SYNOPSIS REPORT

SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR SEMESTER INDUSTRIAL TRAINING AT THERMAL POWER PROJECT -3*660MW (1 JANUARY to 30 JUNE)

SUBMITTED BY SIDHARTH KOHLI CIVIL ENGINEERING (90770101545)

DEPARTMENT OF CIVIL ENGINEERING SURYA SCHOOL OF ENGINEERING AND TECHNOLOGY, RAJPURA, PUNJAB.

INTRODUCTION TO COMPANY
GENERAL PROFILE OF THE COMPANY

NAME TYPE OF BUSINESS

: KK CONSTRUCTIONS AND BUILDERS :REAL ESTATE AND INDUSTRIAL CONSTRUCTION :1st FLOOR KASANA TOWER,B-1 COMMERCIAL BELT,ALPHA-1 GREATER NOIDA G.B NAGAR.

CORPORATE OFFICE

WEBSITE

: www.kkconstruction.in

KK CONSTRUCTION waz developed by JK Anand in the year 1991 and is based in Gorakhpur,INDIA. KK developed reliance energy plant,balrampur chini mill,civil structural work at bajaj energy in khambharkhera,vardhman mahavir medical college,construction of vilas and estate homes at jaypee greens golf course ,greater noida. K.K construction is backed by experience, qualified and hard working engineers ,skilled craftsmen etc. The company philosophy of personal participation and commitment to total customer satisfaction, through innovation, quality, sound business planning and team work has taken the company to a leading position. The reputation if the company has been built on the quality of work which is always of high standard and never sacrificed on any account. The organisation is well established and known for its ability to execute work speedily and within the stipulated period . We conduct and supervise our work incompliance with the legislation and make sure that all personal are equipped withwith best knowledge of safety.

Brief introduction of the project

KK construction work as a sub contaractor in this project. It is situated in lalitpur distt Jhansi. Thermal power plants contribute maximum to the generation of power of our country. Thermal power plant constitute 75.43% of total installed captive and non-captive power generation.

MAIN AND AUXILIARY EQUIPMENTS:


Coal handling plant Ash handling plant Turbine Cooling tower Boiler coal bunker Coal conveyor Mill Primary air fan Boiler Force Draught fan Electrostatic precipitator Chimey Roads & Drains

PROJECT DETAILS
Project Name Project Size Project cost Client Contract Type Sub contractors Project manager : Lalitpur Super Thermal Power Plant :1800acres (3*660)MW :15000 crores INR approximately : Bajaj infrastructures : Lump sump contract : 1)KK construction and builders.2)Simplex infrastructures.3)L&T : Mr.A.k chauhan

Lalitput super thermal power plant is the biggest power plant to be made in uttar Pradesh (3*660)MW. Its located in lalitpur distt Jhansi. It can provide electricity in all the rural as well as urban areas of U.P. In thermal power plant mechanical power is produced by heat engine that transform thermal energy ,often from combustion of fuel into rotational energy.

Different systems
Coal system Water system TG systems Furnace systems Ash systems Power evacuation system Support system.

Construction work under K.K construction and builders


Mill foundation Bunker foundation Electrostatic precipitator Earthing matt Roads and drains Id fan Fd fan Pa fan Site office Control building Id duct support foundation

Id duct support :No of total support :- 264 including 3 units Design of support according to given drawing. Steel use FE 415 which is given by bharat heavy electrical ltd. (B.H.E.L)

Earthing matte :Rod used of 36 dia. Joints req butt joint and T joint

Methodology /Planning of work

COMPONENTS OF PROJECT: 1.SURVEYING. 2.EXCAVATION. 3.FOUNDATION. 4.P.C.C WORK 5.SUPER SRUCTURE. 6.QUALITY CONTROL.

1.SURVEYING The equipment used for levelling is auto level which is used to determine the existing level and to calculate the required excavation or filling at a particular site,to layout our proposed structures on ground.

2.EXCAVATION After the marking and levelling excavation work starts which includes jcb to excavate or even sumtimes rock breaker is used when there is hard rock while excavatingand a truck to dump the excavated soil and rock.

3.P.C.C After the excavation work the P.C.C was laid with M7.5 (1:4:8)with thickness of 75mm to 100mm upto the marked area.

4.FOUNDATION After the laying of P.C.C shutterinf was done firstly of footing then after that of pedestal as [er the drawing specification. Grade of concrete used for footing and pedestal is M30 and for the drain purpose its M25 and the concrete was transported from the batching plant which was there at site only.the grade of steel used is Fe415 and Fe500

5.SUPER STRUCTURE The part of the building or structure which is constructed above the ground level is known as super structure.

6.Quality Control The test for quality control is performed at laboratory by casting cubes at every 50 cubic meter of casting.To check there strength and slump test was performed at sight as per IS code specification.