You are on page 1of 51

DOLPHIN CONSTRUCTION CO.

Panwar Bhawan, Road No. 2, Nayapura B.S.F.,


Jodhpur Rajasthan - 342026
M.No. +91 9928366291, +91 9001891168
www.dolphinconstruction.co.in
SOIL TESTING REPORT
Client
BMD Pvt. Ltd.
Name of Work
Soil Testing for Proposed 5.83MW (DC) Solar Power Project
Project Execution by
AEG Power Solutions Pvt. Ltd.
Location
At Village- Gajner, Tehsil- Kolayat, Distt.- Bikaner, Rajasthan
Prepared By

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
BRIEF DETAIL OF PROJECT SITE
CLIENT : BMD Pvt Ltd.
PROJECT EXECUTION by : AEG Power Solutions Pvt Ltd.
NAME OF WORK : Electrical Resistivity Testing For Proposed 5.83
MW (DC) Solar Project at Village Gajner,
Tehsil- Kolayat, Distt.- Bikaner, Rajasthan
LOCATION : At Village Gajner, Tehsil- Kolayat, Distt.- Bikaner,
Rajasthan
BH ID : BH-1 to BH-10
TESTING AGENCY : DOLPHIN CONSTRUCTION CO.
Panwar Bhawan, Road No. 2, Nayapura B.S.F.,
Jodhpur Rajasthan - 342026
M.No. +91 9928366291, +91 9001891168
www.dolphinconstruction.co.in
Nos. of BOREHOLE : 10

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
CONTENTS
Sr. No.
PARTICULARS
Page No.
1. Introduction. 04
2. Field Work 05
3. Sub Surface Exploration 06
4. Laboratory Test 08
5. Safe Bearing Capacity 12
6. IS Codes Followed 13
7. Boreholes Location 14
8. Conclusion & Recommendation 15
9. Appendix
1) Tables
2) Drawings
16-33

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
1.0 INTRODUCTION:
Sub surface investigation and laboratory tests for Geotechnical
Investigation for Proposed Project at Gajner Village. Tah. : Kolayat, Dist:
Bikaner was referred us by AEG Power Solutions Pvt. Ltd.
The objective of the exploration work was to determine the probable
sub surface conditions such as stratification, denseness or hardness of the
strata, position of ground water table etc. and to evaluate probable range
of safe bearing capacity and Safe bearing pressure.
Ten boreholes up to the depth of 3.0 meter below Natural Ground in
order to know the sub surface stratification, conducting necessary
field tests and to collect disturb and undisturbed soil samples for
laboratory testing.
Testing soil / rock samples in the laboratory to determine its physical
and engineering properties of the soil / rock samples, and
Analyzing all field and laboratory data to evaluate safe bearing
capacity and safe bearing pressure of the soil for given foundation
sizes and necessary recommendations for foundation design and
construction.
The site is located at Village Gajner Tah. Kolayat Dist. Bikaner.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
2.0 FIELD WORK:
2.1 Scope of Work:
Topographical survey:
To carryout Topographical Survey with the use of Total Station
having spot levels at 10m interval and fixing 4 Nos. PBM with defining
boundary. It also includes demarcation of soil investigation points.
Soil Investigation:
(1) Mobilization of necessary equipments, technical supervisors,
skilled & unskilled labour etc. for successful execution of work.
(2) Carrying out all necessary boreholes with suitable method up to
3.0m depth.
(3) Collection of disturbed and undisturbed soil samples.
(4) Conducting standard penetration tests (SPL) at specified intervals
in the boreholes.
(5) Conducting lab tests on the collected soil samples.
(6) Conducting Electrical Resistivity test as specified by client.
(7) Submission of report containing all field data, laboratory test
results, calculations, recommendations etc. complete with all
respect.
3.0 SUB SURFACE EXPLORATION
3.1.1 DISTURBED SAMPLES:
Disturbed representative samples were collected, logged, labeled
and placed in polythene bags.
3.1.2 UNDISTURBED SAMPLES:
Undisturbed soil samples are collected in 100 mm diameter thin
walled sampler from the borehole. The sampler used for the sampling had
smooth surface and appropriate area ratio and cutting edge angle thereby

