PROYECtO DE INSTALACIONES MECANICAS

SISTEMA DE AIRE ACONDICIONADO


GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

BAH 1

398.00

6"

4.40

1.00

40.00

229.00

2.69

0.00

2.69

2.69

BAH 2

398.00

6"

4.40

1.00

45.00

229.00

2.74

0.00

2.74

2.74

BAH 3

398.00

6"

4.40

1.00

40.00

229.00

2.69

0.00

2.69

2.69

Chiller 1

398.00

6"

4.40

1.00

6.00

6.00

8.74

Chiller 2

398.00

6"

4.40

1.00

6.00

6.00

8.74

Chiller 1

398.00

6"

4.40

1.00

43.00

42.00

0.85

0.00

0.85

9.59

Chiller 2

398.00

6"

4.40

1.00

27.00

31.00

0.58

0.00

0.58

9.32

General

796.00

8"

5.00

1.00

70.00

30.00

1.00

0.00

1.00

10.59

BAH 4

398.00

6"

4.40

1.00

14.00

142.00

1.56

0.00

1.56

12.15

BAH 5

398.00

6"

4.40

1.00

14.00

142.00

1.56

0.00

1.56

12.15

BAH 6

398.00

6"

4.40

1.00

14.00

142.00

1.56

0.00

1.56

12.15

BAH 4

398.00

6"

4.40

1.00

17.00

209.00

2.26

0.00

2.26

14.41

BAH 5

398.00

6"

4.40

1.00

14.00

209.00

2.23

0.00

2.23

14.38

BAH 6

398.00

6"

4.40

1.00

14.00

209.00

2.23

0.00

2.23

14.38

General

796.00

8"

5.00

1.00

56.00

46.00

1.02

0.00

1.02

15.43

Montante 1

326.72

6"

3.50

0.70

4.00

30.00

0.24

0.00

0.24

15.67

Sub Total

78.97

2,1/2"

5.50

5.00

7.00

12.00

0.95

0.00

0.95

16.62

Uma 29 P4

38.42

2"

4.00

3.00

20.00

80.00

3.00

5.00

8.00

24.62

Uma 28 P4

40.55

2"

4.00

3.00

24.00

80.00

3.12

5.00

8.12

24.74

Montante 1

245.70

4"

6.00

3.00

18.00

21.00

1.17

0.00

1.17

17.79

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

18.98

Uma 25 P3

27.59

1.1/2"

4.50

6.00

20.00

58.00

4.68

5.00

9.68

28.66

Designacion
Suministro
Primario

Secundario
Succion

Descarga

Uma 24 P3

27.35

1.1/2"

4.50

6.00

24.00

58.00

4.92

5.00

9.92

28.90

Montante 1

188.71

4"

4.80

2.00

18.00

21.00

0.78

0.00

0.78

18.57

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

19.76

Uma 17 P2

27.35

1.1/2"

4.50

6.00

20.00

58.00

4.68

5.00

9.68

29.44

Uma 18 P2

27.59

1.1/2"

4.50

6.00

24.00

58.00

4.92

5.00

9.92

29.68

Montante 1

131.72

3"

5.50

3.50

18.00

15.00

1.16

0.00

1.16

19.72

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

20.91

Observaciones

PROYECtO DE INSTALACIONES MECANICAS


SISTEMA DE AIRE ACONDICIONADO
GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Uma 10 P1

27.35

1.1/2"

4.50

6.00

20.00

58.00

4.68

5.00

9.68

30.59

Uma 11 P1

27.59

1.1/2"

4.50

6.00

24.00

58.00

4.92

5.00

9.92

30.83

Montante 1

74.73

2.1/2"

5.00

4.00

18.00

12.00

1.20

0.00

1.20

20.92

Sub Total

60.68

2.1/2"

4.00

2.50

7.00

12.00

0.48

0.00

0.48

21.40

Uma 3 PB

29.34

1.1/2"

4.80

6.00

20.00

58.00

4.68

5.00

9.68

31.08

Designacion

Uma 4 PB

31.34

1.1/2"

4.80

6.00

24.00

58.00

4.92

5.00

9.92

31.32

Montante 1

14.05

1"

4.00

7.00

30.00

5.00

2.45

0.00

2.45

33.04

Voz Data S

2.05

1/2"

2.20

5.00

10.00

24.00

1.70

7.00

8.70

41.74

Montante 1

12.00

1"

4.00

7.00

30.00

5.00

2.45

0.00

2.45

23.37

Voz Data S

2.05

1/2"

2.20

5.00

10.00

24.00

1.70

7.00

8.70

32.07

Sub Total

9.95

1"

3.80

6.00

40.00

2.00

2.52

0.00

2.52

25.89

Coord. S

3.79

3/4"

2.50

4.00

10.00

26.00

1.44

7.00

8.44

34.33

Mant. S

6.16

3/4"

3.80

8.00

16.00

26.00

3.36

24.00

27.36

53.25

Montante 2

504.10

6"

5.80

2.00

130.00

50.00

3.60

0.00

3.60

19.03

Sub Total

68.47

2,1/2"

4.80

4.00

7.00

12.00

0.76

0.00

0.76

19.79

Uma 26 P4

29.17

1.1/2"

4.80

6.00

20.00

58.00

4.68

5.00

9.68

29.47

Uma 27 P4

39.30

2"

4.00

3.50

24.00

80.00

3.64

5.00

8.64

28.43

Montante 2

435.63

6"

5.00

1.50

18.00

30.00

0.72

0.00

0.72

19.75

Sub Total

39.42

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

20.35

Uma 22 P3

19.67

1.1/2"

4.30

6.00

20.00

58.00

4.68

5.00

9.68

30.03

Uma 23 P3

19.75

1.1/2"

4.30

6.00

24.00

58.00

4.92

5.00

9.92

30.27

Montante 2

396.21

6"

4.50

1.00

18.00

30.00

0.48

0.00

0.48

20.23

Sub Total

39.23

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

20.83

Uma 15 P2

19.67

1.1/2"

4.30

6.00

20.00

58.00

4.68

5.00

9.68

30.51

Uma 16 P2

19.56

1.1/2"

4.30

6.00

24.00

58.00

4.92

5.00

9.92

30.75

Montante 2

84.90

3"

4.00

2.00

18.00

15.00

0.66

0.00

0.66

20.89

Sub Total

39.33

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

21.49

Uma 8 P1

19.58

1.1/2"

