You are on page 1of 4

CURRICULUM VITAE

PERSONAL DETAILS NAME DATE & PLACE OF BIRTH NATIONALITY RELIGION MARITAL STATUS ADDRESS : : : : : : Syahril Putra Augustus 12 1984, Bireuen - Indonesia Indonesian Islam Merieed Jl. Rajawali,No.78. BTN Panggoi lama , Lhokseumawe Phone :+62852 60605 284

E-mail : syahril.putra84@yahoo.com

Experience

: 5 Years in Senior Mechanical Technician Rotating Equipment

Formal Education Diploma Mechanical Engineering (D3) Qualification : Overhaul: Gas Turbine, Compressor, Pumps, Gear Box MOV, Fin-Fan, Mechanical Seal.

Skills:
Select and aplicate both general and special mechanical tools. Familiar with Plant Maintenance procedure and safety regulation. Assembly and disassembly the Rotating Equipment procedure such Pump, Mechanical Seal, Compressor, Gas Turbine, Gear Box etc. Application computer microsoft window, exel, email. Familiar with Alignment reverse and Face & Rim methods in assembly of Rotating Equipment. Familiar on Rotating Equipment Trouble shooting. Familiar Mechanical Seal and Bearing.

CV Gunawan Page 1 of 4

Specialist Course:

FIRE TRAINING & EMERGENCY RESPONSE TEAM, On-site PT.Arun.NGL Lhokseumawe.

MECHANICAL ENGINEERING DIPLOMA ( D3 ) H2S AWARENES by PTA / MOI on-site PT.Arun NGL.Co. Lhokseumawe. INJECTION PUMP by COMPANY on-site PT.Arun NGL.Co. Lhokseumawe. GAS TURBINE MAINTENANCE CONDUCTED by COMPANY on-site PT.Arun NGL.Co. Lhokseumawe. FIRST AID CONDUCTED by COMPANY on-site PT.Arun.NGL Lhokseumawe. Working at High by COMPANY on-site PT.Arun.NGl Healt Safety Enviroment Induction by COMPANY on-site PT.Arun.NGL Lhokseumawe. Sea Survival & Dicipline on site Rancung Marine Kamp.

Present Company Employment date


: PT.Arun.NGL Lhokseumawe.Indonesia. ; 18-September 2006- Present.

Turbo Machinery Mechanic and Spesialis Rotating Equipment Maintenance HGPI Gas Turbine Power Genetation PG 9001G Shutdown Compressor Butane K-5501 Assembly Mechanical Seal Compressor & Pump 1. May. 31, 2010 May.31. 2012 Had worked at KPN. Bina Berata Maintenance at PT. Arun NGL Co. Lhokseumawe. Position Senior Mechanical Technician Maintenance. Had worked at KPN. Bina Berata Maintenance at PT. Arun NGL Co. Lhokseumawe. Position Senior Mechanical Technician Maintenance. Had worked at KPN. Bina Berata Maintenance at PT. Arun NGL Co. Lhokseumawe. Position Mechanical Technician Maintenance. Had worked at KPN. Bina berata Maintenance at PT. Arun NGL Co. Lhokseumawe. Position Mechanical Technician Maintenance. Had worked at KPN. Bina Berata Maintenance at PT. Arun NGL Co. Lhokseumawe. Position Mechanical Technician Maintenance. Had worked at KPN. Bina Berata Had Training at PT. Arun NGL Co. Lhokseumawe. position Mechanical Technician Maintenance.

