CV Amtris Hardiyanto

Page 1

CURRICULUM VITAE
Category: 1. Family name 2. First names 3. Date of birth 4. Nationality 5. Civil status 6. Education: : Hardiyanto : A.M. Tris : 8 January 1963 : Indonesian :Married ( 2 children , 19 years old and 17 years old )

Institution [ Date from - Date to ] University of Indonesia (2002 2004) University of Indonesia (1993 1998) Institute Sience Technologi University of Indonesia (1984 1988)

Degree(s) or Diploma(s) obtained: Master Degree, Major Environmental Science Bachelor Degree, Major Economic Business Bachelor Degree, Civil Engineering Diploma Degree, Mechanical Engineering

7. Language skills: Indicate competence on a scale of 1 to 5 (1 - excellent; 5 - basic) Language English Bahasa Indonesia Melayu Reading 2 1 1 Speaking 2 1 1 Writing 2 1 1

8. Membership of professional bodies: Indonesia Environmental Service (INDEVS), Alumni Association ( University of Indonesia ) Water Environment Federation ( No 01016815), ATAKI ( Environmental Association )

9. Other Skills : Process & Design Wastewater treatment Page 2

CV Amtris Hardiyanto

10. 11.

Microsoft Project Program, Auto Cad , All windows application Environmental Impact Analysis (EIA Certificate) Management Project implementation
Water and Wastewater Specialist Mott MacDonald Indonesia

Present position:

Years within the firm: 18 years

12. Key qualifications:

Senior Expert with 18 years of work experience in Water and Wastewater process ( Industrial and Municipal ); Water Supply & Sanitation projects, quality Engineering ; Feasibility Study , Research & Development Water & Waste Water Treatment, Environment Protection, Quality Evaluation Audit, Environmental Impact Assessment, Infrastructure management programme and Supervision. Post graduate academic credentials in Mechanical Engineering and Environmental Protection. Demonstrated experience with Monitoring and Evaluation as evidenced by several projects funded by major multilateral and bilateral agencies; AUS aid, ADB, UNDP etc. Wastewater Project Manager with several years of experience in Engineering, Procurement and Construction in Indonesia.

13. Specific experience in the region:

Country Indonesia China Vietnam Singapore Indonesia

Date from - Date to 2009 - Present Feb 2010 to May 2010 0ct 2009 to Jan 2010 2005 - 2009 1988 - 2005

CV Amtris Hardiyanto

Page 3

14. Professional experience


Date from - Date to July 2010 to present Location Indonesia Company / Donor
Mott Mac Donald Indonesia Reff : Imam Hudori Phone :+6287821731974 Imam.hudori@mottmac.co.id Web Mail : www.mottmac.com

Position
Deputy Team Leader and Water Supply and Environmental Specialist

Description

Supporting to technical team to determine the feasibility and cost for pipeline, and system for water treatment from the Jatiluhur Reservoir to Jakarta at minimum cost, and calculating the financial and legal consequences also the adjustment of risk access to improve the reliability and safety of Water Supply to Jakarta and the vicinity. As water supply specialist, responsible to identification of existing systems and data collection, for understanding the problems associated with water supply that will be planned within the future of Bandar Lampung Water Supply schema through PPP-Public Private Partnership Project. 104 Km Pipe Transmission using 1800 to 1000 mm diameter pipe for Water Supply to 5 City in Eeast Java, Environmental Impact Analysis for Pipe transmission Water Supply and Social Impact for Umbulan Project. Responsibility for Operation HSE for installation and construction project.

CV Amtris Hardiyanto

Page 4

Dec 2009 to April 2010

Indonesia

PT.MLD subsidiary DHV Donor : Ausaid Program Client: Ministry of Public Utility Reff : SetiajI Hadipryitno, President Director Email setiaji.hadiprayitno@dhv.com Website : www.dhv.com Phone : +628121028706

Watsan Specialist

Environmental Impact Analysis of Municipal Wastewater Treatment Plant for Losari Makasar, Sulawesi,Indonesia. To improve the quality and sustainability of Makasar Citys environmental wastewater infrastructure base, in particular targeting the protection of water recipients losari Beach. Technical Assistance for the preparation of preliminary design for the Construction of the Waste Water Treatment Plant and sewerage network in the Municipality of Losari

Collect information from all relevant stakeholders and actors in the sustainable Environmental for Makassar City
Review DED, Effluent assessment, make alternative for Municipal WWTP Develop program monitoring and Environmental Evaluation.

