You are on page 1of 17

Grand Total

P1: Unit 1
Total CM 6 PM 4

P2: Unit 2
Total 2 CM 2 Total 28

P3: Com
CM 8 DM 7 PM 13

Total Boiler BOP Coal&Ash ES HV Instrument LV Mills Turbine Workshop

40 3 5 2 2 1 8 4 1 3 11

10

3 0 0 0 0 3 0 1 1 2

2 0 0 0 0 2 0 0 1 1

1 0 0 0 0 1 0 1 0 1

0 0 0 0 0 0 0 0 2 0

0 0 0 0 0 0 0 0 2 0

0 5 2 2 1 5 4 0 0 9

0 2 0 0 1 3 0 0 0 2

0 0 0 0 0 0 0 0 0 7

0 3 2 2 0 2 4 0 0 0

Unit1: Availability impact Unit2: Availability impact Common: Availability impact

Yes Yes Yes

No No No

Remark: _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ Page 1 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:33

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown

P1: Unit 1
Eq / Loc :
WT
PM
Jobplan # :

10 Continuous emission monitoring system


WO#
WO13-108631 Safety Plan # : Yes UNIT 1 PREVENTIVE MAINTENANCE OF CEMS IM-M02-0008
Responsible engineer name :

01CNB00GH001
Plant cond
N1

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Instrument

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
26-Mar-13

Issue by
BOONYARAT_N KHOMGRICH_K

Status
INPRG

Priority
3

IM-M02-0008

Anon

Responsible suervisor name :

KHOMGRICH_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4012-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E41

GL-account :

No

WEEKS

KHOMGRICH_K

Eq / Loc :
WT

01ETB11BB101
Plant cond
S1

Bottom Ash Silo Boiler 1


WO#
WO13-109377

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Boiler

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
9-Apr-13

Issue by
UDOM_S WATTANA_B

Status
INPRG

Priority
2

CM

Increase size of drain pan for anti water fall down for line Bottom Unit 1 N/A
Responsible engineer name :

Jobplan # :

BM-CM-STD

Safety Plan # : Yes

Tawa

Responsible suervisor name :

WATTANA_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4010-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11539

No

E21

GL-account :

No

PARAMEE_K

Taskid
10 20 30

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood

schedstart

schedfinish

estdur hrs 0.08

Ref wonum
WT13-1215885 WT13-1215886 WT13-1215887

status
INPRG INPRG INPRG

SDR
No No No

0.08 0.08

hrs hrs

Page 2 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
40 50 60 70 80 90 100 110 120 130 140 150 Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements CAUTION:!Prior to carrying out any maintenance work, confirm that the equipment has been isolated and locked as document specify. Install rubber sheet for protection water spill. Connect rubber sheet with drain pan by tag welding. Connecting and confirm protection not water spill On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-SHE-05-007: Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1215888 WT13-1215889 WT13-1215890 WT13-1215891 WT13-1215892 WT13-1215893 WT13-1215894 WT13-1215895 WT13-1215896 WT13-1215897 WT13-1215898 WT13-1215899 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No No No No

0.08 0.08 0.08 0.53 0.83 0.65 0.08 0.08 0.08 0.08 0.08 0.08

Eq / Loc :
WT

01ETG01BR217
Plant cond
S1

Ash intake valve EP-A5-1S


WO#
WO13-109110

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Boiler N/A

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
2-Apr-13

Issue by
SUWAT_S WATTANA_B

Status
INPRG

Priority
3

CM

replace cylinder of ash intake valve.(cylinder shaft seal leak) N/A


Responsible engineer name :

Jobplan # :

Safety Plan # : Yes

Tawa

Responsible suervisor name :

WATTANA_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4010-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11379

No

E21

GL-account :

No

BOONYARAT_N

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements ! CAUTION: Prior to carrying out any maintenance work, confirm that the equipment has been isolated and locked as document specify. Disconnecting the parts of air cylinder ash intake valve. Replace new air cylinder ash intake valve. Connecting and adjust stroke new air cylinder ash intake valve. On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-ER-P-SHE-05-007-C: Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart
24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13

schedfinish
24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13

estdur hrs 0.08

Ref wonum
WT13-1215970 WT13-1215971 WT13-1215972 WT13-1215973 WT13-1215977 WT13-1215991 WT13-1215992 WT13-1216007 WT13-1216088 WT13-1216265 WT13-1216266 WT13-1216267 WT13-1216268 WT13-1216269 WT13-1216270

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No

0.08 0.08 0.08 0.08 0.08 0.53 0.85 0.65 0.08 0.08 0.07 0.08 0.08 0.08

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT

01HCB01
Plant cond
S1

Steam sootblowing system for boiler


WO#
WO13-109292 Safety Plan # : Yes N/A Overhaul maintenance for gear reducer
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Boiler

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
5-Apr-13

Issue by
MANOAD_B MANOAD_B

Status
INPRG

Priority
3

PM

Jobplan # :

BL-Y03-0001

Tawa

Responsible suervisor name :

MANOAD_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5431100-4013-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E21

GL-account :

No

MANOAD_B

Child details for Work order : wonum

WO13-109292
Asset num Asset description Status Schedstart Schedfinish JPnum

Task description

Page 3 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
WO13-109293 WO13-109294 Overhaul maintenance for gear reducer at A-1 Overhaul maintenance for gear reducer at A-4 01HCB01AN201 01HCB01AN204 Wall deslagger A-1 Wall deslagger A-4 INPRG INPRG 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13