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
minimizing disturbance of soil during sampling. Samples are logged and
labeled properly and transfer to the laboratory for further testing.
3.1.3 WATER TABLE:
Water table was Not encountered during the sub soil exploration
work carried out in the month of Oct. 2012. (As per discussion with local
People water table in that area is below 400 Feet.)
3.1.4 METHOD OF SAMPLING:
Sampler is coupled together with a sampler head to form a sampling
assembly. The sampler head provide a non-flexible connection between
the sampling tube and the drill rods. Vent holes are provided in the
sampler head to allow escape of water from the top of sampler tube
during penetration. The sampling tubes are made free from dust and rust.
Coating of oil is applied on both sides to obtain the undisturbed samples
in best possible manner.
The sampler is then lowered inside the bore hole on a string of rods
and driven to a predetermined level. On completion of driving the
sampler is first rotated within the borehole to shear the soil sample at
bottom and then pulled out. Upon removal of the sampling tubes, the
length of sample in the tube is recorded. The disturbed material in the
upper end of the tube, if any, is completely removed before sealing.
The soil at the lower end of the tube is trimmed to a distance of
about 10 to 20 mm. After cleaning and inserting an impervious disc at
each end, both ends are sealed. The empty space in the sampler, if any, is
filled with the moist soil, and the ends covered with tight wrapper. The
identification mark is then made on each sample.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
3.2 STANDARD PENETRATION TEST:
The standard penetration tests are conducted in each bore as per IS:
2131: 1981 (Reaffirmed 2002). The split spoon sampler resting on the
bottom of bore hole is allowed to sink under its own weight, then the split
spoon sampler is seated 15 cm with the blows of hammer falling through
750mm. The driving assembly consists of a driving head and a 63.5 kg
weight.
It is ensured that the energy of the falling weight is not reduced by
friction between the drive weight and the guides or between ropes. The
rods to which the sampler is attached for driving are straight, tightly
coupled and straight in alignment. Thereafter the split spoon sampler is
further driven by 30cm. The number of blows required to drive each 15cm
penetration is recorded. The first 15cm of drive considered as seating
drive. The total blows required for the second and third 15cm penetration
is termed as a penetration resistance - N value. The N- values for each
bore hole are given in bore logs.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
4.0 LABORATORY TEST
A. Laboratory Test for Soil
1. Natural Moisture Content Test (IS: 2720, 1992 Part 2)
2. Grain Size Analysis (IS: 2720, 1992 Part 4)
3. Atterberg s Limits Test (IS: 2720, Part 5 1992)
4. Specific Gravity Test (IS: 2720, Part 3 1992)
5. Direct Shear Test (IS: 2720, Part 13, 1992)
4.A.1 Natural Moisture Content Test (IS: 2720, 1992 Part 2)
This test is done to determine the water content in soil by calcium
carbide method as per IS: 2720 (Part II) 1973. It is a method for rapid
determination of water content from the gas pressure developed by the
reaction of calcium carbide with the free water of the soil. From the
calibrated scale of the pressure gauge the percentage of water on total
mass of wet soil is obtained and the same is converted to water content on
dry mass of soil.
The water content on dry mass basis
w = m/[100-m] * 100%
Where m = Mass of Soil
4.A.2 Grain Size Analysis (IS: 2720, 1992 Part 4)
Testing procedure generally conforms to IS: 2720 Part 4. Both sieve and
hydrometer analysis has been carried out.
Sieve Analysis: Sieve analysis is done by wet sieving method. Oven dried soil
is washed through 75 IS sieve. Fraction retained was oven dried and particle
size analysis carried out using sieve shaker by passing through the following
IS sieve: 4.75mm, 2.36mm, 1.70mm, 1.40mm, 1.00mm, 600, 425, 100, and
75 respectively.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
4.A.3 Atterberg s Limits Test (IS: 2720, Part 5 1992)
Liquid limit and plastic limit test on cohesive and semi cohesive
Samples has been done as per procedure in IS 2720 (Part 5).
Liquid Limit: Liquid limit and plastic limit test on cohesive has been done as
per procedure in IS 2720 (Part 5) using the more reliable cone penetrometer ,
method where errors of grove cutting involved in Casagrande s device are
minimized. In cone penetrometer test about 200 gm of passing 425 sieve is
taken mixed with requisite water, placed in cup and compacted lightly in 3
layers. The tip of penetrometer is adjusted such that it just touches soil
surface. The needle is allowed to plunge slowly under its own weight for 5
seconds and penetration in mm is recorded. The water content is adjusted
such that penetration is between 20-30mm. The following relationship is used
to evaluate liquid limit.
Plastic Limit: About 15gm of oven dried soil passing through 425 sieve is
mixed with sufficient quantity of water to become plastic enough to be easily
shaped into a ball. A portion of this ball is rolled on a glass plate with the
palm into a thread of uniform diameter of 3mm. The corresponding water
content represents the plastic limit of the soil.
Plastic Index: PI = Liquid limit Plastic limit.
Shrinkage Limit (IS : 2720, Part 6, 1992): It is the maximum water content
expressed as percentage of oven-dry weight at which any further reduction in
water content will not cause a decrease in volume of the soil mass is
calculated as follows:
SL = W ((V
V0) / W0) x 100
Where,
SL = Shrinkage limit in %.
W = Moisture content of wet soil pat in %.
V = Volume of wet soil pat in ml.
V0 = Volume of dry soil pat in ml.
W0 = Weight of oven-dried soil pat in gm.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
4.A.4 Specific Gravity Test (IS: 2720, Part 3 1992)
The specific gravity of soil solids is determined by Pycnometer. The
weight (W1) of the empty Pycnometer with cap and washer is taken first. A
sample of oven-dried soil about 200-400 gm is put in the Pycnometer, and
weight (W2) of the Pycnometer and the soil taken. The Pycnometer is then
filled with distilled water gradually removing the entrapped air either by
applying (W3) of the Pycnometer, soil and water (full up to the top) is then
taken. Finally the Pycnometer is emptied completely and thoroughly washed
and clean water is filled to the top and the weight (W4) is taken.
G = (W2
W1) / [(W4 W1)
(W3
W2)]
4.A.5 Direct Shear Test (IS: 2720, Part 13, 1992)
Direct shear test is carried out using shear box with the specimens
(60mm x 60mm). Specimen with plain grid plate at the bottom of the specimen
and plain grid plate at the top of the specimen is fitted into position in the
shear box housing and assembly placed on the load frame. The serrations of
the grid plates are kept at right angle to the direction of shear. The loading
pad is kept on the top grid plate. The required normal stress is applied and
the rate of longitudinal displacement shear stress application so adjusted that
no drainage can occur in the sample during the test (1.25mm/min.). The upper
part of the shear box is raised such that a gap of about 1mm is left between the
two parts of the box. The test is conducted by applying horizontal shear load
to failure or to 20 percent longitudinal displacement whichever occurs first.
The test is repeated on identical specimens.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
5. 0 SAFE BEARING CAPACITY
Looking to the proposed type of project, site conditions and sub soil
stratification, RCC Open Isolated Foundation is recommended along with safe
bearing capacity and safe bearing pressure at different depths. Intensity of
bearable load determined as soil bearing capacity (SBC)of soil.
SBC BASED ON SHEAR :- The ultimate net bearing capacity is
evaluated after taking into consideration of shape factor and depth factor of
the foundation in accordance with I.S. 6403-1981.
The net bearing capacity worked out using the following equation.
Q = C N c Sc dc + q (Nq -1) Sq dq + 0.5 B . N. S. d.
Where, c = Cohesion
q = Overburden Pressure
. = Density
B = Width of the Footing
Nc,Nq,N. = Bearing capacity Factor
S c,Sq,S. = Shape Factor
dc,dq,d. = Depth Factor
Following parameters are adopted for the evaluation of bearing
capacity for shallow foundation. The investigation site is mainly divided into
three groups according to the soil strata encountered, worst combination of
soil parameter, and effect of water table is also considered to evaluate SBC .