4.30

6.00

20.00

58.00

4.68

5.00

9.68

31.17

Uma 9 P1

19.75

1.1/2"

4.30

6.00

24.00

58.00

4.92

5.00

9.92

31.41

Montante 2

45.57

2"

5.00

5.00

24.00

10.00

1.70

0.00

1.70

22.59

Uma 1 PB

21.96

1.1/2"

3.50

3.00

20.00

58.00

2.34

5.00

7.34

29.93

Uma 2 PB

23.61

1.1/2"

3.50

3.00

24.00

58.00

2.46

5.00

7.46

30.05

Ramal 1

272.08

4"

7.00

3.00

60.00

21.00

2.43

0.00

2.43

22.66

Montante 3

94.58

3"

4.50

2.50

14.00

15.00

0.73

0.00

0.73

23.39

Observaciones

PROYECtO DE INSTALACIONES MECANICAS


SISTEMA DE AIRE ACONDICIONADO
GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Uma 20 P2

38.02

2"

4.00

3.50

24.00

80.00

3.64

5.00

8.64

32.03

Montante 3

56.56

2"

5.30

5.50

18.00

10.00

1.54

0.00

1.54

24.93

Uma 13 P1

27.10

1.1/2"

4.80

6.00

20.00

58.00

4.68

5.00

9.68

34.61

Uma 6 PB

29.46

1,1/2"

4.80

6.00

40.00

58.00

5.88

5.00

10.88

35.81

Ramal 1

177.50

4"

4.50

2.00

66.00

28.00

1.88

0.00

1.88

24.54

Montante 4

56.46

2"

5.30

5.50

4.00

10.00

0.77

0.00

0.77

25.31

Uma 19A P2

23.47

1.1/2"

3.50

3.00

20.00

58.00

2.34

5.00

7.34

32.65

Montante 4

32.99

1.1/2"

5.00

6.00

18.00

8.00

1.56

0.00

1.56

26.87

Uma 12A P1

15.63

1.1/4"

3.30

3.50

20.00

58.00

2.73

5.00

7.73

34.60

Uma 5A PB

17.36

1.1/4"

3.50

3.80

40.00

58.00

3.72

5.00

8.72

35.59

Ramal 1

121.04

3"

5.50

4.00

132.00

20.00

6.08

0.00

6.08

30.62

Montante 5

58.47

2"

5.50

5.80

4.00

10.00

0.81

0.00

0.81

31.43

Uma 19B P2

22.51

1.1/2"

3.50

3.00

20.00

58.00

2.34

5.00

7.34

38.77

Montante 5

35.96

1.1/2"

5.50

7.00

18.00

8.00

1.82

0.00

1.82

33.25

Uma 12B P1

17.27

1.1/4"

3.50

3.80

20.00

58.00

2.96

5.00

7.96

41.22

Uma 5B PB

18.69

1.1/2"

4.30

6.00

40.00

58.00

5.88

5.00

10.88

44.13

Ramal 1

62.57

2"

6.00

7.00

92.00

10.00

7.14

0.00

7.14

37.76

Uma 21 P2

26.18

1,1/2"

4.80

6.00

20.00

58.00

4.68

5.00

9.68

47.44

Ramal 1

36.39

2"

4.00

3.50

4.00

10.00

0.49

0.00

0.49

38.25

Uma 14 P1

16.07

1.1/4"

3.30

3.50

20.00

58.00

2.73

5.00

7.73

45.98

Uma 7 PB

20.32

1.1/2"

4.30

6.00

40.00

58.00

5.88

5.00

10.88

49.13

General

796.00

8"

5.00

1.00

92.00

65.00

1.57

0.00

1.57

1.57

BAH 1

398.00

6"

4.40

1.00

10.00

128.00

1.38

0.00

1.38

2.95

BAH 2

398.00

6"

4.40

1.00

10.00

128.00

1.38

0.00

1.38

2.95

BAH 3

398.00

6"

4.40

1.00

10.00

128.00

1.38

0.00

1.38

2.95

Montante 1

326.72

6"

3.50

0.70

4.00

30.00

0.24

0.00

0.24

3.19

Retorno

Sub Total

78.97

2,1/2"

5.50

5.00

7.00

12.00

0.95

0.00

0.95

4.14

Uma 29 P4

38.42

2"

4.00

3.00

20.00

80.00

3.00

0.00

3.00

7.14

Uma 28 P4

40.55

2"

4.00

3.00

24.00

80.00

3.12

0.00

3.12

7.26

Montante 1

245.70

4"

6.00

3.00

18.00

21.00

1.17

0.00

1.17

4.36

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

5.55

Uma 25 P3

27.59

1.1/2"

4.50

6.00

20.00

58.00

4.68

0.00

4.68

10.23

Uma 24 P3

27.35

1.1/2"

4.50

6.00

24.00

58.00

4.92

0.00

4.92

10.47

Observaciones

PROYECtO DE INSTALACIONES MECANICAS


SISTEMA DE AIRE ACONDICIONADO
GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Montante 1

188.71

4"

4.80

2.00

18.00

21.00

0.78

0.00

0.78

5.14

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

6.33

Uma 17 P2

27.35

1.1/2"

4.50

6.00

20.00

58.00

4.68

0.00

4.68

11.01

Designacion

Uma 18 P2

27.59

1.1/2"

4.50

6.00

24.00

58.00

4.92

0.00

4.92

11.25

Montante 1

131.72

3"

5.50

3.50

18.00

15.00

1.16

0.00

1.16

6.29

Sub Total

54.94

2"

6.00

7.00

7.00

10.00

1.19

0.00

1.19

7.48

Uma 10 P1

27.35

1.1/2"

4.50

6.00

20.00

58.00

4.68

0.00

4.68

12.16

Uma 11 P1

27.59

1.1/2"

4.50

6.00

24.00

58.00

4.92

0.00

4.92

17.08

Montante 1

74.73

2.1/2"

5.00

4.00

18.00

12.00

1.20

0.00

1.20

7.49

Sub Total

60.68

2.1/2"

4.00

2.50

7.00

12.00

0.48

0.00

0.48

7.97

Uma 3 PB

29.34

1.1/2"

4.80

6.00

20.00

58.00

4.68

0.00

4.68

12.65

Uma 4 PB

31.34

1.1/2"

