Code No: V3205/R07 III B. Tech II Semester Regular Examinations, April/ May 2011 ESTIMATING AND COSTING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer the Part A Answer any three questions from the Part B ***** Part A (1x50=50) Estimate the required quantities for the following data from the given plan Fig.3.4 by using centre line method.

ww

w.

jn

tu
1 of 2

hu

b.

co

Set No. 1
Code No: V3205/R07 (i) Earth work excavation in foundation with 1:4 C.M (ii) C.C in foundation (1:3:6) (iii)First Class Brick work in sub structure (C.M of 1:4) (iv)R.C.C (v) White washing 2. Part-B(3x10=30)

ww

w.

jn

tu

(i) What is approximate method of Estimation and explain? (ii) Write brief note on the earth for roads and explain? (iii)What do you understand about the Valuation and explain in detail (iv)Write the standard specifications for different items of building constructions and explain? (v) What do you understand about the Contract Documents and explain?

2 of 2

hu

b.

co

Set No.2
Code No: V3205/R07 III B. Tech II Semester Regular Examinations, April/ May 2011 ESTIMATING AND COSTING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer the Part A Answer any three questions from the Part B ***** Part A (1x50=50) 1. Estimate the required quantities for the following data from the given plan Fig 3.5 &3.6 by using individual wall method.

ww

w.

jn

tu
1 of 2

hu

b.

co

Set No.2
Code No: V3205/R07

(i) Earth work excavation in foundation with 1:4 C.M (ii) C.C in foundation (1:3:6) (iii)First class brick work in foundation (C.M of 1:4) (iv)First class brick work in super structure (v) Painting or white washing 2. Part-B(3x10=30) (i) Define the contractor & the contract and what are the types of contracts and explain? (ii) Explain the types and conditions of contracts in detailed? (iii)What do you understand about the bar bending and what factors plays major roll in case of bar bending? (iv)Write the units for working out quantities for detailed and abstract estimates? (v) Explain the principle and procedure for the earth work of roads and canals? 2 of 2

ww

w.

jn

tu

hu

b.

co

Set No.3
Code No: V3205/R07 III B. Tech II Semester Regular Examinations, April/ May 2011 ESTIMATING AND COSTING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer the Part A Answer any three questions from the Part B ***** Part A (1x50=50) 1. Estimate the required quantities for the following data from the given plan 3.4 by any one method.

ww

w.

jn

tu
1 of 2

hu

b.

co

Set No.3
Code No: V3205/R07 (i) (ii) (iii) (iv) (v) 2. Part B(3x10=30) (i) What are the Principles of working out quantities and explain them in brief? (ii) Perform the rate analysis for the following (a). 1:6 CM (b). 1:2:4 C C (iii) What are the types of contract and explain? (iv) Explain the conditions of contracts in detailed? (v) What are the standard Specification for the construction of buildings and explain them in brief? Earth work excavation in foundation C.C in foundation Second class brick work in foundation (C.M of 1:4) First class brick work in super structure Sand filling basement

ww

w.

jn

tu

hu

2 of 2

b.

co

Code No: V3205/R07 III B. Tech II Semester Regular Examinations, April/ May 2011 ESTIMATING AND COSTING (Civil Engineering) Time: 3 hours Max Marks: 80 Answer the Part A Answer any three questions from the Part B ***** Part A (1x50=50)

Set No.4

ww

w.

jn

tu
1 of 2

hu

b.

co

Estimate the required quantities for the following data from the given plan Fig.3.3 by any one method

Code No: V3205/R07 (i) (ii) (iii) (iv) (v) 2. Earth work excavation in foundation D.P.C Second class brick work in foundation (C.M of 1:4) Flooring with 1: 4 C:M Brick work for parapet wall Part B(3x10=30)

Set No.4

ww

w.

jn

tu
2 of 2

hu

(i) What are the Principles of working out quantities and explain them in brief? (ii) What are the types of contract and explain? (iii)What do you understand about the Valuation and explain in detail (iv)Write the standard specifications for different items of building constructions and explain? (v) What do you understand about the Valuation and explain in detail?

b.