MUJAHID HUSSAIN S/O Shah Muhammad

P/O Rind Jada, Tehsil Kehror pakka, Distt. Lodhran, Punjab, Pakistan. mujahid_6184@yahoo.com Cell #: +923219336410

OBJECTIVE: To pursue a career in a progressive organization that provides opportunities for career growth and professional development and also in order to groom the overall personality

QUALIFICATION: 1: Diploma of Associate Engineer (Mechanical) (2007) From P.B.T.E Lahore.

CERTIFICATIONS: 1: LEVEL II (RT, MT, PT)

SKILLS: 1: 2: 3: Posses good knowledge of my relative Engineering Subjects. Keep ability to develop Co-operation among workers and officers. Good at problem solving and ready to face challenges with Great Courage and velour

COMPUTER SKILLS: 1: 2 3: 4: 5: 6: 7: Auto CAD 2D-3D drafting and designing. Autodesk 3D studio max modeling. Microsoft World. Microsoft Excel. Enhanced capability to operate internet. In page Corel Draw

PROFESSIONAL EXPERIENCE: Having more than 5 years a wide range of experience in construction, manufacturing & shutdown maintenance activities of Oil & Gas in offshore & onshore sectors in Inspection of Process Piping. Having a good practical and theoretical knowledge in NDT Techniques, interpretation & evaluation of drawings, International codes, specifications, QA/QC procedures, inspection methods and techniques. 1: Company: Period: Post: . o o o o o o o o o o o o o o o o o o o 2: Responsibilities: 1: Study contract & specification thoroughly for developing PQP and QIPs/ITPs for various projects to meet customers expectation/requirements comprehensively. Implementation of QIPs/ITPs at site. Controlling quality control activities and directly involving in inspection activities. Review and maintaining records of Calibration certificates of Instruments, Personnel Certifications, Batch test Certificates for Consumables etc. Review of material test certificates as per Codes, Standards and Client specification. Positive material identification for alloy steel and stainless steel materials. Verify equipment fabricated in accordance with specified tolerances. Ensuring all welding activities is in compliance with the approved WPS. Welding Inspection & NDT inspection of Pressure Vessels & process piping. Verifying that PWHT was done as per specifications. Conduct all required tests in according to contract requirements. Making records and reports of accomplishment. Inspection of piping system and punch listing as per isometric drawings. Verify that paint touch up performed & inspected prior to installing the equipment. Ensure all the piping connected to equipment have been NDT performed, hydro-tested, flushed & reinstated. Verification of piping to equipment nozzles installed with correct parallelism & no load (stress) transfer from piping to equipment. Inspection of Flange faces, Gasket condition, Nut & Bolt material during blinding and bolt torqueing after de- blinding. Witness hydro & pneumatic-test of piping loops & pressure vessels. Main-way closing and final box up of equipment. Company: Period: Post: .Responsibilities: Killing of check list related to isotope, Vehicles, Dark room o o o o o o o o o Provision of codes and standard books in NDT Office Submission of weekly forecast NDT related consumables to Head office Updating of personal Dose record for Radiographers Coordination with Execution and QC departments regarding daily radiography of weldments Coordination with HSE Dept regarding radiographic work permit, adaptation of all safety measures specially area cordon off. Execution of film processing and wrapping film interpretation Weekly submission of radiation exposure of data to client Perform R.T (Radiographic Test) of welded joints. Perform D.P.T for different techniques Performing the MT different techniques. Inspectest Pvt. Ltd. 18 Km Ferozepur road, Lahore. 25 July 2008 to Aug. 2010 N.D.T Inspector. Metal Forming Pvt. Ltd. 17 Km ferozepur road, Lahore. 01 Sep 2007 to 25 July 2008. QA QC Inspector

3:

Company: Period: Post: Client: Project # 1 Project # 2 Project # 3 Project # 4 Project # 5 Project # 6 Project # 7 Project # 8 Project # 9 Responsibilities:

JIACCO Pakistan Pvt. Ltd. S-Block, Gulburg II, Lahore. Aug. 2010 to the Date, N.D.T Inspector. ENI (PAKISTAN) K21 Wellhead & Flow line. K23 Wellhead & Flow line. K24 Wellhead & Flow line. K6 Wellhead & Flow line. WVS compressor. Sawan 12 Wellhead & Flow line. Miano 12 Wellhead & Flow line. K27 Wellhead & Flow line. K28 Wellhead & Flow line.

Projects with Gasco Construction (Private) Limited

Killing of check list related to isotope, Vehicles, Dark room o o o o o o o o o Provision of codes and standard books in NDT Office Submission of weekly forecast NDT related consumables to Head office Updating of personal Dose record for Radiographers Coordination with Execution and QC departments regarding daily radiography of weldment Coordination with HSE Dept regarding radiographic work permit, adaptation of all safety measures specially area cordon off. Execution of film processing and wrapping film interpretation Weekly submission of radiation exposure of data to client Perform R.T (Radiographic Test) of welded joints. Perform D.P.T for different techniques Performing the MT different techniques.

MAJOR SHUT DOWNS WITH JIACCO PAKISTAN 1. 2. 3. 4. 5. 6. 7. Kadanwari Central Facility (2010) FFC Sadiqabad (2010) FFBL Karachi (2010) Engro Chemical Plant (2010) OMV Kadanwari plant (2011) OMV Sawan gas plant (2011) Engro Chemical Plant Ghotki (2012)

PERSONAL INFORMATION: Date of birth: CNIC No.: Passport #: Religion: Domicile: Nationality: 10-04-1988 36202-9609955-5 TJ6899551 Islam Lodhran (Punjab) Pakistani