fire protection concept

for SRF project

CREATED FOR

ecovalor SRL
Primaverii 57 RO-011973 Bucharest, Romania

CREATED BY

Ingenieurgemeinschaft Innovative Umwelttechnik GmbH


Hamburgersiedlung 1 A-2824 Seebenstein

ecovalor SRL

fire protection concept

This fire protection concept was made on behalf of:

ecovalor SRL
Primaverii 57 RO-011973 Bucharest, Romania

from the company:

Ingenieurgemeinschaft Innovative Umwelttechnik GmbH


Hamburgersiedlung 1 A-2824 Seebenstein

Ingenieurgemeinschaft Innovative Umwelttechnik GmbH

Ing. Alexander Buchner

Seebenstein, 24.January. 2007

created by - IUT

24.January.2007

page 2

ecovalor SRL

fire protection concept

INDEX
1 Basic data................................................................................................... 4
1.1 author of the concept.............................................................................................4 1.2 client....................................................................................................................4 1.3 goal of the concept................................................................................................5

2 General approach......................................................................................... 5
2.1 General Approach .................................................................................................5 2.2 Location of the plant..............................................................................................5 2.3 Input material.......................................................................................................6

3 content ....................................................................................................... 6
3.1 Objects.................................................................................................................6
3.1.1 Area 1 treatment hall......................................................................................6 3.1.2 Area 2 infrastructural rooms............................................................................9

4 conclusion ................................................................................................. 10
4.1 physical fire prevention.........................................................................................10
4.1.1 Area 1 treatment hall....................................................................................10 4.1.2 Area 2 infrastructural rooms..........................................................................10

4.2 plant fire prevention.............................................................................................10


4.2.1 Water supply...................................................................................................10 4.2.2 Extinguishing system........................................................................................11 4.2.3 Detection system.............................................................................................12

4.3 organizational fire prevention................................................................................13

created by - IUT

24.January.2007

page 3

ecovalor SRL

fire protection concept

1 BASIC DATA
Following concept is based on the Austrian guideline TRVB A 107 edition 2004. The structure of the concept is based on the Austrian guideline TRVB A 107 edition 2004 annex C.

1.1

AUTHOR OF THE CONCEPT

The company Ingenieurgemeinschaft Innovative Umwelttechnik GmbH (acronym IUT) was ordered from company ecovalor SRL to create following fire protection concept. Ingenieurgemeinschaft Innovative Umwelttechnik GmbH Hamburgersiedlung 1 A-2824 Seebenstein

1.2
ecovalor SRL Primaverii 57

CLIENT

RO-011973 Bucharest, Romania for the location: SRF project inside the area of Holcim (Romania) SA Ciment Alesd Str.Viitorului 2 RO-417022, Sat Chistag Comuna Astileu

created by - IUT

24.January.2007

page 4

ecovalor SRL

fire protection concept

1.3

GOAL OF THE CONCEPT

The fire protection concept should give an overview about the necessary fire protection measures. The measures have been splited in following points: physical fire prevention plant fire prevention organizational fire prevention

2 GENERAL APPROACH 2.1 G ENERAL A PPROACH


The main purpose of an SRF-treatment plant (SRF = Solid Recovered Fuels) is to prepare the input material for the use in the cement kiln. Several treatment steps (shredding, separation, transporting, etc.) have to be done until this material can be used in the kiln. The treatment consists of following process steps: Input storage Primary shredder Metal separator Foreign part separator with metal detection unit Secondary shredder Conveyors Electrical equipment De-dusting system Storage in a silo

2.2 L OCATION

OF THE PLANT

The SRF-plant will be located in a new hall which will be built inside the area of Holcim (Romania) SA, Ciment Alesd. The location is shown in the fire protection drawing.

created by - IUT

24.January.2007

page 5

ecovalor SRL

fire protection concept

2.3 I NPUT

MATERIAL

The high calorific input materials (mainly plastics, papers, cardboards, etc.) will come partially from local sources. The input for the SRF treatment plant will mainly consist of following compounds: Plastics (2D = foils), unshredded or already pre-shredded Plastics (3D = Hardplastics, PET-bottles, etc.) Paper and cardboards Wood (Palets, etc.) Textiles Other industrial high calorific solid wastes Foreign materials (metals, etc.) and disturbing materials (stones, etc.)

3 CONTENT 3.1 O BJECTS


The project has been separated in following areas: area 1 area 2 treatment hall infrastructural rooms approx. approx. 1.160 m 190 m

3.1.1 Area 1 treatment hall


Following activities will be done in this area: Delivery of material Storage of input material Treatment of delivered materials Dedusting Maintenance and repair works of the machines

created by - IUT

24.January.2007

page 6

ecovalor SRL

fire protection concept

The area for the SRF hall is located in the middle of the Holcim (Romania) plant area. The walls of the treatment hall which are located direct behind the infrastructural building will be built as fire walls. Those fire walls are made complete of steel concrete (from ground level above the roof approx. 12m). The storage silo (in the north side of the area) is made of steel. Structure of the hall: Ferroconcrete construction for the columns and static elements The roof consists of prefabricated concrete parts Concrete floor walls o input and storage hall south and east direction Steel concrete walls (ground level until + 8m) Sheet metal plates (+8m until roof) Windows inside the sheet metal plates o machinery hall north and east direction Steel concrete walls (ground level until + 1m) Sheet metal plates (+1m until roof) Windows inside the sheet metal plates o machinery hall west direction (approx. 7,5m from the south direction to the north direction) Steel concrete walls (ground level until + 1m) Sheet metal plates (+1m until roof) Windows inside the sheet metal plates o o machinery hall west direction (behind the infrastructural building) Steel concrete walls (ground level until + 12m fire wall) input and storage hall west direction Steel concrete walls (ground level until + 6m) Sheet metal plates (+6m until roof) Windows inside the sheet metal plates