4.80

6.00

24.00

58.00

4.92

0.00

4.92

17.57

Montante 1

14.05

1"

4.00

7.00

30.00

5.00

2.45

0.00

2.45

14.61

Voz Data S

2.05

1/2"

2.20

5.00

10.00

24.00

1.70

0.00

1.70

16.31

Montante 1

12.00

1"

4.00

7.00

30.00

5.00

2.45

0.00

2.45

9.94

Voz Data S

2.05

1/2"

2.20

5.00

10.00

24.00

1.70

0.00

1.70

11.64

Sub Total

9.95

1"

3.80

6.00

40.00

2.00

2.52

0.00

2.52

12.46

Coord. S

3.79

3/4"

2.50

4.00

10.00

26.00

1.44

0.00

1.44

13.90

Mant. S

6.16

3/4"

3.80

8.00

16.00

26.00

3.36

0.00

3.36

15.82

Montante 2

504.10

6"

5.80

2.00

130.00

50.00

3.60

0.00

3.60

6.55

Sub Total

68.47

2,1/2"

4.80

4.00

7.00

12.00

0.76

0.00

0.76

7.31

Uma 26 P4

29.17

1.1/2"

4.80

6.00

20.00

58.00

4.68

0.00

4.68

11.99

Uma 27 P4

39.30

2"

4.00

3.50

24.00

80.00

3.64

0.00

3.64

10.95

Montante 2

435.63

6"

5.00

1.50

18.00

30.00

0.72

0.00

0.72

7.15

Sub Total

39.42

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

7.74

Uma 22 P3

19.67

1.1/2"

4.30

6.00

20.00

58.00

4.68

0.00

4.68

12.42

Uma 23 P3

19.75

1.1/2"

4.30

6.00

24.00

58.00

4.92

0.00

4.92

12.66

Montante 2

396.21

6"

4.50

1.00

18.00

30.00

0.48

0.00

0.48

7.63

Sub Total

39.23

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

8.22

Uma 15 P2

19.67

1.1/2"

4.30

6.00

20.00

58.00

4.68

0.00

4.68

12.90

Uma 16 P2

19.56

1.1/2"

4.30

6.00

24.00

58.00

4.92

0.00

4.92

13.14

Montante 2

84.90

3"

4.00

2.00

18.00

15.00

0.66

0.00

0.66

8.29

Sub Total

39.33

2"

4.00

3.50

7.00

10.00

0.60

0.00

0.60

8.88

Uma 8 P1

19.58

1.1/2"

4.30

6.00

20.00

58.00

4.68

0.00

4.68

13.56

Observaciones

PROYECtO DE INSTALACIONES MECANICAS


SISTEMA DE AIRE ACONDICIONADO
GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o
13.80

Uma 9 P1

19.75

1.1/2"

4.30

6.00

24.00

58.00

4.92

0.00

4.92

Montante 2

45.57

2"

5.00

5.00

24.00

10.00

1.70

0.00

1.70

9.99

Uma 1 PB

21.96

1.1/2"

3.50

3.00

20.00

58.00

2.34

0.00

2.34

12.33

Uma 2 PB

23.61

1.1/2"

3.50

3.00

24.00

58.00

2.46

0.00

2.46

14.79

Ramal 1

272.08

4"

7.00

3.00

60.00

21.00

2.43

0.00

2.43

10.06

Montante 3

94.58

3"

4.50

2.50

14.00

15.00

0.73

0.00

0.73

10.78

Uma 20 P2

38.02

2"

4.00

3.50

24.00

80.00

3.64

0.00

3.64

14.42

Montante 3

56.56

2"

5.30

5.50

18.00

10.00

1.54

0.00

1.54

12.32

Uma 13 P1

27.10

1.1/2"

4.80

6.00

20.00

58.00

4.68

0.00

4.68

17.00

Uma 6 PB

29.46

1,1/2"

4.80

6.00

40.00

58.00

5.88

0.00

5.88

18.20

Ramal 1

177.50

4"

4.50

2.00

66.00

28.00

1.88

0.00

1.88

11.94

Montante 4

56.46

2"

5.30

5.50

4.00

10.00

0.77

0.00

0.77

12.71

Uma 19A P2

23.47

1.1/2"

3.50

3.00

20.00

58.00

2.34

0.00

2.34

15.05

Montante 4

32.99

1.1/2"

5.00

6.00

18.00

8.00

1.56

0.00

1.56

14.27

Uma 12A P1

15.63

1.1/4"

3.30

3.50

20.00

58.00

2.73

0.00

2.73

17.00

Uma 5A PB

17.36

1.1/4"

3.50

3.80

40.00

58.00

3.72

0.00

3.72

17.99

Ramal 1

121.04

3"

5.50

4.00

132.00

20.00

6.08

0.00

6.08

18.02

Montante 5

58.47

2"

5.50

5.80

4.00

10.00

0.81

0.00

0.81

18.83

Uma 19B P2

22.51

1.1/2"

3.50

3.00

20.00

58.00

2.34

0.00

2.34

21.17

Montante 5

35.96

1.1/2"

5.50

7.00

18.00

8.00

1.82

0.00

1.82

20.65

Uma 12B P1

17.27

1.1/4"

3.50

3.80

20.00

58.00

2.96

0.00

2.96

23.61

Uma 5B PB

18.69

1.1/2"

4.30

6.00

40.00

58.00

5.88

0.00

5.88

26.53

Ramal 1

62.57

2"

6.00

7.00

92.00

10.00

7.14

0.00

7.14

25.16

Uma 21 P2

26.18

1,1/2"

4.80

6.00

20.00

58.00

4.68

0.00

4.68

29.84

Ramal 1

36.39

2"

4.00

3.50

4.00

10.00

0.49

0.00

0.49

25.65

Uma 14 P1

16.07

1.1/4"

3.30

3.50

20.00

58.00

2.73

0.00

2.73

28.38

Uma 7 PB

20.32

1.1/2"

4.30

6.00

40.00

58.00

5.88

0.00

5.88

31.53

Primario
Suministro

10.59

Sub Total

15.59

Total

17.00

5.00

Secundario
Suministro

38.54

Observaciones

PROYECtO DE INSTALACIONES MECANICAS


SISTEMA DE AIRE ACONDICIONADO
GERENCIA REGIONAL DE TRIBUTOS INTERNOS
VALENCIA - ESTADO CARABOBO

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Retorno

31.53

Sub Total

70.07

Total

75.00

Observaciones

SERVICIO NACIONAL INTEGRADO DE ADMINISTRACION ADUANERA Y TRIBUTARTIA

SENIAT
EDIFICIOS SEDE EN PLAZA VENEZUELA
CALCULOS DE TUBERIA DE AGUA HELADA
Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Sub Total

