September 22nd, 2010

Interpreting Piping and Instrumentation Diagrams-Symbology [Part 3 of 5]


By Robert Cook | Comments (22)

This entry is part 2 of 5 in the series How to Interpret Piping and Instrumentation Diagrams This post is part 2 of 5 in the series: How to Interpret Piping and Instrumentation Diagrams Interpreting Piping and Instrumentation Diagrams [Part 1 of 5] Interpreting Piping and Instrumentation Diagrams-Symbology [Part 3 of 5] Interpreting Piping and Instrumentation Diagrams [Part 2 of 5] Codes, Tags and LabelsInterpreting Piping and Instrumentation Diagrams [Part 4 of 5] Interpreting Piping and Instrumentation Diagrams [Part 5 of 5] With a Bit of Smoke, a Few Mirrors and a Degree in Hieroglyphics, Anyone Can Learn to Read a P&ID.

Part 3 Symbology Primer

Welcome back to Part 3 folks! Let me apologize at the outset for the delay in getting this posted sooner but we had our Labor Day holiday here in the USA last week and oddly enough, we tend NOT to work on Labor Day. Go figure I suppose it should be called slacker day because I really didnt do much the whole weekend. In any event, Im back in the saddle so lets recap the last two parts before we hit the trail again. We have a lot of ground to cover before sunset. Part 1 talked about why the interpretation of P&IDs is important to everyone involved in the planning, design, and construction through operation of a process plant. Part 2 described the various functions P&IDs serve and highlighted the kinds of information they convey, along with the support documents that are commonly associated with them. We also talked about some of their weaknesses.

With the requisite academics out of the way, its time to focus on the exciting stuff P&ID symbology interpretation. Thats the goal I had when I started this series and by golly, Im sticking to it. However, Im going to warn you up front this is a big part in the series, figuratively and literally speaking. I might even be pushing the limits of Chenected.coms server capacity but I did my best to balance breadth of content with depth of detail. If you think I short-changed any areas and would like more detail on any topic, please let me know via the comment system. Ill do my best to oblige.

Lead Sheets Define Symbology


As I mentioned in Part 2, the meanings of the various symbols used on P&IDs (aka, symbology) are defined on separate drawings called Lead Sheets (or Legend Sheets). These are your secret decoder rings to P&ID symbology interpretation. Every company that builds process plants should have a set of lead sheets customized to their particular ways and means. Having seen a number of lead sheets over the years, I can tell you that most of them are just variations on a core set of generally accepted symbols and notations that engineers and industry organizations have settled on as defacto standards over the years. The lead sheets I provide in the supporting file download to this series include the following; D001 Instrumentation and Valves D002 Codes, Tags, and Labels

Heres the good news these lead sheets include 90.000.05% of what you need to know. Seriously, the significant digits are right here, I checked them. Yeah, I realize some companies have more than two lead sheets, four or five even. Probably even a few with six or seven just to prove a point I suppose, but the number of lead sheets isnt important. What is important is that they are logically organized so that the symbols and tags can be located easily. Poorly organized and/or incomplete lead sheets will just frustrate folks who turn to them for help so its important to keep them neat, concise and logical. And the two I present here should be up-front-and-center in your set. Related to the content I include on the example lead sheets, you might have noticed a conspicuous absence of lead sheets for major equipment, i.e., tanks, pumps, and sundry items typically included in process plants, etc. Its good to have lead sheets for that kind of stuff; Im not going to say otherwise. However, I have generally stopped using them in my group because; 1. It is almost always self-evident what a symbol represents for major equipment, and 2. Even if its not apparent, the major equipment is always tagged and named with some general specifications provided along one edge of the drawing. I underline always because thats the way it should be. I dont want to debate it. Just make it so! Aside from these reasons, its tough to keep an equipment lead sheet updated when new or custom equipment that doesnt really have an industry standard symbol is added to a drawing for a particular job. I could go on regarding the topic of symbols for major equipment but this is a topic I decided not to expand on in the interest of focusing more on the instrumentation and controls side of symbology. Shoot me a note if you want to discuss this more.

Caveat Emptor
Before we move on, I want to address the operations folks here in attendance: Keep in mind that reading and understanding P&IDs is a core topic of operator training. And that training happens long before you step on-site. In fact, you should know this stuff before you enter the room as a team member on a Process Hazards Analysis. As a process engineer at heart, I view operations as my #1 client and work hard to make sure that they fully understand the plant and its procedures so that it can safely and efficiently meet its objectives. If you are in an operations group, you are not expected to have it all figured out just from reading this series alone. However, the following sections should serve as a solid primer. And I will make you a simple promise so long as you dont get bored and start daydreaming about whether Brock Lesner will remain the UFC heavyweight champion for the next five years (I dont even), you will definitely walk away from this series with a solid, functional understanding of P&IDs! If you dont, call me and I will refund your money, no questions asked.

