: ALLOCATION SITE KTAHYA GEDZ ILICASU THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE LOCATION OWNERSHIP STATUS : Ktahya : Gediz : Ilca : Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE - NO. The Repealed Ministry of Environment and Forestry / 02.07.1992-1325 ALLOCATION PERIOD PLANNING STATUS 1/ 25.000 SCALE 1/25.000 SCALE 1/5.000 SCALE 1/5.000 SCALE 1/1.000 SCALE 1/1.000 SCALE : Ktahya-Gediz Ilcasu Thermal Tourism Center Environment Master Plan (Approval Date: 19.12.2006) : Ktahya-Gediz Ilcasu Thermal Tourism Center Environment Master Plan (Approval Date: 23.10.2009) : Gediz Ilcasu Thermal Tourism Center Master Plan (Approval Date: 04.09.2000) : Ktahya Gediz Ilcas Thermal Tourism Center Master Plan Note Revision (Approval Date: 23.10.2009) : Gediz Ilcasu Thermal Tourism Center Master Plan Revision (Approval Date: 21.09.2000) : Ktahya Gediz Ilcasu Thermal Tourism Center Master Implementation Plan Note Revision (Approval Date: 23.10.2009) : 49 Years
PLAN DECISION
PARCEL 1542
INFRASTRUCTURE STATUS Gediz Ilca is placed 15 km far from the Gediz district center, 36 km far away from Ankara zmir Highway and placed on Gediz Simav Road. The periphery area of the thermal allocation land is surrounded by forest. Accommodation facilities of mostly apart units which are operated by municipality are placed in the thermal area. Urban infrastructure services that is inefficient for the requirements or Urban infrastructure services that have to be required shall be realized by municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
160
EXPLANATION AND GENERAL CONDITIONS 1) a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. Maximum 2 floor high limitation is ruled in the area of first degree preservation area for the named parcel. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the ministry of health which was published in Official Gazette in 24.07.2001 with 24472 number. 2) The Geothermal Spring is allocated to Gediz Municipality Ktahya Special Province. 3) In Parcel no. 1542 minimum 1.00 lt/sec. geothermal water for 150 bed capacity is going to be allocated by Gediz Municipality. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 6) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 7) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 8) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 9) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
th
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
9.950.400,00 7.378.950,00
161
YALIKAVAK
GNDOAN
GLTRKBK
PROVINCE: Mula SUB-PROVINCE: Bodrum VILLAGE: Gndoan NEIGHBOURHOOD: Trkbk LOCATION: Mezgit
162
ALLOCATION SITE 1
163
INFORMATION SHEET: ALLOCATION SITE MULA BODRUM YALIKAVAK GNDOAN GLTRKBK TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE NEIGHBOURHOOD LOCATION : Mula : Bodrum : Gndoan : Trkbk : Mezgit
OWNERSHIP STATUS
: Treasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance: 07.06.2010 tarih ve 557 sayl Olur. ALLOCATION PERIOD PLANNING STATUS 1/1.000 SCALE : Glky-Trkbk K.Gndoan-B.Gndoan Implementation Plan (Approval Date: 14.08.1987) : 49 Years
PLAN DECISION
SPECIAL PARCEL
AREA (M2)
CONST. RATIO
H MAX (m)
CAPACITY
5.600
Boutique Hotel
0,30
10.00 mt
80 Beds
INFRASTRUCTURE STATUS The parcel subject to allocation is placed within the city Mula, Bodrum sub-province, Gndoan and at 18 km. far away from the Bodrum sub-province center. The special parcel number 10 has 130 meter vista to the sea. The existing urban infrastructure services of drinking and serving water do not exist; whereas electrification and telecommunication exist in the parcel. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
164
EXPLANATION AND GENERAL CONDITIONS 1) The special parcel 1 of approximately 5.600 m area is formed from the cadastral parcel of 837 of 10.063 m within the use of Tourism Facility Area. 2) The exact area of the allocation land is going to be determined by the Implementation Plan in scale of 1/1.000. The Definite allocation is going to be realized after the required leaving, subdivision, and joining etc. construction applications done by the investor. 3) The construction rules in the plan notes of Glky-Trkbk K.Gndoan-B.Gndoan Implementation Plan in scale of 1/1000 approved by Bodrum Municipality should be followed. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
95.997,00
80
7.679.760,00
* In Boutique Hotel, the unit cost is taken as a five star hotel unit cost.