Accesorios

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Observaciones

TORRE SUR
Suministro

516.00

Chiller 1

172.00

4"

4.80

2.00

30.00

0.60

0.50

15.00

16.10

16.10

Chiller 2

172.00

4"

4.80

2.00

14.00

0.28

0.62

15.00

15.90

15.90

Sub total

344.00

6"

4.00

1.00

14.00

0.14

0.00

0.14

16.24

Chiller 3

172.00

4"

4.80

2.00

14.00

0.28

0.62

15.90

15.90

15.00

sub total

General

516.00

6"

6.00

2.00

50.00

1.00

0.32

1.32

17.56

sub total

Montante

516.00

6"

6.00

2.00

10.00

0.20

0.60

0.80

18.36

sub total

Piso 9

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 9-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

sub total

UMA 9-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

sub total

Montante

480.00

6"

6.00

2.00

14.00

0.28

0.60

0.88

19.24

sub total

Piso 8

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 8-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

UMA 8-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

Montante

444.00

6"

5.00

1.50

14.00

0.21

0.45

0.66

19.90

Piso 7

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 7-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

UMA 7-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

Montante

408.00

6"

4.50

1.50

14.00

0.21

0.45

0.66

20.56

Piso 6

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 6-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

12.00

UMA 6-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

14.58

15.35

Montante

372.00

6"

4.00

1.00

14.00

0.14

0.30

0.44

21.00

Piso 5

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 5-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

UMA 5-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

Montante

336.00

6"

4.00

0.90

14.00

0.13

0.27

0.40

21.40

Piso 4

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 4-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

UMA 4-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

Montante

300.00

6"

3.50

0.90

14.00

0.13

0.27

0.40

21.80

Piso 3

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 3-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

13.08

13.85

12.00

sub total

sub total

sub total

sub total

sub total

SERVICIO NACIONAL INTEGRADO DE ADMINISTRACION ADUANERA Y TRIBUTARTIA

SENIAT
EDIFICIOS SEDE EN PLAZA VENEZUELA
CALCULOS DE TUBERIA DE AGUA HELADA
Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Sub Total

Accesorios

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

12.00

UMA 3-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

14.58

15.35

Montante

264.00

6"

3.00

0.50

14.00

0.07

0.15

0.22

22.02

Piso 2

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 2-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

UMA 2-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

12.00

14.58

15.35

Montante

228.00

4"

6.00

3.00

14.00

0.42

0.63

1.05

23.07

Piso 1

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

0.77

UMA 1-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

12.00

13.08

13.85

12.00

Observaciones

sub total

sub total

UMA 1-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

14.58

15.35

Montante

192.00

4"

5.00

2.50

14.00

0.35

0.53

0.88

23.95

sub total

Mezanina

48.00

2"

6.00

5.00

30.00

1.50

0.50

2.00

25.95

sub total

UMA M-1

48.00

2"

6.00

5.00

14.00

0.70

0.50

15.20

15.20

14.00

Montante

144.00

4"

4.00

1.50

20.00

0.30

0.32

0.62

26.57

sub total

Planta Baja

144.00

4"

4.00

1.50

10.00

0.15

0.62

0.77

27.34

sub total

Ramal

72.00

3"

3.00

1.50

60.00

0.90

0.12

1.02

28.36

sub total

UMA 7

12.00

1"

4.00

7.50

10.00

0.75

0.45

12.00

13.20

41.56

0.72

29.08

12.00

13.20

42.28

1.10

30.18

13.20

43.38

1.40

31.58

12.00

13.20

44.78

Ramal

60.00

2,1/2"

4.00

3.00

12.00

0.36

0.36

UMA 8

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

48.00

2"

6.00

5.00

12.00

0.60

0.50

UMA 9

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

36.00

1.1/2"

5.00

7.00

12.00

0.84

0.56

UMA 10

12.00

1"

4.00

7.50

10.00

0.75

0.45

12.00

sub total
sub total
sub total

Ramal

24.00

1,1/2"

4.00

5.00

12.00

0.60

0.40

1.00

32.58

sub total

UMA 11

12.00

1"

4.00

7.50

10.00

0.75

0.45

12.00

13.20

45.78

sub total

UMA 12

12.00

1"

4.00

7.50

20.00

1.50

0.80

12.00

14.30

46.88

TOTAL

Ramal

72.00

3"

3.00

1.50

10.00

0.15

0.12

0.27

28.63

UMA 6

12.00

1"

4.00

7.50

10.00

0.75

0.45

13.20

41.83

Ramal

60.00

2,1/2"

4.00

3.00

12.00

0.36

0.36

0.72

29.35

UMA 5

12.00

1"

4.00

7.50

10.00

0.75

0.45

13.20

42.55

Ramal

48.00

2"

6.00

5.00

12.00

0.60

0.50

1.10

30.45

UMA 4

12.00

1"

4.00

7.50

10.00

0.75

0.45

13.20

43.65

Ramal

36.00

1.1/2"

5.00

7.00

12.00

0.84

0.56

1.40

31.85

UMA 3

12.00

1"

4.00

7.50

10.00

0.75

0.45

13.20

45.05

12.00
12.00
12.00
12.00

SERVICIO NACIONAL INTEGRADO DE ADMINISTRACION ADUANERA Y TRIBUTARTIA

SENIAT
EDIFICIOS SEDE EN PLAZA VENEZUELA
CALCULOS DE TUBERIA DE AGUA HELADA
Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Sub Total

Accesorios

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Observaciones

Ramal

24.00

1,1/2"

4.00

5.00

12.00

0.60

0.40

1.00

32.85

UMA 2

12.00

1"

4.00

7.50

12.00

0.90

0.45

12.00

13.35

46.05

sub total

UMA 1

12.00

1"

4.00

7.50

16.00

1.20

0.80

12.00

14.00

46.85

sub total

Retorno

0.00

UMA 1

12.00

1"

4.00

7.50

16.00

1.20

0.80

1.00

3.00

3.00

UMA 2

12.00

1"