Eq / Loc :
WT

01HF
Plant cond
S1

Bunker, feeder and pulverising system


WO#
WO13-105914 Safety Plan # : Yes N/A

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Mills

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
26-Feb-13

Issue by
BOONYARAT_N ANUCHA_K

Status
INPRG

Priority
3

PM

Monthly inspection bar screen coal bunker A-F unit 1&2 liner A
Responsible engineer name :

Jobplan # :

BM-M01-0006

Weerasak

Responsible suervisor name :

ANUCHA_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4017-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E23

GL-account :

No

MONTHS

ANUCHA_K

Eq / Loc :
WT
CM
Jobplan # :

01HQY01
Plant cond
N1

Electrostatic preciptator control system


WO#
WO13-110609 Safety Plan # : Yes N/A Repaint EP hopper Building structure rusty.
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
17-May-13

Day(s)
24

Issue date
22-Apr-13

Issue by
TEEKA_B SUCHAT_T

Status
INPRG

Priority
3

WS-DM-0018

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11762

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements supervisor instructs general safety confrim location with cp preparation material ,Installation scaffolding and put tg when inspection scaffolding complete. cleaning dust cleaning rust by brush to painting work to finishing work cleaning working area On completion of work remove all tools , equipment and Remove scaffolding Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215714 WT13-1215715 WT13-1215716 WT13-1215717 WT13-1215718 WT13-1215719 WT13-1215720 WT13-1215721 WT13-1215722 WT13-1215723 WT13-1215724 WT13-1215725 WT13-1215726 WT13-1215727 WT13-1215728 WT13-1215729 WT13-1215730 WT13-1215731 WT13-1215732

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
CM
Jobplan # :

01HRA03CF101
Plant cond
N1

FGD UNIT-1 BOOSTER FAN (A) FLUE GAS FLOW-1


WO#
WO13-110612 Lubricate valve twists are rusty. N/A
Responsible engineer name :

Q:

S:

1
SHE
No

Section
Instrument

Task Description / Work to be done

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
22-Apr-13

Issue by
TEEKA_B KHOMGRICH_K

Status
INPRG

Priority
3

IM-CM-0135

Safety Plan # : No

Anon

Responsible suervisor name :

KHOMGRICH_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4012-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11765

No

E41

GL-account :

No

PARAMEE_K

Page 4 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown

Taskid
10 20 30 40 50 60 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Remove rust on needle valve and repainting On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur

Ref wonum
hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1210353 WT13-1210354 WT13-1210355 WT13-1210356 WT13-1210357 WT13-1210358 WT13-1210362 WT13-1210363 WT13-1210364 WT13-1210365 WT13-1210366 WT13-1210367

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No

0.08 0.08 0.33 0.08 0.17 7.00 0.17 0.17 0.08 0.33 0.08 0.08

Eq / Loc :
WT
CM
Jobplan # :

01HRA03CP752
Plant cond
N1

BUF-A BRG. BOX SEAL DIFF. PRESS.


WO#
WO13-110611 Lubricate valve twists are rusty. N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Instrument

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
22-Apr-13

Issue by
TEEKA_B KHOMGRICH_K

Status
INPRG

Priority
3

IM-CM-0135

Safety Plan # : Yes

Anon

Responsible suervisor name :

KHOMGRICH_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4012-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11766

No

E41

GL-account :

No

BOONYARAT_N

Taskid
10 20 30 40 50 60 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Remove rust on needle vavle and repainting On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.08

Ref wonum
WT13-1210331 WT13-1210332 WT13-1210333 WT13-1210334 WT13-1210335 WT13-1210336 WT13-1210339 WT13-1210340 WT13-1210341 WT13-1210342 WT13-1210343 WT13-1210344

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No

0.08 0.33 0.08 0.17 7.00 0.17 0.17 0.08 0.33 0.08 0.08

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
CM
Jobplan # :

01PAB01AA021
Plant cond
N1

Debris Filter Flushing Valve-A1


WO#
WO13-106053

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Turbine

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
27-Feb-13

Issue by
NIRUN_T NIRUN_T

Status
INPRG

Priority
3

Install hand rail for debris filter flushing valve A1,A2 ,B1,B2 unit 1 . N/A
Responsible engineer name :

TB-CM-00028

Safety Plan # : Yes

Wiroj

Responsible suervisor name :

NIRUN_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4028-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-10637

No

E31

GL-account :

No

PARAMEE_K

Taskid
10 20 30

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1121025 WT13-1121026 WT13-1121027

status
INPRG INPRG INPRG

SDR
No No No

0.00 0.00

hrs hrs

Page 5 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
40 50 60 70 80 90 100 110 160 170 180 190 200 210 Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Select and wear correct PPE to prevent physical injury. Preparation normal tools, light, documents and necessary consumables , Removal coating surface weld Install hand rail Weld joint hand rail to structure Grinding welding joint and repaint On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007: Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1121028 WT13-1121029 WT13-1121030 WT13-1121031 WT13-1121032 WT13-1121033 WT13-1121034 WT13-1121035 WT13-1121036 WT13-1121037 WT13-1121038 WT13-1121039 WT13-1121040 WT13-1121041 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No No No No No No

0.00 0.00 0.25 0.25 0.17 0.25 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :

01SMM01
Plant cond
N1

Unit 1 Boiler auxiliaries lifting apparatus


WO#
WO13-110851 Safety Plan # : Yes N/A PM lubrication for hoist & crane
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

WT
PM
Jobplan # :