CV Amtris Hardiyanto

Page 5

Aug 2009- Dec 2009

Indonesia

PT. Mitra Lingkungan Dutaconsult/DHV Donor : AusAID Program Client : Ministry of public Settlement and Regional Infrastructure, Reference : Jim Coucouvinis | Technical Director Watsan Indonesia Infrastructure Initiative (IndII) Facility Office Phone: (+62) 21 230 6063 ext 146 Hand Phone: (+62) 0816 990169 Email: jim.coucouvinis@indii.co.id Website: www.indii.co.id

Water Sector and Environmental Expert

Evaluation of Infrastructure Enhancement Grant Proposal from local Governments under The Indonesian Infrastructure Initiative (IndII) program to improve the delivery of municipal services and improve the living conditions of the urban environment include water supply and sanitation ( 9 local government in 4 province Sumatra, Java, Kalimantan and Sulawesi) under Ausaid program Thematic studies of key aspects of the water sector amd prepared with the assistance of appropriate bodies. Assets program for need to reflect what can be realistically and reasonably achieved within the timeframe of the project Water Supply and sanitation that adds value to the project purpose. Conduct meeting with SKPD ( local group government authority to be held involving key stakeholder to clearly identify these problem

Analyze the environmental, economic, social, political, legal, technical and institutional developments relevant to the promotion of sustainable water sanitation infrastructure project in Indonesia
International Consultant. Monitoring and Evaluation

May 2009 Aug 2009

Hanoi

PT. Mitra Lingkungan Dutaconsult/DHV Donor : WSP Finland Reference : Markus Saari Director (International) WSP Finland Ltd. tel. +358 40 7434662 e-mail: markus.saari@wspgroup.fi web: www.wspgroup.fi or www.wsproup.com

Review Water and Sanitation Phase1 and Make recommendation for WSP phase 2 for 8 Province in Vietnam ( project under WSP Finland program) * recommends that, based on the current implementation status of phase 1 water supply and sanitation program Activities, prepare a forecast of expenditure for the phase 2 along with the anticipated unspent balance for submission to the Ministry of public utility. * Support the establishment of the Environmental 'Sustainable Water and
Sanitation Task Force' of the Ministry of Utility ;

* Review relevant national document on Water Supply program including second national communication of Vietnam and Finland , and latest information on policies and measurement for water resources, agriculture, energy and waste management assess the tic uncial and institutional capability

CV Amtris Hardiyanto

Page 6

2008 2009

Jakarta

PT. Mitra Lingkungan Dutaconsult Donor : Sinar Mas Group

Expert Group Manager Water Supply & Sanitation

Develop Program and Project Management for water and wastewater treatment, environmental assessment, industrial, drainage, sewerage and other infrastructure projects for BSD project with 3000 HH community. Undertaking an initial assessment of investments by the private development partners. A detailed assessment amd provide an overview of current and proposed future activities especial in allocation water in the future.

20072008

East Java

PT. Mitra Lingkungan Duta Consult PT . Amerta Bumi Capital Reference : S.Yudith Prasetyo Director Phone : +6281332800551 Email : yudithpras@ymail.com

Water Supply Consultant

Pre-FS The Umbulan Water Supply for Sidoarjo, Surabaya, and Adjacent town. Investigation for feasibility study water system and utilized spring water in technical and financial aspect. Investigate Water Resources from Spring Water Umbulan and Rejoso River for water allocation policy to derive on river basin scale and coordinated on institutional level, identifying surplus and shortage zone along with the technical and institutional option to improve the water balance of the area. Prepare for PPP Public Private Partnership Water Supply

2005 2007

Singapore

EnviroSolution & Consulting Pte.Ltd Donor : Multi Donor Fund and UNDP Reference Antun Hidayat National Coordinator Phone : +6281360374081 Email : antun.hidayat@undp.org

Senior Consultant/ Water Sector Expert/ Monitoring and Evaluation

Involved in project management in the field of environmental research and consultancy; prepares Pollution Control Studies & Quantitative risk Assessments for waste management program and chemical manufacturing industries business development Involved in various project with consultancy and NGO organization. The work included planning, tendering and supervision of several infrastructure related projects, environment evaluations, environmental impact studies, environmental training and development of guidelines and training handbooks. Responsible for pre feasibility study, acted as the liaise officer for the sanitary landfill site assignment in Aceh, Indonesia between the Government ,UNDP and consult-ants as well as engineer in several designs of the project Evaluation of potable water systems, water supply and sanitation systems, and solid waste management projects. Involved in a number of Environmental Impact Assessment s (EIA) of various projects including sanitary landfill In the 9 District province Aceh, Tsunami Recovery Waste Management Program. Proposed and conduct UKL/UPL and DPPL for the various landfill site in AcehNias Monitoring and controlling Waste Management Program compliance in all areas, including sub district area, and conduct effective planning, staff training and development, organisation and time management

CV Amtris Hardiyanto

Page 7

2004 2005

Singapore

Glowtec Environmental. Pte.Ltd Donor /Client : Batamindo Chuan Diong Sian President Director Phone :+65 63566861 +6597981910 Email : Nelson.lo@glowtec.com.sg

Water Sector and Environmental Specialist

Project Design and Construction for Water and Wastewater Treatment Designing effective Project Operational procedures to ensure the smooth running of all operations Responsible for Environmental assessment and management for the project construction Investigating and understanding weekly shrinkage issues, construction a user friendly guide, and subsequently testing and commissioning and completion of the project.