Instrumentation and Controls Symbology


Well kick things off with what has traditionally been viewed as the hardest part of P&ID interpretation, that of course being instrumentation and controls. In my experience, this is the area that gives newcomers the most grief. Trust me, its not that hard and once you have this area conquered, everything after that is stupid simple and the learning curve will skyrocket.

The main symbols used for Instrumentation and Control (I&C) are shown in the table above. When you spot one of these on a P&ID, you will be able to glean three things from it, including: 1. What is that device? 2. Where is it located? 3. Why is it there? The what and where aspects can be determined from the symbol shape. The why part comes from text placed inside the symbol that is made up of two parts that form the tag number. This includes: 1. An abbreviation for what the device is (based on ISA S5.1), combined with a 2. Loop number based on your companys preferred numbering system Before I dig into this topic more heavily, its worth providing a couple simple tag number examples as a lead-in. Pressure indicators have the abbreviation PI and temperature indicators use the abbreviation TI. It follows logically that flow and level indicators use the abbreviations FI and LI, respectively. Since most plants can have many instruments of the same type, a unique number is applied so that each one can be individually identified. This number is often referred to as the loop number. Thus, the device abbreviation + loop number become the unique tag number. While the device abbreviations are largely based on accepted standards (ISA S5.1), the loop numbering system is company specific.

My group happens to use a four digit numbering system. In this case, typical tag numbers for pressure and temperature indicators in our plants will be PI0134 and TI4348, respectively. You could even reuse the loop number 0134 to define other types of devices, such as a level indicator, LI0134 or flow indicator, FI0134. The same holds true for loop number 4348; it may be used for PI4348, LI4348 and HS4348 (where HS stands for Hand Switch). The key point is that the abbreviation + loop number must be unique for each device otherwise, it cannot be uniquely identified. You can get creative and apply special prefixes (or suffix) numbers to the tag number when you want to reuse the same tag (like in cases where you have redundant devices but you dont want them to have different loop numbers). I will get into those when we look at the example P&IDs. But that is detail stuff.

What is that control symbol?

Refer to the first row in the table above. A circle symbol is quite simply any physical instrument or device in the field or on a panel. It doesnt matter if it is a level transmitter, a flow meter, a pressure gauge or some other type of indicator. If it is a physical device that measures or displays something, it will be illustrated by the use of a circle on a P&ID. Notice also how I placed the tag number PI0134 inside the symbol. The common practice is to place the device function abbreviation on the top line, with the loop number at the bottom. When the device is ordered and a stamped tag is requested, it should match the tag number placed inside the symbol on the P&ID. Aside: Sometimes, you will hear folks refer to the symbols as instrument bubbles. This is just jargon that is commonly used. When you hear it, they are simply referring categorically to the symbol shapes I am talking about in this part. Just act like youve been calling them bubbles for years and show now sign of confusion!

Move down to the symbols on the second row of the table the ones that show a circle inside of a square. These are used to represent a graphic on a computer screen or control panel that you can see and possibly interface with via touch panel or a computer mouse. It might be used to show the level in a tank (as the tab number in the bubble shown here suggests) or represent a hand switch that you can click on with the mouse to start a pump (or a million other things!). The point is if you can see it on a control screen, it will be represented as a circle inside a square on P&IDs. Dont ask me who decided this, it wasnt me! The last two rows are for symbols that let the reader know a computer is used to do some sort of complex processing. In the case of the hexagon, it means a computer is used. Thats a pretty vague description dont you think? I mean, is your plant a PC or a Mac? I dont want to get into that debate (my wife uses a Mac, otherwise I would) but my point is that some of these symbols begin to show their quaint age.

In the case of a square with a diamond in it, that means a programmable logic controller (PLC) is used. Ah yes, the venerable PLC still hanging tough after all these years. Even if you are not familiar with control computers or PLCs, dont sweat it. Just know that these symbols really represent software instructions that engineers write to define the automated behavior of the plant. For example, code that tells a pump to automatically stop when the tank it is pumping from runs low. That would be a so-called low level interlock type function that would exist as instructions inside a PLC. In this instance, a level element provides the input and the computer runs a set of instructions that say stop the pump if tank level is low.

These symbols are often left off of P&IDs because they really dont provide any usable information that you could get out of just looking at the symbol. For example, in the simple example that I just provided, how could you describe the low level interlock using a symbol that looks like a square with a diamond in it? You couldnt! You would need to supplement the P&ID with a written description of what the plant is supposed to do with all of the input it receives. So the symbols would just take up space and clutter the drawing for no good reason other than perhaps provide some pointer via a tag number to coded instructions. But the P&IDs serve the process, not the programmer so we cant have that!

Symbology Star Power!