165
166
1/25.000 SCALE ORDU AYBASTI TOYGAR KABAKTEPE TOURISM CENTER ENVIRONMENT MASTER PLAN
167
INFORMATION SHEET: ALLOCATION SITE ORDU AYBASTI TOYGAR KABAKTEPE TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE LOCATION OWNERSHIP STATUS : Ordu : Aybast : Toygar : Kabaktepe : Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Repealed Ministry of Environment and Forestry/ 13.06.2011-185 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE : Ordu Aybast Toygar Kabaktepe Tourism Center Environment Master Plan (Approval Date: 04.01.2007) : 49 Years
PLAN DECISION
SPECIAL PARCEL
AREA (m)
CONST. RATIO
NO. OF STOREYS
CAPACITY
412.209
0.30
250 beds
INFRASTRUCTURE STATUS The area subject to allocation is located at an 11 km. distance from Aybast District. Serving and drinking water, and sewage system do not exist in the parcel. Water and sewage system do not exist in the parcel. Urban infrastructure services that is inefficient for the requirements or which require shall be realized by municipality, the related public institutions and/or the investors or the required financial contribution shall be made. The operation and management of the treatment plant for wastewater of the facilities to be constructed on Special Parcel No 1 must be obligatory. Building Occupation Permission shall not be granted before the mentioned wastewater treatment is realized.
168
EXPLANATION AND GENERAL CONDITIONS 1) All buildings on Special Parcel No 1 shall be constructed of wooden and Stone materials in compliance with traditional local environment. The facades shall comply with this condition. Stone material shall be used for terracing and garden walls. 2) Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the investor according to the Tourism Incentive Law and Regulations of the Implementation Plan Preparation in the Culture and Tourism Conservation and Development Regions and Tourism Centers; and according to the development statue, and are going to be submitted for the approval of the Ministry. 3) The area of 53.991 m in which both the lines of the road whose permission is continuing and water transmission line which is stil operating and A type excursion area are out of the area subject to allocation within the Ordu Aybast Toygar Kabaktepe Tourism center Environment Master Plan. 4) The area sizes subject to the allocation have been given approximately. The exact area of the parcel is going to be determined after the procedures of subdivision leaving etc. accord the Implementation plan in scale of 1/1000, and the definite allocations going to be realized afterwards. 5) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 6) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 7) Local endemics and natural vegetation special to the environment shall be protected. 8) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 9) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 10) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
th 2
SORT AND TYPE OF FACILITY Rural Tourism Facility 4 Star Holiday Village
15.593,00 41.364,00
250
3.898.250,00 10.341.000,00
169
170
1/25.000 SCALE UAK BANAZ HAMAMBOAZI THERMAL TOURISM CENTER ENVIRONMENT MASTER PLAN REVISION 171
1/5.000 SCALE UAK BANAZ HAMAMBOAZI THERMAL TOURISM CENTER MASTER PLAN
172
INFORMATION SHEET: ALLOCATION SITE UAK BANAZ HAMAMBOAZI THERMAL TOURISM CENTER PROVINCE SUB-PROVINCE VILLAGE OWNERSHIP STATUS : : Uak : Banaz : Hasanky Forest
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE - NO. The Repealed Ministry of Environment and Forestry / 22.06.2004-262 ALLOCATION PERIOD PLANNING STATUS 1/25.000 SCALE : Uak Banaz Hamamboaz Thermal Toursm Center Environment Master Plan Revision (Approval Date: 18.12.2006) :Uak Banaz Hamamboaz Thermal Toursm Center Environment Master Plan Revision (Approval Date: 23.10.2009) : Uak Banaz Hamamboaz Thermal Toursm Center Master Plan (Approval Date: 18.12.2006) : Uak Banaz Hamamboaz Thermal Toursm Center Master Plan (Approval Date: 23.10.2009) : Uak Banaz Hamamboaz Thermal Tourism Center Implementation Plan (Approval Date: 18.12.2006) : Uak Banaz Hamamboaz Thermal Tourism Center Implementation Plan (Approval Date: 23.10.2009) : 49 Years
1/25.000 SCALE
PLAN DECISION
SPECIAL PARCEL
CONST. RATIO
CAPACITY
Hotel
0,30
600 Beds
15
100.600
Hotel
0.30
600 Beds
18
96.000
Hotel
0.30
500 Beds
173
INFRASTRUCTURE STATUS Uak Banaz Hamamboaz Thermal Toursm Center placed in Afyonkarahisar city, on Uak city road and had a distance 7 km to Banaz city center. Subject parcels of allocation are located within the borderline of Banaz Municipality. The existing infrastructure in the settlement area is going to be used. Urban infrastructure services that are inefficient for the requirements shall be realized by The Municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) The exact area of the allocation land is going to be determined by the Master Plan in scale of 1/5.000 and Implementation Plan in scale of 1/1.000 and the definite allocation is going to be realized after this. 2) In case of realization of water distribution project by Uak Province, minimum 4,86 lt/sec for special parcel 7, special parcel 15 and minimum 4,05 lt/sec for special parcel 18 shall be allocated. 3) In case of a thermal accommodation facilities together with thermal facilities are realized on the special parcels subject to allocation number 7-15-18; a) For all kinds of geothermal application; Law of Geothermal Springs and Natural Mineral Waters which was published in Official Gazette in 13.06.2007 with 26551 number and Application Regulations are going to be applied. b) All requirements for facility and management permissions are going to be taken by completing the requirements in the regulation of thermal springs operated by the ministry of health which was published in Official Gazette in 24.07.2001 with 24472 number. 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to article 29 of the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) In case of building cure center, health and thermal facility besides the accommodation facility, the closed construction area shall be submitted to the Ministry with the site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 6) The area subject to the allocation is situated in the areas Preventive Area-1 (A1), Preventive Area2 (A2), Preventive Area-3 (A3) in the map of appropriateness of the settlement. The applications shall be made according to the clauses of the Geological Conditions of approved plan. 7) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 8) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 9) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time.