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
6.0 IS Codes Followed:
Field work was executed generally in accordance with IS specifications
listed below:
1. IS-1892: Code of practice for Subsurface Investigation of Foundations.
2. IS- 1498: Classification and Identification of soils for General
Engineering.
3. IS-2131: Method for Standard Penetration Test for Soils.
4. IS-1888: Method for load test in soil.
5. IS-6935: Method of determination of water level in borehole
6. IS-7422: Symbols and abbreviations for use of geological maps, sections
and subsurface exploratory logs.
7. IS-9640: Specification for split spoon sampler.
Laboratory work was executed in accordance with IS specifications
listed below:
IS: 2720 : Methods of tests for soils
1. Part2 : Determination of water contents
2. Part4 : Grain size analysis
3. Part5 : Determination of liquid and plastic limit
4. Part6 : Determination of shrinkage factors
5. Part10 : Determination of unconfined compression strength
6. Part27 : Determination of sodium sulphate
7. IS: 3025 : Methods of sampling and test (physical and Part11
Chemical) for water and waste water: part 11 pH value
8. IS: 3025 : Methods of sampling and test (physical and chemical) for
Water and Waste Water: part 24 Sulphates.

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
7.0 Boreholes Location:
The Co-ordinates of Borehole locations where field tests are performed
and various soil samples are taken:Bore Hole Points Location
BH No. Easting Northing
BH-1 5154.880 4980.930
BH-2 5083.726 5093.842
BH-3 4901.459 5079.142
BH-4 4544.329 4869.375
BH-5 4539.894 4774.277
BH-6 4603.619 4708.216
BH-7 4788.611 4771.648
BH-8 4956.179 4822.232
BH-9 4744.903 5034.926
BH-10 4567.083 4991.498
ERT Points Location
ERT Easting Northing
ERT-1 4836.606 5046.998
ERT-2 4603.768 5003.221
ERT-3 4526.570 4793.723
ERT-4 5108.884 4891.447

Soil Testing Report For Proposed 5.83 MW (DC)Solar Power Project At Vill-. Gajne
r, Bikaner
Dolphin Construction Co. Jodhpur
8.0 Conclusion & Recommendation
1. The present report covers the Geotechnical investigation carried out of
Twenty Seven boreholes Location in At Village Gajner, Tal. Kolayat,
Dist. Bikaner.
2. Topographical Survey & Geotechnical Investigation work at Bap village
is in general observed to consist of sandy soil having low plasticity.
3. The above report is based on the soil strata encountered at site up to
depth of Investigation i.e. 3.0 meter.
4. The above recommendations are based on the collected field data,
laboratory tests results conducted on soil samples recovered from the
test locations. However if the actual subsoil condition during execution
vary from what has been represented in this report, the client/agency
may be referred to us for suggestions.
5. The results of the laboratory tests are incorporated in the form of table
at the later part of the report.
For Dolphin Construction Co. Jodhpur
Authorized Signatory

