City of Rockville Department of Public Works 111 Maryland Avenue Rockville, MD 20850 Phone (240) 314-8500 Fax (240) 314-8539
STANDARD PRICES FOR COST ESTIMATING AND PERMIT APPLICATIONS CITY OF ROCKVILLE DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION
TABLE OF CONTENTS
GRADING AND PAVING TRAFFIC STORM DRAINAGE WATER AND SEWER SEDIMENT CONTROL STORM WATER MANAGEMENT PAGES 2-4 PAGES 5-6 PAGES 7-9 PAGES 10-11 PAGES 12-13 PAGES 14-15
It should be noted that the estimated costs shown on the following pages are for normal installations. Where unusual circumstances appear, such as heavily traveled streets, extra depths, rock, small quantities of work, etc., extra costs must be added to cover such situations.
[1]
[2]
Unit
LF LF SF VF SF LF SF CY CY CY CY CY EA EA EA EA EA EA Acres CY SY SY LF SY SY SY SY LF EA EA LF TON TON TON TON SY SY SY SY
Cost
$4.00 $32.00 $25.00 $60.00 $20.00 $200.00 $20.00 $15.00 $10.00 $15.00 $25.00 $50.00 $275.00 $600.00 $1,000.00 $1,200.00 $450.00 $550.00 $7,500.00 $50.00 $8.00 $10.00 $10.00 $9.00 $15.00 $10.00 $5.00 $12.00 $750.00 $750.00 $16.00 $75.00 $60.00 $85.00 $65.00 $4.50 $3.60 $5.10 $3.90
[3]
Unit
SY CY LF LF LF SY SY SY SY SF SY TON TON SY SY SY SY SY CY EA LF EA LF CY SY SY SY EA EA EA EA EA LF LF LF LF LF
Cost
$6.00 $40.00 $18.00 $18.00 $10.00 $70.00 $40.00 $25.00 $28.00 $25.00 $16.00 $80.00 $90.00 $4.80 $5.40 $40.00 $50.00 $34.00 $600.00 $80.00 $20.00 $600.00 $25.00 $45.00 $0.75 $5.50 $4.50 $300.00 $400.00 $200.00 $200.00 $65.00 $12.00 $10.00 $12.00 $16.00 $20.00
[4]
TRAFFIC
[5]
Traffic
ITEM
Traffic Signal Equipment 15" Single Section Pedestrian Signal Head 12" One-Way 3 Section (R,Y,G) 5 Section LED t,s,h Econolite Traffic Signal Cabinet With Equipment Video Detection Camera 6' X 6' Loop Detector 6' X 22' Loop Detector 6' X 30' Loop Detector Traffic Signal Construction 3" Schedule 80 Rigid PVC Conduit (Bored) 3" Schedule 80 Rigid PVC Conduit (Trenched) 4" Schedule 80 Rigid PVC Conduit (Bored) 4" Schedule 80 Rigid PVC Conduit (Trenched) Standard Handbox in Earth 20' Lighting Bracket Arm for Traffic Signal Structure 21' Steel Pole and 40' Mast Arm 21' Steel Pole and 50' Mast Arm 12' X 30' Strain Pole (On Existing Base) 3/8" Span Wire Traffic Sign on Span Wire Solar Powered School Beacon Pavement Marking 4" White Painted Markings 4" Yellow Painted Markings 4" White Marking Thermoplastic Tape 4" Yellow Marking Thermoplastic Tape 12" Yellow Marking Thermoplastic Tape 24" Yellow Marking Thermoplastic Tape Street Lights (With Base) 25' Aluminum Pendant Pole With Cobra Head Fixture Washington 14' Flaked Steel Pole With Globe Luminare Decorative Pendant 16' Fiberglass Pole With Fixture 16' Decorative Post 2" PVC Conduit (Bored) Type II Traffic Drums or Barricades Traffic Cones Metal Traffic Signs
Unit
EA EA EA EA EA EA EA EA LF LF LF LF EA EA EA EA EA LF EA EA LF LF LF LF LF LF EA EA EA EA EA LF EA EA EA
Cost
$550.00 $1,100.00 $1,600.00 $10,000.00 $7,500.00 $1,100.00 $1,400.00 $1,600.00 $25.00 $6.00 $30.00 $9.00 $900.00 $1,000.00 $5,000.00 $6,000.00 $3,500.00 $4.00 $400.00 $5,600.00 $0.30 $0.30 $3.50 $3.50 $8.00 $12.00 $2,500.00 $4,500.00 $6,000.00 $1,800.00 $5,000.00 $20.00 $7.00 $3.00 $35.00
[6]
STORM DRAINAGE
[7]
Storm Drainage
ITEM
Flowable Fill for Pipe and Structure Backfill Precast Trench Drain Inlets (Up to 8' Depth) MCDOT A-5 MCDOT A-10 MCDOT A-15 MCDOT A-20 MCDOT B-10 MCDOT B-15 MCDOT B-20 MCDOT D MCDOT E WR Inlet (MD 374.21) Inlets (Greater then 8') per Additional Vertical Foot MSHA J, MCDOT J Remove and Dispose of Existing SD Inlets Manholes MCDOT Manhole A or B (Up to 8' Depth) MCDOT Manhole A or B (Greater then 8') per Additional Vertical Foot Renovate Inlet to M.H. Remove and Dispose of Existing Manholes Field Connection Remove and Dispose of Existing Piping Class I Rip Rap Class I Rip Rap Class II Rip Rap Class II Rip Rap Gabions Gabions RCP Class III, IV, and V Pipe 15" Diameter 18" Diameter 21" Diameter 24" Diameter 27" Diameter 30" Diameter 33" Diameter 36" Diameter 42" Diameter 48" Diameter 54" Diameter 60" Diameter 66" Diameter 72" Diameter