th
174
10) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
600
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 3 Star Hotel
500
175
DETAILED INFORMATION AND SPECIAL CONDITIONS FOR PUBLIC IMMOVABLE TO BE ALLOCATED OUTSIDE CULTURE AND TOURISM CONSERVATION, DEVELOPMENT REGION AND TOURISM CENTER
176
PROVINCE: MERSN SUB-PROVINCE: TARSUS VILLAGE: SOFULAR STREERT: 37th & 43rd Streets
177
INFORMATION SHEET: ALLOCATION SITE PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD STREET OWNERSHIP STATUS : Mersin : Tarsus : Sofular : 37. and 43. Streets : Terasury
ASSIGNMENT DATE OF THE POWER OF DISPOSAL: General Directorate of National Estateel Governopship-Revenue Office/ 28.01.200212 (677Lot, 61 parcel) General Directorate of National Estateel Governopship-Revenue Office / 25.02.200219 (677 Lot, 63 parcel) Tarsus District Governopship Fiscal Directorate/ 22.04.20102891 (677 Lot, 64 parcel) General Directorate of National Estateel Governopship-Revenue Office / 28.01.200212 (677 Lot, 70 parcel) Tarsus District Governorship- Fiscal Directorate/ 07.04.20082354 (121 Lot, 1 parcel) Tarsus District Governorship- Fiscal Directorate/ 27.12.20011048 (121 Lot, 2 parcel)
ALLOCATION PERIOD
: 49 Years
PLANNING STATUS
1/5000
: Tarsus Master Plan for Preservation (Approval Date: 04.06.1996) : Tarsus Ipmlementation Plan for Preservation (Approval Date: 27.10.1995)
1/1.000
PLANNING DECISION: Urban Site Area Registered and Proposal of Registered Buildings
SPECIAL PARCEL 1
LOT 677
PARCEL 61 63
272
118 137 127 134 101
LAND USE STATUS Special Facility (RestaurantCafebar) Special Facility (Accomodation+ Eating-Drinking) Special Facility (Accomodation+ Eating-Drinking+ Sales Units)
677
64 70 1
26 Beds
121 2
10 Beds
178
INFRASTRUCTURE STATUS
Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. shall be utilized Urban infrastructure services that is inefficient for the requirements or which require shall be realized by municipality, the related public institutions and/or the investors or the required financial contribution shall be made.
EXPLANATION AND GENERAL CONDITIONS 1) The parcels subject to allocation are placed around the St.Pul Well which has a religious meaning by nd the Christians in which the St. Paul has born. The immovables subject to allocation are registered as 2 Group Cultural Assest by the decision of Adana Cultural and Natual Preservation Regional Board date 01.01.1990 and number 696. the immovables in Urban Site Area have expropriated within the scope of The Project of Environmental Organization of St. Paul Well and Religious Tourism. Within this Project of Environmental Organization of St. Paul Well and Street Sanitation, the building survey, restitution and restoration projects were approved by Adana Regional Board in order to repair and renovate the buildings.
2) the restoration (which has started by the Ministyr and Mersin Governorship) of these immovables placed on Sofular Neighbourhood, as 677 Lot 61, 63, 64, 70 Parcels and on Camicedit Neighbourhood as 121 Lot 12 Parcels have finished in November 2011 by the contribution fund granted by Mersin Governorship. On 21.03.2012, provisional acceptance was taken by Adana Surveying and Monument Directorship. 3) by the decision of on 26.01.2006 date numbered 1356, Adana Culture and Natural Assest Preservation Regional Board; -The Special Parcel number 1 (677 Lot, 61 parcel) has given the function of Restaurant-cafebar in the restoration Project, -The Special Parcel number 2 (677 Lot, 63, 64,70 parcels) has given the function of Accomodation+Eating-Drinking in the restoration Project, -The Special Parcel number 3 (121 Lot, 1-2 parcels) has given the function of Accomodation+Eating-Drinking+ Sales Unit in the restoration Project, 4) -The immovable having inner court and ground- first floors, placed in special parcel 1, is made up of cut Stone. It has used as Courthouse in the beginning of the Republican Period, then it was begined to functioned as house. It has a facade to St. Paul Square(43rd Street). -The 2 floor immovable of the lot 677 parcel 63 within the scope of Special Parcel number 2 has the entrance through the wooden door facing to St. Paul Square and reached to 2nd flor by wooden stairs. The 2 floor immovables in 677 lot, parcel 64 and 70, has made up of Stone on ground flor and wood on second flor. -The immovables placed on special parcel 3, are 2 floors and are made up of cut Stone. They have facade to St. Paul Square and 37th Streets. They unite in the restoration Project. 2 sales units, breakfast lounge and a bar on ground floor, and 5 rooms independent from the ground flor are designed. 5) Before all the applications done to the registered buildings, the permission of Adana Preservation Regional Board has to be taken within the scope of the Law of 2863 Cultural and Natural Assest Preservation Law number 2863. the functional alteration other than the approved projects are under the decision of related Preservation Board. In this case, the site plan of the parcels in case of the permission of the Preservation Board shall be submitted to the Ministry during the preliminary permit. 6) The registered buildings have to be insured to theft, sabotage, terrorism or natural disaster etc. The copy of the insurance document has to be submitted to the Ministry. 179
7) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities.