This brings me to the arbitrary star rating I gave all of the symbols in the table (see Bobs Review key at bottom of table). Folks, this isnt published by the ISA (as if I had to qualify this) but weve been together long enough for you to know that this is how I roll. Its my way of explaining the frequency and importance of these symbols in most cases. Here goes. For each symbol, I rate it based on how often it typically shows up on drawings that I have worked on over the years. Every plant is different but there is a general theme here. I view symbols with only one star as pretty much useless because the abstract concept they are trying to illustrate simply cant be done effectively with just symbology. Two star symbols have value but may not show up very often or at all in many cases, depending on the type of plant and its design. Anything at or above three stars is a celebrity in our P&ID feature presentations. Were talking Arnold Schwarzenegger, whereas the one star symbol is akin to the nondescript ensign killed off in the first five minutes of a Star Trek episode. So what about those quizzical computer symbols that I poke fun of? Well, you can still use them if you want but they need heavy support from a document that describes all of the functional requirements of a plant and that is typically called a Functional [Control] Description. Maybe in a future series (if youre good), we will cover functional control aspects. Oh Goody! I can almost sense your joy at the thought! Hey, pay attention and no smart remarks. We still have work to do here!

Where is the device located?


If you glance back at the table, you will see that there are four columns that provide the Where part of a symbol. Now, as we discussed in Part 2 of this series, P&IDs generally arent good at showing you where something is located in the field. We arent talking about that kind of where. In this case, we are using where as a relative reference. Relative location is indicated via the presence of a centered, horizontal line (or lack thereof), a dual centered horizontal line, or a dashed centered horizontal line placed inside the symbol; 1. Single horizontal line located on a main control panel near the control room or some computer screen in the main control room, 2. No horizontal line located somewhere in the field, probably close to the general area shown on the P&ID, 3. Double horizontal line on some secondary (satellite) local panel in the field. 4. Single dashed horizontal line inaccessible or not generally located where it can be easily accessed or viewed. May also be used for hidden or password protected areas of a control system. Notice in the above items, no specific location information is provided, only that the device or graphic is associated with a relative, general location. In many cases, its not hard to figure out where something is just from where the symbol is at on the drawing. But there are limits to what the symbol can convey.

More on the Dashes

I have found that the dashed line symbols can cause confusion so I want to speak on those a bit more. When you see a symbol such as the one shown at left, that simply means that you cant normally see it or work with that device it in the field. It might be installed behind or inside of a panel so that it is normally not in view (inaccessible to the operator).

So in the symbols shown here, a circle with a dashed line in the middle means it is an instrument or device that you cant normally see or get to. If you are an operator, it is probably something you do not need to get to but it might still be vitally important to the plant control system, so we show it this way on a P&ID. In a similar fashion, a graphic display symbol with a dashed line in the middle simply means that this portion of the control system is password protected or hidden from normal view on a screen or operating panel so you cant get to it unless you know the secret access code. Its not that people are keeping secrets from you (or maybe they arehmmmm); its just that it might contain important settings that nobody should ever need to mess with.

Why is that device here?


Youve come a long way towards understanding control symbology. You can now identify what a control symbol represents and its relative location in the plant. But you still dont know why its there. Its not helpful to know how to identify a control symbol type if you cannot explain what purpose it serves in the plant. That is the point of the textual abbreviations placed inside the symbols. We touched on this a bit above so now lets cover the essence of what you need to know and keep in mind, come of this is the way I like to do things, which doesnt necessarily mean it is the best or only way. Refer to the figure below entitled Instrument Symbol Tag Identification. A control symbol will typically contain two lines inside it, as follows: 1. Upper Line an abbreviation for the functionality it provides (based on the ISA 5.1 standard), and 2. Lower Line a loop number that corresponds to the equipment or area it is associated with (or based on your companys preferred standard). The upper line text abbreviation, along with the lower line tag number makes up the unique symbol identification tag. It is important that each symbol have a unique tag so that it can be individually identified. In this example, the symbol would be referred to as PDIT1703 in a process document or operating procedure. There may be a bunch of other symbols with 1703 in them, but they must have a different text abbreviation before the 1703 or you wont be able to uniquely identify it. Part 4 of this series will talk more about typical device tagging protocols but for now; consider this your Introduction to Tagging 101.

The letters on the first line are in accordance with ISA standard 5.1, as described in the upper left corner of lead sheet D001. Each letter provides unique information. We can use the table in D001 to determine that this symbol represents: 1. P First Letter stands for Pressure 2. D Second letter is a modifier for the first and stands for Differential 3. I Third letter stands for Indicating 4. T Fourth letter stands for Transmitter 5. 1703 is the loop number (the Electrical Engineering eggheads need loop numbers too) I like to base loop numbers off the associated major equipment. Thats just me, and I think it makes good sense. But if your company uses a different technique, roll with it. Now is not the time to be a renegade creator of new tagging systems. Fight your battles but win your wars! So in this case, we have a pressure differential indicating transmitter installed on equipment 1703. You might see such a device across a strainer inlet and outlet to let you know what the pressure drop is across it so that you can clean it when it gets high.