4.00

7.50

12.00

0.90

0.45

1.00

2.35

2.35

Ramal

24.00

1,1/2"

4.00

5.00

12.00

0.60

0.40

1.00

4.00

UMA 3

12.00

1"

4.00

7.50

10.00

0.75

0.45

2.20

2.20

1.40

5.40

2.20

2.20

1.10

6.50

2.20

2.20

0.72

7.22

2.20

2.20

0.27

7.49

1.00

Ramal

36.00

1.1/2"

5.00

7.00

12.00

0.84

0.56

UMA 4

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

48.00

2"

6.00

5.00

12.00

0.60

0.50

UMA 5

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

60.00

2,1/2"

4.00

3.00

12.00

0.36

0.36

UMA 6

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

72.00

3"

3.00

1.50

10.00

0.15

0.12

Uma 12

12.00

1"

4.00

7.50

20.00

1.50

0.80

1.00

3.30

3.30

UMA 11

12.00

1"

4.00

7.50

10.00

0.75

0.45

1.00

2.20

2.20

Ramal

24.00

1,1/2"

4.00

5.00

10.00

0.50

0.40

0.90

4.20

UMA 10

12.00

1"

4.00

7.50

20.00

1.50

0.45

2.95

2.95

1.40

6.10

2.20

2.20

1.10

7.20

2.20

2.20

0.72

7.92

2.20

2.20

1.00
1.00
1.00

1.00

sub total

sub total

Ramal

36.00

1.1/2"

5.00

7.00

12.00

0.84

0.56

UMA 9

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

48.00

2"

6.00

5.00

12.00

0.60

0.50

UMA 8

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

60.00

2,1/2"

4.00

3.00

12.00

0.36

0.36

UMA 7

12.00

1"

4.00

7.50

10.00

0.75

0.45

Ramal

72.00

3"

3.00

1.50

60.00

0.90

0.12

1.02

8.94

sub total

Planta Baja

144.00

4"

4.00

1.50

10.00

0.15

0.62

0.77

9.71

sub total

Montante

144.00

4"

4.00

1.50

20.00

0.30

0.32

0.62

10.33

sub total

UMA M-1

48.00

2"

6.00

5.00

14.00

0.70

0.50

2.20

2.20

Mezanina

48.00

2"

6.00

5.00

30.00

1.50

0.50

2.00

4.20

Montante

192.00

4"

5.00

2.50

14.00

0.35

0.53

0.88

11.21

UMA 1-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 1-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

1.00
1.00
1.00

1.00

SERVICIO NACIONAL INTEGRADO DE ADMINISTRACION ADUANERA Y TRIBUTARTIA

SENIAT

sub total

EDIFICIOS SEDE EN PLAZA VENEZUELA


CALCULOS DE TUBERIA DE AGUA HELADA
Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Sub Total

Accesorios

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Piso 1

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

228.00

4"

6.00

3.00

14.00

0.42

0.63

1.05

12.26

UMA 2-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 2-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 2

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

264.00

6"

3.00

0.50

14.00

0.07

0.15

0.22

12.48

UMA 3-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 3-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 3

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

300.00

6"

3.50

0.90

14.00

0.13

0.27

0.40

12.88

UMA 4-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 4-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 4

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

336.00

6"

4.00

0.90

14.00

0.13

0.27

0.40

13.28

UMA 5-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 5-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 5

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

372.00

6"

4.00

1.00

14.00

0.14

0.30

0.44

13.72

UMA 6-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 6-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

piso 6

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

408.00

6"

4.50

1.50

14.00

0.21

0.45

0.66

14.38

UMA 7-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 7-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

piso 7

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

444.00

6"

5.00

1.50

14.00

0.21

0.45

0.66

15.04

UMA 8-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 8-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 8

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

480.00

6"

6.00

2.00

14.00

0.28

0.60

0.88

15.92

UMA 9-2

18.00

1,1/4"

4.00

6.00

35.00

2.10

0.48

1.00

3.58

3.58

UMA 9-1

18.00

1,1/4"

4.00

6.00

10.00

0.60

0.48

1.00

2.08

2.08

Piso 9

36.00

1.1/2"

5.00

7.00

7.00

0.49

0.28

0.77

4.35

Montante

516.00

6"

6.00

2.00

10.00

0.20

0.60

0.80

16.72

SERVICIO NACIONAL INTEGRADO DE ADMINISTRACION ADUANERA Y TRIBUTARTIA

SENIAT

Observaciones

sub total

sub total

sub total

sub total

sub total

sub total

sub total

sub total

sub total

EDIFICIOS SEDE EN PLAZA VENEZUELA


CALCULOS DE TUBERIA DE AGUA HELADA
Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Sub Total

Accesorios

Equipo

Sub Total

Total

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Ft h2o

Ft h2o

General

516.00

6"

6.00

2.00

25.00

0.50

0.00

0.50

17.22

Bomba 1

258.00

4"

6.00

3.00

10.00

0.30

0.90

1.20

18.42

Bomba 2

258.00

4"

6.00

3.00

10.00

0.30

0.90

1.20

18.42

Bomba 3

258.00

4"

6.00

3.00

10.00

0.30

0.90

1.20

18.42

Descarga 1

258.00

4"

6.00

3.00

15.00

0.45

0.96

1.41

19.83

Descarga 2

258.00

4"

6.00

3.00

15.00

0.45

0.96

1.41

19.83

Descarga 3

258.00

4"

6.00

3.00

15.00

0.45

0.96

1.41

19.83

General

516.00

6"

6.00

2.00

30.00

0.60

0.96

1.56

21.39

Chiller 3

172.00

4"

4.80

2.00

15.00

0.30

0.80

Sub total

344.00

6"

4.00

1.00

15.00

0.15

0.00

Chiller 2

172.00

4"

4.80

2.00

15.00

0.30

0.80

Chiller 1

172.00

4"

4.80

2.00

25.00

0.50

0.80

1.00

2.10

2.10

0.15

21.54

1.00

2.10

23.64

1.00

2.30

23.84

Observaciones
sub total

TOTAL = 80,00 Ft h2o

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida

Longitud

Accesorios

Sub Total

Equipo

gpm

pulg

ppm

Ft h2o/100 Ft

Ft

Ft h2o

Ft h2o

Ft h2o

Suministro
Primario
General

120.00

3"

5.00

3.00

33.00

10.00

1.29

0.00

UMA 1

24.00

1.5"