8)
a) For the registered buildings, 0,5% of the total investment cost, according to the clause (a) of nd the 22 Article of the Regulations of the Land Allocations of the Public Immovables, is going to be paid to Ministry of Finance and 0,5% annual of the Business Proceeds shall be paid after the operations of the facility. However, 50% of a discount shall be applied in the annual rent cost as Kars Province is within the nd scope of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations number 5084. b) The use cost, for the 50 beds accommodations unit within the allocation parcel, which is the 0,5% of the unit costs of following the definite allocations shall be paid and 1% of annual rent of the operation income shall be paid after the operation of the facility. However, 50% of a discount shall be nd applied in the annual rent cost as Kars Province is within the scope of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations number 5084. In addition to this reduce in the clauses of (a) and (b) according to the clause (a) of the 21 Article of the Regulations of the Land Allocations of the Public Immovables, the first year use rent value shall be cut 70%
st
9) Total Investment Cost is calculated according to the unit cost of 2013 year of the type of the facility
and type unit cost which are given following formula shown in the table.
SPECIAL PARCEL NUMBER 1 SPECIAL FACILITY INVESTMENT COST = Kuver (Service Plate) Number X Unit Cost = 120 Kuver X 17.678 TL/Kuver = 2.121.360 TL
(In special Facilities, the unit cost is taken as restaurant unit cost) SPECIAL PARCEL NUMBER 2 SPECIAL ACCOMODATION FACILITY INVESTMENT COST = Bed Number X Unit Cost = 26 Bed X 95.997 TL/m2 = 2.495.922 TL
SPECIAL PARCEL NUMBER 3 SPECIAL ACCOMODATION FACILITY INVESTMENT COST = Bed Number X Unit Cost = 10 Bed X 95.997 TL/m2 = 959.970 TL
(In special Accommodation Facilities, the unit cost is taken as a five star hotel unit cost)
180
181
PROVINCE: MERSN SUB-PROVINCE: TARSUS NEIGHBOURHOOD: SOFULAR STREERT: 37th & 43rd Streets
677 LOT 64 PARCEL 677 LOT 63 PARCEL
182
1/25.000 SCALE MULA MERKE ARDIOVASI LOCATION GOLF AREA ENVIRONMENT MASTER PLAN
183
INFORMATION SHEET: ALLOCATION SITE PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION OWNERSHIP STATUS : Mula : Center : enyayla : Ylanl Ardovas : Forest
ASSIGNMENT DATE OF THE POWER OF DISPOSAL: The Repealed Ministry of Environment and Forestry: 07.11.2005 / 1263 ALLOCATION PERIOD PLANNING STATUS 1/ 25.000 SCALE : Mula Merkez Ardovas Location Golf Area Environment Master Plan (Approval Date: 03.04.2006) : 49 Years
SPECIAL PARCEL
AREA (m)
CONST. RATIO
MAX.H (m)
CAPACITY
G1
1.051.500
0,05
9,50
INFRASTRUCTURE STATUS The area subject to allocation is situated 30 km distance to the city center, coded 1350, and the road has asphalt road cover. Electricity infrastructure, sewage and purification system, drinking and usage water does not exist in the plot. The nearest electricity source is the pillar no. 91 of the electricity line in Krkhan Neighbourhood in zlce Village. In order to feed the facilities in the area, a new Incisory Measurement Cabin needs to be established in the pillar and a 7 km. new Electricity Transplantation Line needs to be established beginning from that point. Drinking and serving water systems do not exist in the area. In accordance with the drillings by the General Directorate of Rural Affairs, the possibility of the water utilization has been determined as maximum 2-3 lt/second water in the ground of kizce Village, which has the same lithologic structure with the subject area of allocation. In addition, Mortuma Stream, at the southeast of the area, in Yemiendere Village, which has 280 mt denim difference with the area, has a 2.000 lt/second flow (125 lt/second in dry seasons) could be utilized alternatively. There are lime-stones and loose conglomerate cements which presents in layers, in piece and karstic; and there are gray, thick layering lime-stones on slopes and mountain within the borders of the land suject to allocation. 184
The main urban infrastructure services such as telecommunication, electricity, purification and sewage shall be realized by the investors.
