You are on page 1of 6

CIVIL ENGINEER With TRANSFERABLE AQAMA Driving License

AURANGZEB SIDDIQUI
Objective To work with a progressive organization, to use my everlasting capabilities as well as offer me a challenging environment to work with.

Father Name

Shoukat Iqbal Siddiqui

Date of birth

05th October 1976

Domicile

(Pakistn)

Marital Status

Married (2 Children)

Academic Qualification

(B.E) Bachelor of Engineering (Civil) (1997-2001) N.E.D. University of Engineering and Technology-Karachi. (H.S.C) Higher Secondary Certificate. ( Pre- Engineering) Pakistan (S.S.C)Secondary School Certificate (Science) Pakistan

Computer Skills

MS-Office (Word, Excel, PowerPoint) Fluent in using of internet Data recovery programs Installation of software and windows

MEMBERSHIP

American Society For Quality

TRAININGS

Health & Safety Orientation Training Module (HS07007).

Behavior Based Safety 2009 Training Module (HS09001) Office Ergonomics Training Module (HS09018) Vehicle Safety Training Module (HS07006) Heat Stress Management Safety Training (By SNC-Lavalin HSE) Theory Fire Training (By SNC Lavalin HSE) Vision Forward Training (By SNC-Lavalin HSE)

Summary of Experience
Eleven Years & Four months.

Construction of heavy structures like Multi storey Buildings and Quality Control Preparation of Planning Commission (PC-1) and contract agreement

Basis on FIDICS.
Construction of Water treatment plant and water transmission line. Project and Construction Management Project Co-ordination between Client, Consultant and Contractor. Construction of Highways and Infra structure.

EXPERIENCE (11 years and 4 months)


One year and Two Month

Ali Shar Corp. (K.S.A) Project Name


WATER TRANSMISSION LIE FROM DAM OF HALI YUBAH AND AL-LITH TO SHUAIBAH PLANT COMPLETION OF PHASE-1. Worked as Senior Engineer+ QC RESPONSIBILITIES:-

June 2011 to till date

- Construction of the multi storey Buildings.


Construction Water Treatment Plant Project (Saudi Arabia)

PROJECT COST (278.00 Million Saudi Riyal)


1. WATER TREATMENT PLANT

Main Component are Treated water Tank, Plant Room Building, Administration Building, Power House Building, Workshop Building, Dirty / Back Wash Tank, Motor Room, Gravity Filter Building, Clarifier Tanks, Flow meter chamber Distribution Chamber, Guard Room Building, SCECO Building And Surrounding Fences Etc.
2. WATER TRANSMISSION LINE

Excavation, Gravel bedding laying, D.I. Pipe Laying (600mm, 1500mm and 1400mm) laying, Construction of water control chambers, warning tape laying, compacted backfill.
RESPONSIBILITIES:-

- Complete Site Supervision and Quality Control. - Working as a site engineer on the project of water

transmission pipe line and treated water tank. -To supervise all the construction works i.e. Survey layout, concreting of water Tank base slabs and roof slabs, columns, walls etc. -To supervise all works regarding chambers of pipe line. -Installation of Ductile Iron pipes with gaskets. -Supervision of Pipe Laying, fittings installation etc. -Visit with Consultant for different Inspections. -Reinforcement fabrication at site. -Formworks checking. -Work Inspection upon Requests (R.F.I)

PEAK CONSTRUCTION & MAINT. COMPANY LTD. MEDINAH, K.S.A.


One year and one Month CONSTRUCTION OF ROADS INFRASTRUCTURE AND PERMENENT VILLAGE FOR BARRIK GOLD AND COPPER MINING LTD. AT SAYID PROJECT, MADINAH, K.S.A.
PROJECT CLIENT : BARIQ MINNIG K.S.A PROJECT CONSULTAN : SNC LAVALIN AUSTRALIA

April. 2010 to May 2011

WORKING AS SITE ENGINEER+ QC


RESPONSIBILITIES:-

-Construction of Infra structure work (Approaching Roads and storm Water navigation etc.) -Managing the project to finish as per schedule date. -Dealing with consultant in order to solve the issue regarding the site. -Attending the coordination meeting with client, consultant and other contractors. -To co-ordinate with the Client in order to resolve Quality Control related problems on Site. -Inspect the above mentioned works done by contractor to ascertain that the work is proceeding in accordance with contract documents, approved drawings and accepted practice. -Site Supervision / Management of the Construction of Buildings. -Inspection of Construction like Foundation, Beams, Columns, Slabs, Plaster. Paint work, etc -Work on the specification and submission of shop drawings when needed.


