SOMESUNDAR BANERJI

Mobile: 09049362892

E-Mail:

ss_banerji@yahoo.co.in

Seeking Assignments in Electrical Domain on Project Engineering with a growth oriented organization.

AN OVERVIEW
Qualified Electrical & Electronics Engineer with nearly 4 years of experience in Project Engineering. Currently associated with Siemens Ltd, Aurangabad, Maharashtra as Executive Engineer, responsible for planning, scheduling, conducting and coordinating the technical and management aspects of projects. Possess Onsite experience in handling projects by analysing, designing and configuring functions to meet process requirements Responsible for Budget Monitoring and Trend Tracking. Preparation of BOQ, estimation of material, issue of purchase request and arrangement of material. Material submittal. Coordination with consultant. Supervision of the overall execution of the projects. Approval of Inspection Reports. Making daily, weekly and monthly reports on project progress. Experienced in working with multiple discipline projects. Undertaken SAP MM Module Training from Siemens Intranet. Effective communicator & negotiator with strong analytical, problem solving & organisational abilities. Knowledge Purview:

Experienced in working with AutoCAD 2D/3D, PRO-E, Printech and Elcad. Gas Insulated Switchgears/ LV Switchgears/ HV Switchgears Knowledge on SAP MM Module Excellent computer skills in MS Project, MS Word, PowerPoint, Excel etc.

PROFESSIONAL EXPERIENCE
Executive Engineer (Project Engineering) with Siemens Ltd, Aurangabad, Maharashtra (Gas Insulated Switchgear) Position: Industry: Functional Area: Duration: Executive Engineer Electricals Project Engineering & testing of Gas insulated switchgears Sep 2010Till Date

PROJECT IMPLEMENTATION:

Worked with Our French colleagues in Grenoble for localizing the 400kV product 8DQ1-0 in Aurangabad Scope included: Reviewing the technical facilities in Grenoble Channelizing new resources required Upgrading the High voltage testing facility Involved myself in Project Tracking using Microsoft Project Management Tool Completed other tasks given by the Electrical Engineer Manager or other members of Management

Worked with our German colleagues in Berlin for localizing the 245kV product 8DN8-2 in Aurangabad Scope included:

Reviewing the technical facilities Procurement of all the new equipment Implanting a checking facility for local control cubicles Upgrading the High voltage testing facility Dealt with faults along with troubleshooting in GIS system Performed equipment selection such as testing transformers and other equipment. Completed other tasks given by the Electrical Engineer Manager or other members of Management.

KEY DELIVERABLES

Testing of Gas Insulated Switchgears, this includes all the routine test for a GIS bays and Factory Acceptance
test Monitoring and status reporting procedures to accurately report progress of the project to the Management. Support for all the type test for the product developed Giving Factory support to the commissioning team at site. Verifying all the secondary drawings prior releasing to customers Giving technical know how to customers about the product Create standard MS office templates for tracking the project progress.

PROJECTS EXECUTED: Title: Responsible for conducting all the Routine test and Factory acceptance test for 8DN8-2 type (145 kV) GIS Title: Delhi international Airport (DIAL) ,Delhi : 7 Bays Indian oil corporation ltd, Paradeep, Orissa: 44 Bays GETCO, Gujarat: 7 Bays A P Transco, Andhra Pradesh: 17 Bays Praxair, Paradeep: 2 bays

Support for all the type test of 8DN8-2 type (145 kV) GIS Circuit Breaker M2 class test Earthing switch, disconnector M1 class test Temperature rise test for 3100 Amps

Title: Responsible for conducting all the Routine test and Factory acceptance test for 8DQ1-0 type (400 kV) GIS Bharat Aluminium company ltd, korba: 7 bays Unosugen, Torrent Power, Gujarat: 4 bays India bulls, Nasik: 13 Bays

Assistant Manager (Electrical Division) with Bharat Aluminium Company (Vedanta group), Korba, Chhattisgarh (0.675 MTPA smelter expansion project) Position: Industry: Functional Area: Duration: Assistant Manager Smelter Expansion project (Electrical Division) Project in charge of complete HT LT system Nov 2008Aug 2010

KEY DELIVERABLES: Project Execution Managing activities right from the conceptualization stage to the execution; involving finalization of technical specifications, procurement, scheduling, progress monitoring, erection, testing & commissioning, site management, manpower planning. Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the stakeholders and end user clients. Maintaining and ensuring stringent adherence to quality standards, norms & practices, identifying gaps and taking corrective action.

Installation & Commissioning Installing and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities; planning & effectuating maintenance schedules for equipment. Designing electrical layout, making drawing, approving them and carrying out inspection tests for determining the effectiveness of the plant/equipment. Erection of all HT & LT systems of smelter expansion projects and providing construction power to entire project area. Accountable for testing and commissioning of all switchyard equipment. PROJECTS EXECUTED: Title: Managed: Engineer In charge for complete HT system of 0.675 MTPA Smelter Expansion Project

Tendering & complete engineering of HT system Technical discussions with the potential suppliers Finalising the make of products Coordination with the civil team for timely attainment of the targets Executing and coordinating testing, commissioning & charging activities of 13 Nos. HT switchboard. Executing and coordinating testing, commissioning & charging activities of 83 Nos. of 11/.415 kV Transformers of range up to 5 MVA .

NOTABLE ATTAINMENTS:

Successfully provided construction power for entire project area prior to starting of civil jobs. Efficiently accomplished detail engineering of all HT & LT systems and finalized the order in time limit. Implemented concept of using compact substation. Received excellent grade in training completion.

ACADEMIC C REDENTIALS
C

2008 78.4% 2003 2001

B.E. (Electrical & Electronics) from Biju Patnaik University of Technology, Orissa. Secured XII from CBSE. Secured 72.6% X from CBSE. Secured 82.6%

IT PURVIEW
Operating Systems: Programming Language: Software Package: Windows XP. Vista C, C++, Data Structure, JAVA MS Projects, MS Office, AUTOCAD, SAP

TRAININGS ATTENDED
Switchgears Training High Voltage Testing Techniques Noise interference on substation

EXTRAMURAL ENGAGEMENTS
Received special award for distinctive performance in National Science Olympiad organized by Wipro, in
the year 2001. Awarded runners up in hostel table tennis tournament in the year 2007. Significantly represented school in All India Social Science Project held in Patna, in the year 2000. Won first prize in painting competition organized by All Orissa Lalit Kala Academy. Actively represented Kendriya Vidyalaya Hinoo in regional level inter school cricket tournament for 3 successive years.