EXPLANATION AND GENERAL CONDITIONS 1)1/5.000 scale Master Plan and 1/1.000 scale Implementation Plan do not exist. Unless the area has land use; land use maps tree survey plans (to be evaluated by the related regional directorates of the Ministry of Environment and Forestry and the report shall be provided), 1/5.000 scale Master Plan and 1/1.000 scale Implementation Plan shall be prepared by the investor. Master and Implementation Plans could not be prepared before the allowance of the Ministry of Forestry and Water Affairs.
2)The area size of the G1 parcel no. 1 subject to the allocation has been given approximately. The actual size shall be determined following the establishment of the parcels to be realized after relinquishment, integration, parceling etc. processes by the investor as per 1/1.000 scale Implementation Plan and definite allocation shall be realized thereafter. 3) The Golf Club in 27 holes golf area, which has a maximum construction area of 6.000 m Golf Club could be constructed. 4) In case of building Golf Club besides the accommodation facility on the G1 parcel, the closed construction area shall be submitted to the Ministry with site plan. In addition to the rent value, the cost of these closed areas shall be added to the rent. 5) While preparing the architectural projects of the facility, solutions shall be appropriate with the topography and natural vegetation and the natural assets shall be protected. 6) Within the scope of the 8 article of the Tourism Incentive Law numbered 2634; the plantation fee which is the 3 times bigger area of the land subject to allocation and the maintenance fee of this area for 3 years have to be paid in the account of General Directorate of Forest by the investor and it will be kept as revenue in order to be used for the plantation and maintenance works; and the value of income is kept as subsidy. Otherwise tourism investment or management license is not going to be given to the investor. 7) Forestry Peasant Development Revenue shall be taken for once only and it shall be entered as receipt to the budget as per the article 5 of the Provisions and Procedures Corresponding the Forestry Peasants Development Services published in the Official Gazette dated 31/12/2005 and no. 26040. The Forestry Peasant Development Revenue is at amount of 3% (tree percent) of the part of the total project which is located in the forest area. In addition in the event of a change in type, sort or capacity of the facility, the cost to be calculated according to the unit costs in the date of issuing the investment or operation certificate shall be paid each time. 8) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 9) According to the Act 5761 enacted in 15.05.2008 as an Amendment to the law 2634 the construction ratio on the forest allocation land shall not exceed this ratio 0,30 (E). 10) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below is shown in the table:
th
185
Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village 4 Star Holiday Village
G1 1.051.500 m
2
39.957.000 TL
The maximum area of the G1 Special Parcel the Golf Club Building is 6.000 m2 in the Implementation Plan. The closed areas of the daily use facilities on the parcel subject to allocation shall be submitted to the Ministry with the site plan during the preliminary permit. The investment cost shall be re-calculated for the closed areas in the site plan and shall be added to the total investment cost shall be revised.
186
187
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi N
188
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi N
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi N
INFORMATION SHEET: ALLOCATION SITE PROVINCE SUB-PROVINCE VILLAGE NEIGHBOURHOOD LOCATION : Mula : Fethiye : Kayaky : Kurban and 3rd Degree Archeological Site & Fethiye Gcek Special Environment Protection Region : Levissi
OWNERSHIP STATUS
: Treasury
THE INSTITUTION ASSIGNING THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 04.06.2012-701 ALLOCATION PERIOD : 49 Years
PLANNING STATUS 1/5.000 : Fethiye Kayaky Conservation Master Plan (Repeled Environmental Protection Agency for Special Areas/ Approval Date: 18.12.2006) : Preservation Master Plan Decisions of Kayaky Levissi Urban and 3rd Degree Archeological Site Area (Repeled Environmental Protection Agency for Special Areas/ Approval Date: 18.12.2006) : Kayaky- Historical and Cultural Tourism Area
1/5.000
PLAN DECISION
SPECIAL PARCEL
REGION
CADASTRAL PARCEL
LOT
PARCEL
1432 1 1438 1451 2 1 3 4 5 1449 1450 1461 1458 1454 1455 1457 6 1452 1453
149 149 149 149 151 151 152 153 153 153 157 157
10 6 4 11 1 3 1 1 4 2 1 2
531,53 24,99 58.507,98 * 60.394,59 (25.270,13 m2lik alan hari) 28.240,16 26,25 23.413,79 52.589,01 118,74 91,95 22.719,95 304,60 221.765,41
191
* The lot 149 parcel 11 has a case of number 2009/660 in the Fethiye Civil Court of First Instance due to the fact that 25.270,13m2 area of the total area of 60.394,59m2. the allocation process fort his part shall be re-organized according to the end of the case. In order to preotect the restortion area of special parcel number 1, certain amount of the registered buildings in the 1- 2- 3- 4- 5- 6 regions within he parcel shall be arranged as accomodation facilities, but the bed capacity shall not be surpassed 300 beds. * In the Lot 149 parcel 11 has a provisional injunction comment in the land registration certificate as htiyati Tedbir 20/2/2006 Yev: 1814 Fet. 2. Asl. Hu. Mh. 2006/1 Mt. INFRASTRUCTURE STATUS Urban infrastructure does not exist in the plot. The physical alterations including the walking paths, roads, drain water, underground water, use water, fire-water, dranaige water, purification, electricity, low circuit, lightning conductor, enviromental lighting wtc. within the scope of technical infrastructure shall be done without giving harm to the environment; with the harmony of existing tissue and utilized the present buildings at most, by the rules of the the related rules of laws and regulations in contemporary technology. Urban infrastructure services that is inefficient for the requirements or which require shall be realized by municipality, the related public institutions and/or the investors or the required financial contribution shall be made. The responsibility to finish the infrastru