4.00

4.50

33.00

25.00

2.61

7.00

Sub Total

96.00

4.50

2.50

66.00

25.00

2.28

0.00

UMA 2

12.00

2"

4.00

3.00

20.00

80.00

3.00

5.00

Sub Total

84.00

2"

4.00

3.00

24.00

80.00

3.12

5.00

UMA 3

48.00

4"

6.00

3.00

18.00

21.00

1.17

0.00

Sub Total

36.00

2"

6.00

7.00

7.00

10.00

1.19

0.00

UMA 4

27.59

1.1/2"

4.50

6.00

20.00

58.00

4.68

5.00

UMA 5

27.35

1.1/2"

4.50

6.00

24.00

58.00

4.92

5.00

HELADA
Sub Total

Total

Ft h2o

Ft h2o

1.29

1.29

9.61

10.90

2.28

3.57

8.00

11.57

8.12

11.69

1.17

4.74

1.19

5.93

9.68

15.61

9.92

15.85

Observaciones

Ap Equipo= 15.00 Ft h2o

Ap Equipo= 7.00 Ft h2o

Ap Equipo= 10.00 Ft h2o

UMA 5
5 TR / 12 GPM

UMA 3
20 TR / 48 GPM

UMA 1
10 TR / 24 GPM

24 GPM

48 GPM

BOMBA
c
a

120 GPM

96 GPM

84 GPM

12 GPM

UMA 2
5 TR / 12 GPM

36 GPM

12 GPM

24 GPM

UMA 4
10 TR / 24 GPM

Nota: El diferencial de Temperatura puede variar de acuerdo al Criterio de Diseo del Proyectista

Ap Equipo= 10.00 Ft h2o

Ap Equipo= 5.00 Ft h2o

FORMULA BASICA PARA CALCULO DEL CAUDAL


CAUDAL = (( TONELADAS DE REFRIGERACION X 24) / (DIFERENCIAL DE TEMPERATURA ))
CAUDAL =
( TR X 24 ) / ( AT )
CONDICION STANDARD (ARI) PARA LA ENTRADA Y SALIDA DEL CHILLER = 10.00 F

Temperatura de Entrada = 54.00 F / Temperatura de Salida = 44.00 F At= 10.00 F


Nota: El diferencial de Temperatura puede variar de acuerdo al Criterio de Diseo del Proyectista
La referencia para Calculo de Tuberias se basan en Manual de Diseo de Carrier (Piping Design)

VELOCIDADES RECOMENDADAS EN CALCULOS DE TUBERIAS

Dimensiones de Tuberias

Servicio

Minimo

Maximo

Descarga de Bombas

8 fps

12 fps

Carretes

0.20

mts

Succion de Bombas

4 fps

7 fps

Niples

1.20

mts

Lineas de drenaje

4 fps

7 fps

Tuberias Principales

4 fps

15 fps

Ramales verticales

3 fps

10 fps

GPM

Galones por minuto

Servicios Generales

5 fps

10 fps

Ft h2o

Pie de agua

Servicios de aduccion

3 fps

7 fps

fps

Pie por segundo

fps = Pie (Ft) x segundo

DETALLE TIPICO DE CONEXIN A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "a" AL

24 GPM

"b" (SUMINISTRO)

Niple

CARRETE

Bomba

CARRETE

Niple

Ampliacion

96 GPM

Valvula de Globo
Junta Antivibratoria

Conexin "T"
Valvula de Check

Valvula de Compuerta

Valvula de Globo

Formula aplicada

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Junta Antivibratoria
Valvula Check

0.30 mts (0.98 Ft)


30.00 Ft equivalentes

0.03 Ft

Perdida en =
Accesorios

0.90 Ft

Caida de P Equi. X Perdida Friccional


100

Valvula de Globo

84.00 Ft equivalentes

2.52 Ft

Valvula de Compuerta

3.20 Ft equivalentes

0.10 Ft

Conexin "T"

5.00 Ft equivalentes

0.15 Ft

Longitud de la Tuberia

2.00 mts (6.28 Ft)

Ampliaciones

13.00 Ft equivalentes
Total

0.39 Ft
4.09

Long Equiv. Accesorios

1.36 mts ( 4.09 Ft)

NOTA:
Para su seleccin nos basamos en un Diametro de 3" de tuberia determinado para el tramo principal del nodo "a" / "b"
con 120 gpm, 5.00 Ft por seg de velocidad y una perdida de presion estatica de 3.00 Ft por 100 Ft
La Junta Antivibratoria se asume como una tuberia de la longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

Suministro
General

DETALLE TIPICO DE CONEXIONADO A BOMBA

DETALLE DE CONEXIN UMA SUMINISTRO

EJEMPLO DE ESTUDIO DEL NODO "b"-"UMA 1" (Suministro)


10 TR - 24.00 GPM

Ap Equipo= 15.00 Ft h2o

Dimensiones de Tuberias
Carretes
0.20
mts
Niples
5.00
mts

UMA 1

5.00 mts

24 GPM

Ampliacion
Carrete

Reduccion

96 GPM

Valvula de
Compuerta

Conexion "T"

Conexin "T"
Manometro
Valvula de
Balanceo

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Union Universal
0.0149
0.33 Ft (0.1 mts)
Valvula de Balanceo
0.34
7.5 Ft = 50% C.P.S.
Valvula de Compuerta
0.08
1.8 Ft equivalentes
Conexin "T" (2)
0.68
15 Ft equivalentes
Reducciones
0.22
Ft
equivalentes
4.9
Ampliaciones
0.26
5.8 Ft equivalentes
Total
1.59

S
E
R
P
E
N
T
I
N

Union
Universal
Conexin "T"
Termometro

Perdida en =
Accesorios

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

5.80 mts (19.03 Ft)


32.63 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 3" de tuberia determinado para el tramo principal del nodo "b"/"UMA 1"
con 24 gpm, 4.00 Ft por seg de velocidad y una perdida de presion estatica de 4.50 Ft por 100 Ft
La Union Universal se asume como una tuberia de la longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "b" / UMA 1 de 28,40 Ft/h2o

Dimensiones de Tuberias
Niples
15.00
mts

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "b"-"UMA 1" (Suministro)

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Conexin "T"
0.3800
15 Ft equivalentes
Total
0.38
Niple

