Section 101 Cont Added acronyms for CPM, DBE, IRI, LTRC, PCCP Revised/Added definitions for:
Acts of God Approved Producer/Supplier Disqualification Falcon Fresh Concrete Notice of Contract Execution Project Limits Qualified Brand Name Railway/Railroad Specifications Work Order
Section 101 (Cont) Added the following to 101.o4 Understood Works or Expressions
Where the party responsible for the work, testing, or sampling described is not specifically identified, the work is to be performed by the contractor
The contractor will be required to ensure all work performed conforms to Louisiana licensing laws and permit requirements Added that contact be through Falcon. Specifically added Paper Bids
The low bidder is prohibited from bidding or working on any federally funded project by FHWA. This reason applies for state or federally funded projects An enforceable contract is not created until it is fully executed by all parties
Verbal approval of a change order at the proper level for Category 1, 2, or 3 Change Order will be allowed to begin critical activities. Force Account type records shall be maintained until a full executed Change Order is approved The contractor shall provide for and maintain through and local traffic at all times and shall conduct his operations in such manner as to cause the least possible interference with traffic at junctions with roads, streets and driveways in accordance with Section 402, unless otherwise noted in plans or special provisions
Except as noted elsewhere, the contractor guarantees, by signing the contract, the quality of materials and workmanship, including that of payments and structures, provided under the contract for a period of 3 years after final acceptance. For National Highway System (NHS) projects, the period shall be 1 year
Other corrective actions submitted by the contractor will be considered by the engineer and if accepted, will be performed by the contractor at no direct pay The amount of such design cost will be the salary cost of design personnel plus 110 percent
When a contract is let within, adjoining, or adjacent to the limits of existing project(s), the existing project(s) schedule of work takes precedence over the subsequent project States the Contractor shall set, not the Engineer
Section 105 Cont Revised first paragraph of 105.12.1 Approval for Shipment
Concrete girders, piles and major structural members are stamped. For other minor members or items, the shipping list or manifest will be stamped Application of the inspectors stamp does not transfer risk of loss of the fabricated material to the Department . periodic mowing (not to exceed 4 times per calendar year)
Added to 105.12.1
If contract time is stopped by the engineer, all corrections shall be completed within 30 calendar days or the contract time will resume along with any additional stipulated damages
Section 106 Revised wording of 106.01 Source of Supply and Quality Requirements
If it is found after installation that sources of supply for previously approved materials do not produce specified products or results, the contractor shall furnish materials from other sources or make necessary changes to provide acceptable materials If the contract has a Buy America provision, the certificates must indicate compliance with the provision
Contractor personnel shall have appropriate training and experience in testing procedures and methods of construction for the work they are overseeing
Concerning federal aid form PR-47 The contractor shall comply with all Occupational Safety and Health Administration (OSHA) regulations
Safety
When the highway under construction is to be kept open for traffic, the subgrade and surfacing shall be kept in such condition that the public can travel in safety
It is the Contractor s responsibility to contact the railroad to determine the railroads requirements for work within the railroad right of way and to comply with the requirements. The Contractor shall attend any safety orientation/training required by the Railroad Specifically state proof of Railroad Insurance is required at the Project Site State the Certificate of Release and Contractors Affidavit can be found on DOTD website
For construction operations in waters of the US, It is the responsibility of the contractor to ensure all appropriate permits are obtained prior to commencement of operations Attention is further directed to the federal , state and local air pollution control programs and their rules and regulations regarding air pollution, especially open burning, fugitive dust and asphalt concrete plant restrictions
Department will reimburse, When responsible parties cannot be identified Unavoidable damage, except for materials and equipment that are not incorporated into the work due to Acts of God
Section 107 Cont Re-wrote 107.27 Archaeological Findings and Unmarked Burials
If the contractor encounters evidence of archaeology, operations in the area of the discovery shall be discontinued. The engineer will contact the DOTD Environmental Section in order that an appropriate assessment may be made to determine the disposition thereof and necessary actions relative to the site. Borrow and muck disposal areas furnished by the contractor will be subject to such assessment by the contractor prior to use.
If the contractor discovers unmarked burial sites, human skeletal remains, or burial artifacts, operations in the area of the discovery shall be discontinued. The contractor will notify the proper authorities, as well as the DOTD Engineer and Environmental Section in compliance with the Louisiana Unmarked Human Burial Sites Preservation Act (RS 8:680-681)
The contractor shall accept the summation of the products of the unit prices bid on the schedule of items multiplied by the actual quantity of units of measure performed for each item, as audited by DOTD, as full and final payment for all work, labor and materials necessary to complete the subject change only for change orders approved by the DOTD Chief Engineer or his designee
Some issues were not fully resolved: 108.04.2, Disqualification, 108.04.3, Disqualification Review Board, 108.08, Failure to Complete on Time, 108.09, Default and Termination of Contract, 108.11, Termination of Contract 109.03, Compensation for Altered Quantities 108.01, Subletting of Contract