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Soil Testing for Proposed 5.83 MW (DC) Solar Power Project
Village- Gajner, Bikaner
Project Execution by :- AEG Power Solutions Pvt Ltd.
Silt / Clay
(%)
Sand (%) Gravel (%)
Liquid Limit
(%)
Plastic
Limit (%)
Plastic Index
(%)
Types of
Test
Cohesion
Kg/Cm2
Angle of Internal
friction
1.0 7 0.42 76.10 23.48 37.09 27.89 9.20 1.79 3.7 CU 0.12 29.0
2.0 9 0.06 60.07 39.87 36.15 27.21 8.94 1.80 4.0 CU 0.11 29.5
3.0 11 0.07 58.86 41.07 38.25 28.65 9.60 1.65 3.5 CU 0.10 30.0
1.0 8 0.12 78.61 21.28 37.35 29.50 7.85 1.79 3.3 CU 0.12 30.5
2.0 10 0.14 58.27 41.58 37.50 28.90 8.60 1.80 4.1 CU 0.10 29.5
3.0 13 0.08 69.16 30.77 37.65 29.15 8.50 1.75 3.5 CU 0.10 29.0
1.0 8 0.06 56.05 43.89 37.09 27.89 9.20 1.82 4.0 CU 0.12 29.0
2.0 10 0.02 49.96 50.02 36.51 27.95 8.56 1.68 4.2 CU 0.10 28.0
3.0 12 0.26 54.94 44.80 35.65 26.85 8.80 1.75 4.1 CU 0.10 30.0
1.0 9 0.24 67.76 32.00 36.85 27.48 9.37 1.79 3.6 CU 0.10 31.0
2.0 11 0.26 69.88 29.86 37.12 29.50 7.62 1.77 3.8 CU 0.11 32.0
3.0 13 5.04 61.00 33.96 37.15 29.15 8.00 1.72 3.8 CU 0.10 30.0
1.0 9 0.34 70.28 29.38 37.50 28.02 9.48 1.80 3.5 CU 0.12 30.5
2.0 13 0.60 71.72 27.68 38.12 28.65 9.47 1.82 3.2 CU 0.10 31.0
3.0 15 0.34 51.50 48.16 36.40 28.21 8.19 1.88 3.5 CU 0.10 30.0
TABLE No.-1 SOIL CHARACTERISTIC PROPERTIES
BMD Pvt Ltd.
Grain Size Analysis Atterberg limit Natural
Water
Content (%)
Shear Parameters
Borehole
No.
Depth
(m)
N values
Observed
Name of Work:Location :Dry Density
(t/m3)
BH-5
BH-1
BH-2
BH-4
BH-3
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Silt / Clay
(%)
Sand (%) Gravel (%)
Liquid Limit
(%)
Plastic
Limit (%)
Plastic Index
(%)
Types of
Test
Cohesion
Kg/Cm2
Angle of Internal
friction
Grain Size Analysis Atterberg limit Natural
Water
Content (%)
Shear Parameters
Borehole
No.
Depth
(m)
N values
Observed
Dry Density
(t/m3)
1.0 9 0.40 78.32 21.28 37.09 27.89 9.20 1.79 3.5 CU 0.12 30.0
2.0 12 0.82 75.88 23.30 36.70 28.60 8.10 1.80 4.0 CU 0.11 31.0
3.0 13 0.26 59.04 40.70 35.48 28.65 6.83 1.76 4.0 CU 0.10 29.0
1.0 8 0.14 78.58 21.28 37.52 28.50 9.02 1.80 3.5 CU 0.12 30.5
2.0 10 0.12 79.56 20.32 37.95 28.36 9.59 1.73 3.8 CU 0.10 30.0
3.0 12 0.18 76.46 23.36 36.85 28.15 8.70 1.71 3.5 CU 0.11 31.0
1.0 9 0.38 84.92 14.70 34.95 28.67 6.28 1.82 3.2 CU 0.12 30.5
2.0 12 0.40 68.76 30.84 36.4 28.32 8.08 1.76 3.5 CU 0.11 31.0
3.0 13 0.28 88.08 11.64 36.84 28.15 8.69 1.84 3.5 CU 0.10 29.0
1.0 8 0.20 81.18 18.62 37.95 28.64 9.31 1.88 3.6 CU 0.12 30.0
2.0 10 3.44 74.82 21.74 37.65 28.14 9.51 1.73 3.5 CU 0.12 30.0
3.0 13 2.14 80.78 17.08 38.15 28.66 9.49 1.79 4.2 CU 0.10 31.0
1.0 9 4.52 80.86 14.62 37.15 28.17 8.98 1.77 3.8 CU 0.11 32.0
2.0 11 2.30 90.12 7.58 38.35 29.50 8.85 1.82 4.0 CU 0.12 30.0
3.0 14 1.18 94.42 4.40 37.35 28.15 9.20 1.83 3.9 CU 0.11 31.0
For Dolphin Construction Co. Jodhpur
Authorized Signatory
BH-8
BH-9
BH-10
BH-6
BH-7
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Name of Work:- Soil Testing for Proposed 5.83 MW (DC) Solar Power Project
Location :- Village- Gajner, Bikaner
Project Execution by :- AEG Power Solutions Pvt Ltd.
Cohesion
c
Safe Bearing
Capicity
Safe Bearing
Capicity
(kg/cm2) (t/sqm) (t/sqm) (t/sqm)
1.0 1.79 3.7 0.12 29.0 7.1 7.0 12.1 7.1
2.0 1.80 4.0 0.11 29.5 13.9 9.0 16.1 13.9
3.0 1.65 3.5 0.10 30.0 19.8 11.0 18.1 18.1
1.0 1.79 3.3 0.12 30.5 9.1 8.0 14.3 9.1
2.0 1.80 4.1 0.10 29.5 13.9 10.0 16.8 13.9
3.0 1.75 3.5 0.10 29.0 17.9 13.0 20.9 17.9
1.0 1.82 4.0 0.12 29.0 7.2 8.0 14.3 7.2
2.0 1.68 4.2 0.10 28.0 10.1 10.0 16.5 10.1
3.0 1.75 4.1 0.10 30.0 21.0 12.0 19.1 19.1
1.0 1.79 3.6 0.10 31.0 9.7 9.0 15.7 9.7
2.0 1.77 3.8 0.11 32.0 19.3 11.0 17.4 17.4
3.0 1.72 3.8 0.10 30.0 20.7 13.0 20.8 20.7
1.0 1.80 3.5 0.12 30.5 9.2 9.0 15.7 9.2
2.0 1.82 3.2 0.10 31.0 17.5 13.0 22.9 17.5
3.0 1.88 3.5 0.10 30.0 22.5 15.0 24.9 22.5
1.0 1.79 3.5 0.12 30.0 8.5 9.0 15.7 8.5
2.0 1.80 4.0 0.11 31.0 17.3 12.0 21.5 17.3
3.0 1.76 4.0 0.10 29.0 18.0 13.0 20.9 18.0
1.0 1.80 3.5 0.12 30.5 9.2 8.0 14.3 9.2
2.0 1.73 3.8 0.10 30.0 14.5 10.0 16.6 14.5
3.0 1.71 3.5 0.11 31.0 23.6 12.0 19.0 19.0
1.0 1.82 3.2 0.12 30.5 9.3 9.0 15.7 9.3
2.0 1.76 3.5 0.11 31.0 16.9 12.0 21.4 16.9
3.0 1.84 3.5 0.10 29.0 18.8 13.0 21.1 18.8
1.0 1.88 3.6 0.12 30.0 8.9 8.0 14.4 8.9
2.0 1.73 3.5 0.12 30.0 14.5 10.0 16.6 14.5
3.0 1.79 4.2 0.10 31.0 24.6 13.0 21.0 21.0
1.0 1.77 3.8 0.11 32.0 11.0 9.0 15.7 11.0
2.0 1.82 4.0 0.12 30.0 15.3 11.0 17.5 15.3
3.0 1.83 3.9 0.11 31.0 25.2 14.0 23.3 23.3
For Dolphin Construction Co. Jodhpur
Authorized Signatory
BH-10
BH-5
BH-1
BH-6
BH-7
BH-2
BH-3
BH-4
BH-8
BH-9
BMD Pvt Ltd.
TABLE No.-2 SAFE BEARING CAPACITY OF SOIL
Borehole
No.
Depth

