You are on page 1of 14

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS

General: These Preliminaries are applicable to the whole of the works. If the Tenderer wishes to price any of the items contained herein, then each such item, clause, or subclause must be individually priced. Lump sums covering more than one item shall not be inserted. Preliminary prices shall not be adjusted in the event of any changes to the Contract Price due to variations Where any item, clause or sub-clauses has not been priced, the value of such shall be deemed to be included in the rates for measured items elsewhere in the Bills of Quantities. It is a condition that the selected Contractor will be required to provide the Engineer with a full and detailed Tender breakdown upon being awarded the Contract. This Tender breakdown is to show the actual calculations of the Preliminaries, the labour, plant and material costs of the Works, the build-up of measured rates with oncosts and overheads and any other allowances used to arrive at the Tender Sum. Such breakdown shall be submitted with in 15 days from the date of signing of the contract. The interim payment application shall be issued only upon receipt of such breakdown.

Locations of Site: The site of the works is shown on the Site Plan.

Brief Description of the Works: The Works comprises the Construction, Completion, Maintenance and Delivering up of -1- Residential Main Villa Block (A), Majliss Block (B) & Services Block (C) precast boundary walls around the plot limits, All infrastructure works, paving, roads, car parking and landscaped areas within the plot limits, All other connected electro-mechanical, A/C works all completed as specified and detailed on drawings with Time of Completion 18 (eighteen) Calendar Months including mobilization, permanent services connections and completion Certificate including all related works complete as specified detailed on Drawings and to the approval of the Engineer and Authorities

World Planners Consultant Engineers (WP) llc 1/1

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Conditions of Contract: The Contractor shall describe and list below and price herein any obligations contained in Conditions of Contract or which he has not allowed elsewhere and wishes to price separately

Qty.

Unit Rate Dh.

Amount Dh.

Provision of insurance for the Works and all risk Insurance Plant and equipment insurance Provision of Third Party Liability Insurance Provision of Performance Bond Provision of advance payment bond and bank guarantee. Provision of Workmen compensation policy Provision of all guarantees and warranties for all materials, components, equipment as required under preliminaries, all guarantees and warranties shall commence from the actual date of completion stated in the taking over certificate issued under this main works contract and be valid for minimum of 1year unless otherwise stated. Health, Safety & Environment :

Item

B C D E F G

Item Item

Item

Item

Provision to prepare and submit health, safety & Environment (HSE) plans of the project as required by Municipality of Abu Dhabi and to the Engineer approval Item Site Sign Boards;

Provision to provide and installation of 2.Nos of site notice boards size 8000 x 4000 mm as specified and to the approval of the Engineer.

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/2

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Temporary Hoardings and advertising rights

Qty.

Unit Rate Dh.

Amount Dh.

The Contractor shall allow for providing 8 mm thick plywood or steel site hoarding, painted plain color. Markings shall be made as directed by the Engineer , gates, entrances, etc. for the protection of the site and removing on completion. Hoarding shall be maintained by repainting at regular intervals and replacement as required to replace damaged/deteriorated materials. All such protective measures shall be to the approval of the Engineer. The Contractor shall be responsible for obtaining the Site Boundary Demarcation Certificate from the Client or their Sub-Consultant and to agree the location of the Site Boundary markers. The Contractor shall provide the Engineer with a copy of the Demarcation Certificate The sole right is to the Employer for attach advertisements to any temporary fencing, boarding, screens or the like to erect separate advertising hoardings if so required Site Survey and Setting Out

Item

As soon as the Contract has been signed, the Contractor shall make an accurate survey of the Site showing the existing ground levels and shall furnish the Engineer with two copies of the survey drawings A permanent datum point must be established during this operation to the approval of the Engineer The Contractor shall be held responsible for the correctness of the Site Survey and establishment of a permanent datum point

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/3

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Contractor's Site offices & Facilities

Qty.

Unit Rate Dh.

Amount Dh.

Provision to provide Contractor's site Offices and facilities including Water, Electricity ...etc with all services fixtures and equipment and the like for his own workforce and those of the sub-contractors with all services fixtures and equipment, and eventually remove site offices Item Consultant Site Offices & Facilities

Provision to provide Consultant Site Offices and facilities including Water, Electricity ...etc with all services fixtures and equipment and the like for his own workforce with all services fixtures and equipment, and eventually remove site offices Temporary Roads

Item

Provision to prepare temporary roads and warning signs as may be necessary within the Site. The roads shall be positioned in accordance with the Engineer's instructions and shall be kept free for access at all times Item Permits, Etc:

Provision to obtain all permits necessary for carrying out the works. Provision to obtain all documentation necessary for the timely provision of labor, plant and materials used for the works Constructional Plant and Equipment:

Item

Item

Provision to provide all mechanical and non-mechanical plant and tools required for expeditious carrying out of the works in accordance with the contract documents including mobilization, testing and demobilization on completion and make good disturbed areas to the Engineers satisfaction.