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
30-Apr-13

Day(s)
7

Issue date
23-Apr-13

Issue by
NARONG_S NARONG_S

Status
INPRG

Priority
1

WS-M01-0025

Sophon

Responsible suervisor name :

NARONG_S

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Child details for Work order : wonum


WO13-110852 WO13-110853 WO13-110854 WO13-110855 WO13-110856 WO13-110857 WO13-110858

WO13-110851
Asset num
01SMA01AE201 01SMA01AE202 01SMA01AE203 01SMA01AE204 01SMA01AE205 01SMA01AE206 01SMA01AE207

Task description
PM lubrication for Coal pulverizer maintenance crane-B1 PM Lubrication for Coal pulverizer maintenance crane-B2 PM Lubrication for Coal pulverizer maintenance crane-B3 PM Lubrication for Coal pulverizer maintenance crane-B4 PM Lubrication for Coal pulverizer maintenance crane-B5 PM Lubrication for Coal pulverizer maintenance crane-B6 PM Lubrication for Coal pulverizer maintenance crane-B7

Asset description
Coal pulverizer maintenance crane-B1 Coal pulverizer maintenance crane-B2 Coal pulverizer maintenance crane-B3 Coal pulverizer maintenance crane-B4 Coal pulverizer maintenance crane-B5 Coal pulverizer maintenance crane-B6 Coal pulverizer maintenance crane-B7

Status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG

Schedstart

Schedfinish

JPnum
WS-M01-0025 WS-M01-0025 WS-M01-0025 WS-M01-0025 WS-M01-0025 WS-M01-0025 WS-M01-0025

P2: Unit 2
Eq / Loc :
WT
CM
Jobplan # :

2 Turbine oil cooler-B


WO#
WO13-103727 Safety Plan # : Yes N/A Turbine oil cooler-B leak.
Responsible engineer name :

02MAV08AC102
Plant cond
N1

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Turbine

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
15-Feb-13

Issue by
MONGKHOL_T NIRUN_T

Status
INPRG

Priority
3

TB-CM-00018

Wiroj

Responsible suervisor name :

NIRUN_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4027-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-10424

No

E31

GL-account :

No

PARAMEE_K

Taskid
10 20

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215797 WT13-1215798

status
INPRG INPRG

SDR
No No

0.00

hrs

Page 6 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
30 40 50 60 70 80 90 100 160 170 180 190 200 210 Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Select and wear correct PPE to prevent physical injury. Preparation normal tools, light, documents and necessary consumables Check the long pressing plate cooler referance operation & maintenance manual for S/T oil cooler M1-MN-MAV-OM-00525 If found the differance length bolt should retighten and monitoring leaked oil ***The torque of tightening please see the recommend if need*** On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007: Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1215799 WT13-1215800 WT13-1215801 WT13-1215802 WT13-1215803 WT13-1215804 WT13-1215805 WT13-1215806 WT13-1215807 WT13-1215808 WT13-1215809 WT13-1215810 WT13-1215811 WT13-1215812 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No No No No No No

0.00 0.00 0.00 0.25 0.25 0.83 2.50 0.50 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
CM
Jobplan # :

02PAB01AA021
Plant cond
N1

Debris Filter Flushing Valve-A1


WO#
WO13-106051

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Turbine

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
27-Feb-13

Issue by
NIRUN_T NIRUN_T

Status
INPRG

Priority
3

Install hand rail for debris filter flushing valve A1,A2 ,B1,B2 unit 2 . N/A
Responsible engineer name :

TB-CM-00028

Safety Plan # : Yes

Wiroj

Responsible suervisor name :

NIRUN_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4028-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-10638

No

E31

GL-account :

No

MATTIKA_P

Taskid
10 20 30 40 50 60 70 80 90 100 110 160 170 180 190 200 210

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Select and wear correct PPE to prevent physical injury. Preparation normal tools, light, documents and necessary consumables , Removal coating surface for weld Install hand rail Welding hand rail Grinding and coating On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007: Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1121044 WT13-1121045 WT13-1121046 WT13-1121047 WT13-1121048 WT13-1121049 WT13-1121050 WT13-1121051 WT13-1121052 WT13-1121053 WT13-1121054 WT13-1121055 WT13-1121056 WT13-1121057 WT13-1121058 WT13-1121059 WT13-1121060

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.25 0.25 0.17 0.25 0.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

P3: Com
Eq / Loc :
WT
CM

28 500kV Gas Insulated Switchgear (GIS)


WO#
WO13-110848

00ABA00GS101
Plant cond
N1

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
HV

Sched start
24-Apr-13

Sched finish
30-Apr-13

Day(s)
7

Issue date
23-Apr-13

Issue by
TAWATCHAI_Y

Status
INPRG

Priority
3

Touch up paint all local control panel and phase identification of GIS

Page 7 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

EH-JP-0001

Safety Plan # : Yes

N/A

Responsible engineer name :

Tawatchai

Responsible suervisor name :

BANCHA_W

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

BANCHA_W

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4001-740

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11789

No

E51

GL-account :

No

BANCHA_W

Taskid
10 20 30 40 50 60 61 62 63 64 65 66 67 100 110 120 130 140 150

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements MSDS shall be provided for worker and at site all the time Pad lock shall be protected by tape wrapping during painting work Barricade working area by Nylon cord Cleaning LCP and surface preparation Painting work shall be followed as specify the attached file Remove the existing phase identify Surface preparation before attach new sticker of phase idenfication Attach new sticker for Phase identification of GIS ( phase "A " ,"B" , "C" ) On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.17