Based on Shear Test Based on Settlement


Recommendent
Safe Bearing
Capacity
Angle of
friction
.
N
Dry
Density
(t/m3)
Natural Water
Content (%)
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Name of Work:Location :- Village- Gajner, Bikaner
Project Execution by :- AEG Power Solutions Pvt Ltd.
Borehole
No.
Depth
(m)
Dry Density
(t/m3)
Overburdden
Pressure
(t/m2)
BH-1 1.5 1.79 2.685
BH-2 1.5 1.79 2.685
BH-3 1.5 1.82 2.730
BH-4 1.5 1.79 2.685
BH-5 1.5 1.80 2.700
BH-6 1.5 1.79 2.685
BH-7 1.5 1.80 2.700
BH-8 1.5 1.82 2.730
BH-9 1.5 1.88 2.820
BH-10 1.5 1.77 2.655
For Dolphin Construction Co. Jodhpur
Authorized Signatory
TABLE No.-3 EFFECTIVE OVERBURDEN PRESSURE OF SOIL
BMD Pvt Ltd.
Soil Testing for Proposed 5.83 MW (DC) Solar Power Project
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing for Proposed 5.83MW (DC) Solar Power Project


Silt / Clay (%) Sand (%) Gravel (%)
1.0 0.42 76.10 23.48
2.0 0.06 60.07 39.87
3.0 0.07 58.86 41.07
1.0 0.12 78.61 21.28
2.0 0.14 58.27 41.58
3.0 0.08 69.16 30.77
1.0 0.06 56.05 43.89
2.0 0.02 49.96 50.02
3.0 0.26 54.94 44.80
1.0 0.24 67.76 32.00
2.0 0.26 69.88 29.86
3.0 5.04 61.00 33.96
1.0 0.34 70.28 29.38
2.0 0.60 71.72 27.68
3.0 0.34 51.50 48.16
1.0 0.40 78.32 21.28
2.0 0.82 75.88 23.30
3.0 0.26 59.04 40.70
1.0 0.14 78.58 21.28
2.0 0.12 79.56 20.32
3.0 0.18 76.46 23.36
1.0 0.38 84.92 14.70
2.0 0.40 68.76 30.84
3.0 0.28 88.08 11.64
1.0 0.20 81.18 18.62
2.0 3.44 74.82 21.74
3.0 2.14 80.78 17.08
1.0 4.52 80.86 14.62
2.0 2.30 90.12 7.58
3.0 1.18 94.42 4.40
GRAIN SIZE ANALYSIS
BH-8
BH-9
BH-10
BH-3
BH-4
BH-5
BH-6
BH-7
Depth
(m)
Grain Size Analysis
Borehole
No.
BH-2
BH-1
BMD Pvt Ltd.
Name of Work:Location :- Village- Gajner, Bikaner
Project Execution by :- AEG Power Solutions Pvt Ltd.
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Sieve Analysis-Observation and Calculation
Bore No. 1 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 234.78 23.48 23.48 76.52
2.36 157.1 15.71 39.19 60.81
2 46.22 4.62 43.81 56.19
1.18 173.56 17.36 61.17 38.83
1 24 2.40 63.57 36.43
0.6 41.58 4.16 67.72 32.28
0.425 55.32 5.53 73.26 26.74
0.3 118.79 11.88 85.14 14.87
0.212 101.55 10.16 95.29 4.71
0.15 15.39 1.54 96.83 3.17
0.075 27.5 2.75 99.58 0.42
0 4.21 0.42 100.00 0.00
Total Sample Mass 1000
38.83
26.74
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Se
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Sieve Analysis-Observation and Calculation
Bore No. 1 Dept. (m) 2
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 398.72 39.87 39.87 60.13
2.36 167.61 16.76 56.63 43.37
2 67.82 6.78 63.42 36.59
1.18 139.6 13.96 77.38 22.63
1 68.95 6.90 84.27 15.73
0.6 69.49 6.95 91.22 8.78
0.425 50.38 5.04 96.26 3.74
0.3 18.04 1.80 98.06 1.94
0.212 13.64 1.36 99.43 0.58
0.15 1.4 0.14 99.57 0.44
0.075 3.75 0.38 99.94 0.06
0 0.6 0.06 100.00 0.00
Total Sample Mass 1000
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Se
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 1 Dept. (m) 3
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 410.7 41.07 41.07 58.93
2.36 137.33 13.73 54.80 45.20
2 32.38 3.24 58.04 41.96
1.18 175.5 17.55 75.59 24.41
1 25.58 2.56 78.15 21.85
0.6 49.58 4.96 83.11 16.89
0.425 46.9 4.69 87.80 12.20
0.3 57.51 5.75 93.55 6.45
0.212 52.64 5.26 98.81 1.19
0.15 4.85 0.49 99.30 0.70
0.075 6.29 0.63 99.93 0.07
0 0.74 0.07 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F I
N
ER
PARTICLE SIZE (mm)
Ser
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 2 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 212.77 21.28 21.28 78.72
2.36 177.47 17.75 39.02 60.98
2 46.89 4.69 43.71 56.29
1.18 176.67 17.67 61.38 38.62
1 25.21 2.52 63.90 36.10
0.6 40.38 4.04 67.94 32.06
0.425 47.6 4.76 72.70 27.30
0.3 92.54 9.25 81.95 18.05
0.212 143.9 14.39 96.34 3.66
0.15 20.77 2.08 98.42 1.58
0.075 14.64 1.46 99.88 0.12
0 1.16 0.12 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F I
N
ER
PARTICLE SIZE (mm)
Ser
