You are on page 1of 220
5 E&C - HR presents Pressure Vessel Design ; as per ASME Boiler and Pressure Vessel Code, S Batch Il © ¥Date: 10 - 13*" December 2007 >Timing: 8:30 am — 5:00 pm >Venue: 4' Floor, Auditorium, EPC Block Powai Campus Oooc°c >Faculty: Mr. B. J. Shenoy Technical Consultant, HED, L&T C0000 Oo £} = DOC ) e) 20 COOOO0CC 2 {LARSEN & TOUBRO LIMITED Eac-HR © “Pressure Vessel Design as per ASME Boiler and Pressure Vessel Code", 10th - 13th Dec’ 07 - Batch IT ‘Venue - Auditorium - EPC - 4th Floor - Powai Campus (West) freemrek ag, Tag opie Tas [Bay 1 Dee 10, 2007- Monday 05:30 09:00__|Registraton, Tea & Snacks 05:00 09:05 | Welcome & Course Introduction MT Tans 0 -09:30 ftnauguration & Context Setting Narayanan G50 10-00 Sef ntroduction by Participants go, | Seon I Brief history of ASME Boiler and Presnure Vewel Code and 10:00 11:00 atroduction to Twelve Sections oer ins [remem age Sesion introduction to ASME Section VII Division 1 Swuctare, 11:15- 12:450 | nomenclature, definitions and scope [B- 3. Shenoy fas 130 [tan renr AR) Session 3: Subsection A General requlrement, Subsection B» Methods of fabrication - weld oint category nd weld efficiency Section |P-¥- Shenoy ILD - Tables of allowable stress values fess [aioe ge ~ ynap [Session lateral pressure design of Cylindvcal, Spherical and conical 15:30-17:00 | setts, and reinforcement at junction [B- Shenoy [Bayz bee 2007 Tueway oss0-08.00 ra & Snacks ge : op. Session 5 Subsection B - Design of welded joins attachment details, + 11:00 | radiographicexamination, alignment tolerances, procedure for pwht em a ce sas -12:450 [session 6: Subscetion B (Continued) [b.. Shenoy fizsas=13:30 [Lunch Break A) “a0 1.9 Sesion 6: Internal Pressure design of heads lipsoldal, toispherical, [3:30- 15:507 5 cmispherical, conical, toriconical etme iss0-1645 freak Taga, Sesion 7: Exernl Pressure design of Cylindrical sells and Stine ing, 5:30. 17-0031} sternal pressure design of heads, External pressure design of toriconicsl_ |B, J. Shenoy Iransitions and enforcement at junctions a Rea Ta ae J08:30- 09:00 _| Tea & Snacks . Sesion §: SubléBion A - Construction olerante of shell & heads, yng | shtey impact test quirements, responsibilities of manufactarer & or 11:00 | jaspector, hydrotest, pneumatic test and proof test, methods of marking, [BF ¥ data reports. nav tas [remo at :t5~ 12450 [session 8: Su section A - Construction (continued) [2 Shenoy san 1545 __[raeh oe a2) ~ ga0a [Sesion 9: Openings sie limits, reinforcement, multiple openings, noze 15:300 | neck, farge openings, studded connections, Unstayed Flat Heads and covers [B. F- Shenoy 4:30 - 14385 4 (Objective of CALD: to update experts in BPC

You might also like