Ref wonum
WT13-1215833 WT13-1215834 WT13-1215835 WT13-1215836 WT13-1215837 WT13-1215844 WT13-1215845 WT13-1215846 WT13-1215847 WT13-1215848 WT13-1215849 WT13-1215850 WT13-1215851 WT13-1215838 WT13-1215839 WT13-1215840 WT13-1215841 WT13-1215842 WT13-1215843

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No No No

0.50 0.50 0.03 0.25


24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 24-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 0.50 0.17 0.50 0.03 0.17

Eq / Loc :
WT
PM
Jobplan # :

00EAC01AF103
Plant cond
N1

BC-3, 1600W Conveyor steel cord belt


WO#
WO13-110862 Walk down-Visual Check for Belt conveyor BC-3 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Coal&Ash

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
23-Apr-13

Issue by
BOONYARAT_N PITAK_I

Status
INPRG

Priority
3

BC-PM-0053

Safety Plan # : Yes

Yindee

Responsible suervisor name :

PITAK_I

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4007-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E22

GL-account :

No

MONTHS

PITAK_I

Eq / Loc :
WT
DM
Jobplan # :

00EAC01AF105
Plant cond
N1

BC-5, 1600W Conveyor Steel cord blet


WO#
WO13-110774 Install hade barricade at takeup BC5 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
22-Apr-13

Issue by
SUCHAT_T SUCHAT_T

Status
INPRG

Priority
3

WS-CM-0004

Safety Plan # : Yes

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements confirm location with repairing team preparation scaffolding material on working area

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1214508 WT13-1214509 WT13-1214510 WT13-1214511 WT13-1214512 WT13-1214513 WT13-1214514

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs

Page 8 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
80 90 100 110 120 130 140 150 160 170 180 installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1214515 WT13-1214516 WT13-1214517 WT13-1214518 WT13-1214519 WT13-1214520 WT13-1214521 WT13-1214522 WT13-1214523 WT13-1214524 WT13-1214525 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
PM
Jobplan # :

00EAD01AE301
Plant cond
N1

Stacker Reclaimer No.1


WO#
WO13-110860 Walk down - Visual check for Stacker reclaimer 1 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Coal&Ash

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
23-Apr-13

Issue by
BOONYARAT_N PITAK_I

Status
INPRG

Priority
3

BC-PM-0022

Safety Plan # : Yes

Yindee

Responsible suervisor name :

PITAK_I

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4008-730

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E22

GL-account :

No

MONTHS

PITAK_I

Eq / Loc :
WT

00EAF01AE101
Plant cond
S1

Tripper Car A
WO#
WO13-104316

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
LV

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
18-Feb-13

Issue by
BOONYARAT_N KHACHEN_K

Status
INPRG

Priority
3

PM

Monthly PM-TRIPPER A (Electrical Equipment) while it's isolated EL-PM-29


Responsible engineer name :

Jobplan # :

EL-M01-0027

Safety Plan # : Yes

Chidisaan

Responsible suervisor name :

KHACHEN_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4007-740

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E52

GL-account :

No

MONTHS

SIDDHA_J

Eq / Loc :
WT
PM
Jobplan # :

00EAF01AE102
Plant cond
N1

Tripper Car B
WO#
WO13-104321

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
LV

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
18-Feb-13

Issue by
BOONYARAT_N KHACHEN_K

Status
INPRG

Priority
3

Monthly PM - TRIPPER B (Electrical Equipment) while it's running EL-PM-30


Responsible engineer name :

EL-M01-0028

Safety Plan # : Yes

Chidisaan

Responsible suervisor name :

KHACHEN_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4007-740

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E52

GL-account :

No

MONTHS

SIDDHA_J

Eq / Loc :
WT
DM
Jobplan # :

00EAF01AF101
Plant cond
N1

NO.6A Belt Conveyor


WO#
WO13-110785 Install hard barricade at takeup BC6 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
22-Apr-13

Issue by
SUCHAT_T SUCHAT_T

Status
INPRG

Priority
3

WS-CM-0004

Safety Plan # : Yes

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1214926 WT13-1214927 WT13-1214929 WT13-1214931 WT13-1214933

status
INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No

0.00 0.00 0.00 0.00

hrs hrs hrs hrs

Page 9 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
60 70 80 90 100 110 120 130 140 150 160 170 180 confirm location with repairing team preparation scaffolding material on working area installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1214935 WT13-1214937 WT13-1214939 WT13-1214941 WT13-1214943 WT13-1214945 WT13-1214947 WT13-1214949 WT13-1214951 WT13-1214954 WT13-1214955 WT13-1214957 WT13-1214959 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
DM
Jobplan # :

00EAF01AF103
Plant cond
N1

NO.7A Belt Conveyor


WO#
WO13-110807 Install hard barricade at takeup BC7 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
22-Apr-13

Issue by
SUCHAT_T SUCHAT_T

Status
INPRG

Priority
3

WS-CM-0004

Safety Plan # : Yes

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements confirm location with repairing team preparation scaffolding material on working area installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215178 WT13-1215179 WT13-1215180 WT13-1215181 WT13-1215182 WT13-1215183 WT13-1215184 WT13-1215185 WT13-1215186 WT13-1215188 WT13-1215189 WT13-1215190 WT13-1215191 WT13-1215192 WT13-1215193 WT13-1215194 WT13-1215195 WT13-1215196

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
DM

00EAF01AF105
Plant cond
N1

NO.8A Belt Conveyor


WO#
WO13-110808 Install hard barricade at takeup BC8

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13

Sched finish
24-Apr-13

Day(s)
1

Issue date
22-Apr-13

Issue by
SUCHAT_T

Status
INPRG

Priority
3

Page 10 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

WS-CM-0004

Safety Plan # : Yes

N/A

Responsible engineer name :