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 2 Dept. (m) 2
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 415.84 41.58 41.58 58.42
2.36 90.85 9.09 50.67 49.33
2 39.74 3.97 54.64 45.36
1.18 181.76 18.18 72.82 27.18
1 29.99 3.00 75.82 24.18
0.6 43.14 4.31 80.13 19.87
0.425 50.41 5.04 85.17 14.83
0.3 84.41 8.44 93.61 6.39
0.212 50.3 5.03 98.64 1.36
0.15 4.56 0.46 99.10 0.90
0.075 7.57 0.76 99.86 0.14
0 1.43 0.14 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F I
N
ER
PARTICLE SIZE (mm)
Ser
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 2 Dept. (m) 3
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 307.66 30.77 30.77 69.23
2.36 113.55 11.36 42.12 57.88
2 51.18 5.12 47.24 52.76
1.18 184.34 18.43 65.67 34.33
1 44.02 4.40 70.08 29.93
0.6 102.47 10.25 80.32 19.68
0.425 121.27 12.13 92.45 7.55
0.3 40.69 4.07 96.52 3.48
0.212 25.28 2.53 99.05 0.95
0.15 2.87 0.29 99.33 0.67
0.075 5.89 0.59 99.92 0.08
0 0.78 0.08 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 3 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 299.48 29.95 29.95 70.05
2.36 139.38 13.94 43.89 56.11
2 49.51 4.95 48.84 51.16
1.18 139.18 13.92 62.76 37.25
1 31.75 3.18 65.93 34.07
0.6 87.23 8.72 74.65 25.35
0.425 148.94 14.89 89.55 10.45
0.3 64.95 6.50 96.04 3.96
0.212 28.55 2.86 98.90 1.10
0.15 4.05 0.41 99.30 0.70
0.075 6.36 0.64 99.94 0.06
0 0.62 0.06 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I N
ER
PARTICLE SIZE (mm)
Ser
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 3 Dept. (m) 2
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 377.2 37.72 37.72 62.28
2.36 123 12.30 50.02 49.98
2 47.2 4.72 54.74 45.26
1.18 188.2 18.82 73.56 26.44
1 24.4 2.44 76.00 24.00
0.6 36 3.60 79.60 20.40
0.425 83 8.30 87.90 12.10
0.3 64.8 6.48 94.38 5.62
0.212 41.6 4.16 98.54 1.46
0.15 9 0.90 99.44 0.56
0.075 5.4 0.54 99.98 0.02
0 0.2 0.02 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Ser
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 3 Dept. (m) 3
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 275.4 27.54 27.54 72.46
2.36 172.6 17.26 44.80 55.20
2 46 4.60 49.40 50.60
1.18 178.8 17.88 67.28 32.72
1 35.6 3.56 70.84 29.16
0.6 61.4 6.14 76.98 23.02
0.425 72.4 7.24 84.22 15.78
0.3 43.8 4.38 88.60 11.40
0.212 65.2 6.52 95.12 4.88
0.15 29.2 2.92 98.04 1.96
0.075 17 1.70 99.74 0.26
0 2.6 0.26 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Se
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 4 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 167.2 16.72 16.72 83.28
2.36 152.8 15.28 32.00 68.00
2 42.8 4.28 36.28 63.72
1.18 171 17.10 53.38 46.62
1 20.4 2.04 55.42 44.58
0.6 45 4.50 59.92 40.08
0.425 53.8 5.38 65.30 34.70
0.3 82.4 8.24 73.54 26.46
0.212 199.8 19.98 93.52 6.48
0.15 47.6 4.76 98.28 1.72
0.075 14.8 1.48 99.76 0.24
0 2.4 0.24 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I N
ER
PARTICLE SIZE (mm)
Se
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 4 Dept. (m) 2
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 184 18.40 18.40 81.60
2.36 114.6 11.46 29.86 70.14
2 40.6 4.06 33.92 66.08
1.18 219.6 21.96 55.88 44.12
1 36 3.60 59.48 40.52
0.6 66.6 6.66 66.14 33.86
0.425 75 7.50 73.64 26.36
0.3 61.6 6.16 79.80 20.20
0.212 151.2 15.12 94.92 5.08
0.15 34 3.40 98.32 1.68
0.075 14.2 1.42 99.74 0.26
0 2.6 0.26 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F I
N
ER
PARTICLE SIZE (mm)
Se
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 4 Dept. (m) 3
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 208.6 20.86 20.86 79.14
2.36 131 13.10 33.96 66.04
2 37.4 3.74 37.70 62.30
1.18 221.4 22.14 59.84 40.16
1 29 2.90 62.74 37.26
0.6 52.8 5.28 68.02 31.98
0.425 64.8 6.48 74.50 25.50
0.3 36 3.60 78.10 21.90
0.212 49.2 4.92 83.02 16.98
0.15 27.8 2.78 85.80 14.20
0.075 91.6 9.16 94.96 5.04
0 50.4 5.04 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 5 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 293.8 29.38 29.38 70.62
