You are on page 1of 1

Written by Vass Karatzas

WHITE TOWER CONSULTING Ltd.

Drilling BOP Data


Location: Rig: Engineer: Pressure Rating: Size: NACE Trim: NACE Certified: Make: Hydril Closing Volume: Opening Volume: Make: Shaffer Closing Volume: Opening Volume: Make: NL Shaffer Opening Volume: Closing Volume: Make: Shaffer Closing Volume: Opening Volume: 40.54
plus 50%=

Well Name:

Date: 21000 254 yes yes kPa mm

Well T.V.D. and Minimum BOP Pressure Requirements: to 750m Class II & 14000kPa
to 1800m Class III & 14000kPa A.P.

BOP STACK:

ANNULAR PREVENTER:
Rated kPa: Size (mm): Blind R. 34000 254

Model: 28.12 Litres Litres Model: LWS 11.28 Litres Litres Type: DB 1.14 Litres Litres Model: LWS 11.28 Litres Litres 60.81 Litres

BLIND RAMS:
Rated kPa: Size (mm):
75mm Throughout

D.S.
50mm Throughout

34000 254

to 3600m Class IV & 21000kPa over 6000m Class VI & 69000kPa

HCR VALVE:
Pipe R. to 6000m Class V & 34000kPa
50mm

Rated kPa: Size (mm):

34000 76

C.B.

PIPE RAMS:
Rated kPa: Size (mm): 34000 254

TOTAL VOLUME for CLOSING BOPs:


Csg Bowl Size, mm: 228.6 and, kPa: 21000 Last Csg Above Ground Burst Rating, kPa: 15621

Surface Csg at, m 320 Intermediate Csg, m 1450

Well TD, m 3100 Well TVD, m 3100

RIG ACCUMULATOR UNIT DATA


o

Rated kPa: 21000

REQUIRED ACCUMULATOR SIZE


Minimum Accum. Size Required Litres: o Required Minimum Bottle N Is Rig's Accumulator Adequate ? Is Back-Up Nitrogen Adequate ? NOTES: 121.62 4 YES YES

Make: Model N : Bottles No 4 ACCUMULATOR: Per Bottle Size in Litres: 37.85 Required Remaining Pressure kPa: 8400 Precharge Pressure kPa: 7000 Total Volume Litres: 151.40 BACK-UP NITROGEN: Bottles No 3 Stored Pressure kPa, #1: 17500 Average Pressure kPa: 15333 Enter Bottle Size: 2 #2: 14000 #3: 14500 Usable Total Volume Litres: 104

Initial Mud Wt. kg/m3 1150 Mud Wt Desired kg/m 1180 Original Mud Volume m 120 Wt. Material Specific Gravity kg/m 2650 Kilos per sack of Wt. Material kg/sack 25
3 3 3

To Increase Mud Wt. While Drilling Only


Total Wt. Material to be Added kg

Mud Wt. Reduction


Initial Mud Volume m3 80 Initial Mud Wt. kg/m3 1140 Volume of Base Fluid Added m3 10 Specific Gravity of Base Fluid kg/m3 1000 Reduced Mud Wt. kg/m3

3600 Wt. Material Added in Sacks 144 Volume Increase after Mixing m3 1.36 Total Mud Volume after Mixing m3 121.36

1124

on Densities of Calcium Chloride and Sodium Chloride Solutions


15 Mud Circulating Temperature oC 80 Required Solution Density kg/m3 1250 Pre-Mix Solution Density kg/m3 1292
Premix Water Temperature
o

The Effect of Temperature


C

Prepare a Heavy Pill-Slug


Initial Mud Wt. kg/m3 1100 Mud Wt. Desired kg/m3 1400 Heavy Pill/Slug Volume Required m 10.0
3

9.0 2714 or Number of 40kg Baryte Sacks 68


Initial (Starting) Mud Volume m3

Total Baryte Required kg

1090 2600 Formation Fracture Mud Wt. kg/m3 1600 Hole Inclination Degrees 90 Mud Wt. Required kg/m3 2340
Mud Wt. for Vertical Well kg/m3 Overburden Wt. kg/m3

Mud Weight for Directional Wells

INPUT
3000.0 m 14670.0 ft to to

OUTPUT
ft 9842.5 m 4471.4

Related Conversions
INPUT OUTPUT INPUT OUTPUT
1.85 m3 to BBLs 11.64 10.00 BBLs to m3 1.59 18.0
o

INPUT

OUTPUT

75.7 Litres to gals 20.0 20.0 gals to Litres 75.7 1850.0 kg/m3 to ppg 15.439 19.000 ppg to kg/m3 2276.7

1.00 m3 to gals 264.2 300.0 gals to m3 1.14 20.0


o

18500 kPa to psi 2683.2 5000.0 psi to kPa 34474

to

F 64.4

F to

C -6.7