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

SUCHAT_T

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements confirm location with repairing team preparation scaffolding material on working area installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215205 WT13-1215206 WT13-1215207 WT13-1215208 WT13-1215209 WT13-1215210 WT13-1215211 WT13-1215212 WT13-1215213 WT13-1215214 WT13-1215215 WT13-1215216 WT13-1215217 WT13-1215218 WT13-1215219 WT13-1215220 WT13-1215221 WT13-1215222

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
DM
Jobplan # :

00EAF01AF108
Plant cond
N1

NO.9B Belt Conveyor


WO#
WO13-110817 Install hard barricade at takeup BC9 N/A
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
25-Apr-13

Day(s)
2

Issue date
22-Apr-13

Issue by
SUCHAT_T SUCHAT_T

Status
INPRG

Priority
3

WS-CM-0004

Safety Plan # : Yes

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements confirm location with repairing team preparation scaffolding material on working area installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215375 WT13-1215376 WT13-1215378 WT13-1215379 WT13-1215380 WT13-1215381 WT13-1215382 WT13-1215383 WT13-1215384 WT13-1215385 WT13-1215386 WT13-1215387 WT13-1215388 WT13-1215389 WT13-1215390 WT13-1215391

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Page 11 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
170 180 Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs WT13-1215392 WT13-1215394 INPRG INPRG No No

0.00 0.00

Eq / Loc :
WT

00EAN21AP101
Plant cond
S1

Yard spray system - water pump NO.1


WO#
WO13-107692 Monthly Clean Strainer Yard Spray Water Pump No. 1 TP-PM-000004
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
BOP

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
19-Mar-13

Issue by
BOONYARAT_N PANOM_B

Status
INPRG

Priority
3

PM

Jobplan # :

TP-M01-0001

Safety Plan # : Yes

Paisan

Responsible suervisor name :

PANOM_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4030-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E32

GL-account :

No

MONTHS

PANOM_B

Eq / Loc :
WT

00EAN21AP102
Plant cond
S1

Yard spray system - water pump NO.2


WO#
WO13-107730 Monthly Clean Strainer Yard Spray Water Pump No. 2 TP-PM-000004
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
BOP

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
19-Mar-13

Issue by
BOONYARAT_N PANOM_B

Status
INPRG

Priority
3

PM

Jobplan # :

TP-M01-0001

Safety Plan # : Yes

Paisan

Responsible suervisor name :

PANOM_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4030-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E32

GL-account :

No

MONTHS

PANOM_B

Eq / Loc :
WT

00EAN21AP103
Plant cond
S1

Yard spray system - water pump NO.3


WO#
WO13-107731 Monthly Clean Strainer Yard Spray Water Pump No. 3 TP-PM-000004
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
BOP

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
19-Mar-13

Issue by
BOONYARAT_N PANOM_B

Status
INPRG

Priority
3

PM

Jobplan # :

TP-M01-0001

Safety Plan # : Yes

Paisan

Responsible suervisor name :

PANOM_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4030-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E32

GL-account :

No

MONTHS

PANOM_B

Eq / Loc :
WT
PM
Jobplan # :

00GNA01CQ608
Plant cond
N1

Wastewater Treated Water Pumps A/B Outlet COD Analyzer


WO# Task Description / Work to be done
MASTER PM: Common Unit Preventive Maintenance of COD Analyzer (HACH) IM-W01-0008
Responsible engineer name :

Q:

S:

1
SHE
No

Section
Instrument

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
26-Mar-13

Issue by
BOONYARAT_N TEERAWAT_K

Status
INPRG

Priority
3

WO13-108823 Safety Plan # : Yes

IM-W01-0008

Anon

Responsible suervisor name :

TEERAWAT_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4012-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E41

GL-account :

No

WEEKS

TEERAWAT_K

Eq / Loc :
WT
PM
Jobplan # :

00GNA03CQ608
Plant cond
N1

Coalyard Treated Water Pumps A/B Outlet COD Analyzer


WO# Task Description / Work to be done
MASTER PM: Common Unit Preventive Maintenance of COD Analyzer (HACH) IM-W01-0008
Responsible engineer name :

Q:

S:

1
SHE
No

Section
Instrument

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
26-Mar-13

Issue by
BOONYARAT_N TEERAWAT_K

Status
INPRG

Priority
3

WO13-108831 Safety Plan # : Yes

IM-W01-0008

Anon

Responsible suervisor name :

TEERAWAT_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4012-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E41

GL-account :

No

WEEKS

TEERAWAT_K

Eq / Loc :
WT
DM
Jobplan # :

00GQB01BB101
Plant cond
N1

Sewage collection cum equalization tank


WO# Task Description / Work to be done
Install scaffolding for cable pulling work (support C&I) N/A
Responsible engineer name :

Q:

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
30-Apr-13

Day(s)
7

Issue date
23-Apr-13

Issue by
PONGTAWAT_K SUCHAT_T

Status
INPRG

Priority
3

WO13-110850 Safety Plan # : Yes

WS-CM-0004

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Page 12 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements confirm location with repairing team preparation scaffolding material on working area installation scaffolding ,the scaffolder must be wearing safety harness and hook up to pipe scaffolding all time when working. inspection scaffolding with put tag there remove scaffolding after area finished work remove scaffolding material back to yard cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur

Ref wonum
hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1215950 WT13-1215951 WT13-1215952 WT13-1215953 WT13-1215954 WT13-1215955 WT13-1215956 WT13-1215957 WT13-1215958 WT13-1215959 WT13-1215960 WT13-1215961 WT13-1215962 WT13-1215963 WT13-1215964 WT13-1215965 WT13-1215966 WT13-1215967

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
CM
Jobplan # :

00PBQ21AP501
Plant cond
N1

SEAWATER DRAIN PUMP


WO#
WO13-109420

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
BOP

Sched start
24-Apr-13 N/A

Sched finish
30-Apr-13

Day(s)
7

Issue date
10-Apr-13

Issue by
ANUVAT_N PANOM_B

Status
INPRG

Priority
3

EC Project / Please verify level switch sea water drain pump cannot operate N/A
Responsible engineer name :

TP-STD-001

Safety Plan # : Yes

Paisan

Responsible suervisor name :

PANOM_B

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4028-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11570

No

E32

GL-account :

No

PHAKORN_S

Taskid
2 4 6 8 10 30 40 150 160 170 180 190 200

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Required BLCP OPS Isolate because Now ESCO Isolate (Pump already remove for replace Meah. Seal) Test run for Confirmed (High Level - Run & Low Level - Off) On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart
18-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 18-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13

schedfinish
30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

estdur hrs 0.17

Ref wonum
WT13-1186464 WT13-1186465 WT13-1186466 WT13-1186467 WT13-1186468 WT13-1186469 WT13-1188594 WT13-1186470 WT13-1186471 WT13-1186472 WT13-1186473 WT13-1186474 WT13-1186475

status
INPRG INPRG INPRG INPRG INPRG INPRG WREV INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No

0.17 0.17 0.17 0.17 0.17 1.00 0.17 0.17 0.17 0.17 0.17 0.17

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
CM

00PBQ21AP502
Plant cond
N1

OILY DRAIN PUMP


WO#
WO13-109421

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
BOP

Sched start
24-Apr-13

Sched finish
30-Apr-13

Day(s)
7

Issue date
10-Apr-13

Issue by
ANUVAT_N

Status
INPRG

Priority
3

EC Project / Please verify level switch oily drain pump cannot operate

Page 13 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

TP-STD-001

Safety Plan # : Yes

N/A

Responsible engineer name :

Paisan

Responsible suervisor name :

PANOM_B

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

PANOM_B

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4028-770

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11571

No

E32

GL-account :

No

PHAKORN_S

Taskid
2 4 6 8 10 30 40 150 160 170 180 190 200

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Required BLCP OPS Isolate (Waiting for Install cover pit) Test run for Confirmed (High Level - Run & Low Level - Off) On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart
18-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 18-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13 11-Apr-13

schedfinish
30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13 30-Apr-13

estdur hrs 0.17

Ref wonum
WT13-1186476 WT13-1186477 WT13-1186478 WT13-1186479 WT13-1186480 WT13-1186481 WT13-1188609 WT13-1186482 WT13-1186483 WT13-1186484 WT13-1186485 WT13-1186486 WT13-1186487

status
INPRG INPRG INPRG INPRG INPRG INPRG WREV INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No

0.17 0.17 0.17 0.17 0.00 0.00 0.17 0.17 0.17 0.17 0.17 0.17

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT

00PBQ21CF301
Plant cond
S1

RECTIFIER (A) COOLING WATER FLOW INDICATOR


WO#
WO13-110589

Q:

S:

1
SHE
No

Section
Instrument

Task Description / Work to be done


Please verify and stop leak at RECTIFIER (A) COOLING WATER FLOW INDICATOR N/A
Responsible engineer name :

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
20-Apr-13

Issue by
PHOONSAK_K WISANU_W

Status
INPRG

Priority
3

CM

Jobplan # :

IM-CM-0135

Safety Plan # : Yes

Anon

Responsible suervisor name :

WISANU_W

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4028-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11741

No

E41

GL-account :

No

PARAMEE_K

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Check connection and loose Fix leakage Confirm no leak point On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.08

Ref wonum
WT13-1214179 WT13-1214180 WT13-1214181 WT13-1214182 WT13-1214183 WT13-1214184 WT13-1214185 WT13-1214186 WT13-1214187 WT13-1214188 WT13-1214189 WT13-1214190 WT13-1214191 WT13-1214192

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No

0.08 0.33 0.08 0.17 0.00 0.00 0.00 0.17 0.17 0.08 0.33 0.08 0.08

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT

00PBQ21CF302
Plant cond
S1

RECTIFIER (B) COOLING WATER FLOW INDICATOR


WO#
WO13-109403 Please verify water leakage

Q:

S:

1
SHE
No

Section
Instrument

Task Description / Work to be done

Sched start
24-Apr-13

Sched finish
26-Apr-13

Day(s)
3

Issue date
10-Apr-13

Issue by
PHOONSAK_K

Status
INPRG

Priority
3

CM

Page 14 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

IM-CM-0135

Safety Plan # : Yes

N/A

Responsible engineer name :

Anon

Responsible suervisor name :

WISANU_W

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

WISANU_W

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4028-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11543

No

E41

GL-account :

No

PARAMEE_K

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Check connection and loose Fix leakage Confirm no leak point On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.08

Ref wonum
WT13-1185616 WT13-1185617 WT13-1185618 WT13-1185619 WT13-1185620 WT13-1185621 WT13-1185622 WT13-1185623 WT13-1185624 WT13-1185625 WT13-1185626 WT13-1185627 WT13-1185628 WT13-1185629