2.36 112.8 11.28 40.66 59.34
2 45.6 4.56 45.22 54.78
1.18 125.7 12.57 57.79 42.21
1 19.8 1.98 59.77 40.23
0.6 27.8 2.78 62.55 37.45
0.425 69 6.90 69.45 30.55
0.3 123.8 12.38 81.83 18.17
0.212 120.5 12.05 93.88 6.12
0.15 25.8 2.58 96.46 3.54
0.075 32 3.20 99.66 0.34
0 3.4 0.34 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 5 Dept. (m) 2
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 276.8 27.68 27.68 72.32
2.36 109 10.90 38.58 61.42
2 31.8 3.18 41.76 58.24
1.18 112.4 11.24 53.00 47.00
1 25.4 2.54 55.54 44.46
0.6 54.2 5.42 60.96 39.04
0.425 155.2 15.52 76.48 23.52
0.3 78.4 7.84 84.32 15.68
0.212 97.6 9.76 94.08 5.92
0.15 17.6 1.76 95.84 4.16
0.075 35.6 3.56 99.40 0.60
0 6 0.60 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
% FINER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 5 Dept. (m) 3
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 481.6 48.16 48.16 51.84
2.36 97 9.70 57.86 42.14
2 26.6 2.66 60.52 39.48
1.18 102.8 10.28 70.80 29.20
1 21 2.10 72.90 27.10
0.6 35.2 3.52 76.42 23.58
0.425 29.4 2.94 79.36 20.64
0.3 26.8 2.68 82.04 17.96
0.212 97.6 9.76 91.80 8.20
0.15 40.6 4.06 95.86 4.14
0.075 38 3.80 99.66 0.34
0 3.4 0.34 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 6 Dept. (m) 1
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 212.8 21.28 21.28 78.72
2.36 133.8 13.38 34.66 65.34
2 44 4.40 39.06 60.94
1.18 165.6 16.56 55.62 44.38
1 21.6 2.16 57.78 42.22
0.6 45.6 4.56 62.34 37.66
0.425 126.8 12.68 75.02 24.98
0.3 96.8 9.68 84.70 15.30
0.212 103.4 10.34 95.04 4.96
0.15 19.2 1.92 96.96 3.04
0.075 26.4 2.64 99.60 0.40
0 4 0.40 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 6 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 233 23.30 23.30 76.70
2.36 152.2 15.22 38.52 61.48
2 44.6 4.46 42.98 57.02
1.18 247.8 24.78 67.76 32.24
1 31.8 3.18 70.94 29.06
0.6 56 5.60 76.54 23.46
0.425 65 6.50 83.04 16.96
0.3 42.2 4.22 87.26 12.74
0.212 58.2 5.82 93.08 6.92
0.15 29.8 2.98 96.06 3.94
0.075 31.2 3.12 99.18 0.82
0 8.2 0.82 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 6 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 407 40.70 40.70 59.30
2.36 70.6 7.06 47.76 52.24
2 25.6 2.56 50.32 49.68
1.18 144 14.40 64.72 35.28
1 23.4 2.34 67.06 32.94
0.6 54.4 5.44 72.50 27.50
0.425 94.4 9.44 81.94 18.06
0.3 57.6 5.76 87.70 12.30
0.212 75 7.50 95.20 4.80
0.15 24.8 2.48 97.68 2.32
0.075 20.6 2.06 99.74 0.26
0 2.6 0.26 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 7 Dept. 1m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 212.8 21.28 21.28 78.72
2.36 117.6 11.76 33.04 66.96
2 28.2 2.82 35.86 64.14
1.18 161.2 16.12 51.98 48.02
1 23.2 2.32 54.30 45.70
0.6 44 4.40 58.70 41.30
0.425 50 5.00 63.70 36.30
0.3 69.8 6.98 70.68 29.32
0.212 231.4 23.14 93.82 6.18
0.15 48.4 4.84 98.66 1.34
0.075 12 1.20 99.86 0.14
0 1.4 0.14 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 7 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 203.2 20.32 20.32 79.68
2.36 133 13.30 33.62 66.38
2 39.2 3.92 37.54 62.46
1.18 164.4 16.44 53.98 46.02
1 26.4 2.64 56.62 43.38
0.6 44.4 4.44 61.06 38.94
0.425 53.4 5.34 66.40 33.60
0.3 104.4 10.44 76.84 23.16
0.212 170.2 17.02 93.86 6.14
0.15 48.8 4.88 98.74 1.26
0.075 11.4 1.14 99.88 0.12
0 1.2 0.12 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 7 Dept. 3m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 233.6 23.36 23.36 76.64
2.36 122 12.20 35.56 64.44
2 46 4.60 40.16 59.84
1.18 218.4 21.84 62.00 38.00
1 33.8 3.38 65.38 34.62
0.6 64 6.40 71.78 28.22
0.425 72 7.20 78.98 21.02
0.3 95 9.50 88.48 11.52
0.212 84.6 8.46 96.94 3.06
0.15 13 1.30 98.24 1.76
0.075 15.8 1.58 99.82 0.18
0 1.8 0.18 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 8 Dept. 1m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 147 14.70 14.70 85.30
2.36 146.6 14.66 29.36 70.64
2 44.8 4.48 33.84 66.16
1.18 189 18.90 52.74 47.26
1 27.6 2.76 55.50 44.50
0.6 52 5.20 60.70 39.30