EXPLANATION AND GENERAL CONDITIONS 1) The special parcel 1 subject to allocation is made up of 221.765,41 m2 area of 149 lot 4, 6, 10 ve 11 parcels; 151 lot 1 & 3 parcels; 152 lot 1, 2 & 4 parcels and ve 157 lot 1 & 2 parcels. (The special parcel 1 is divided into 6 regions within the line of the cadastral borders in order to provide the textural integrity of the architecture. Region number 1 is composed of 149 lot 4, 6 & 10 parcels; region number 2, 149 lot 11 parcel; region number 3, 151 lot 1 & 3 parcels; region number 4, 152 lot 1, parcel; region number 5, 153 lot 1, 2 & 4 parcels; region number 6, 157 lot 1 & 2 parcels.) 2) The Historical and Cultural Tourism Area is composed of Levissi & Ova in Conservation Master Plan in scale of 1/5000. the parcels subject to allocation is placed in Levissi Region. 3) In the Levissi Part subject to allocation, approximately 700 buildings of the example of civic and monumental architecture which has been approved by the decisions of zmir 2nd Number Conservation Council of Cultural and Natural Heritage with number12.06.1991/ 2048 and Mula Conservation Council of Cultural and Natural Heritage 4) The Registration Chart and Monument Receipts are presented in the annex of the article with the number 26.01.2011/ 6770 of Mula Conservation Council of Cultural and Natural Heritage. According to this decision, the investor shall prepare the present plans, indicating on the map of the present buildings, roads in the parcels, garden walls, caves, squares and in case of necessary regulation of the regulation chart, cadastral revision based on the present map and the present architectural tissue; and the Conservation Implementation Plan of scale 1/1.000. 5) The Conservation Implementation Plan of scale 1/1.000 of the area of Levissi in which the buildings shall be allocated according to The Preservation Master Plan of scale 1/5.000 will be prepared by the investor by the Technical Specification. 6) For the preparation of the Conservation Implementation Plan of scale 1/1.000 and the lower scale plans, the provisions of the plan notes of the The Preservation Master Plan of scale 1/5.000 should be obeyed attached as the annex of this specification. 7) The investor shall submitt the Conservation Implementation Plan of scale 1/1.000 prepared during the preliminary Permitt to the Ministry. These plans and projects shall be sent to related institutions by the
192
Ministry if deemed as appropriate. The Conservation Implementation Plan shall be approved by the Ministry of Environment and Urbanization. 8) As The area subject to allocation is urban and 3rd Degree Archeological Site, The Conservation Implementation Plan of scale 1/1.000 shall be submitted to Mula Conservation of Natural Assest Regional Commission and before all the applications the approval of Mula Conservation of Natural Assest Regional Commission shall be taken. 9) Within the Kayaky- Historical and Cultural Tourism Area, the functions of museums for cultural tourism, exhibition and promotion areas, accomodation, catering and sale areas, performance stages, amusement, recreation, health and sport areas, reception and administration, open area exursion paths, and finally technical infrastructure and services for these functions can be done. 10) Within the Kayaky- Historical and Cultural Tourism Area, protection of the architectural texture and the present half-ruin view is a must. For this purpose, maximum %30 of the immovables shall be restorated and re-used. Which immovales to be re-used shall be defined in the Preservation Implementation Plan of scale 1/1.000. 11) The immovables, which will be used for both cultural purposes and tourism purposes, shall be declared to the Ministry of Finance. 12) The total bed capacity and closed/open restoration area shall be defined within the Preliminary Permitt.
13)
Before the definite allocation for the investor having the preliminary permit, new total investment cost, definite guarantee amount and the annual rent cost shall be calculated on the basis of the restoration project and maximum bed capacity of 300. After the submission of the definite letter of quarantine calculated cost to be determined and the letter of performance security approved by the notary public concerning the payment of annual leasing cost to the Ministry; after completing the other duties definite allocation shall be realized by the Ministry and the easement right shall be established by the Ministry of Finance. For the registered buildings, 0,5% of the amount which is calculated by the difference of the restoration investment cost subtracted from the total investment cost based on the unit costs, nd according to the clause (b) of the 22 Article of the Regulations of the Land Allocations of the Public Immovables, is going to be paid to Ministry of Finance and 1% annual of the Business Proceeds shall st be paid after the operations of the facility according to the clause (b) of the 1 subparagraph. The value of the registered building is determined or done by the Ministry. However, the annual use value should not be lower than the 0,5% of the total investment cost. Tourism Investment Certificate and Tourism Operation Certificate shall be obtained according to the Regulations Regarding Certifications and Qualifications of Tourism Facilities.
