22 " Hole

Operator : Report For : Well Name : Contractor : Report For : BP Egypt Kevin/Andrew SALAMAT-1 Maersk Emile/Mark Field/Area : Description : Location : Water Depth : Rig Name :
CASING 36.-in @774 m (774 TVD) 28.-in @1125 m (1125 TVD) 22.-in @1750 m (1749 TVD)

WATER-BASE MUD REPORT No. 52


Depth/TVD : Date : Spud Date : Mud Type : Activity/ Bit Depth : 1894 m / 1894 m
26/09/2012 18/08/2012

North Damietta. Vertical HPHT Explor. Mediterranean Sea 649.1 m Maersk Discoverer
MUD VOLUME (bbl) Total Circulating Volume Hole Volume Open Hole Volume 1558 Active Pits Reserve Volume 4952 OH Capacity Premix Volume 1.54 bbl/m

KCL Pad Clip RCD / 0 m


WIRTH-2200

DRILLING ASSEMBLY m, -in m, -in m, -in m, -in m, -in m, -in Nozzles 0 1/32" Bit 22-in 0

Sample From FlowLine Temp Depth/TVD Mud Weight /Temp Funnel Viscosity Rheology Temp R600/R300 R200/R100 R6/R3 PV YP 10s/10m/30m Gel API Fluid Loss HTHP Fluid Loss Cake APT/HT Solids Oil/Water MBT pH / Temp Alkal Mud (Pm) Pf/Mf Chlorides Hardness (Ca++) Yz Sand KCl Silicate LCM Daily Stop Card Total Stop Card

MUD PROPERTIES Pit-1 KCl/PAD Pit-7 KCl/PAD F m lb/gal s/qt F / 10.90@121 53 106 76/53 44/35 12/10 23 30 13/16/ 12 1/ 11.0 /89 10 9.8@100 0.60 .4/1.0 65000 80 8 / 10.80@116 52 104 77/54 45/32 12/11 23 31 13/15/ 13 1/ 11.0 /89 10 10.0@102 0.80 .5/1.0 64000 80 10

Pit-4 SILDRIL / 10.35@110 60 120 79/55 42/32 10/9 24 31 9/11/14 5 1/ 10.0 /90 11.7@98 33.00 30.0/32.0 67000

CIRCULATION DATA Pump Make WIRTH-2200 Pump Liner x Stk 6.5x14 in Pump Capacity gal/stk 5.912 Pump stk/min 0@98% Flow Rate Pump Pressure Bottoms Up Total Circulation Stks to Bit / Total Stks (Cycle) PRODUCTS USED Last 24 hr Products Size

6.5x14 in 5.912 0@98% gal/min psi

Amount

SOLIDS CONTROL EQUIPMENT Last 24 hr Type Model/Size Hrs Used BEM 650 Shaker 8 BEM 650 Shaker BEM 650 Shaker 5. 5. 12. BEM 650 Shaker 12. BEM 650 Shaker 6. BEM 650 Shaker 3. BEM 650 Shaker 110 BEM 650 Shaker CLEANCUT Cuttings Blower (CCB) CLEANCUT Cuttings Blower (CCB) CLEANCUT Cuttings Blower (CCB) SURVEY DATA & LITHOLOGY MD 1846, Incl .84deg., Az 239.61 TVD 1845 meter Last Survey HOLE VOLUME DETAILS FM & LTH. Open Hole Length (m) Drill String (bbl) Max. Circ. BHT. Drilled Hole Last 24 hr (m) Annulus (bbl) MUD PROPERTY SPECS Actual Daily Drilled Volume (Cutting) (bbl) Below Bit (bbl) Weight 10.7-11 10.90 Average Annulus Cuttings Load (m) Tubing Displacement (bbl) Yz 8-10 8 Average Annulus Cuttings Load (bbl) Average Surface Losses (bbl/m) API Fluid Loss <10 12 REMARKS AND TREATMENT REMARKS * Weighting up SILDRIL pits to 10.4 ppg. * Circulate the 10 .7 ppg KCL PAD in MR#1 for one hour.* Cont pressure test boost line 300psi low - 7500psi high & Choke & Kill 300psi low - 15000psi high w/cmt unit. Skid N Line Preparing 190 bbl of high viscous & high weight 12.4 ppg SILDRIL spacer.* Failed to collect sample from tensioners, Lower bop down to land off in spider. ROV monitoring distance f/ seabed. Pick up 75' landing joint. String wt base oil pontoon (44 dead Volume) and confirmed by barge engineer no sample point & could not open hatch 1088k, Stroke out tensioners & secure with under hull guides. TBT & SJA to connect tension ring. Connect tension ring to collect sample.* Chemicals used will be charged when start drilling the 18 1/8" x 22" section and pick up 650k weight on N line tensioners. Position rig f/35m t/10m off wh. ROV confirm gasket in BOP connector. Dummy run. Set up cmc (915k total load on N line tensioner). 400k hook load , 689k wob ,1527psi on cmc, Wait on BP / Drill Quip to make descision on latching BOP, ROV "buff " Wellhead and carry out final inspection. Kedge rig to Well centre to facilitate landing BOP with ROV assistance. Land out BOP (landing Weight 915K), confirm latch with ROV, take 50 K overpull, carry out Slump test (355K down ), flush Hydraulic Conduits. Flush Choke line (5 bbl), close BSR (acoustic: portable), pressure test connector (500psi / 10 Rack landing double. In), Hold TBT: unlatch landing double. Unlatch landing double (commence ballast of rig to 18.5m), Hold TBT: Rig down RRT / rig up MTj / RCD handling equipment. Rig down RR, install 8" pad-eye sub and 50' sling. Hold TBT: Pick up MTJ / RCD housing assembly. Pick up MTJ / RCD housing assembly. (Studs investigated found to be loose on clip connector flange). Torque check all studs on Clip connector and RCD housing.