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No

0.08 0.33 0.08 0.17 0.00 0.00 0.00 0.17 0.17 0.08 0.33 0.08 0.08

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
CM
Jobplan # :

00PBQ21CT213
Plant cond
N1

NaOCl STORAGE TANK TEMPERATURE SWITCH


WO#
WO13-109514 Verify temperature gauge indicator damage. N/A
Responsible engineer name :

Q:

S:

1
SHE
No

Section
Instrument

Task Description / Work to be done

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
14-Apr-13

Issue by
TEEKA_B WISANU_W

Status
INPRG

Priority
3

IM-CM-0135

Safety Plan # : Yes

Anon

Responsible suervisor name :

WISANU_W

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4028-750

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11643

No

E41

GL-account :

No

BOONYARAT_N

Taskid
10 20 30 40 50 60 70 80 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Remove and calibrate If the result does not satisfy its accuracy , remedy or replace new parts Install back and observe continue On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.08

Ref wonum
WT13-1210375 WT13-1210376 WT13-1210377 WT13-1210378 WT13-1210379 WT13-1210380 WT13-1210381 WT13-1210382 WT13-1210383 WT13-1210384 WT13-1210385 WT13-1210386 WT13-1210387 WT13-1210388

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No

0.08 0.33 0.08 0.17 3.00 1.00 1.00 0.17 0.17 0.08 0.33 0.08 0.08

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

Eq / Loc :
WT
PM

00SAA06
Plant cond
N1

HVAC system
WO#
WO13-107298

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
LV

Sched start
24-Apr-13

Sched finish
26-Apr-13

Day(s)
3

Issue date
19-Mar-13

Issue by
BOONYARAT_N

Status
INPRG

Priority
3

Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House

Page 15 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

EL-M01-0026

Safety Plan # : Yes

EL-PM-03

Responsible engineer name :

Chidisaan

Responsible suervisor name :

KHACHEN_K

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

KHACHEN_K

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4030-740

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E52

GL-account :

No

MONTHS

KHACHEN_K

Child details for Work order : wonum


WO13-107301 WO13-107304 WO13-107307 WO13-107311 WO13-107314

WO13-107298
Asset num
00SAA06AH101 00SAA06AH102 00SAA06AH103 00SAA06AH104 00SAA06AH205

Task description
Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House Preventive Maintenance-Air Condition for Coal Handling Control and Electrical House

Asset description
Coal Handling Control and Electrical House/Coal Operation Rroom, Air Handling unit-A Coal Handling Control and Electrical House/Coal Operation Rroom, Air Handling unit-B Coal Handling Control and Electrical House/Coal Operation Rroom, Air Handling unit-C Coal Handling Control and Electrical House/Coal Operation Rroom, Air Handling unit-D Coal Handling Control and Electrical House/Kitchen room, Condensing unit

Status
INPRG INPRG INPRG INPRG INPRG

Schedstart

Schedfinish

JPnum
EL-M01-0026 EL-M01-0026 EL-M01-0026 EL-M01-0026 EL-M01-0026

Eq / Loc :
WT
PM
Jobplan # :

00SAA21AH101
Plant cond
N1

Coal Handling Operator House(WAST), Air handling unit


WO#
WO13-107359

Q:

S:

1
SHE
No

Section
LV

Task Description / Work to be done


Preventive Maintenance-Air Condition for Coal Handling Operators House(WEST) EL-PM-03
Responsible engineer name :

Sched start
24-Apr-13 N/A

Sched finish
27-Apr-13

Day(s)
4

Issue date
19-Mar-13

Issue by
BOONYARAT_N KHACHEN_K

Status
INPRG

Priority
3

EL-M01-0026

Safety Plan # : Yes

Chidisaan

Responsible suervisor name :

KHACHEN_K

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4030-740

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E52

GL-account :

No

MONTHS

KHACHEN_K

Eq / Loc :
WT
PM
Jobplan # :

00UGD15AREA
Plant cond
N1

Area 15 Water Treatment Plant Area


WO#
WO13-109058

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
ES

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
1-Apr-13

Issue by
BOONYARAT_N NARUESIT_P

Status
INPRG

Priority
3

PM Vibration 2 weekly group 09: Offline measurement for equipment in (BOP area) N/A
Responsible engineer name :

VB-W02-002

Safety Plan # : Yes

Thaworn

Responsible suervisor name :

NARUESIT_P

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4036-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E61

GL-account :

No

WEEKS

NARUESIT_P

Eq / Loc :
WT
CM
Jobplan # :

00UGD15BLDG
Plant cond
N1

Building 15, Water Treatment Plant Building


WO#
WO13-110762

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
22-Apr-13

Issue by
BUNCHA_S SUCHAT_T

Status
INPRG

Priority
3

Please repair Toilet hand sprayer at Water Treatment Plant Building is leak. N/A
Responsible engineer name :

WS-DM-0016

Safety Plan # : Yes

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11785

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 90 100

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements supervisor instructs general safety close vale water suply repair hose repair tile repair dainage line

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1215695 WT13-1215696 WT13-1215697 WT13-1215698 WT13-1215699 WT13-1215700 WT13-1215701 WT13-1215702 WT13-1215703 WT13-1215704

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

hrs hrs hrs hrs hrs hrs hrs hrs hrs

Page 16 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
110 120 130 140 150 160 170 180 190 repair basin to finishing work cleaning working area On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Inform working party not to continue work as the Safety Document/Oral Instruction is to be cancelled Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor hrs hrs hrs hrs hrs hrs hrs hrs hrs WT13-1215705 WT13-1215706 WT13-1215707 WT13-1215708 WT13-1215709 WT13-1215710 WT13-1215711 WT13-1215712 WT13-1215713 INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
PM
Jobplan # :