84 GPM
Conexin "T"
Niple
12 GPM

96 GPM

UMA 2

Perdida en =
Accesorios

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

5 TR - 12.00 GPM

Ap Equipo= 10.00 Ft H2O

49.2 Ft ( 15 mts )
15.00 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 3" de tuberia determinado para el tramo principal del nodo "b"/"c"
con 96 gpm, 4.50 Ft por seg de velocidad y una perdida de presion estatica de 2.50 Ft por 100 Ft

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

General

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "b" / UMA 1 de 28,40 Ft/h2o ya que para satisfacer al nodo
"c" solamente se necesitan 5.63 Ft de h2o

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "c"-"UMA 2" (Suministro)

DETALLE DE CONEXIN UMA SUMINISTRO

Conexin "T"
96 GPM

Dimensiones de Tuberias
Carretes
0.20
mts
Niples
20.00
mts

84 GPM

Ampliacion
Carrete
Niple

Niple
12 GPM

UMA 2
Valvula de
Compuerta

5 TR - 12.00 GPM

Ap Equipo= 10.00 Ft H2O

Valvula de
Balanceo

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Union Universal
0.02
0.33 Ft ( 0.1m )
Valvula de Balanceo
0.38
5 Ft = 50% C.P.S.
Valvula de Compuerta
0.08
1 Ft equivalentes
Conexin "T" (2)
1.13
15 Ft equivalentes
Ft
equivalentes
Reducciones
0.38
5
Ampliaciones
0.15
2 Ft equivalentes
Total
2.12

Conexin "T"
Manometro Conexin "T"
Termometro

Perdida en =
Accesorios

S
E
R
P
E
N
T
I
N

Union
Universal

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

67.57 Ft (20.60 mts)


19.50 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 1" de tuberia determinado para el tramo principal del nodo "c"/"UMA 2"
con 12 gpm, 4.00 Ft por seg de velocidad y una perdida de presion estatica de 7.50 Ft por 100 Ft
La Union Universal se asume como una tuberia de longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

Notese que en este punto la presion a ser vencida porla bomba de agua es la correspondiente al nodo "b"/"UMA 1" de 28,40 Ft/H2O ya que
para satisfacer al nodo "UMA2" solamente se necesitan 22,41 Ft de H2O se puede deducir que aunque el nodo estudiado esta mas alejado
de la fuente generadora de presion no necesariamente este representa la presion del sistema para satisfacer sus requerimientos

Dimensiones de Tuberias
Niples
15.00
mts

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "c"-"d" (Suministro)

20 TR - 48.00 GPM

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Conexin "T"
12 Ft equivalentes
0.66
Reducciones
2 Ft equivalentes
0.11
Total
0.77

Ap Equipo= 7.00 Ft H2O

UMA 3
Reduccion
48 GPM
Niple
Perdida en =
Accesorios
84 GPM

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

36 GPM

Reduccion

49.2 Ft (15.00 mts)


14.00 Ft

Longitud de la Tuberia
Long Equiv. Accesorios

Niple
Conexin "T"

NOTA:
Para su seleccin nos basamos en un diamtero de 2-1/2" de tuberia determinado para el tramo principal del nodo "c"/"d"
con 84 gpm, 6.00 Ft por seg de velocidad y una perdida de presion estatica de 5.50 Ft por 100 Ft

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

General

84.00

2-1/2"

6.00

5.50

2.46

0.77

3.23

0.00

3.23

43.75

Notese que en este punto la presion a ser vencida porla bomba de agua es la correspondiente al nodo "b"/"UMA 1" de 28,40 Ft/H2O ya que
para satisfacer al nodo "d" solamente se necesitan 9.35 Ft de H2O se puede deducir que aunque el nodo estudiado esta mas alejado de la
fuente generadora de presion no necesariamente este representa la presion del sistema para satisfacer sus requerimientos

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "d"-"UMA 3" (Suministro)

Dimensiones de Tuberias
Carretes
0.20
mts
Niples
20.00
mts

20 TR - 48.00 GPM

Ap Equipo= 7.00 Ft H2O

UMA 3

48 GPM

DETALLE DE CONEXIN UMA SUMINISTRO

Niple

Ampliacion
Carrete

Reduccion
20 mts
Conexin "T"
84 GPM

S
E
R
P
E
N
T
I
N

36 GPM
Valvula de
Compuerta

Valvula de
Balanceo

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Union Universal
0.02
0.33 Ft ( 0.1m )
Valvula de Balanceo
3.5 Ft = 50% C.P.S.
0.18
Valvula de Compuerta
2.3 Ft equivalentes
0.12
Conexin "T" (2)
10 Ft equivalentes
0.50
Reducciones
1.6 Ft equivalentes
0.08
Ampliaciones
1.6 Ft equivalentes
0.08
Total
0.97

Conexin "T"
Manometro Conexin "T"
Termometro
Perdida en =
Accesorios

Union
Universal

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

67.57 Ft (20.60 mts)


29.10 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 2" de tuberia determinado para el tramo principal del nodo "d"/"UMA 3"
con 48 gpm, 5.00 Ft por seg de velocidad y una perdida de presion estatica de 5.00 Ft por 100 Ft
La Union Universal se asume como una tuberia de la longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

General

84.00

2-1/2"

6.00

5.50

2.46

0.77

3.23

0.00

3.23

43.75

UMA 3

48.00

2"

5.00

5.00

3.38

0.97

4.35

7.00

11.35

55.09

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "b" / UMA 1 de 28,40 Ft/h2o
ya que para satisfacer al nodo "d" solamente se necesitan 21.18 Ft de h2o Se puede deducir que aunque el nodo estudiado esta mas
alejado de la fuente generadora de presion no necesariamente este representa la presion del sistema para satisfacer sus requerimientos

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "d"-"e" (Suministro)
Dimensiones de Tuberias
Niples
15.00
mts

15 mts
36 GPM

12 GPM
Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier
Conexin "T"
10 Ft equivalentes
0.25
Reducciones
2 Ft equivalentes
0.05
Total
0.30

Conexin "T"

Reduccion

20 mts
Perdida en =
Accesorios

36 GPM
10 TR - 24.00 GPM

Ap Equipo= 5.00 Ft H2O

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

UMA 4
49.2 Ft (15.00 mts)
11.60 Ft

Longitud de la Tuberia
Long Equiv. Accesorios

NOTA:
Para su seleccin nos basamos en un diamtero de 2" de tuberia determinado para el tramo principal del nodo "d"/"e"
con 36 gpm, 3.50 Ft por seg de velocidad y una perdida de presion estatica de 2.5 Ft por 100 Ft