cP lb/100ft lb/100ft cc/30min cc/30min 1/32" %Vol %Vol lb/bbl /F mg/L mg/L mg/L mg/L Ib/100ft2 % %Wt %Vol ppb

TIME DISTRIBUTION Last 24 hrs Rig Up/Service 24 Drilling Tripping Non-Productive Time Running Riser Jet Well Head R/D casing equipment Wait on Cement R/D casing equipment Spot pill on bottom DRILLING PARAMETERS WOB (Klbs) Rotary (RPM) Average ROP (m/hr) M-I ENGR / PHONE M.Kashwaa Atef Ossama/Mohamed Radwan

MUD VOL ACCTG (bbl)


Oil Added Water Added Mud Received Mud Returned Evaporation Dump Hi-Vis Sweeps Pump&Dump Displaced Pad Mud Tripping Dead Volume in Pit Chemical Added Start Volume Final Volume

SOLIDS ANALYSIS (%/lb/bbl) NaCl KCl Low Gravity Bentonite Drill Solids Weight Material Chemical Conc Inert/React Average SG

RHEOLOGY & HYDRAULICS 1.9/ 21.2 1.8/ 16.4 1.3/ 12. 1.1/ 9.8 0.2/ 2.2 6./ 88.5 - / 0. 0.1953 3.91 np/na Kp/Ka Bit Pressure Loss % Bit HHP/HSI Jet Velocity Va Pipe Va Collars Cva Pipe Cva Collars ESD at TD ECD at TD ESD at TD (PWD) ECD at TD (PWD) Total Flow Area (TFA) DAILY COST

4957 4957 WAREHOUSE PHONE (010)051-06902

RIG PHONE (02)275-57011

CUMULATIVE COST $3,265,667.13

MUD VOLUME ACCOUNTING


Daily Report

22 " Hole
Operator : BP Egypt Well Name : SALAMAT-1 Date : 26/09/2012 Report No. : 52

PIT DESCRIPTION
Pit 1 Pit 2 Pit 3 Pit 4 Pit 5 Pit 6 Pit 7 Pit 8 Pit 9 Pit 10 Pit 11 Pit-12 Slug Pit 1 Slug Pit 2 Slug Pit 3 Slops Pit 1 Slops Pit 2 Sand Trap FWD Sand Trap AFT Reserve-1 Reserve-2 Reserve-3 Reserve-4 Base Oil Pantoon Drill Water Sea Bulk-3

CAPACITY bbl
654 660 654 660 600 654 676 722 722 722 722 715 113 113 106 169 176 347 347 2365 2365 2365 2365 4500 10000 12000

WEIGHT lb/gal
10.90 10.30 10.40 10.35 10.30 10.45 10.80 10.30 11.40 10.30 10.30 10.45 10.70 10.70

VOLUME bbl
635 618 610 618 662 601 629 671 517 646 670 600 88 91

REMARKS
KCL PAD SILDRIL SILDRIL SILDRIL SILDRIL SILDRIL KCL PAD SILDRIL Neat Silicate SILDRIL SILDRIL SILDRIL SILDRIL SILDRIL

PIT TYPE

SUM PIT VOLUMES


bbl 4957 bbls 517 5875 3620

Drainage Drainage 10.7 2356 KCL PAD

8.35

4530

Drill Water

Reserve MUD VOLUME SILDRIL Active SILDRIL Reserve SILDRIL Premix Reserve OTHER VOLUME SILDRIL 80% Neat SILICATE Reserve SILDRIL SILDRIL KCL PAD 80% Neat SILICATE SILDRIL Reserve SILDRIL SILDRIL SILDRIL Reserve Slops Slops Reserve Reserve Reserve Reserve Reserve Reserve Base Oil Drill Water Reserve

MUD IN HOLE (bbls)


ANNULUS Total Hole Volume Volume Not Mud Mud Volume PIPE BELOW BIT 1558 1558 TOTAL 1558 1558

VOLUME BALANCE (bbls)