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/4

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Engineers Cameras: Provision to provide Cameras by the contractor for the Engineer use including maintaining up to the handing over date in accordance with the following:

Qty.

Unit Rate Dh.

Amount Dh.

Canon Digital Camera Engineers Computers and Printers: Provision to provide Computers and Printers for the Engineers' site offices including maintains up to the handing over date in accordance with the General specifications:

No

desktop Computers for the Consultant Engineer's use in accordance with the General specifications Multifunction high quality, hard-working large format plotter, copier and scanner machine for CAD users (Size A0) Multifunction Color Copier and Scanner (Toshiba estudio 4520C Series XPS) Workshop Drawings:

item

No

No

Provision to provide workshop drawings as specified for the disciplines under the relevant Sections. Photographs:

Item

Provision to provide compact digital Cameras and monthly progress photographs shall be provided in accordance with the requirements of the General Specifications.

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/5

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Water for the Work: The Contractor shall arrange for an adequate temporary supply of water for the Works, suitable for all purposes, until handing over and shall pay all charges for the consumption of water used. This shall include for water used by all sub- contractors for testing / commissioning / water leakage test, etc. The Contractor will be responsible for supplying and maintaining equipment including any necessary pumps, storage tanks, distribution pipework, etc., required for the execution of the Works. The Contractor will be responsible to clear away this temporary work on completion The Contractor will be responsible for give all requisite notices and arrange for the necessary connections. Any interruption of the water supply is at the Contractor's risk and it is his responsibility to effect all temporary supplies necessary Electricity for the Work:

Qty.

Unit Rate Dh.

Amount Dh.

Item

The Contractor shall arrange and provide for an adequate temporary supply of all necessary electrical power and lighting of the Works, generators...etc including paying all charges for the maintaining Sound attenuated generators at his own expense until handing over the works. This shall include all electrical power / lighting required by all sub-contractors for testing / commissioning Item Any additional lighting for the inspection of the works shall be provided as instructed by the Engineer. The Contractor shall pay all fees and charges in connection therewith. The Contractor will be responsible to give all requisite notices, arrange for the necessary connections and installation of meters, pay all fees and charges in connection therewith and all charges for current used. The method of distribution of electric supplies around the Site, the type of equipment used, safety measures, reduced voltage requirements, planning and programming shall confirm with the requirements of the local authority.

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/6

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Protection of Existing Adjoining Structures:

Qty.

Unit Rate Dh.

Amount Dh.

Provision to take all necessary measures to protect existing adjoining structures from any damage resulting from the execution of the works. Protection of Services and Cables:

Item

The Contractor shall ascertain the position, and protect or divert as necessary all service lines and cables on or adjacent to the site as required and approved by the Engineer. Allow for carefully re-routing to the existing underground pipe lines in working areas including hand excavating trial holes as necessary, include all necessary earthwork supports as required by ADDC and approved by the Engineer. The Contractor shall be responsible for the protection of all existing services within the Site and shall make good any damage to existing services resulting form his carrying out of the Works to the satisfaction of the Engineer and relevant authority .The Contractor shall be responsible for giving notice to the relevant authority where temporary or permanent re- routing of existing services is found to be necessary and shall provide attendance upon any Contractor employed to carry out such re-routing. Where utilities are to remain in place provide adequate means of support and protection during excavation and shoring operations Other Contractors:

Item

Item

Item

Item

Provision to liaise, cooperate and coordinate with other Contractors and afford them all reasonable opportunity for carrying out their works.

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/7

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Recurring Preliminary Costs incurred during the execution of the Works Maintenance of Constructional Plant and Equipment:

Qty.

Unit Rate Dh.

Amount Dh.

Provision to maintain all mechanical and non-mechanical plant, tools required for expeditious carrying out of the Works in accordance with the contract documents Item Maintenance of Contractor's Site offices and facilities

Provision to Maintenance of Contractor's site staff office, stores, Water, Electricity and facilities Water for the Work:

Item

Provision to Maintain all equipment, necessary pumps, storage tanks, distribution pipe work..etc required to provide water for the works and transporting water to the site for the execution of the works Item Electricity for the Work:

Provision to Maintain all necessary equipment and site facilities to provide power, lighting and generators, fuel..etc for the works and all other necessary maintenance charges shall be pay by the Contractor. Item Safety and Security:

Provision to provide all safety regulations in force and ensure that his work-force, those of the sub-contractors and any other persons engaged on the Works also comply with their requirements. Provision to provide all necessary watching for the security of the Works and the protection of the public. The Contractor shall provide all warning signs, fire fighting, barricades/handrails, first aid tools, safety shoes, protection helmets, safety belts and protection screens, lamps, etc. as necessary.