Two year and Three Month

URS NOKIA SIEMENS NETWORKS, KSA DEC 2008To Feb2010


Civil Engineer ZAIN Projects HAJJ 1429h & Phase A/B The responsibilities are including to: - Producing the supporting documents for Build Permit - Furnish the full civil reports for all Customers, including Tracking Sheets, Work Schedules, PAT Documents, Site Folders, attending meetings with customers weekly and meeting in GSM control office Riyadh. Managing manpower resources finance coordination, equipment & Tools and all logistic and other related tasks to complete the Project as per the satisfaction of our customers. - Checking of installation of Generator, fuel tank, ACDB, ATS Panel & all the electric work. - To supervise all types of civil works including SAR, TSSR, civil construction grounding system, and antenna mount fixing. - To check site as per drawings. - Perform PAT and FAT. - Liaison with sub contractor and client. - Coordinating with Structural Design with Consultants to get detail design for Roof Top and Green field sites. - Prepare daily activities report on site from start to end of site and make things possible to complete on time. - Updating NOLS. (Nokia Online Services) - Completion of NSN quality check list. - Lead the group of engineer.

Three years
Sep2005 to Sep2008

AL-MEHRAN BUILDERS (Buildings)


Working as Engineer/ QC
CONSTRUCTION OF WATER PUMPING STATION BUILDING AT KORANGI CANTONMENT AREA.

PROJECT COST (300.00 Million)


RESPONSIBILITIES:-

- Site Supervision / Management of the Construction of the multi storey Building. -Inspection of Construction like Foundation, Beams, Columns, Slabs, Plaster. Paint work, etc -Inspection of all Rooms of the building and put deep concentration on the interior construction e.g Gypsum board wall, false ceiling, fixing of structure, Carpentry works, bath room fixing and sanitation, cable laying from transformer to sub main

D.B. of house, Interior wiring, Tile fixing, water proofing on false ceiling, wooden work for doors and interior cup boards, aluminum windows and related all jobs.
Two years and Six month 2003Feb to Aug 2005

MALIK-E-YUMID DEEN CONSTRUCTIONS(PAKISTAN)


GAK-KHAR PHATAK TO PORT QASIM PERIFREE ROAD PROJECT 12 KM, 4 LANE HIGHWAY PROJECT, KARACHI (PAKISTAN)
PROJECT CLIENT MAIN CONTRACTOR. CONSULTANT TOTAL PROJ. COST : N.H.A (NATIONAL HIGHWAY AUTHORITY), PAKISTAN.

: N.L.C PAKISTAN
: OSMANI AND COMPANY.

: 3.00 BILLION PKR

WORKED AS HIGHWAY ENGINEER


RESPONSIBILITIES:-

-Construction Supervision / Management of the Construction of Highway. -Main component are Pavements, Culverts (of More than one cell), Cause ways, Side barriers, Sub Grade, Sub Base, Asphaltic work, Storm Water Drain (Pipe/Structured), Kerb Blocks, Pavers, Man holes works, Lighting Pole Fixings and Road related all objects, specially road safety material and its provision to the staff. -Execution of structure work on approved concrete mix design like (culverts, cause ways etc). -Steel fabrication as per given steel design. -Making Daily, weekly and monthly progress report for the submission of main contractors, consultants and for the clients. -Dealing with consultant in order to solve the issue regarding the site. -Attending the coordination meeting with client, consultant and other contractors. -Managing the project to finish as per schedule date.

LYARI EXPREES WAY PROJECT ( 16.5KM, 8 Lane Express way) KARACHI (PAKISTAN). (Two year and Five Month)

Feb. 2001 to Nov. 2003

CLIENT MAIN CONTRACTOR. CONSULTANT TOTAL PROJ. COST

: N.H.A (NATIONAL HIGHWAY AUTHORITY), PAKISTAN

: F.W.O (FRONTIER WORKS ORGANIZATION) PAKISTAN


: A.A.A CONSULTANTS.

: 8.00 BILLION PKR.

WORKED AS HIGHWAY ENGINEER


RESPONSIBILITIES:-

- Site Supervision / Management of the Construction of the Highway. -Main component are Sub Grade, Sub Base and their Compaction test (F.D.T), Asphaltic work with its Core cutter test, storm Water Drain (Pipe/Culvert),Inlet and outlet chambers, Kerb Blocks, Pavers, Man holes WORKs, Lighting Pole Fixings, Road painting, , etc, Level checking and Road related all objects. -Management of staff and to control the miss use of companys machinery like grader, compactor, roller, and excavator etc and reduces the expenses as well as increase the progress of the project. -Dealing with consultant in order to solve the issue regarding the site. -Attending the coordination meeting with client, consultant and main contractors. -Managing the project to finish as per schedule date.

Language

Language URDU ENGLISH : :

Read Excellent Excellent

Write Excellent Excellent

Speak Excellent Excellent

References

TARIQ AHMED KHAN Refinery Supervisor AFIA International.(JEDDAH) K.S.A. MUHAMMAD FARAZ RAJA Civil Engineer Aithah-NESPAK, (JEDDAH) K.S.A

You might also like