Common Instrument Abbreviations


There are a number of instrument letter combinations that you are likely to come across a lot. A few of these are listed in the figure titled Common Primary Device Symbols. These examples will help you get some practice understanding the abbreviations used for control symbols. You can compare the examples to the table on D001 to get the hang of it. These examples all represent field-mounted devices. We know that because they are all simple circle symbols with no horizontal lines. I told you this was pretty straight forward!

The hardest part in deciphering the abbreviations inside control symbols is figuring out what the letters designate when there are three or more letters used. Here are a couple rules of thumb: In the case of abbreviations with four letters, the second letter is a modifier to the first. When only three letters are used, the second letter probably is not a modifier. As with any rule of thumb, you mileage may vary, so if in doubt, look it up using the table on D001 (or your own company lead sheets).

Symbol Attributes
Depending on the symbol purpose, various other attributes may be placed near control symbols in supporting role. The section called Instrument Abbreviations on lead sheet D001 defines some of the more common ones you might run into. These are simply helpful bits that provide further clarification for the situation at hand.

In many cases, it is helpful to know at a glance that a valve is FC (Fail Closed) or that DI is a (Digital Input). Refer to this table when you encounter abbreviations used around control symbols.

Instrument Input-Output (I/O)

Despite major advances in computer technology and communications protocols, many instruments still transmit their signals using a trusty analog signal (via a 4-20ma, 24V). For switched devices, the input is typically a switch that simply provides a voltage input. While it is not a common practice to show the type of signal a particular device sends to and/or receives from the control system (collectively referred to as the I/O), in my company I like to employ simple triangular symbols along the interconnecting lines to help illustrate the I/O flow (if you will) on a P&ID. This is illustrated using the symbols shown in the figure below. The important point to remember when you see these symbols is that the I/O flow is always from the control computers perspective. Thus, all outputs (DO, AO) come out of a output module and go to some field device. Conversely, all inputs (DI, AI) are signals from field devices that flow into some input module. Other types of I/O that may require specialized transducer cards or network protocols are sometimes used. For example, the KT signal is a common type of signal that a thermocouple employs. You may have also heard of RTD temperature sensors. There are a myriad of transmission protocols used today and as process engineers, we dont need to get caught up in that. But it is helpful to understand the flow of I/O in a plant and using these symbols is a cheap, easy way of showing that with no penalty on the complexity of the drawing! All of the I/O symbols invariably link to the software line type (described below), as this is used to illustrate software processing within a computer or PLC. You dont know what is taking place just by looking at a line, but you can be sure that whatever it is, the Functional Control Description is the place to look to find out.

Line Symbols

The key line types are highlighted in the figure at right. By far, the most common line type is the solid line, which is used to represent a pipe. Although not shown, a process line with long dashes means the pipe is existing or is outside the battery limits (OSBL) of the plant. Other common line types that you should be able to identify are electrical signal (anywhere wires are employed), instrument air to control valves/devices (labeled as pneumatic signal) and software or data link which includes virtual communication such as what occurs inside a computer program or PLC ladder logic. The software can include anything that happens inside a computer, but you need a functional description to actually know what that is, as we discussed earlier in this brief. Just know that when you see a software line, it means computers are at work linking the devices in some meaningful way that relates to the system controls.

Computing Functions
These symbols describe the types of functions that run inside a computer program. A problem with applying these symbols is that they do not really provide solid insights into how the plant is controlled in complex instances. For this reason, most P&IDs will make limited use of computing function symbols. You can safely ignore these and not miss out on much because the functional control description is really intended to describe control details that these symbols try to illustrate.

Valve Symbols
The figures below show the key symbols for the various types of manually-operated valves and actuator details for automated valves. Note the attributed stems on the actuators to indicate fail state. This is a good example of using attributes to provide key information that is valuable to operations.

Connection Types
Regarding connections, the symbology shown in the figure below is standard. One point I will make is that in plastic piping systems (PVC, CPVC and ABS), everything is generally glued using a connection type called socket weld. However, socket weld can also be applied to metallic piping systems where a welded connection is employed using socketed (versus butt weld) fittings. There is no specific designation between glued or welded socket connections. Nor is there a symbol for threaded connections.

When you start getting into what type of connection should be used in a particular pipe, this is not really something that is based on personal preference or simply what you might have on hand in the maintenance trailer. This is something that is based on things like the line service (whats in the line), conditions (temperature, pressure), and other factors (like supporting requirements). This kind of stuff is defined in a Material and Line Specification Standard. We wont cover that in detail here but you know what? I just got an idea! This is great topic for a future series. The fun never ends does it?

What about pipe fittings?


In case you are wondering (and I know you were), P&IDs generally do not show pipe fittings (elbows, tees, unions, o-lets, etc.). Nor will

they include all the various flanged connections that might actually exist in the plant. These are details that show up on piping plans/sections, isometrics and fabrication drawings. So, unless it is important to the process design for some reason, fittings and extraneous flanged connection are generally not shown. If you need to get a fitting take-off, look elsewhere!