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

General

84.00

2-1/2"

6.00

5.50

2.46

0.77

3.23

0.00

3.23

43.75

UMA 3

48.00

2"

5.00

5.00

3.38

0.97

4.35

7.00

11.35

55.09

General

36.00

2"

3.50

2.50

1.23

0.30

1.53

0.00

1.53

56.62

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "b" / UMA 1 de 28,40 Ft/h2o ya que
para satisfacer al nodo "d" solamente se necesitan 10.87 Ft de h2o Se puede deducir que aunque el nodo estudiado esta mas
alejado de la fuente generadora de presion no necesariamente este representa la presion del sistema para satisfacer sus requerimientos

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "e"-"UMA 4" (Suministro)

DETALLE DE CONEXIN UMA SUMINISTRO

12 GPM

Ampliacion
Carrete

Dimensiones de Tuberias
Carretes
0.2 mts
Niples
20 mts

36 GPM

UMA 4

Valvula de
Compuerta

10 TR - 24.00 GPM

Ap Equipo= 5.00 Ft H2O

Valvula de
Balanceo

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Union Universal
0.01
0.33 Ft ( 0.1m )
Valvula de Balanceo
2.5 Ft = 50% C.P.S.
0.11
Valvula de Compuerta
1.8 Ft equivalentes
0.08
Conexin "T" (2)
8 Ft equivalentes
0.72
Reducciones
1.6 Ft equivalentes
0.07
Ampliaciones
1.6 Ft equivalentes
0.07
Total
1.07

Conexin "T"
Manometro Conexin "T"
Termometro

Perdida en =
Accesorios

S
E
R
P
E
N
T
I
N

Union
Universal

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

67.57 Ft (20.60 mts)


22.80 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 1-1/2" de tuberia determinado para el tramo principal del nodo "e"/"UMA 4"
con 24 gpm, 4.00 Ft por seg de velocidad y una perdida de presion estatica de 4.50 Ft por 100 Ft
La Union Universal se asume como una tuberia de la longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

General

84.00

2-1/2"

6.00

5.50

2.46

0.77

3.23

0.00

3.23

43.75

UMA 3

48.00

2"

5.00

5.00

3.38

0.97

4.35

7.00

11.35

55.09

General

36.00

2"

3.50

2.50

1.23

0.30

1.53

0.00

1.53

56.62

UMA 4

24.00

1-1/2"

4.00

4.50

3.04

1.07

4.11

5.00

9.11

65.74

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "b" / UMA 1 de 28,40 Ft/h2o ya que
para satisfacer al nodo "d" solamente se necesitan 19.94 Ft de h2o Se puede deducir que aunque el nodo estudiado esta mas
alejado de la fuente generadora de presion no necesariamente este representa la presion del sistema para satisfacer sus requerimientos

DETALLE TIPICO DE CONEXIONADO A BOMBA


EJEMPLO DE ESTUDIO DEL NODO "e"-"UMA 5" (Suministro)

DETALLE DE CONEXIN UMA SUMINISTRO


Carrete

5 TR - 12.00 GPM

UMA 5

Ap Equipo= 10.00 Ft H2O

S
E
R
P
E
N
T
I
N

12 GPM

20 + 10 mts
Reduccion

Codo
Valvula de
Compuerta

Valvula de
Balanceo

Caidas de presion asumidas segn la Tabla 10, 11 y 12 de Carrier


Union Universal
0.02
0.33 Ft ( 0.1m )
Valvula de Balanceo
5 Ft = 50% C.P.S.
0.38
Valvula de Compuerta
1 Ft equivalentes
0.08
Conexin "T" (2)
5 Ft equivalentes
0.75
Reducciones
1.6 Ft equivalentes
0.12
Ampliaciones
2 Ft equivalentes
0.15
Total
1.49

Conexin "T"
Manometro Conexin "T"
Termometro

Perdida en =
Accesorios

Union
Universal

Formula aplicada
Caida de P Equi. X Perdida Friccional
100

Longitud de la Tuberia
Long Equiv. Accesorios

100.37 Ft (30.60 mts)


12.93 Ft

NOTA:
Para su seleccin nos basamos en un diamtero de 1" de tuberia determinado para el tramo principal del nodo "e"/"UMA 5"
con 12 gpm, 4.00 Ft por seg de velocidad y una perdida de presion estatica de 7.50 Ft por 100 Ft
La Union Universal se asume como una tuberia de la longitud real de la misma

CALCULOS DE DISTRIBUCION DE AGUA HELADA


Designacion

Caudal

Diametro

Velocidad

Perdida Fricc.

Longitud

Accesorios

Sub Total

Equipo

Sub Total

Total

gpm

pulg

pps

Ft h2o/100 Ft

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Ft /h2o

Suministro
General

120.00

3"

5.00

3.00

0.19

4.09

4.27

0.00

4.27

4.27

UMA 1

24.00

1.5"

4.00

4.50

0.86

1.59

2.45

15.00

17.45

21.72

General

96.00

3"

4.5

2.5

1.23

0.38

1.61

1.61

23.33

UMA 2

12.00

1"

4.00

7.50

5.07

2.12

7.19

10.00

17.19

40.52

General

84.00

2-1/2"

6.00

5.50

2.46

0.77

3.23

0.00

3.23

43.75

UMA 3

48.00

2"

5.00

5.00

3.38

0.97

4.35

7.00

11.35

55.09

General

36.00

2"

3.50

2.50

1.23

0.30

1.53

0.00

1.53

56.62

UMA 4

24.00

1-1/2"

4.00

4.50

3.04

1.07

4.11

5.00

9.11

65.74

UMA 5

12.00

1"

4.00

7.50

7.53

1.49

9.02

5.00

14.02

79.76

Notese que en este punto la presion a ser vencida por la bomba de agua es la correspondiente al nodo "e" / UMA 5 de 29,37 Ft/h2o ya que puede
satisfacer al nodo "b"/UMA 1 que necesita 28.40 Ft de h2o Se puede deducir que el nodo estudiado siendo el mas alejado de la fuente generadora
de presion, necesariamente representa la presion del sistema para satisfacer sus requerimientos

0.375

67.57

67.57
0.10
22.80