IN/TO: ACTIVE RESERVE PREMIX TOTAL

LOSS BREAKDOWN (bbls) 4957


Evaporation Dump Hi-Vis Sweeps Pump&Dump Displaced Pad Mud Tripping Dead Volume in Pit

Start Volume Oil Added Water Added Vol Chem Added Chem Not For Mud Total Volume Built Received Return From Active To From Reserve To From Premix To Daily Loss

4957

Final Volume

4957

4957

Total Loss

WELLSITE CHEMICAL INVENTORY 22 " Hole


Operator : BP Egypt Well Name : SALAMAT-1 Total Daily Cost : Date : 26/09/2012 Report No : 52 Cumulative Cost : $3,265,667.13

Daily Report

Category

Product ESCAID 110 M-I BARITE M-I GEL Neat Silicate 80% BLOK-R 750 (Safe Carb 750) E Z SQUEEZE FORM-A-SQUEEZE G-SEAL PLUS M-I-X II (COARSE) M-I-X II (FINE) M-I-X II (MEDIUM) MARBLE COARSE MARBLE FINE MARBLE MEDIUM MI SEAL COARSE MI SEAL FINE MI SEAL MEDIUM MICA (COARSE) MICA (FINE) MICA (MEDIUM) NUT PLUG (COARSE) NUT PLUG (FINE) NUT PLUG (MEDIUM) SAFE CARB 250 SAFE CARB 40 SAFE CARB 500 CALCIUM CHLORIDE (98%) CALCIUM CHLORIDE BRINE (26% Wt) ECOTROL RD EMI -1050 EMI-943 HRP LIME RHEBUILD RHEDUCE RHEFLAT RHETHIK SOLTEX SUREMUL SUREWET VERSA HRP VERSAGEL HT VG-SUPREME BIOZAN CAUSTIC SODA CITRIC ACID CONQOR 303A D-D DEFOAM A DESCO M-I CIDE MEG (GLYCOL) OS-1L PIPE LAX W SAFE-SOLV OM SAFE-SURF E SAFE-SURF O ZINC CARBONATE ZINC OXIDE

Unit Size 1. BL BK 1. MT BK 1. MT BK 1. BL BL 50. LB BG 25. LB BG 40. LB BG 25. KG BG 25. LB BG 25. LB BG 25. LB BG 25. KG BG 25. KG BG 25. KG BG 40. LB BG 40. LB BG 40. LB BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 25. KG BG 1. BL BK 25. KG BG 25. KG EA 15. KG EA 55. GA DM 25. KG BG 55. GA DM 55. GA DM 55. GA DM 55. GA DM 25. KG BG 55. GA DM 55. GA DM 55. GA DM 25. KG BG 50. LB BG 50. LB BG 25. KG CN 25. KG BG 55. GA DM 55. GA DM 55. GA DM 25. LB BG 5. GA CN 55. GA DM 55. GA DM 55. GA DM 55. GA DM 55. GA DM 55. GA DM 25. KG BG 25. KG BG

Start Amount 460 32

Daily Used

Cum Used 12872 359

Daily Rec'd

Cum Rec'd 12805 379

Daily Return

Cum. Return

Final Stock 460 32

Bulk

40 140 140

40 140

Loss Circulation Chemicals

160 60 80 180 36

40 317 660 560 1224

280 377 740 770 1260

80

160 60 80 180 36

40 30

83

77 40 560 21 288

160 40 720 192 912 103

83

120 171 624 103

40

120 171 624 103

OBM Chemicals

27

977

80 968 80

80 27 80

Other Chemicals

6 138 28

10 158 270

14 296 287

6 138 28

WELLSITE CHEMICAL INVENTORY 22 " Hole


Operator : BP Egypt Well Name : SALAMAT-1 Total Daily Cost : Date : 26/09/2012 Report No : 52 Cumulative Cost : $3,265,667.13

Daily Report

Category

Product DRISPAC R DRISPAC SL DUO-VIS FLO-TROL GUAR GUM KCL (BIG BAG) M-I GEL M-I GEL (BIG BAG) M-I PAC R M-I PAC UL MI Gel Supreme SILDRIL L SODA ASH SODIUM BICARBONATE SPERSENE CF SUPER SWEEP TOTI SILDRIL L (30 DM) XCD POLYMER

Unit Size 50. LB BG 50. LB BG 25. KG BG 25. KG BG 25. KG BG 1. MT BG 25. KG BG 1. MT BG 25. KG BG 25. KG BG 100. LB BG 294. KG DM 25. KG BG 25. KG BG 25. KG BG 15. LB CN 8820. KG TK 25. KG BG

Start Amount 204 248 239

Daily Used

Cum Used 574 995 702

Daily Rec'd

Cum Rec'd 818 1243 915 160 248

Daily Return

Cum. Return 40

Final Stock 204 248 239

160 23

WBM Chemicals

23

254 9

58 99 80 24

2 766 870

60 847 80 773 24 737

58 99 80 24

744