Transducer Functions
This is an area that defines signal conversion. Only electrical engineers get excited about this stuff, and you really dont need to focus too much on this. In fact, I almost skipped it but I just know that if I did someone would ask, so lets get this out of the way because this electrical stuff is starting to get a tad boring A transducer is something that takes a signal in one form and converts in into another form so that it can be used by a downstream device. For example, a control valve may need air to actuate but receive an electrical signal to tell it to do that. Somehow, you have to get the electric signal converted into an equivalent air signal so the valve can move. Hello signal transducer.

In this particular example, an I/P (current to pneumatic) transducer is necessary so that the valve can be positioned to any desired opening point with just an electrical signal. This is the most common transducer function used in many plants; the others listed are comparatively rare. So, understand what I/P means when you see it and dont worry too much about the rest of them for now. When you graduate to Master Ninja P&ID interpreter, then we will focus on these details.

Primary Flow Elements

These symbols are nothing more than graphic illustrations that complement the control bubbles to help readers of the drawing more easily identify the type of flow element being employed. The most common types are shown in this table on D001. These symbols are not really critical towards an understanding of the instrumentation or controls. Level elements dont have an equivalent. Nor do other common instrument types.

Breaktime!
OK, so now you have a solid feel for what P&IDs are, the purposes they serve, their limitations and supporting document requirements and now a pretty solid handle on the symbology used. Despite all the ground we covered in this part, we havent really had a chance to go through a few examples. Everyone knows that when it comes to learning new information, application it is key. The old adage use it or lose it applies. I still aim to get to some examples but for now, just take a well deserved break and let this stuff sink it. Besides, Im sure they need to go buy a couple more hard drives for Parts 4 and 5.

Be sure to drop me any comments you have so that I can tailor the remaining parts.
Hang in there, we are almost done. Your on the back side of the race and heading towards the finish line. Thanks for joining me!

Related posts:
1. Interpreting Piping and Instrumentation Diagrams [Part 5 of 5] 2. Interpreting Piping and Instrumentation Diagrams [Part 1 of 5] 3. Interpreting Piping and Instrumentation Diagrams [Part 2 of 5] 4. Codes, Tags and LabelsInterpreting Piping and Instrumentation Diagrams [Part 4 of 5] 5. Boils Laws The Piping and Instrumentation Diagram (P & ID) [Comic] Share Login Follow the discussion

Comments (22)
Sort by: Date Rating Last Activity 0 javascript: voteComment(101629430, 1)javascript: voteComment(101629430, 0)

David Greene 117 weeks ago Robert, Excellent presentation - one minor comment is that the PLC symbol that you rarely encounter is commonly used in batch procsses that are typical of pharmaceutical plants. Great series. David Report Reply 1 reply active 116 weeks ago +1 javascript: voteComment(102492608, 1)javascript: voteComment(102492608, 0)

RGCook 33p 116 weeks ago David - thanks for your kind feedback. Your note about the PLC symbol showing up often in the types of projects you work on is not surprising. I do see it now and again but tried to speak at a very generic level about its utility. It always comes down to your audience and mine is generally operations. I can see how programmers (EI&C types) might enjoy using it for their work to mark code, procedures, etc. - Bob Report Reply 0 javascript: voteComment(102129227, 1)javascript: voteComment(102129227, 0)

aravind 117 weeks ago hai to all, i need a clear representation about closed tank and open tank level calculation and how to measure and calculate the range for the level and flow transmitter i am in need of this calculation Report Reply 0 javascript: voteComment(102913980, 1)javascript: voteComment(102913980, 0)

lww 116 weeks ago what are some more linstrument ine symbols and function symbols Report Reply +1 javascript: voteComment(103918414, 1)javascript: voteComment(103918414, 0)

jessica 115 weeks ago thanks for sharing! it's very useful informations! waiting for part 4 and 5! Report Reply 0 javascript: voteComment(153395278, 1)javascript: voteComment(153395278, 0)

Ken 84 weeks ago Robert, I bet you, your stuff is AWESOME! Where did you learn how to teach so easily? My four years in Univ. studying mineral processing technology couldn't give me much on P&IDs than I have just gotten out of you right here. It has kept haunting me ever since I left Uni 11yrs ago and was just lucky to have branched into HSE. But bcos I now find myself also doing process safety management, I had to run back to refresh on my P&Id stuff. Thanks for the great job Bob. Cheers. Ken. Thanks for the good job. Report Reply +1 javascript: voteComment(191106453, 1)javascript: voteComment(191106453, 0)