Unit
CY LF EA EA EA EA EA EA EA EA EA EA VF EA EA EA VF EA EA EA LF TON CY TON CY TON CY LF LF LF LF LF LF LF LF LF LF LF LF LF LF
Cost
$110.00 $125.00 $3,100.00 $3,300.00 $3,800.00 $4,500.00 $3,300.00 $4,000.00 $4,500.00 $2,500.00 $2,000.00 $3,700.00 $300.00 $3,000.00 $750.00 $3,150.00 $300.00 $1,250.00 $750.00 $500.00 $12.00 $47.00 $65.00 $57.00 $85.00 $160.00 $200.00 $38.00 $40.00 $45.00 $48.00 $52.00 $55.00 $62.00 $76.00 $105.00 $175.00 $190.00 $210.00 $225.00 $230.00
[8]
Storm Drainage
ITEM
CMP 15" 18" 21" 24" 30" 36" 42" 48" Perforated CMP/PI - Additional Cost per LF CMPA 18"X11" (Equiv. 15") 22"X13" (Equiv. 18") 25"X16" (Equiv. 21") 29"X18" (Equiv. 24") 36"X22" (Equiv. 30") 43"X27" (Equiv. 36") 50"X31" (Equiv. 42") 58"X36" (Equiv. 48") PVC Pipe 4" 6" 8" 10" to 15" 18" to 24" Perforated PVC - Additional Cost per LF MCDOT Cutoff Wall 15" Diameter-27" Diameter 30" Diameter-42" Diameter 48" Diameter and Larger MCDOT End Wall 15" Diameter-27" Diameter 30" Diameter-48" Diameter 54" Daimeter & Larger SHA Type Endwall 15" to 24" Diameter 27" to 42" Diameter 48" and 54" Diameter 60" Diameter 66" Diameter RCP End Section 15" to 24" Diameter 27" to 42" Diameter CMP End Section 15" to 24" Diameter 27" to 42" Diameter CMPA End Section 18" X11" to 29" X 18" (Equiv. 15" to 24" Round) 36" X 22" to 50" X 31" (Equiv. 27" to 42" Round) LF LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA $5.00 $7.00 $10.00 $20.00 $50.00 $3.00 $225.00 $450.00 $850.00 $1,000.00 $2,500.00 $5,000.00 $1,600.00 $3,000.00 $5,000.00 $8,500.00 $11,000.00 $400.00 $650.00 $350.00 $500.00 $450.00 $600.00 LF LF LF LF LF LF LF LF $30.00 $35.00 $45.00 $50.00 $65.00 $90.00 $110.00 $125.00 LF LF LF LF LF LF LF LF LF $25.00 $32.00 $40.00 $45.00 $55.00 $70.00 $85.00 $100.00 $5.00
Unit
Cost
[9]
[10]
Unit
LF LF LF LF LF LF LF EA EA CY EA EA EA EA EA EA EA EA EA EA LF LF LF LF LF EA VF EA
Cost
$35.00 $40.00 $60.00 $70.00 $85.00 $12.00 $16.00 $3,500.00 $1,000.00 $460.00 $500.00 $600.00 $900.00 $1,400.00 $2,000.00 $2,500.00 $4,000.00 $4,000.00 $7,000.00 $10,000.00 $40.00 $55.00 $85.00 $105.00 $30.00 $3,500.00 $200.00 $4,500.00
[11]
SEDIMENT CONTROL
[12]
Sediment Control
ITEM
Excavation (First 2000 CY) Excavation (Over 2000 CY) Excavation Hauled Off-Site Earthen Dike Type A-1, A-2 Type A-3, A-4 Type B-1, B-2 Type B-3 Temporary Swale Type A-1, A-2 Type A-3, A-4 Type B-1, B-2 Type B-3 Inlet Protection Device For 5' Inlet For 10' Inlet For 15' Inlet For 20' Inlet Riser Fabrications/Concentric Anti Vortex Device 18" Diameter/42" Diameter 24" Diameter/48" Diameter 30" Diameter/54" Diameter Each 6" Diameter Over 30" Diameter for Riser Concentric Anti Vortex Device 60" Diameter 66" Diameter 72" Diameter 78" Diameter 84" Diameter 90" Diameter Stabalized Construction Entrance (Community or Subdivision) Stabalized Construction Entrance (One Single Family) Stabalized Construction Entrance With Racks Dewatering Basin Silt Fence Super Silt Fence Tree Protection Fence Safety Fence Root Pruning Sump Pit Filter Cloth MSHA #2 Stone MSHA #2 Stone Temporary Class I Rip Rap for Sediment Control Temporary Class I Rip Rap for Sediment Control Sand Bag/Stone Diversion Stone Check Dam Pipe Slope Drain EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA LF LF LF LF LF EA SY TON CY TON CY LF EA LF $75.00 $150.00 $225.00 $300.00 $450.00 $500.00 $600.00 $35.00 $500.00 $550.00 $625.00 $675.00 $725.00 $825.00 $1,750.00 $800.00 $2,000.00 $2,000.00 $4.00 $8.00 $5.00 $3.00 $8.00 $250.00 $5.00 $22.00 $30.00 $47.00 $65.00 $10.00 $500.00 $22.00 LF LF LF LF $4.00 $9.00 $12.00 $15.00
Unit
CY CY CY LF LF LF LF
Cost
$15.00 $10.00 $15.00 $5.00 $8.00 $10.00 $16.00
[13]
[14]
[15]