00UPA28AREA
Plant cond
N1

Area 28, Circulating Water Inlet Pipe Area


WO#
WO13-109056

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
ES

Sched start
24-Apr-13 N/A

Sched finish
24-Apr-13

Day(s)
1

Issue date
1-Apr-13

Issue by
BOONYARAT_N NARUESIT_P

Status
INPRG

Priority
3

PM Vibration 2 weekly group 07: Offline measurement for equipment in (INT area) N/A
Responsible engineer name :

VB-W02-002

Safety Plan # : Yes

Thaworn

Responsible suervisor name :

NARUESIT_P

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-4036-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E61

GL-account :

No

WEEKS

NARUESIT_P

Eq / Loc :
WT
DM
Jobplan # :

00UZ
Plant cond
N1

General service structure


WO#
WO13-110867 Safety Plan # : Yes N/A Repair damaged traffic sign - Unit 1
Responsible engineer name :

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13 N/A

Sched finish
26-Apr-13

Day(s)
3

Issue date
23-Apr-13

Issue by
SANSUDA_R SUCHAT_T

Status
INPRG

Priority
3

WS-DM-0021

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

Current Assignees in work flow system : SD status : Change by :

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411300-4998-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

N/A

No

E63

GL-account :

No

SOPHON_S

Taskid
10 20 30 40 50 60 70 80 81 82 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Main body of job plan (refer to procedure) confirm location strart working., remove old traffic sign to workshop Recheck straight line of pipe ,if not straight shall be change. new column Dig the soil for installation base column , and back fill the soil finished work On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1216680 WT13-1216681 WT13-1216682 WT13-1216683 WT13-1216684 WT13-1216685 WT13-1216686 WT13-1216687 WT13-1216695 WT13-1216909 WT13-1216688 WT13-1216689 WT13-1216690 WT13-1216691 WT13-1216692 WT13-1216693

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG WREV INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


24-Apr-13 26-Apr-13

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Eq / Loc :
WT
CM

00UZT80AREA
Plant cond
N1

Area 80, Plant Green Area


WO#
WO13-109647

Q:
Task Description / Work to be done

S:

1
SHE
No

Section
Workshop

Sched start
24-Apr-13

Sched finish
31-Jul-13

Day(s)
99

Issue date
19-Apr-13

Issue by
PHISSAMAI_B

Status
INPRG

Priority
3

Planting tree along entrance road and Contractor Car Park Including Power Plant Area

Page 17 of 17

The committed work report V9.0


Summary date: 23-April-2013 16:15:39

Schedule Start date:

24-Apr-13

to

24-Apr-13

Equipment risk code: 1: High - Critical Risk to Process , 2: Med - Medium Risk to Process , 3: Low - Low Risk to Process, 4: None - No Risk to Process

SHE: SHE related ? (Yes or No)

Plant condition code: N1 Normal Plant Condition , O15 Outage 15 days (Minor) , O3 Outage <= 3 days, O30 Outage 30 days (Minor) , O7 Outage <= 7 days , O70 Outage 70 days (Minor) , S1 Equipment Shutdown , SS Station Shutdown
Jobplan # :

WS-DM-0021

Safety Plan # : Yes

N/A

Responsible engineer name :

Sophon

Responsible suervisor name :

SUCHAT_T

Parent Work order :

N/A
SD status : Change by :

Current Assignees in work flow system :

SUCHAT_T

Safety Document Required:


Originating WO # :

Limitted Work Certificate


Hasfollowupwork:

Permit For Work


Cost center :

Sanction For Test


10-5411100-????-760

Oral Instruction
NOD :

Restoration Of Motive Power


PM Frequency:

SR13-11605

No

E63

GL-account :

No

PARAMEE_K

Taskid
10 20 30 40 50 60 70 80 81 82 90 100 110 120 130 140

Description
Receive instruction from supervisor Ensure that job plan, risk assessment, MSDS and general safety requirements are understood Obtain a Safety Document / Instruction from SAP and ensure that the safety precautions applied are understood Inform Unit Operator Brief working party on the Safety Instruction received from the SAP, job plan, risk assessment, MSDS and general safety requirements Main body of job plan (refer to procedure) confirm location strart working. ,Dig the soil depth 30 centimeter and 50 centimeter Put the tree in the hole , Back fill soil to the hole Fix the tree with wood column (temporary support ) finished work On completion of work remove all tools and equipment Tidy working area ensuring waste materials are disposed of in accordance with BLCP-P-ER-05-007 Waste Management and Recycling Clear Safety Document or sign off Oral Instruction Register as applicable Inform Unit Operator that all persons and materials have been removed from the working area Report to supervisor

schedstart

schedfinish

estdur hrs 0.00

Ref wonum
WT13-1210697 WT13-1210698 WT13-1210699 WT13-1210700 WT13-1210701 WT13-1210702 WT13-1210703 WT13-1210704 WT13-1215739 WT13-1215743 WT13-1210705 WT13-1210706 WT13-1210707 WT13-1210708 WT13-1210709 WT13-1210710

status
INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG INPRG

SDR
No No No No No No No No No No No No No No No No

0.00 0.00 0.00 0.00 0.00 0.00 0.00


24-Apr-13 24-Apr-13 31-Jul-13 31-Jul-13

hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

You might also like