RGCook 33p 68 weeks ago Ken and Andrew, Many thanks for your kind feedback. I've been away too long. I intend to begin my next series. It will be the Prequel to P&IDs. I still plan to contribute my best on the process engineering core. Scope and writing functional descriptions that really work in helping programmers make the plant do what it should. Along with major equipment specs (the key stuff). Etc. It's so easy to get caught up in huge tomes on these topics and I think this is the value of this site. For older guys like me to distill it down based on experience and what really works. Thanks for the motivation to get started again. Best, Bob Report Reply 1 reply active 68 weeks ago +1 javascript: voteComment(191308557, 1)javascript: voteComment(191308557, 0)

jvasko 45p 68 weeks ago Great to hear this Robert. Your series has consistently been one of the most popular on ChEnected! Report Reply 0 javascript: voteComment(250854243, 1)javascript: voteComment(250854243, 0)

Annie John 52 weeks ago Hi Robert Writing this to convey a special thank you for making reading P&IDs fun to learn. At work . I was tasked this week, to create a tutorial

for our fresh recruits on reading P&IDs. Googling led me to your article that greatly simplified my task.. I have borrowed freely from your blog and it has made my write-up that much richer. You will find that you are immortalized through my reference list !!. In closing , it must be said that you have flair for making drab technical stuff seem light and even interesting May your tribe flourish...Happy New Year Report Reply +1 javascript: voteComment(250957478, 1)javascript: voteComment(250957478, 0)

RGCook 33p 52 weeks ago Annie, Many thanks for your kind feedback. I am very happy that you can use it in your work. I leveraged the great vision of this site to provide this open and free resource. I had fun putting it together (despite the work), and still plan to get a few more out. I will resolve to do that in 2012! Best wishes to you in 2012 as well. Bob <div style="display:block;margin:6px 0 0"><a class="a2a_dd" href="http://www.addtoany.com/share_save">

Report Reply 0 javascript: voteComment(252229773, 1)javascript: voteComment(252229773, 0)

ram 52 weeks ago i am a process engineer with some operation back ground and willing to make career in process safety. I have started learning P& ID but I could not locate all symbols which are generally used with some basic description and examples. Also I would like to have simplified loops normally seen on the P& ID explained. Please provide further source for reading. I found your article very good and it is great service to young process engineers. Report Reply +1 javascript: voteComment(252294541, 1)javascript: voteComment(252294541, 0)

RGCook 33p 52 weeks ago ram, Thanks for your note. Regarding explanation of simplified loops, have you looked at any of the companion videos I provide at youttube? This is at least a start. Take a look and let me know if that helps. - Bob Report Reply 0 javascript: voteComment(336075704, 1)javascript: voteComment(336075704, 0)

FJ BLACK 37 weeks ago

Thank you so much for your clear and informative articles. I wish I had found this site years ago!!!! Unfortunately, the link to download the Lead Sheets for this article doesn't seem to work - could you look into this and hopefully fix. Many Thanks F J Black Report Reply 1 reply active 37 weeks ago +1 javascript: voteComment(336436589, 1)javascript: voteComment(336436589, 0)

RGCook 33p 37 weeks ago FJ, Thanks for the feedback. I have notified the operators of this site about the broken link. If you wish to send me a private email, I will send the files directly to you. I've obscured the @ symbol below to keep the spammers at bay. robert.cook AT veoliawaterna.com Best wishes, Bob Report Reply 0 javascript: voteComment(336080594, 1)javascript: voteComment(336080594, 0)

Hanieh 37 weeks ago Hi Robert I was looking for a good guide line about P&ID and all of a sudden I found it all here. I am so excited to read more. Your article is full of good and handy information and I would say it is simply "well-written".... Just Thank you , Thank you and Thank you. please keep on the good job! Report Reply 2 replies active 37 weeks ago +1 javascript: voteComment(336437007, 1)javascript: voteComment(336437007, 0)

RGCook 33p 37 weeks ago You are quite welcome Hanieh. Please refer to my response to FJ BLACK above regarding a broken link to the example files. If you would like a copy, send me an email as well. Best regards, Bob Report Reply 0 javascript: voteComment(336526569, 1)javascript: voteComment(336526569, 0)

Douglas 37 weeks ago Sorry the link wasn't working. I saw the comments and have fixed it! Douglas@Chenected. Report Reply 0 javascript: voteComment(336765307, 1)javascript: voteComment(336765307, 0)

Hanieh 37 weeks ago Thanks again Robert , The link is now working, tnx to Douglas too. I also wish to ask you about preparing the P&IDs, like basic rules ,, where to put check valve, where to put gate and etc. or How to do pipe sizing ? I have heard about simple calculation of Flow/Velocity and then pipe sizing , but what is the best velocity for each case ? is there any Ref? I think I am asking lot! Thanks in advance Report Reply 0 javascript: voteComment(337724983, 1)javascript: voteComment(337724983, 0)