14)
15)
SPECIAL CONDITIONS: The investor who has an application should follow the following special conditions besides the conditions defined in the General Conditions for the Public Land Allocation. 1) The lot 151 parcel 1 in the Levissi Region has allocated to the Ministry as being ruin box Office and sale unit. The operation of ruin area, which is placed on the tour route, is done by TURSAB. The box Office which is in the possession of DSMM and operated by TURSAB shall be served until the easement settled; hence in case of the existence of the cafes and sale units operated by DSMM shall close when the facility is in operation. The fees and the rules of the entrance to the ruin durin the operation period shall be defined by a contract between the firm and DSMM.
193
2) Total investment which is calculated according to the 2013 facility type and unit cost given below is shown in the table. (The unit cost for Special Tourism Facility is calculated according to 5 Star Hotel Unit cost)
SPECIAL PARCEL: SPECIAL ACCOMODATION FACILITY: (Unit Cost of special Facility for Tourism ) CAPACITY (Bed) SPECIAL ACCOMODATION FACILITY COST (Unit Cost of 5* Hotel X Bed Capacity )
* Before the definite allocation for the investor having the preliminary permit, new total investment cost, definite guarantee amount and the annual rent cost shall be calculated on the basis of the restoration project and maximum bed capacity of 300.
194
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi
View to Levissi
195
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi
196
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi
Lower Church
Upper Church
197
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi
Lower Fountain
House in use
198
PROVINCE: MUla SUB-PROVINCE: Fethiye VILLAGE: Kayaky NEIGHBOURHOOD: Urban and 3rd Degree Archeological Site Area LOCATION: Levissi
House
House
199
PLAN
200
201
INFORMATION SHEET: ALLOCATION SITE SVAS ABDULLAHPAA VILLA PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD STREET : Sivas : Divrii : Ceditpaa Neghbourhood : Paa Camii
OWNERSHIP STATUS : Divrii Municipality ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: Divrii Municipality / 07.12.2010 date and 14 Number Council Decision
PLANNING STATUS Boutique Hotel Accommodation Facility of Tourism Usage is determined by the decision of Divrii Municipality Decision of 14.12.2010 date. In this site, the usage and the conditions of Sivas Cultural and Natural Heritage Conservation Council are in operation.
LOT
PARCEL
AREA (m)
USE TYPE
CAPACITY
295
1.864,52
16 beds
INFRASTRUCTURE STATUS The subject immovable to allocation of Abdullah Paa Villa is located in Sivas Province, Divrii Subprovince, Ceditpaa Neighborhood, Paa Camii Street, with alt Valley view. Urban infrastructure such as drinking and serving water, sewage system, telecommunication, electricity etc. exist in the plot. On the other hand, if these services are insufficient, urban infrastructure services shall be realized by the municipality, the related public institutions and/or the investors shall be made.
202
EXPLANATION AND GENERAL CONDITIONS 1) Divrii Ulu Mosque and its health house of importance of Seljuks period is present at Sivas Province, Divrii Sub-province. The Kmbet and historical castle is not in the previous vivid, however the iron-steel factory is increases the need for an accommodation facility. 2) The Abdullah Paa villa subject to allocation is constructed by Abdullah Paa (1876-1909) whom given nd as an honoree pasha by 2 Abdulhamit. The date construction date of building is 1902. 3) The building has been used as military office, hospital and police station. The building as the last villa of Divrii pashas and gentlemen has been abandoned for years. 4) The restoration of villa has been completed and little incompleteness can be finished within a short period. 5) There are 8 bedrooms, lobby, breakfast room, kitchen in the villa. The blind well near is placed on the left of the door and fountain with writings on the right 6) the open stair combining ground floor and first floor, the thick walls, summer-winter rooms, star lounge are the important reminiscent of the Anatolian civic architecture. Besides, the wooden ceiling, long windows, and garden doors are the richness of the building. 7) The council decision of Divrii Municipality of date 14.12.2010 decided to use the building as Boutique Hotel Accommodation Facility of tourism purpose and this decision has been sent to Sivas Culture and Natural Preservation Council for approval. 8) Abdullah Paa Villa has been restorated as an accommodation facility with 16 beds, and additional units as closed open restaurant, lobby etc. the facility shall serve high quality and service in operation management. 9) Before all the application for the immovable, required permissions have to be taken from Sivas Cultural and Natural Heritage Conservation Council within the scope of the law of Conservation of Cultural and Natural Assets of law number 3386 and 5226. the restoration projects shall be submitted to the related Conservation Council, function revision and all usages are decided by this conservation council. 10) Tourism Investment Certificate and Tourism Operation Certificate shall be obtained according to the Regulations Regarding Certifications and Qualifications of Tourism Facilities. 11) Within this scope, the use cost, for the 16 beds accommodations unit within the allocation parcel, the preliminary permission cost which is the 0,1% of the unit costs of total investment cost shall be taken. However, 50% of a discount shall be applied in the annual rent cost as Sivas Province is within the scope nd of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations number 5084. For the registered buildings, 0,5% of the total investment cost, according to the clause (a) of the 22 Article of the Regulations of the Land Allocations of the Public Immovable, is going to be paid to Municipality and 0,5% annual of the business proceeds shall be paid after the operations of the facility. However, 50% of a discount shall be applied in the annual rent cost as Divrii Province is within the nd scope of the 2 article of the Law of Incentive of Investment and Employment, and Related Alterations st number 5084. Besides this discount, 70% discount shall be applied according to the clause (a) of the 21 nd Article of the Regulations of the Land Allocations of the Public Immovable, for the use value (rent) of 2 rd and 3 year. 12) The registered buildings should be insured according to the theft, fire, vandalism and natural disasters. The sample of insurance should be submitted to the Ministry.