Item

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/8

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Recurring Preliminary Costs incurred during the execution of the Works (Cont'd): Care of the Site:

Qty.

Unit Rate Dh.

Amount Dh.

Provision to keep the Site in a clean and safe condition including the orderly and tidy storage of materials, regular and prompt removal of rubbish and debris during the progress of the Works as it appears and the immediate removal from the construction area and tidy stacking of scaffolding and shuttering after use. Item

Provision to Protect all works from the effects of the weather and subsequent operations by the provision of dust sheets ,barriers... etc to the satisfaction of the Engineer. Provision to Maintaining temporary roads, site hoarding and sign boards. Contractors Construction and Progress Reporting procedure:

Item

Item

Provision to provide and maintaining an effective construction progress reporting and coordination procedure in accordance with the General specifications Item Insurance:

Provision to provide the insurance cover described elsewhere in the Contract documents and shall submit to the Engineer, certificates and receipts for premiums as required as proof of this cover.

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/9

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Recurring Preliminary Costs incurred during the execution of the Works (Cont'd): Running & Maintain Consultant & Client Site Offices

Qty.

Unit Rate Dh.

Amount Dh.

Provision to Run, Clearing and Maintain Consultant and Client site offices, toilets, storage, Water, Electricity, facilities and the like; for more details about the site offices, Refer the General specifications and appendix (A) Item Telephone

The Contractor shall provide a telephone in the Engineer's office and shall pay all charges in connection including the cost of calls (local calls only) by his staff and the Engineer's staff. Samples and Testing:

Item

Provision to provide all samples of materials and workmanship required by the Engineer. Provision to test all materials as required by the specifications or directed by the Engineer. The Contractor shall supply all test certificates and other documentation necessary to prove the suitability of materials for incorporation in the Works. As-Built Drawings and O& M Manual:

Item

Item

Provision to provide As-Built drawings and Operation & Maintenance Manual in accordance with the General Specifications. Mock-up:

Item

Provision to provide mock-ups as specified and selected by the Engineer, in advance when ordered to do so by the Engineer, complete including all metalwork, carpentry and joinery finishes, paint, MEP works all complete as specified

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/10

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- Recurring Preliminary Costs incurred at the Commencement of the Works Clearing up and Demobilization

Qty.

Unit Rate Dh.

Amount Dh.

Provision of Demobilization and removal of the site offices, stores, equipment, plant, tools and facilities Provision of Clearing up and making good site establishment after completion of the Works and demobilization. This includes re-instating surrounding areas affected by the construction works and make good all works disturbed, to the satisfaction of the Engineer

Item

Item

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/11

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): Non- BOQ item Percentages for Overheads and Profit to any additional items The Contractor is to show below the percentages for overheads and profit which shall be included in the rates against any additional items if any (Non- BOQ), These percentages will be employed in the calculation of the rate of new items

Qty.

Unit Rate Dh.

Amount Dh.

A B C

Overheads Profit Attendance

% % %

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/12

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): ADDITIONAL ITEMS:

Qty.

Unit Rate Dh.

Amount Dh.

The tenderer is to detail below any additional items with quantities and rates not previously included to complete the build up of the lump sum tender price for this section of the works. Should the tenderer fail to insert any items here, it will be deemed that his lump sum price for the tender includes all items and no subsequent claim for any additional item will be entertained.

To Collection

Dh.

World Planners Consultant Engineers (WP) llc 1/13

Preliminaries General Conditions

November 2012 Rev (0)

Project No: WPC149 Residential Private Villa Khalifa -A- City, Sector: SE-42, Plot No: 49
BILL NO. 01 PRELIMINARIES & GENERAL CONDITIONS

Item

Description PRELIMINARIES & GENERAL CONDITIONS (Cont'd): COLLECTION: FromPage1/1R0 FromPage1/2R0 FromPage1/3R0 FromPage1/4R0 FromPage1/5R0 FromPage1/6R0 FromPage1/7R0 FromPage1/8R0 FromPage1/9R0 FromPage1/10R0 FromPage1/11R0 FromPage1/12R0 FromPage1/13R0

Amount Dh.

Dh. TOTALPRELIMINARIES&GENERALCONDITIONS CARRIEDTOGRANDSUMMARY

World Planners Consultant Engineers (WP) llc 1/14

Preliminaries General Conditions