2. Marc. 02, 2009 May.31. 2010

3. Marc. 15, 2008 - Feb. 28, 2009

4. Dec. 01, 2007 - Feb. 29, 2008

5. Jun. 01, 2007 - Nov. 30, 2007

6. Sep. 18, 2006 - Apr. 17, 2007

CV Gunawan Page 2 of 4

WORK EXPERIENCES : Mechanical Technician , Millwright: Carry out daily routine preventive maintenance program to keep all equipment in good condition by relubrication and readjustment or mayor/minor repair if required. This included centrifugal and positive displacement pumps, fin-fan coolers and motor operated valve ( MOV ), Nitrogen plant, Gas Turbine, Compressors and Power Generator Gas Turbines. Conduct detection oriented program on all mechanical equipment by visual inspection to identify potential failure of the equipment. This included; oil leak, heat, dirtiness, vibration, noisy, corroded part and also the related safety aspects and house keeping. Prepare proposal to superior to Review and readjust: interval preventive maintenance,tasks list and manhour required and modification required. Prepare the check list of inspection findings and create work order for execution by maintenance field crew. Carry out shut down train jobs, power generator job of MI / HGPI gas turbine, compressor and shop repair as required by supervisor.

Primary Equipment :
3x LNG Trains consisting of 18 GE MS-5002 Gas Turbines driving Elliot Compressors 3x LPG Trains consisting of 3 GE MS-5002 Gas Turbines driving GE 2BCL-606 Compressors. A 200 MW Power Generation Plant consisting of 8 Hitachi MS-5001N Gas Turbinedriving Brush Generators. A 75 MW Power Generation Plant consisting of 3 GE MS-5001P Gas Turbine drivingBrush Generators. 2x Feed Gas Booster Compressors consist of Mitsubishi FKBW Electric Motors driving KAWASAKI RB4BCompressors. 3x Fuel Gas Compressors consisting of Mitsubishi FKBW 800LL Electric Motors driving Mitsui V5008 Compressors. 3x Low Press Fuel Gas Compressors consisting of Mitsubishi FKBW Electric Motors driving Mitsui Compressors. 2x Refrigerant preparation Compressors consisting of Mitsubishi FKBW Electric Motors driving KAWASAKI RC6B Compressors. 3x Instrument Air System consisting of Westinghouse Electric Motors driving JoyCompressors. 2x LPG Refrigerant Compressors consisting of Mitsubishi 710L Electric Motors driving Hitachi 3MCL 456 Compressors. 2x LPG Boil Off Compressors consisting of Mitsubishi 710L Electric Motors driving Hitachi 3MCL 456 Compressors. 2x Nitrogen System consisting of HSW2 Electric motors driving Joy Compressors. 4x LNG Boil Off Compressors consisting of Siemens ITF42275FE627 Electric motors driving Demag 10 MH 94 Compressors. 1x LPG Expander Compressors consisting of Rotoflow Compressors. 3x Sea Water Pumps consisting of Toshiba TIKE Electric motors drivingEbara pumps. 18x Carbonate High Press Pumps consisting of Mitsubishi FKBW Electric motors driving United Centrifugal Pumps. 18x Carbonate Booster Pumps consisting of Mitsubishi FKBW Electric motors driving United Centrifugal Pumps.

CV Gunawan Page 3 of 4

Responsibilities :
To carry out routine & break down Maintenance on all of above equipment and its accessories system. To conduct regular Plant inspection and Internal safety audit to uncover abnormal equipment condition. To prepare weekly report about equipment condition status to Superior. To conduct detection oriented program on all mechanical equipment by visual inspection to identify potential failure of the equipment. This included: oil leak, heat, dirtiness, vibration, noisy, corroded part and also the related safety aspects and house keeping. To be available for both shift work schedule and available for 24 hours on call duties. To prepared proposal to Superior to review and readjust : interval Preventive Maintenance task list and man-hour required and modification require.

PERSONAL REFERENCE Ir. Mahyuddin Hasan (Hand Phone : 081361601945) Pos / PAM Div II Superintendent PT.Arun NGL Co. North- Aceh Lhokseumawe. Indonesia. M.Rafi Ali Pos / Pam Div II Supervisor PT.Arun NGL.Co. North- Aceh Lhokseumawe Indonesia. Suprianto.M (0811671692) Pos / Pam Div II Planner Process PT.Arun NGL.Co. North- Aceh Lhokseumawe Indonesia.

CV Gunawan Page 4 of 4

You might also like