nd
203
13) Total Investment Cost is calculated according to the unit cost of 2013 year of the type of the facility and type unit cost which are given following formula shown in the table. (In special Accommodation Facilities, the unit cost is taken as a five star hotel unit cost)
204
PLANS
205
206
VIEWS
FRONT FACADE
RIGHT FACADE
207
LEFT FACADE
208
209
210
INFORMATION SHEET: ALLOCATION SITE PROVINCE SUB-PROVINCE VILLAGE/NEIGHBOURHOOD LOCATION : Yalova : iftlikky : Siteler : Kurueme
OWNERSHIP STATUS: Treasury ASSIGNMENT DATE OF THE POWER OF DISPOSAL / DATE NO.: The Ministry of Finance / 05.05.2011 - 539. ALLOCATION PERIOD : 49 Years
PLANNING STATUS 1/25.000 SCALE : Yalova Province Environment Master Plan (Approval Date: 08.06.2007)
PLAN DECISION
SPECIAL PARCEL
AREA (M2)
CONST. RATIO
CAPACITY
750 Beds
INFRASTRUCTURE STATUS The parcels subject to allocation is placed within the city center of Yalova, iftlikky sub-province, Siteler Neighborhood and 1.5 km. far away from sub-province center. The parcel 10 has 175 meter vista to the sea on north and D-100 road between Yolova Kocaeli on South-east. The existing urban infrastructure services such as drinking-serving water, sewage system, electrification, telecommunication shall be used in the parcel. Urban infrastructure services that are inefficient for the requirements or which require renovation shall be realized by the Municipality, the related public institutions and/or the investors or the required financial contribution shall be made. 211
EXPLANATION AND GENERAL CONDITIONS 1)1/5.000 scale Master Plan in Scale of 1/5.000 and Implementation Plan in scale of 1/1.000 consistent with the Environment Master Plan in scale of 1/25.000 are going to be prepared by the, and are going to be submitted for the approval of the iftlikky Municipality. 2) The exact area of the allocation land is going to be determined by the Master Plan in scale of 1/5.000and the Implementation Plan in scale of 1/1.000 which shall be approved according to the Geological Geotechnic Study Report of Environment Master Plan in scale of 1/25.000. The Definite allocation is going to be realized after the required leaving, subdivision, and joining etc. construction applications done by the investor. 3) The special parcel 1 approximately 39.600 m area is formed from the parcel of 3318 parcel of 2 69.323,67 m . 4) The parcel subject to allocation shall take Tourism Investment and Tourism Management Certificate according to the Regulations Regarding Certification and Qualifications of Tourism Facilities. 5) The facilities which were transferred to Ministry of Finance which have been belonging to Eti Maden letmeleri General Investment are placed on special parcel subject to allocation. 6) In case of demolition of the facilities on the special parcel subject to allocation and constructing new facility, according to the 21st article item (a) of the Regulations Regarding Certification and Qualifications of Tourism Facilities the use cost of the allocation parcel which its final allocation has been realized the annual rent cost as 0,5% of the total investment cost shall be paid to Ministry of Finance as annual rent st and according to the 21 article item (b) 1% share of the total operation cost after the operation of the facility. 7) The application is going to be done by determining the facility class with the scope of Regulations Regarding Certification and Qualifications of Tourism Facilities. Total investment cost which is calculated according to the formula given below, is shown in the table: Total investment cost = Bed capacity X Unit cost of 2013 year according to type of the facility
TOTAL CAPACITY INVESTMENT COST (Bed) (TL)
2
SORT AND TYPE OF FACILITY 5 Star Hotel 4 Star Hotel 5 Star Holiday Village
212
213