0.425 65.6 6.56 67.26 32.74
0.3 67.4 6.74 74.00 26.00
0.212 164.6 16.46 90.46 9.54
0.15 61.8 6.18 96.64 3.36
0.075 29.8 2.98 99.62 0.38
0 3.8 0.38 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 8 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 308.4 30.84 30.84 69.16
2.36 170.8 17.08 47.92 52.08
2 32.6 3.26 51.18 48.82
1.18 184.4 18.44 69.62 30.38
1 25.6 2.56 72.18 27.82
0.6 47.4 4.74 76.92 23.08
0.425 48.4 4.84 81.76 18.24
0.3 36.8 3.68 85.44 14.56
0.212 71.6 7.16 92.60 7.40
0.15 47.6 4.76 97.36 2.64
0.075 22.4 2.24 99.60 0.40
0 4 0.40 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 8 Dept. 3m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 116.4 11.64 11.64 88.36
2.36 105 10.50 22.14 77.86
2 29.2 2.92 25.06 74.94
1.18 246.5 24.65 49.71 50.29
1 38.6 3.86 53.57 46.43
0.6 82 8.20 61.77 38.23
0.425 109 10.90 72.67 27.33
0.3 105.4 10.54 83.21 16.79
0.212 101.9 10.19 93.40 6.60
0.15 38.2 3.82 97.22 2.78
0.075 25 2.50 99.72 0.28
0 2.8 0.28 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 9 Dept. 1m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 186.2 18.62 18.62 81.38
2.36 135.6 13.56 32.18 67.82
2 31.6 3.16 35.34 64.66
1.18 160.6 16.06 51.40 48.60
1 20 2.00 53.40 46.60
0.6 44.4 4.44 57.84 42.16
0.425 53.6 5.36 63.20 36.80
0.3 93 9.30 72.50 27.50
0.212 213.8 21.38 93.88 6.12
0.15 46 4.60 98.48 1.52
0.075 13.2 1.32 99.80 0.20
0 2 0.20 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 9 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
19 0 0.00 0.00 100.00
10 0 0.00 0.00 100.00
4.75 217.4 21.74 21.74 78.26
2.36 145.4 14.54 36.28 63.72
2 27.4 2.74 39.02 60.98
1.18 139.4 13.94 52.96 47.04
1 20.4 2.04 55.00 45.00
0.6 42.4 4.24 59.24 40.76
0.425 48 4.80 64.04 35.96
0.3 43.8 4.38 68.42 31.58
0.212 82.4 8.24 76.66 23.34
0.15 125.8 12.58 89.24 10.76
0.075 73.2 7.32 96.56 3.44
0 34.4 3.44 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 9 Dept. 3m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 170.8 17.08 17.08 82.92
2.36 121.6 12.16 29.24 70.76
2 40.6 4.06 33.30 66.70
1.18 215 21.50 54.80 45.20
1 35.8 3.58 58.38 41.62
0.6 65.8 6.58 64.96 35.04
0.425 73.2 7.32 72.28 27.72
0.3 76.8 7.68 79.96 20.04
0.212 53.6 5.36 85.32 14.68
0.15 46.6 4.66 89.98 10.02
0.075 78.8 7.88 97.86 2.14
0 21.4 2.14 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 10 Dept. 1m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 146.2 14.62 14.62 85.38
2.36 155.2 15.52 30.14 69.86
2 52.6 5.26 35.40 64.60
1.18 215.2 21.52 56.92 43.08
1 30.2 3.02 59.94 40.06
0.6 46.8 4.68 64.62 35.38
0.425 52 5.20 69.82 30.18
0.3 38 3.80 73.62 26.38
0.212 73.6 7.36 80.98 19.02
0.15 44.2 4.42 85.40 14.60
0.075 100.8 10.08 95.48 4.52
0 45.2 4.52 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 10 Dept. 2m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 75.8 7.58 7.58 92.42
2.36 160 16.00 23.58 76.42
2 55.2 5.52 29.10 70.90
1.18 272.6 27.26 56.36 43.64
1 41 4.10 60.46 39.54
0.6 79.2 7.92 68.38 31.62
0.425 88 8.80 77.18 22.82
0.3 62 6.20 83.38 16.62
0.212 60.4 6.04 89.42 10.58
0.15 38.6 3.86 93.28 6.72
0.075 44.2 4.42 97.70 2.30
0 23 2.30 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
I
N
ER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

Soil Testing Report For Proposed 5.83 MW (DC) Solar Power Project At Vill-. Gajn
er, Bikaner
Bore No. 10 Dept. 3m
Sieve Size Mass Retained % Mass Retained Cumulative % retained % Passed
4.75 44 4.40 4.40 95.60
2.36 99.8 9.98 14.38 85.62
2 38.6 3.86 18.24 81.76
1.18 229.8 22.98 41.22 58.78
1 49.6 4.96 46.18 53.82
0.6 112.8 11.28 57.46 42.54
0.425 128 12.80 70.26 29.74
0.3 89 8.90 79.16 20.84
0.212 99.6 9.96 89.12 10.88
0.15 42.6 4.26 93.38 6.62
0.075 54.4 5.44 98.82 1.18
0 11.8 1.18 100.00 0.00
Total Sample Mass 1000
Sieve Analysis-Observation and Calculation
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
0.01 0.1 1 10
%
F
INER
PARTICLE SIZE (mm)
Seri
DOLPHIN CONSTRUCTION CO. JODHPUR

You might also like