GROUP A TENDER EVALUATION COMMITTEE

TENDER EVALUATION REPORT

Name of the Building Project Serial Number

: :

SOPPING MALL (DEHIWALA) ABC/SM/2013/12

Construction of Shopping Mall In Dehiwala

Details of Invitation
Tender Invitation Method Invitations Issued to Tender Invitation Date Tender Closing Date Tender Validity Period : : : : : Open Tender Service Providers (Contractors) 19th November 2012 19th February 2013 90 days from 19th January 2012

Tender Received
Number of Tender Received Details of Tender Received No 1 2 3 4 5 6 7 8 9 10 SRMN GROUP I MSD GROUP G Mask Construction AAA TIMB VINCI Phoenix Construction SPAD : : Tender Sum (In Ascending Order) LKR. 27,573,750.00 LKR. 29,277,300.00 LKR. 30,790,550.00 LKR. 35,170,500.00 LKR. 36,189,500.00 LKR. 38,689,650.00 LKR. 40,874,150.00 LKR. 43,013,000.00 LKR. 55,459,000.00 LKR. 77,169,250.00 10 (Ten)

Contractor

Page 1 of 4

GROUP A TENDER EVALUATION COMMITTEE

COMPLIANCE WITH TENDER SPECIFICATIONS


Contractor SRMN GROUP I MSD GROUP G Mask Construction AAA TIMB VINCI Phoenix Construction SPAD Compliance with the Tender Specification
Not Achieved Not Achieved Not Achieved YES YES Not Achieved YES
(VALIDITY PERIOD COULD BE EXTENDED ON REQUEST)

Details of any non-compliance


Bid Bond Value, Bond Validity Period not as required Bid Bond Value, Bond Validity Period not as required Bid Bond Value, Bond Validity Period not as required Bid Bond Value, Bond Validity Period not as required Information and Bond value not compatible with the requirements Information and Bond value not compatible with the requirements

Not Achieved YES Not Achieved

STRENGTH AND WEAKNESSES OF LOWEST THREE TENDERS


NAME OF TENDERERS Group G
Lowest Bid

Mask Construction
2nd Lowest Bid Building and Civil Construction No Sub-Contracting It is recommended to have sub-contractors for execution of specialized work

TIMB
3rd Lowest Bid Building and Civil Construction Suppliers Quotations are High No evidence on Suppliers Quotation whereas included in the BOQ with High Value for Prime Cost

Strengths Weakness

Expert in Building Construction Some Rates are not Realistic Schedule of Rate should be realistic in compliance with the current price

Recommendations of assessment panel

Page 2 of 4

GROUP A TENDER EVALUATION COMMITTEE

TENDER QUALIFICATION OF LOWEST THREE TENDER

NAME OF TENDERERS Group G


Lowest Bid

Mask Construction
2 Lowest Bid
nd

TIMB
3
rd

Lowest Bid

Tender Qualification

C3 Graded

C5 Graded

C2- Graded

Recommendations of assessment panel

Sufficient Experience in Similar Projects

Considerable amount of projects handled are Civil Engineering Related

Experienced in both equally, in Building and Civil Sector

PERFORMANCE RECORD OF LOWEST THREE TENDERERS

NAME OF TENDERERS Group G


Lowest Bid

Mask Construction
2 Lowest Bid
nd

TIMB
3
rd

Lowest Bid

Previous Dealings with the owner corporation Previous Performance Recommendations of assessment panel

NO
Satisfactory with Project Carried out Suitable for Contract Award

NO
Satisfactory with the Civil Engineering Construction Not Suitable for Contract Award

NO
Satisfactory with small housing scheme projects Not Suitable for Contract Award

As per the above evaluation carried out for the bids submitted successfully by the ten different contractors, the Group - G Construction Pvt. Ltd. has been recommended to execute the construction work for the particular proposed building project as the contractor has previous working experience similar projects in compliance with the requirements of the project tendered. Furthermore, the contractor has also achieved the main requirement of bid bond validity period. It is suggested that the contractor to provide latest price which could be realistic further along which shall be compatible with the current Building Schedules of Rate and the request can be made by the tender evaluation panel after the evaluation is carried out. Once the suitable contractor agrees up on the request made by the tender evaluation committee, the contractor will then be selected as the best contractor as the Group - G Contraction has a reasonable amount quoted for this particular project achieving many of the tender requirements. Moreover, the above data show that the Group G Contraction has become the first lowest in many evaluating criteria and has achieved whereas some of the rates in BOQ are non-compliance. The contractor can still be recommended to be selected under the special request made for the extension of bid bond validity period to be awarded with the particular project.

Page 3 of 4

GROUP A TENDER EVALUATION COMMITTEE

RECOMMENDATION
The Best Contractor quoting the lowest Tenderer submitted by Group G Construction has been

recommended for contract award. The contractor has been selected as the best contractor to execution of construction work of Shopping Mall in Dehiwala. Due to the fact that the contractor has been eligible to be the first lowest and has previous dealings with similar types of building projects are satisfactory performance showed during the previous projects. To negotiate with the tender submitting the lowest and the best confirming tender for a better price with a view for tender award. Contractor is also mandatory to include updated unit rates for a few amount of work in the Bill of Quantities which might be comparatively law or similar to the Engineers estimation for each section of the bill . Therefore, Group G Construction has hereby been eligible to be awarded with the project for the value agreed and quoted by the contractor

AVOIDING CONFLICT OF INTEREST


This is to confirm that persons involved in preparing the tender documents and assessing Tenders have declared conflict of interest. The persons involved will be required to declare any conflict of interest before contract award. The tender specifications and assessment results will be reviewed by the management committee to detect any favouritism to particular tenderers if any conflicts are declared

Signature

Name and Post of Assessment Panel:

Page 4 of 4