Raleigh Lamirande 37 weeks ago Oh my goodness! a tremendous article dude. Thanks Nonetheless I am experiencing situation with ur rss . Dont know why Unable to subscribe to it. Is there anyone getting similar rss problem? Anyone who knows kindly respond. Thnkx Report Reply 0 javascript: voteComment(391382241, 1)javascript: voteComment(391382241, 0)

babak 26 weeks ago easy to understand thanks Report Reply 0 javascript: voteComment(419698532, 1)javascript: voteComment(419698532, 0)

Amit 20 weeks ago dear sir i m confused about the primary & secondary line used in p&ids sir i just want to know how to understand where is the primary line (process line) is used and where is the secondary line is used in a drawing. Report Reply 0 javascript: voteComment(471346575, 1)javascript: voteComment(471346575, 0)

VIJAY 9 weeks ago hello sir, how to identify a I/P signal from an insrument or a system to instrument index

Report Reply

Post a new comment


Embed video Add poll Check Spelling

Comment as a Guest, or login: Login to IntenseDebate Login to WordPress.com Login to Twitter Login to OpenID Name Email Website (optional) Displayed next to your comments. Not displayed publicly. If you have a website, link to it here. Submit Comment Subscribe to

Featured Series

We Are ChE: Entering a Golden Age


This is a weekly blog series about who ChEs are, what were doing, and where were going. Incoming AIChE president Phil Westmoreland looks at trends, considers the wide range of chemical engineers abilities and achievements, and writes about some of the core and new directions emerging.

Read all the posts in the series.

Events
o 4th ICBEInternational Conference on Biomolecular Engineering
January 13-16, 2013

Hyatt Pier 66 Ft. Lauderdale, Florida SBEs 3rd International Conference on Accelerating Biopharmaceutical Development
February 24-26, 2013

Coronado Island Marriott Coronado Island, California 2013 North Central Student Regional Conference
March 22-23, 2013

University of Cincinnati Cincinnati, Ohio

2013 AIChE Spring Meeting and 9th Global Congress on Process Safety
April 28-2, 2013

Grand Hyatt San Antonio, Texas

ChEnected Series
o o o o o o o o o o o o o o o o o o o o o o o 2011 Chem-E-Car Nationals (5) 2012 Chem-E-Car (7) AIChE Election Candidates Q&A (5) Chemical Engineering in the Kitchen (3) Excelling With Excel (4) Fukushima Update (3) How ChE Prepared Me for Business (and How It Didnt) (8) How to Interpret Piping and Instrumentation Diagrams (5) Interviews with Leading Engineers (3) Landing the Job (2) Nuclear Q&A (5) Path to Sustainability (4) Prominent Chemical Engineers' First Job (4) Salaries and Benefits for Chemical Engineers (5) Talking to Your Bo$$The Economics of Engineering (8) Tools and Tips for Successful Management and Leadership (7) We Are ChE: Entering a Golden Age (12) Young Professionals Point of View (3) Interpreting Piping and Instrumentation Diagrams [Part 1 of 5] Interpreting Piping and Instrumentation Diagrams-Symbology [Part 3 of 5] Interpreting Piping and Instrumentation Diagrams [Part 2 of 5] Codes, Tags and LabelsInterpreting Piping and Instrumentation Diagrams [Part 4 of 5] Interpreting Piping and Instrumentation Diagrams [Part 5 of 5]

Other posts belonging to this series

Donate

http://chenected.aiche.org/wp- content/uploads/2012/10/Giving_Image_ChEnected.jpg
The AIChE Foundation raises funds to support projects and activities that further the Institute's mission and enable the profession of chemical engineering to have a greater impact on the world. Donations small and large and make a difference. Learn More

Find a Grant!
See and Download our most up-to-date listings of grants from Grants.gov, including those from the National Science Foundation.

Authors ChemE On Demand


o o o 02/20/12 Leadership Is Everyones Responsibility 03/06/12 New Materials for Membrane Separations 12/12/12 Safety in the LNG Value Chain About Careers Contact Fun

More
o o o o

o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

Membership Useful Stuff Video December 2012 (33) November 2012 (34) October 2012 (42) September 2012 (28) August 2012 (24) July 2012 (23) June 2012 (23) May 2012 (42) April 2012 (37) March 2012 (34) February 2012 (39) January 2012 (30) December 2011 (30) November 2011 (40) October 2011 (72) September 2011 (34) August 2011 (32) July 2011 (30) June 2011 (40) May 2011 (29) April 2011 (34) March 2011 (51) February 2011 (34) January 2011 (39) December 2010 (29) November 2010 (59) October 2010 (46) September 2010 (26) August 2010 (34) July 2010 (39) June 2010 (38) May 2010 (29) April 2010 (35) March 2010 (46) February 2010 (7)

Archives

ChEtube Contribute!
Looking For Exposure?
Fancy Yourself a Writer? We're looking for authors for The Reactor and contributors of video, humor, book reviews, challenges/brain teasers, and polls for ChEnected pages. You'll be credited in the post. Find out more at Chenected.aiche.org/contribute

