Energy from Waste with Combined Heat and Power Facility, Oxwellmains

Appendix B

Indicative EfW Plant Construction and Commissioning Timeline

RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\Appendices.doc February 2010 Rev1

JAS4061

Energy from Waste with Combined Heat and Power Facility, Oxwellmains

Blank

DUNBAR TURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT Electro - mechanical scope of supply
ID 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Task Name MILESTONES - CLIENT ACTIVITIES CONTRACT AWARD Approval Process and Mechanical basic design Submission Turbine Design Specification Approval Electrical and Process control basic design WtE Plant Floorslab, Levels and Foundations Acceptance Constraint towards Civil works project programme Electrical Power Supply to LV Switchboards Available Plant Utility systems Operational Waste Available for Crane Drivers Training Start waste combustion TAKE OVER of delivery scope WtE plant TAKE OVER BASIC DESIGN Mobilise project team, set-up project standards Project Kick-off Meeting H&M Balance, PFD's Preliminary P&ID's Preliminary General Arrangement Preliminary Civil Drawings, Load List Preliminary Equipment Data Sheets Preliminary EIA Data DETAILED ENGINEERING Process Design - P&ID's for Construction General Arrangement Drawings Civil design: foundations, superstructures . EIA Engineering for Construction, IO list, Consumer list Process Control Programming Specification Low Voltage Switchboards Design Furnace Grate Specification Furnace auxiliary equipment Design Boiler CFD Modelling Design Auxiliary Equipment WtE plant Design Turbine, Condensor and Auxiliary Equipment Submission AS BUILT documentation Furnace / Boiler EQUIPMENT PURCHASE Contracting civil design and realisation company Furnace Grate Furnace Auxiliary Equipment Auxiliary Equipment WtE plant Turbine, Condensor and Auxiliary Equipment Low Voltage Switchboards M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26

page 1 of 3

M27

M28

CONTRACT AWARD Submission Turbine Design Specification WtE Plant Floorslab, Levels and Foundations Acceptance Constraint towards Civil works project programme Electrical Power Supply to LV Switchboards Available Plant Utility systems Operational Waste Available for Crane Drivers Training Start waste combustion TAKE OVER of delivery scope WtE plant TAKE OVER

doc nr : 4061_Sch4_Q4_incCFD date : Fri 29/01/10 By : PHo / Approv : ICAR - EP

DUNBAR TURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT Electro - mechanical scope of supply
ID 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 Task Name EQUIPMENT MANUFACTURING Furnace Grate Furnace Auxiliary Equipment Boiler Steelstructure and Pressure parts Auxiliary WtE plant Equipment Turbine, Condensor and Auxiliary Equipment Low Voltage Switchboards CIVIL WORKS / INDICATIVE Opening site, Commencement of the works Substructure works, foundations, floorslab Superstructures Walls, roof Finishing accommodations, surroundings EQUIPMENT INSTALLATION TRAIN # A Furnace Grate Furnace Auxiliary Equipment Boiler Steelstructure and Pressure parts Flue Gas Cleaning Plant TRAIN # B Furnace Grate Furnace Auxiliary Equipment Boiler Steelstructure and Pressure parts Flue Gas Cleaning Plant BALANCE OF PLANT Auxiliary WtE plant Equipment Turbine , Condensor and Auxiliary Equipment Piping MCC's, Electrical Cabling WtE Plant Electrical Cabling Turbine Plant COMMISSIONING AND START-UP TRAIN # A Cold Commissioning WtE Plant Warm Commissioning WtE Plant Start Burners, Curing Refractory, Boiler Cleaning Boiler Cool Down, Final Inspection Start-up WtE Plant Start Waste Incineration, Fine tuning Steam Delivery, Fine tuning TRAIN # B Cold Commissioning WtE Plant Warm Commissioning WtE Plant Start Burners, Curing Refractory, Boiler Cleaning Boiler Cool Down, Final Inspection M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26

page 2 of 3

M27

M28

doc nr : 4061_Sch4_Q4_incCFD date : Fri 29/01/10 By : PHo / Approv : ICAR - EP

DUNBAR TURN-KEY WASTE to ENERGY & FLUE GAS CLEANING PLANT Electro - mechanical scope of supply
ID 94 95 96 97 98 99 100 101 Task Name Start-up WtE Plant Start Waste Incineration, Fine tuning Steam Delivery, Fine tuning Commissioning Turbine - Condensor Plant Cold Commissioning Turbine = Condensor Plant Warm Commissioning Condensor Plant Warm Commissioning Turbine Plant TEST RUN M-1 M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26

page 3 of 3

M27

M28

doc nr : 4061_Sch4_Q4_incCFD date : Fri 29/01/10 By : PHo / Approv : ICAR - EP