Apr 2004 May 2004 (2 months)

Indonesia

PT.Nippon Kiyoe ConsortiumDonor/client : ADB Reference: Johannes Wibowo Team Leader Email : Johnwibowo2000@yahoo.co m Phone :+628158933523

River Design Engineer

Lower Brantas River Basin Rehabilitation Project, under the Rehabilitation Loan Carry out the design of proposed groundsills including stability analysis; Carry out the structural design of the proposed ground sills.

2003 2004

Lampung, Indonesia

Medco Ethanol Lampung Donor : Medco Group Reference: Sulasmo Sudharno Phone: +62-21 72786844 Email lasmo@trada.co.id www.medcoenergi.com

Project Manager

Pre feasibility study for the Medco Ethanol Lampung, Capacity 180 klpd, location Kota Bumi, Lampung Review the Detail Engineering Design Wastewater Treatment with the Principal and consultant Serve as project Manager and Engineer of works for a variety of construction projects including the construction of a water, waste water treatment plants, roads and infra-structure

CV Amtris Hardiyanto

Page 8

Sept 2002November 2003

Indonesia

ADB Client : Ministry of Settlement and Regional Infrastructure, Directorate General of Water Resources Reference: Billy masterion Director bmasterion@yahoo.com Phone :+62 21 42886678

Hydraulica Mondeling

Flood Management in Selected River Basin Project Indonesia ADB TA no. 4159-INO Objectives of the project are to reduce the incidence of and damage from flooding in selected river basins Prepared Hydraulic and flood modelling for Ciujung River, Tuntang and Jragung River with SOBEK Software.

Jul 2001 to Sept 2002

Indonesia

European Union Client : Directorate General of Water Resources, Dept Of Public Works & The Lampung Province Local Government

Hydraulic Engineer

Good Governance in Water Resources Management (GGWRM) Project Project Management Unit of Lampung, Indonesia Prepare basin water resources management master planning; Prepare water allocation strategies for the arrangement of integrated river basin management; Support the senior specialists in preparing watershed management plans, river behavior study, water quality management network; Java Irrigation Improvement and water Resources Management project : Irrigation Development and Turn Over Component (IBRD Loan), DG of Water Resources Development Ministry of Public Works The Government of Indonesia introduced policies and action programmes for water resources development and management. Within the World Bank supported JIWMP these policies and action programme are worked out in different components to develop river basin plans and water resources management in 5 pilot basins on Java, rehabilitation and upgrading of 225,000 ha irrigated area handed over to the provinces, special maintenance for 350,000 ha irrigated area to be handed and to the farmers and introduction of Irrigation Services Fee. Set up of the database system and GIS related with the Water Resources Management Project Design and Construction for Water and Wastewater Treatment Process Design, Include design of various water, wastewater and sewage treatment plant, tender preparation and technical proposal and equipment procurement Provides day today leadership and works with staff to ensure a highperformance, customer service oriented work environment that supports achieving the departments and the Districts mission, objectives and values regarding team building and employee empowerment;

2000 2001

Indonesia

PT.Gamma Epsilon Donor : IBRD Client : Ministry of Settlement and Regional Infrastructure, Directorate General of Water Resources

Consultant

1994 2000

Jakarta

PT Sarana Adiniagatama Client : Salim Group Wisma Indocement , floor 18 Jl.Jend Sudirman Kav 21

Project Manager

CV Amtris Hardiyanto

Page 9

Jakarta , Indonesia Reff : Mr Djunedy Suparmo Telp : +62-21-5703770

Conduct for construction WWTP, reviewing and analyzing the environment and existing situation of planning area; (Engineering Procurement Construction and

Below are the achievement Management) Project :