One access is located in the north side of the hall and two accesses are located in the south side of the hall. The hall will be equipped with smoke and heat outlets located on the roof.

created by - IUT

24.January.2007

page 7

ecovalor SRL

fire protection concept

(layout)

(View from the west side)

(View from the north side)

created by - IUT

24.January.2007

page 8

ecovalor SRL

fire protection concept

3.1.2 Area 2 infrastructural rooms


Following rooms are included in this area: First floor o o o o o o o o o Office Lavatory and Change room for woman Lavatory and Change room for man Staff room Transformer room Compressor room Room for fire fighting equipment laboratory room for control cabinets

Second floor

The infrastructural rooms are located directly near the treatment hall (near the western side of the building). The wall behind the infrastructural rooms will be built as a fire wall (steel concrete wall from the ground level up to the roof). Structure of the building: Brick wall The roof consists of prefabricated concrete parts Concrete floor with floor covering Windows inside the main building (the first 8m of the eastern wall in south direction - are free of windows to prevent a fire trespass from the input and storage hall)

created by - IUT

24.January.2007

page 9

ecovalor SRL

fire protection concept

(detail of the infrastructural rooms)

4 CONCLUSION 4.1

PHYSICAL FIRE PREVENTION

4.1.1 Area 1 treatment hall


Emergency exit Emergency lights above the emergency exit doors Heat and smoke outlets Fire wall between the hall and the infrastructural rooms

4.1.2 Area 2 infrastructural rooms


Emergency exit Emergency lights above the emergency exit doors Fire wall between the hall and the infrastructural rooms

4.2

PLANT FIRE PREVENTION

4.2.1 Water supply


The water supply for the extinguishing system will be guaranteed by the plant water supply. Data of the water supply: 200 m/h approx. 3.333 l/min 3-4 bar

created by - IUT

24.January.2007

page 10

ecovalor SRL

fire protection concept

4.2.2 Extinguishing system


4.2.2.1 Area 1 treatment hall
The extinguishing will be done by a foam system. The system will be built as a dry non-automatic system (only in case of fire the system will be filled with water manual operated selection of the extinguishing zone in case of fire - by trained staff).The extinguishing zones are shown in the fire protection drawing. The selection of the extinguishing area can be done in the fire protection room (location is shown in the fire protection drawing). The necessary equipment (pumps, control unit etc.) will be also located in the fire protection room. As shown in the fire protection drawing, the extinguishing zones (1-3) will overlap between themselves. This is a preventive measure to protect the adjoining storage areas. Normal water sprinkler heads will be located directly in the chutes of the two shredders. If (in case of fire) one sprinkler-section is initiated it is possible to supply the other sections with an external water supply (tank-truck etc.). Therefore are manual valves foreseen (one for each section) inside the fire protection room. Furthermore there will be also wall-hydrants and mobile fire extinguisher inside the hall. The location of the wall-hydrants and the mobile fire extinguisher is shown in the fire protection drawing. Extinguishing zones: Zone 1 Zone 2 Zone 3 Zone 4 input storage 1 input storage 2 input storage 3 storage silo approx. 200 m approx. 540 m approx. 340 m approx. 250 m

4.2.2.2 Area 2 - infrastructural rooms


Mobile fire extinguisher will be foreseen in the infrastructural rooms. The several locations of the mobile fire extinguishers are shown in the fire protection drawing.

created by - IUT

24.January.2007

page 11

ecovalor SRL

fire protection concept

4.2.3 Detection system


4.2.3.1 Fire alarm center
The fire alarm center will be located in the office room (as shown in the fire protection drawing). All detection units will be connected to this fire alarm center. Each detection unit will be shown (in case of fire) separately on the display of the fire alarm center. The fire alarm center will be connected to the main fire alarm center of the plant. An optical and acoustical signal will be generated in case of fire. The location of the signal units are shown in the fire protection drawing.

4.2.3.2 Manual push buttons


Manual push buttons will be located near/inside the infrastructural rooms and near/inside the hall. The manual push buttons will be also connected to the fire alarm center.

4.2.3.3 Automatic detection system


An automatic detection system will be installed inside the hall and the infrastructural rooms. The system is connected to the fire alarm center. An optical and acoustical signal will be generated in case of fire. The location of the detection units is shown in the fire protection drawing. Separate detection units will be located inside the hoppers of the shredders, inside the conveyor before the storage silo and inside the storage silo.

4.2.3.4 Detection system of the heat and smoke outlets


Each heat and smoke outlet system has his own fire detection system. In case of fire the local fire detection unit will give a signal which opens the heat and smoke outlet system.

created by - IUT

24.January.2007

page 12

ecovalor SRL

fire protection concept

4.2.3.5 Filter shut down


The dedusting system will shut down in case of fire. Otherwise a fire can be transported to the filter system.

4.3

ORGANIZATIONAL FIRE PREVENTION

Also the organizational fire prevention is an important part of the fire protection concept. Enclosed there are the foreseen points of the organizational fire prevention for this project. Creation of fire protection drawings Instruction of the employees Constant check of the equipment Execution of fire protection practices Nomination of an fire prevention officer

/var/www/apps/conversion/tmp/scratch_1/132909809.doc

created by - IUT

24.January.2007

page 13