Environmental Aspect Evaluation Form

Project/Department: 0905 Evaluated by: Leung Yat Fung Category: Date: Drainage Works 3 August 2009

Critical Factors Contract requirement Large quantities of resource/ waste Complaint/ concern of interested parties Legal Requirement

Activity

Aspect

Impact

Significance

Operation control

Setting out Underground utilities detection & diversion

N/A Avoid any damage to the existing underground utilities Material consumption Dust emission

N/A Minimization of the disturbance to public Resource consumption Air pollution Disturbance to public Disturbance to public Resource consumption Air pollution Disturbance to public Disturbance to public Resource consumption Air pollution Soil contamination Water pollution * * * * * * * * * * * * * *

N/A

N/A

N/A

N/A

N * * * * * * * * Y Y Y

N/A SI 19.02 SI 19.04 Suitable timber will be reused/ WMP SI 19.02 SI 19.04 N/A SI 19.02 SI 13.02 SI 19.03

Timber shoring

Noise Timber consumption

Y Y Y Y N Y Y Y

Dust emission Noise Sheet piling Fuel consumption in plant operation Exhaust emission Leakage of fuel oil/ lubrication oil

Page 1 of 4 Company Procedure No: CP11.01 Form No: 11.01-FR01 Revision No: 0

Environmental Aspect Evaluation Form


Project/Department: 0905 Evaluated by: Leung Yat Fung Category: Date: Drainage Works 3 August 2009

Critical Factors Contract requirement Large quantities of resource/ waste Complaint/ concern of interested parties Legal Requirement

Activity

Aspect

Impact

Significance

Operation control

Reuse of sheet pile Open cut excavation Excavated materials handling and transportation

Lighting from welding process Reduce sheet piles consumption

Disturbance to public Minimization of waste being produced

N * Y

N/A Sheet piles will be reused later

Refer to Environmental Aspect Evaluation Form (Excavation & Backfilling)

Refer to Environmental Aspect Evaluation Form (Excavation & Backfilling) Air pollution Disturbance to public Disturbance to public Resource consumption Water pollution Air pollution Disturbance to public Disturbance to public Air pollution Resource consumption * * * * * * * * * * * * * * * * * Y Y Y Y N Y Y Y Y N SI 19.02 SI 19.04 SI 19.02 N/A SI 19.02 SI 19.04 N/A SI 19.03

Dust emission Noise Dewatering Fuel consumption in plant operation Muddy water generation Dust emission Noise Exhaust emission Fuel consumption in plant operation

General formation

Page 2 of 4 Company Procedure No: CP11.01 Form No: 11.01-FR01 Revision No: 0

Environmental Aspect Evaluation Form


Project/Department: 0905 Evaluated by: Leung Yat Fung Category: Date: Drainage Works 3 August 2009

Critical Factors Contract requirement Large quantities of resource/ waste Complaint/ concern of interested parties Legal Requirement

Activity

Aspect

Impact

Significance

Operation control

Placing blinding

Dust emission Concrete consumption Dust emission Noise Exhaust emission Fuel consumption in plant operation Geotextile sheet consumption

Air pollution Disturbance to public Resource consumption Air pollution Disturbance to public Disturbance to public Air pollution Resource consumption Resource consumption

* *

* * * *

Y Y Y Y * * Y Y Y N N SI 19.02 SI 19.04 SI 19.02 N/A N/A Order right amount at right time. Proper storage to minimize wastage SI 19.02 SI 19.04 N/A SI 19.02 PSI 01

* * * *

* * * *

Pipe laying

Pipes consumption

Resource consumption

Dust emission Concrete surround Noise Fuel consumption in plant operation

Air pollution Disturbance to public Disturbance to public Resource consumption

* * *

* * * * *

Y Y Y N

Page 3 of 4 Company Procedure No: CP11.01 Form No: 11.01-FR01 Revision No: 0

Environmental Aspect Evaluation Form


Project/Department: 0905 Evaluated by: Leung Yat Fung Category: Date: Drainage Works 3 August 2009

Critical Factors Contract requirement Large quantities of resource/ waste Complaint/ concern of interested parties Legal Requirement

Activity

Aspect

Impact

Significance

Operation control

Exhaust emission Leakage of fuel oil/ lubrication oil Material dropped on public road Concrete consumption Construction of manholes, gullies, etc. Backfilling and Compaction

Air pollution Soil contamination Water pollution Disturbance to public Resource consumption

* * * *

* * * * * *

Y Y Y Y Y

SI 19.02 SI 13.02 SI 19.03 SI 19.02 PSI 01

Refer to Environment Aspect Evaluation Form (RC Works)

Refer to Environment Aspect Evaluation Form (Excavation & Backfilling) Air pollution Disturbance to public Disturbance to public Resource consumption Air pollution * * * * * * * * Y Y Y N Y SI 19.02 SI 19.04 N/A SI 19.02

Dust emission Extract sheet piling Noise Fuel consumption in plant operation Exhaust emission

Page 4 of 4 Company Procedure No: CP11.01 Form No: 11.01-FR01 Revision No: 0