Waste Water Treatment Plant, Capacity 600 m3/day PT.Bimoli Palm Oil,Bitung North Sulawesi ( Year 2000) Waste Water Treatment Plant, Capacity 750 m3/day PT.Indo Sentra Pelangi, Semarang ( Year 2000) Waste Water Treatment Plant, Capacity 800 m3/day PT. Indofood Sukses Makmur ( Year 1999) Waste Water Treatment Plant, 200 m3/day PT.Saritama, Narogong, Bogor ( Year 1999 ) Waste Water Treatment Plant, 1500 m3/day PT.Indolakto, Sukabumi ( 1997-1998) Waste Water Treatment Plant , Capacity 10500 m3/day PT.Bataminto, Batam ( 1995 1997 ) Wastewater Treatment Plant, Capacity 5400 m3/day PT. Bukit Indah City ,Cikampek, Indonesia ( 1994 1995 )
To manage day to day operation of Engineering for ensuring all aspect of the production operation work efficiency and effectively. Work closely with design/ product engineer providing technical support in areas of production. Prepare corrective measurement technical system. Technical operation (achieving planned engineering, maintenance schedules, inventory management, assets and equipment management, quality management . Responsible in monitoring the process of projects to ensure timely delivery of assignments while maintaining standards and cost effectiveness, Analyze & execute project based on contract, ensure the quality, cost, and time management for the project. Execute and ensure the quality of maintenance work to be carried out on mechanical equipment, respecting budget, policies and deadlines. Contribute in his field, to the development of working methods and definition of procedures and ensure their implementation. Optimize maintenance operations, using best available tools and procedures in order to maximise equipment availability. Ensure proper day-to-day scheduling of works and necessary resources.

1993 1994

Cikampek, Indonesia

PT Pacific Indonesia Client : Salim Group

Quality Engineering Manager

1992 1993

Jakarta

PT Indoroc Manufacturing Client : Salim Group

Engineering Manager/ Monitoring Expert

CV Amtris Hardiyanto

Page 10

1991 1992

Jakarta

PT. Mattel Indonesia ( USA Company )

Product Engineer

1990 1991

Jakarta

PT. Panasonic Matsushita Electronic ( Japan Company )

Research & Development Engineer

1989 1990 Jakarta, Indonesia PT. YKK Alumico Indonesia Jl. Manis Industrial Estate, Jl. Manis Raya No. 23, Tangerang, Banten 15810 Reff : Mr Moriwaki Telp: (021) 5919073, (021) 5917910 Fax: (021) 5919074, (021) 5917413 1988 1989 Jakarta, Indonesia Siemens Indonesia, PT Krakatau Industrial Estate Cilegon Kav. B-2, Jl. Eropa I, Cilegon, Banten 42443 Business Line: Power generation Reff : Bambang Munajat General Manager Phone: (0254) 369500 Fax: (0254) 369505 Quality Engineer Research & Development Engineer

Ensure completion of major operations within schedule (yearly overhaul). Promoted to Develop and implement policies and management system in product safety, Supported quality and laboratories, analyzed processes for potential modifications, functioned as primary liaison between company and buyer regulatory agencies. To improve on product quality. To get better product or to fulfil government regulation. As well as to solve the problem in conjunction with product formulation, or ingredient. R & D work closely with management production to en-sure they get all the support they need to enable them to support new design release and easy in the applications when the product running with standard and specification Define the detailed methodology for carrying out all the jobs according to priorities, required resources, skills co-ordination and supervision. Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely. Prepare time and cost estimates for work orders and job plans to help optimising resources allocation. Responsible for monitoring design progress, checking structural analysis from consultant, Fully Support Engineering Department. Ensure, upon completion of repairs, that equipment is in good operating condition, ready to meet operational requirements, fully inspected, tested, clean and safe.

Reporting to Mechanical Manager to provide mechanical design, correction based on standardized plant or customer requirement. To get define within target zero defects or parts and minimize design time Responsible for implementing Distribution Board and Mo-tor Control. Local Adaptation. Manage Complaint and Part Data Based. Preparing/ Updating Offering Tools, Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely.

CV Amtris Hardiyanto

Page 11

webmaster.id@siemens.com

14. Other relevant information (e.g., Publications) The Implementation of Industrial Liquid Waste Management ( Study on the implementation of Wastewater Treatment Plant in Tugurejo Sub District, Semarang, Central Java Indonesia) Library University of Indonesia, 2004 Cost and Benefit to Built Wastewater Treatment Plant for Environmental Sustainability; Library University of Indonesia publishers 1998 Soft Loan for Environmental Protection, Minister Environmental digital publishers , Indonesia 2003

15. Courses and Trainings : Review of Environmental Regulations Green Building LEED in House Training, Shanghai 2010 Training in Hazardous Waste Management 2009Seminar Environmental Due Diligence seminar and site assessment PT.Duta Mitra Lingkungan, Jakarta 2009 Hazardous Analysis & Risk Assessment training, Ministry of Environmental Indonesia. Seminar of Technology for Persistent Organic Pollutants (PoPs) Degradation Faculty of Chemical, Bogor Agriculture University-Bogor Workshop of Culture, Capture Conflicts: Sustaining Fish Production Livelihood in Indonesia Reservoirs Certificated Course on Civil Engineering and Environmental Problem held by University of Indonesia EHS management particularly in EHS compliance and due diligence auditing, EHS Permitting, EMS-ISO 14001 & OHSAS