ChEnect With Us
o

o o o o o o
Chenected on Facebook

The last comments for Chemistry in Cake: Putting the Red in Red Velvet Cake Send Cakes to India Very nice creation with the help of science

http://chenected.aiche.org/general-interest/chemistry-in-cake-putting-the-red-in-red-velvet-cake/ - IDComment532487103 13 hours ago


The last comments for Interview: Anjana Meel of Safer Systems on Handling Spills [On Location] a dasot very nice presentation

http://chenected.aiche.org/process-safety/interview-anjana-meel-of-safer-systems-on-handling- spills-on-location/ - IDComment531143655 2 days ago


The last comments for T. Boone Pickens Wants Truckers To Start Dumping Diesel Kent Harrington I read where Waste Management has been converting many of their trash trucks to LNG. Apparently, UPS...

http://chenected.aiche.org/energy/t-boone-pickens-wants-truckers-to-start-dumping-diesel/ - IDComment530072722 3 days ago


The last comments for From Soda Bottle to Solar Light Bulb Fulvio Correct, Melissa. Alfredo Mozer invented it in 2002 during a blackout. Which doesn't stop other... 3 days ago The last comments for T. Boone Pickens Wants Truckers To Start Dumping Diesel ehorahan 58p We do manufacture natural gas trucks - right now they are mostly for short haul applications - trucks...

http://chenected.aiche.org/energy/from-soda-bottle-to-solar-light-bulb/ - IDComment530068654

http://chenected.aiche.org/energy/t-boone-pickens-wants-truckers-to-start-dumping-diesel/ - IDComment529514630 4 days ago


Comments by IntenseDebate

Categories
o o o o o o Biological Engineering (RSS) (88) Challenge Questions (RSS) (9) Chemical Engineering Progress (RSS) (44) Chemicals (RSS) (36) Contests (RSS) (19) Education (RSS) (52) K-12 (RSS) (11) Energy (RSS) (222) Environment (RSS) (72) Events (RSS) (336) AIChE Conferences (RSS) (244) Annual Meeting (RSS) (109) Regional Conferences (RSS) (17) Spring Meeting (RSS) (60) Student Conferences (RSS) (65) CCPS Conferences (RSS) (17) IFS Conferences (RSS) (7) SBE Conferences (RSS) (15) Finance (RSS)

o o o

o o o o o o o o o o o o

o o o o

(12) Funny Bone (RSS) (59) Boil's Law Comic Strip (RSS) (11) General Interest (RSS) (96) Legal (RSS) (7) Materials (RSS) (28) Nanotechnology (RSS) (35) News (RSS) (131) Office Life (RSS) (18) On Demand (RSS) (12) Plant Operations (RSS) (15) Polls (RSS) (10) Process Equipment (RSS) (3) Process Safety (RSS) (51) Professional and Career Development (RSS) (158) Management (RSS) (12) Public Outreach (RSS) (25) Recommended Reading (RSS) (42) Science and Technology (RSS) (23) Students (RSS) (77)

o o o o

o o

Sustainability (RSS) (147) Tools and Techniques (RSS) (47) Travel (RSS) (6) Video (RSS) (272) AIChE Annual Meeting (RSS) (9) Biological Engineering (RSS) (26) Chem-E-Car (RSS) (4) Chemical Engineering Practice (RSS) (8) Chemicals & Materials (RSS) (5) Energy (RSS) (19) Environment & Sustainability (RSS) (8) Process Safety (RSS) (28) Professional Development (RSS) (10) Student Conference (RSS) (1) Water (RSS) (1) Water (RSS) (43) Young Professionals (RSS) (144) YPAB (RSS) (58)

Twitter Feed

ChEnected AIChE
ChEnected

ChEnected Saudis Want to Export Solar Power to Europe ow.ly/grU61 about 1 hour ago reply retweet favorite

ChEnected Saudis Want to Export Solar Power to Europe ow.ly/grU4X 3 hours ago reply retweet favorite

ChEnected Liquid crystal research may lead to creation of new materials that can be actively controlled ow.ly/grRTQ 5 hours ago reply retweet favorite

ChEnected Popular Science's Best Longreads Of 2012 | Popular Science ow.ly/grRQF 6 hours ago reply retweet favorite

ChEnected Top 10 Solar Power Stories Of 2012 ow.ly/grRNF 6 hours ago reply retweet favorite

ChEnected Fuel Fix Energy predictions see a big future ow.ly/grRLU 7 hours ago reply retweet favorite

ChEnected Saudis Want to Export Solar Power to Europe ow.ly/grU2R #PV #saudi 8 hours ago reply retweet favorite

ChEnected Strange behavior: New study exposes living cells to synthetic protein ow.ly/grRKb 9 hours ago reply retweet favorite Join the conversation

Join Now | Member Center | ChemE on Demand | Conferences | Publications | Career Resources
Copyright 2010 American Institute of Chemical Engineers | All rights reserved | Privacy & Security Policy

You might also like